ML20138S013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 2
| page count = 2
| project =  
| project = TAC:55720, TAC:55721
| stage = Request
| stage = Request
}}
}}
Line 29: Line 29:
==Dear Mr. Denton:==
==Dear Mr. Denton:==


By letter dated April 25, 1985 Duke Power submitted proposed license amendment to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.
By {{letter dated|date=April 25, 1985|text=letter dated April 25, 1985}} Duke Power submitted proposed license amendment to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.
The proposed changes to the Technical Specifications were primarily concerned with Section 6.0, Administrative Controls and reportability requirements. Attached is a corrected page 6-24 for this submittal which includes a reference to the foot-note, the reference (an asterik) being previously inadvertantly omitted.
The proposed changes to the Technical Specifications were primarily concerned with Section 6.0, Administrative Controls and reportability requirements. Attached is a corrected page 6-24 for this submittal which includes a reference to the foot-note, the reference (an asterik) being previously inadvertantly omitted.
The change is strictly administrative in nature a A the Justification and Safety Analysis and the Analysis of Significant Hazards Cor:siderations for the original submittal apply to this change.
The change is strictly administrative in nature a A the Justification and Safety Analysis and the Analysis of Significant Hazards Cor:siderations for the original submittal apply to this change.
This document supplements the proposed Technical Specifications revisions contained in our letter dated April 25, 1985. As such, no additional fees are required.
This document supplements the proposed Technical Specifications revisions contained in our {{letter dated|date=April 25, 1985|text=letter dated April 25, 1985}}. As such, no additional fees are required.
Please feel free to contact us if you require any additional information.
Please feel free to contact us if you require any additional information.
Very truly yours, Hal B. Tucker            k JBD/hrp Attachments I
Very truly yours, Hal B. Tucker            k JBD/hrp Attachments I

Latest revision as of 20:03, 12 December 2021

Revised Application for Amends to Licenses NPF-9 & NPF-17, Changing Tech Spec Section 6.0, Administrative Controls & Reportability Requirements
ML20138S013
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/13/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20138S014 List:
References
TAC-55720, TAC-55721, NUDOCS 8511190386
Download: ML20138S013 (2)


Text

-

  • e DUKE POWER GOMPANY I

P.O.DOx 33180 CIIAlttoTTE, N.C. 28242 HALB. TUCKER TELEPHONE wws emannommy (704) 373~4531 WITARAR PDODt;CTION November 13, 1985 l

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulat.*.on U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 l

Subject:

McGuire Nuclear Station Docket Nos. 50-369, 50-370 Technical Specification Amendment Administrative Controls

Dear Mr. Denton:

By letter dated April 25, 1985 Duke Power submitted proposed license amendment to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.

The proposed changes to the Technical Specifications were primarily concerned with Section 6.0, Administrative Controls and reportability requirements. Attached is a corrected page 6-24 for this submittal which includes a reference to the foot-note, the reference (an asterik) being previously inadvertantly omitted.

The change is strictly administrative in nature a A the Justification and Safety Analysis and the Analysis of Significant Hazards Cor:siderations for the original submittal apply to this change.

This document supplements the proposed Technical Specifications revisions contained in our letter dated April 25, 1985. As such, no additional fees are required.

Please feel free to contact us if you require any additional information.

Very truly yours, Hal B. Tucker k JBD/hrp Attachments I

0 \

1,(0 es111,oses pDR ADOCK o esMa69 PDR P-

g--

-n ..

Mr. Harold R. Denton, Director November 13, 1985 Page 2 cc: Dr. J. Nelson Grace, Regional Administrator U. S.-Nuclear Regulatory Commission

-Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323

.Mr. W. T. Orders Senior Resident Inspector

'McGuire Nuclear Station Mr. Dayne Brown, Chief

-Radiation Protection Branch Division of Facility Services

-Department of Human Resources P. O. Box 12200 Raleigh, North Carolina 27605 i

asaw_ - ---

E.

ATTACHMENT a

f