ML20135B019

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-9 & NPF-17,requesting Change to TS 3.8.2 Re DC Sources
ML20135B019
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/26/1996
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135B022 List:
References
NUDOCS 9612040130
Download: ML20135B019 (5)


Text

'

11 I Duke &nr Cornpany T C Mdians McGuire Nuclear Generation Departrnent 17ce President 12700Hagers ferryRoad(MG0lVP) DOCUMENT CDNTROL DESK C0PY (704)8754800 Huntersville, NC28078M5 (704}8754809 Fax DUKEPOWER l

November 26, 1996 Document Control Desk US Nuclear Regulatory Commission  !

Washington, D.C. 20555

Subject:

McGuire Nuclear Station Docket Nos: 50-369 and 370 Proposed Technical Specification Amendment Technical Specification 3.8.2 - DC Sources s I

Dear Sir:

Pursuant to 10CFR50.4 and 10CFR50.90, please find attached the  !

proposed license amendments to Appendix A (Technical '

Specification of Facility Operating License NPF-9 and NPF-2 7 for McGuire Nuclear Station Un' 1 and 2) regarding the safety-related 125VDC Vital Inst .antation and Control Power System. The proposed amendments are a one-time only change necessary to allow replacement of the existing 125VDC battery cells with new cells.

McGuire currently has AT&T high specific gravity round cell batteries installed in all four battery banks of the vital 125VDC system. On October 28, 1996, the TS surveillance test of vital battery EVCC failed to meet TS 4.8.2.1.2.e requirements resulting in the shutdown of both McGuire units.

Since then, the operabi2 ity of all vital batteries has been confinned via surveillance testing and both McGuire units returned to service. In order to prevent a recurrence of this situation, the long term plan is to replace all high specific gravity battery cells with conventional low specific gravity cells by the end of 2EOC11. While a battery bank is being I replaced, a temporary battery bank will be installed so that . l the affected vital bus will remain battery-backed during the replacement. Modification plans are in progress on an accelerated schedule with the initial replacement being Vital Battery Bank EVCA targeted for early February, 1997.

Therefore, expedited approval of the proposed amandment is requested by February 1, 1,17'to allow the modifications to proceed. Current plans wi .11 result in replacement of all four vital battery banks by the end of 2EOC11.

I o

96120go PDR M [5 369 h';{

N }l PDR P

04004fi

US Nuclear Regulatory Commission '

November 26, 1996 Page 2 Attachment 1 contains the proposed TS amendment changes.

Attachment 2 contains the Technical Justification, Attachment 3 contains the No Significant Hazards Statement, Attachment 4 contains.the Environmental Impact Statement, and Attachment 5 contains the April 16, 1991, Duke Power submittal and the July 1, 1991,' ONRR approval for the TS amendment relating to the 1991-92 vital battery replacements. In addition,

, Attachment 1 contains the proposed TS Bases changes submitted for information only. The Bases section for Technical Specifications 3.8.1, 3.8.2, and 3.8.3 will be reviewed and revised as necessary as part of the TS implementation process.

The proposed TS amendmant has been reviewed and approved by the McGuire Plant Operation Review Committee and by the Duke Power Nuclear Safety Review Board.

If you require further information, please contact James E.

Snyder at 704/875-4447.

Yours Very Truly, l

l 1'

6!/

/

l T. C. McMeekin, Vice President l McGuire Nuclear Station I

l l

l I

l l

1 J

1 I

l }

i l t US Nuclear Regulatory Commission November 26, 1996 Page 3 xc: Mr. S. D. Ebneter Administrator, Region II US Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Ga. 30323 l Mr. Victor Nerses US Nuclear Regulatory Commission

! Office of Nuclear Reactor Regulation (14H25)

Washington, D.C. 205bs Mr. Peter S. Tam US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation l Washington, D.C. 20555 Mr. Scott M. Shaeffer NRC Senior Resident Inspector McGuire Nuclear Station Mr. Dayne Brown, Chief Division of Radiation Protection State of North Carolina i 3825 Barnett Drive Raleigh, N. C. 27609-7221 l

l l

l l

US Nuclear Regulatory Commission November 26, 1996 Page 4 T. C. McMeekin, being duly sworn, states that he is Vice President, McGuire Nuclear Generation Department, Duke Power Company: that he is authorized on the part of the said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Technical Specifications and that all statements and matter set forth therein are true and correct to the best of his knowledge.

~

h/k T. C. McMeekin, Vice President McGuire Nuclear Station Subscribed and sworn to me this 26th day of November, 1996, i

Yu ~ . YAd b No(aryMb1ic'{~

U My Commission expires:

addff

/I

1 US Nuclear Regulatory Commission November 26, 1996 Page 5 bxc: E. Mac Geddie J. W. Boyle P. R. Herran G. A. Copp (EC050)

M. S. Kitlan (CN01RC)

J. E. Burchfield (ON01RC)

J. W. Pitesa V. S. Owen )

W. R. Cross K. L. Crane P. T. Vu  ;

J. M. Washam P. R. Newton (PB05E)

,