05000245/LER-1997-025, Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed
ML20148C792
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/27/1997
From: Noll W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148C795 List:
References
B16436, NUDOCS 9705290095
Download: ML20148C792 (2)


LER-2097-025, Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed
Event date:
Report date:
2452097025R00 - NRC Website

text

. , . . . - . . - - . . - - - . - . - . . . . .~ - . . . . ~ , . - - - . . . - ~ . . - ..- ~ - ~

}-

hhd. M& tone ffices e lhq.c Ferry Hd., Waterford, CT Utilities System P.o.no 128 Waterford. CT 0638',-0128 (860) 447-1791 i

i MAY 27 sgr Docket No. 50-245 .

B16436 e Re: 10CFR50.73(a)(2)(i) i . U.S. Nuclear Regulatory Commission .

- 1

" Document Control Desk Washington, DC 20555 i

t

This letter forwards Licensee Event Report (LER) 97-025-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on April 24, 1997. This LER is ]
submitted pursuant to 10CFR50.73(a)(2)(ii).

!- 1 The following are Northeast Nuclear Energy Company's (NNECO's) commitments'made within )

this letten. All ofner statements made within this letter are for information only.

B16436-1 NNECO commits to submit to the NRC for approval, a revision to Technical Specification 3.6.G and Technical Specification Surveillance Requirement 4.6.G prior j to startup for operating cycle 16. The new specifications and requirements, relating to jet pump integrity and operability, will be similar to those established by the industry in the Standard Technical Specifications, NUREG-1433.

B16436-2 NNECO commits that a review of the Technical Specifications requirements will be performed to ensure procedures exist to adequately implement all requirements in the Technical Specifications prior to startup for operating cycle 16.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY  !

I For: P. D. Hinnenkamp Director, Unit Operations

. l By: W. G. Noll Manager, Operations  ; _

s b a (

l 9705290095 970527 PDR ADOCK 05000245 <

S PDR ,

owl 422-9 REV.12-95.

j

' e U.S. Nuclear Regulatory Commission i B16436\Page 2 of 2 '

Attachment:

LER 97-025-00 '

I cc: Dr. W. D. Travers, Director, Special Projects l

H. J. Miller, Region I Administrator S. Dembek, NRC. Project Manager, Millstone Unit No.1  :

T. A. Eastick, Senior Resident Inspector, Millstone Unit No. I  !

i t

r t

I E

A 1

I