Application for Amends to Licenses NPF-9 & NPF-17,updating Loss of Power Functional Unit of ESFAS Instrumentation TS Tables 3.3-3,3.3-4,3.3-5 & 4.3-2
ML20073H281
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/28/1994
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073H285 List:
References
NUDOCS 9410050185
Download: ML20073H281 (4)


Text

Il I

t DukeIbw2r Cornpny T C hidtrz.m I

hkGuire Nuclear Generation Department Vice President 12700Hagers FerryRoad(AfG0lVP)

(704)87H800 Huntersalle.NC28078s385 (704)8754809 Fax DUKEPOWER September 28,1994 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 22055

Subject:

McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369 and 50-370 Proposed Technical Specification Amendments 4 kV Degraded Voltage Relay Setpoints Tables 3 3-3, 3.3-4, 3.3.5, and 4.3-2

Dear Sir:

Pursuant to 10 CFR 50.4 and 50.90, please find attached (Attachment 1) proposed license amendments to Appendix A (Technical Spccifications) of Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station. The proposed changes provided by this submittal update the " Loss of Power" functional unit of the Engineered Safety Features Actuation System (ESFAS) Instrumentation tables within the Technical Specifications (TS) for McGuire Nuclear Station. The specific tables oeing revised are Tables 3.3-3, 3.3-4, 3.3-5, and 4.3-2.

The current TS for the " Loss of Power" functional unit includes only one level of undervoltage protection that covers both the loss of voltage and degraded voltage conditions on the 4160 Volt Essential Auxiliary Power System buses. McGuire Nuclear Station is planning to update this existing level of undervoltage protection to be excluwely for loss of voltage, and add a second level of undervoltage protection to be exclusively for degraded voltage.

As such, modifications to install the degraded voltage protective relay scheme are planned for both units. The modification for Unit 1 is being installed but not activated during the current Unit 1 end-of-cycle 9 refueling outage,8/19/94 to 10/20/94. The modification for Unit 2 will be installed during the Unit 2 end-of-cycle 9 refueling outage, 11/24/94 to 1/28/95. Upon approval of these TS amendments by the NRC, these modifications will be activated after the completion of the Unit 2 modification. contains the marked up TS pages indicating the proposed changes. Attachment 2 contains the technical justification for the proposed changes. Attachment 3 contains the safety analysis. Pursuant to 10 CFR 50.91, Attachment 4 provides the analysis performed in accordance with the standards contained in 10 CFR 50.92. This analysis concluded that the proposed amendments do not involve a significant hazards consideration. By copy of this submittal, this amendment request application and No Significant Hazards Consideration Evaluation are being forwarded to the appropriate North Carolina State Official.

We request that the effective date for these TS amendments (for both units) be 60 days after the completion date of the Unit 2 modification, or 60 days after the approva! date, whichever is later.

9410050185 94o929 PDR ADOCK 05000369 k

0 PDR

,0 \\

g

U d.S. Nuclear Regulatory Commission September 28,1994 Page 2 Please contact P. T. Vu of McGuire Regulatory Compliance group at (704) 875-4302 if there are any questions regarding this license amendment submittal.

Very truly yours, 4#/ i

.C. McMeekin PTV/TS332.est Attachments xc: (w/ attachments)

Mr. S.D. Ebneter Administrator, Region ll U.S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, GA. 30323 Mr. V. Nerses Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 9H3 Washington, D.C. 20555 Mr. G. Maxwell NRC Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Division of Radiation Protection P.O. Box 27687 Raleigh, N.C. 27611-7687 i

l

v l

i U.S. Nuclear Regulatory Commission September 28,1994 Page 3 T.C. McMeekin, being duty sworn, states that he is Vice-President of Duke Power Company; that he is authorized on the part of said company to sign and file with the U.S. Nuclear Regulatory Commission these revisions to the McGuire Nuclear Station license Nos. NPF-9 and NPF-17; and, that all statements and matters set forth therein are true and correct to the best of his knowledge.

i

/

4 r

T.C 'McMeekin, Site'Vice-President Subscribed and sworn to before me this 28th day of September 1994.

.hbd Y Nopry P ic My Commission Expires:

Enubi a Mff

?

W a

b E

t i

r U.S. Nuclear Regulatory Commission September 28,1994 Page 4 bxc: (w/ attachments)

G.D. Gilbert j

J.E. Snyder J.W. Silver (MG010P)

R.J. Delonis (MG010P)

A.C. Williams (MG01 EE)

W.N. Matthews (MG01 EE)

D.

Jamil (MG01EE)

L.S. Reed (MG02EE)

W.M. Griffin (MG01tE)

R.A. Lindsay (MG030T)

P.T. Vu P.H. Cox (EC050)

A.V. Carr (PB05B)

G.A. Copp (EC05N)

Z.L. Taylor (CN01 RC)

J.E. Burchfield (ONO3RC)

B.J. Dolan (ON01VP)

MNS RGC Tech. Spec. Subject File

,