Application for Amends to Licenses NPF-9 & NPF-17,locating New Meteorological Tower to Be Installed at Plant
ML20217N918
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/03/1998
From: Barron H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217N924 List:
References
NUDOCS 9803090333
Download: ML20217N918 (6)


Text

  • ..

Duke Power Company

(]:

f A D a En y G mp ay McGuirr Nudear Station MG0lVP

, 12700 Hagers Ferry Rd.

Huntersville. NC 28078-9340 H. B. Barron Vice President, McGuire V04 875-4800 OFFICE Nudear Generation Department VOD 875-4809 fax March 3, 1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Proposed Technical Specification (TS) Amendment TS 5.5 - Meteorological Tower Location Pursuant to 10 CFR 50.90, please find attached proposed license amendment to Appendix A (Technical Specifications) of Facility Operating Licenses NPF-9 and NPF-17 for'McGuire Nuclear Station.

The proposed change is for showing the location of a new meteorological tower to be installed at McGuire Nuclear Station.

Figure 5.1-1 of TS 5.5 shows the meteorological tower location.

.The location of the existing tower will be used for site construction. The new tower location meets the requirements of Regulatory Guide 1.23 (Safety Guide 23), Revision 0, 1972, Regulatory Position C.2, " Siting of Meteorological Instruments."

Attachment I.A contains the marked TS pages indicating the proposed changes. Attachment I.B contains the marked Figure 5.1- t }

1 for Improved Standardized Technical Specifications (ITS).

Attachment II contains the new TS pages. Attachment III contains the Description of Proposed Changes and Technical Justification.

Attachment IV contains the No Significant Hazards Considerations.

Attachment V contains the Environmental Impact Assessment.

In the 5/27/97 McGuire ITS submittal, TS 5.5 and Figure 5.1-1 were proposed to be relocated to the UFSAR. Only marked Figure 5.1-1 in that submittal is affected by this submittal. The proposed change requires changes to the McGuire UFSAR. The UFSAR changes will be submitted via 10 CFR 50.71(e) requirements.

The proposed change has been reviewed and approved by the Plant Operations Review Committee and the Nuclear Safety Review Board.

Pursuant to 10 CFR 50.91, a copy of this proposed license 1 amendment is being forwarded to the appropriate North Carolina l State Officials.

9903090333 980303-PDR ADOCK 05000369 I P PDR I HlRIRIMMMMi

i

~

! US .' NRC .

, March 3, 1998 Page 2 Duke requests NRC' approval of this. proposed amendment'by July of 1998 in order for the new meteorological tower to bel implemented-and site construction to be started' .

Please contact P. T.'Vu at-(704) 875-4302 if there are'any.

questions regarding'this proposed license amendment.

Very truly yours, 1

e_:: s H.B. Barron Attachments s

I 1

LUS NRC

, March 3, 1998 Page,3 l.

xc: '(w/ attachments)

L.A..Reyes/

Administrator,' Region II U.S.' Nuclear Regulatory Commission

101 Marietta.St., NW, Suite 2900 Atlanta,.GA. 30323

.F . Rinaldi ,

Senior' Project Manager Office of U.S. Nuclear Reactor Regulation-One White Flint North, Mail Stop.14E21 .I Washington, D.C. 20555 l

i S.M.'Shaeffer I NRC Senior Resident-Inspector McGuire Nuclear Station  !

i R.M. Fry, Director Division of Radiation Protection

'Statelof North Carolina 3825 Barrett Drive Raleigh, N.C. 27609-7221 .l t

1

{

l l

US NRC

. March 3, 1998  ;

Page 4  ;

i i

H.B. Barron, being duiy sworn, states that he is Vice President .

of McGuire Nuclear. Station; that'he is. authorized on the part of -;

Duke Energy Corporation to sign and file with the U.S. Nuclear '

Regulatory Commission these revisions to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17; and,.that all' statements i

and matters set forth therein are true and correct to the best of his knowledge.

t

&C l

-H.B. Barron, Vice President l 1

l Subscribed and sworn to before me this 3rd day of March 1998.

. . i 1 2 A,run)) 0AU '

Notary Public I

})eloc.st, C? . 37epp My Commission Expires: I 4l6 ANevv3 4 /

1 l

1 1

US NRC

, March 3, 1998 Page 5 bxc: (w. attachments)

ELL (EC050)

NSRB (EC05N)

N. Osburn (MG01WC)

B. Nesbitt (MG01MO)

M. Kinley (MG03C4)

B. Gragg (MG05EE)

L.B. Jones (EC050) l

1 i

l l

l i

1 l

1 l

1 1

ATTACHMENT I.A 1 MARKED CURRENT TS PAGES