ML20092K438

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-9 & NPF-17,revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints
ML20092K438
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/18/1995
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092K442 List:
References
NUDOCS 9509260007
Download: ML20092K438 (5)


Text

it t

i

n p.

DukehwerComparty

}

MSTLm 3

P.O. Box 1006

.y Senior Vice PtrU."

f ly t

0arlotte, NC282M006 Nuclear Generaw-g y

,,y (7041382-2200 othce q l (7W)3824360 Fax L

4 Lkl September 18,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Supplement to Replacement SG Proposed TS Amendment Pursuant to 10 CFR 50.90, attached are proposed revisions to Table 2.2-1, Reactor Trip System Instmmentation Trip Setpoints. These changes reflect the change in programmed jgg T

from 588.2 'F to 585.1 F upon replacement of the steam generators at McGuire Units 1 oo and 2. These changes were inadvertently omitted from n.y September 30,1994 submittal.

h i

Duke power is requesting that the change requested for the steam line safety valve lift A

settings in Table 3.7-3, which was requested in my September 30,1994 submittal, be a

withdrawn. It has been determined that these changes are no longer needed.

Duke Poweris requesting review and approval of these changes by May 25,1996, which

_=

reflects the beginning of the Catawba steam generator replacenant outage. Duke is asking y that these changes be reviewed and approved concurrently with the Catawba changes g

(submitted under separate cover 9/18/95), and that the McGuire and Catawba Unit 1 changes y

beco.w a.ffcetive upon replacement of their steam generators. This requested date reflects 4

the

urrent replacement outage schedule. Duke will keep the staffinformed of any charg

.n the desired approval dates, g

Also attached to this submittal is the Replacement Steam Generator Topical Report, Rev. 4.

5 This updated report (originally submitted September 30,1994), is included for information during the review of the steam generator replacement license amendment.

g.

g The following are attached: Attachment 1. marked up pages to the Technical Specifications,

$, Technical Justification and No Significant Hazards Analysis, and Attachment r3 b

3, Replacement Steam Generator Topical Report, Rev. 4.

9 I

l

(

4

\\

s E-T0003" l

A 9509260007 950918 PDR ADOCK 05000369 P

PDR

\\ \\'

[

33

?'

l w anw*n**

j

\\

j W&1

.,3

~

U.'S'. Nuclear Regulitory Commission

^

, 3; September 18,1995

. Page 2 :.

)

1 Pursuant to 10 CFR 50.91(b)(1), a copy of this amendment request has been provided to the i

appropriate North Carolina state officials.

Very truly yours,

)-

W D

M. S. Tuckman I

I i

l i

i

?

l a

f n

i U. S. Nuclear Regulatory Commission -

September 18,1995-Page 3 l

T

. cc:

Mr. V. Nerses, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission -

Mai1 Stop 14H25, OWFN Washington, D. C. 20555 Mr. S. D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 Mr. G. F. Maxwell i

Senior Resident Inspector

.McGuire Nuclear Station l

R. C. Jones, Branch Chief Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission j

Mail Stop 8 E23, OWFN Washington, D. C. 20555 Dayne Brown, Director j

Division of Radiation Protection P.O. Box 27678 j

Raleigh, Nonh Carolina 27611-7687 l

i

i i 0; S. Nuclear Regulatory Commission h

September 18,1995 Page'4 I

i l

I n-I M. S. Tuckman, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part of said company to sign and file with the U.S.

l Nuclear Regulatory Commission these revisions to the McGuire Nuclear Station License

'. Nos. NPF-9 and NPF 17; and, that all statements and matters set forth therein are true and r-correct to the best of his knowledge.

{

R

]

M. S. Tuckman

]

Subscribed and sworn to before me this lNday of 1995.

i m

41 /

Notary blic I

My Commission expires: dAU 22, {Mb

U. S. Nuclear Regulitory Commission September 18,1995 Page 5 bxc:

G. A. Copp T. R. Niggel G. B. Swindlehurst M.R. Robinson S. A. Gewehr J. E. Snyder MC 1201.37-28 5

t l

1 l

1 I

j i

i j

L