ML20117A261

From kanterella
Jump to navigation Jump to search

Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Spec Section 6 Re Administrative Controls to Streamline & Clarify Existing Controls by Deleting Corporate Organizational Charts.Fee Paid
ML20117A261
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 04/25/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20117A264 List:
References
GL-83-43, TAC-55720, TAC-55721, NUDOCS 8505080158
Download: ML20117A261 (3)


Text

n-- m-D9 I DUKE POWER GOMPANY P.O. BOX 33189 CHAMLOTTE. N.G. 28242 HAL B. TIJCKER TELEPHONE vnos passinant (704) 373-4531

= ==e=a-nio- April 25, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation -

-U. S. Nuclear Regulatory Commission Washington, D. C. 20555

. Attention: Ms.-E. G. Adensam, Chief Licensing Branch No. 4

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 TechInical Specification Amendment, Administrative Controls

Dear Mr. Denton:

Attached are proposed license amendments to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.

The proposed changes to the Technical Specifications are concerned primarily with Section 6.0, Administrative Controls, and reportability requirements associated with the revision of the regulatory requirements of 10 CFR 50.72 and 50.73 as presented in Generic Letter 83-43 (dated December 19, 1983).

The proposed changes to the Administrative Controls section of the Technical Specifications are intended to streamline and clarify the existing controls. This

- proposal seeks to delete corporate organizational charts in Section 6.0 of the Technical Specifications, as this is redundant to Chapter 13 of the McGuire Nuclear Station Final Safety Analysis Report, which is required (by 10 CFR 50.71) to be updated annually. The proposal also seeks to include the Superintendent of Integrated Scheduling in the review and approval process of procedures and events.

Also included in this proposal is a change to base QA record retention on ANSI N45-2.9-1974, as recommended by Regulatory Guide 1.88; a rewording of Section 6.12, '

High Radiation Areas, to clarify requirements; a change that would allow the Station Services Superintendent to review and approve modifications to the Station Security Program and associated procedures; to update the solid waste reporting

- requirements (Specification 6.9.1.7) to make these requirements consistent with 10 CFR part 61; and to correct an error in Table 4.11-1 where the word " inlet" was inadvertantly substituted for " outlet". The proposed changes to Specification-6.9.1.7 and Table 4.11-1 were recommended by an in-house QA audit. These proposed changes are purely administrative in nature.

Also included in this submittal are several proposed changes to remove inconsistences that were intfaduced when reporting requirements (per 10 CFR sections 50.72 and

'50.73) were changed and Section 6.0 of the McGuire Technical Specifications was accordingly modified. At the time that the Administrative Controls section of the Technical Specifications was changed, references elsewhere in the Specifications l_

to this section were not modified, causing redundancies and meaningless references.

j This proposal seeks to remedy these inconsistencies and is administrative in nature.

e DR a e[ 11

r e.

, .Mr. Harold R. Denton, Director-April 25, 1985 Page 2 Attachment I contains the proposed changes to the Administrative Controls Section and Table 4.11-1.- Attachment II contains the proposed changes to the Technical

- Specifications _concerning reporting requirements. Each attachment contains a Justification and Safety Analysis in support of the proposed changes, and an analysis performed in accordance with the Standards contained in 10 CFR 50.92 as required-by 10CFR50.91. These analyses conclude that no Significant Hazards Considerationsare involved.

This request' involves one application for amendment to McGuire's Technical Specifications. :Accordingly, pursuant to 10CFR170.21 a check for $150.00 is enclosed.

Please feel free to contact-us if you require any additional information.

.Very truly yours, and' '1h SQh l

Hal B.. Tucker JBD/mljf Attachment cc: Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II

, 101 Marietta Street, Suite 3100 Atlanta, Georgia 30323 Mr. W. T. Orders Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown Chief Radiation Protection Branch Division of Facility Services Department of Human Resources P. O. Box 12200 Raleigh, North Carolina 27605

r p.

Mr. Harold R. Danton, Diractor April 25, 1985 Page 3 HAL B. TUCKER, being duly sworn, states that he is Vice President of.

Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct.to the best of his knowledge.

dk Hal B.-Tucker, Vice President Subscribed and sworn to before me this 25th day of April, 1985 O$12 0-Notary Public My Commission Expires:

bao b Ltu 30 '

19 6 I

.