Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS for DGs by Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431
ML20095E926
Person / Time
Site: Catawba, McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/14/1995
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095E931 List:
References
RTR-NUREG-1366, RTR-NUREG-1431 GL-93-05, GL-93-5, GL-94-01, GL-94-1, NUDOCS 9512180211
Download: ML20095E926 (11)


Text

- ~ . _ _ _ - _ _. - -. -

ll I DukeFute2rCornpany M S Tvacua P.O. Bat 2006 Senior VicePresident Charlotte, NC23201-1006 NudearGeneration

(704)38C2200 Office (704)3824360 Fax DUKEFDWER December 14, 1995 U.S. Nuclear Regulatory Commission Attention
Document Control Desk ,

Washington, D.C. 20555

Subject:

McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Catawba Nuclear Station, Units 1 and 2 i Dochet Nos. 50-413 and 50-414 Proposed Technical Specification (TS) Amendments TS 3/4.8.1 and Bases - A.C. Sources  !

TS 6.8.4 - Programs

Dear Sir:

Pursuant to 10 CFR 50.4 and 50.90, please find attached proposed license amendments to Appendix A (Technical Specifications) of Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station, and Facility Operating Licenses NPF-35 and NPF-52'for Catawba Nuclear Station. '

The proposed changes significantly improve the TS Action Statements and Surveillance Requirements for the diesel generators (DG) by incorporating guidance and recommendations (as applicable to DGs) contained in NUREG-1366, " Improvements to-Technical Specifications Surveillance Requirements," Generic Letter-(GL) 93-05, "Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operations," GL 94-01, " Removal of Accelerated testing and Special Reporting Requirements for Emergency Diesel i Generators," and NUREG-1431, " Revised Standard Technical Specifications for Westinghouse PWRs". The proposed changes can be grouped into 5 categories: 1/ changes in accordance with GL '

93-05, 2/ changes in accordance with GL 94-01, 3/ changes in accordance with UUREG-1431 (more stringent, less stringent), 4/  ;

other technical changes, and 5/ pure administrative changes.  ; is a matrix summarizing all the changes with their  !

corresponding TS numbers and change categories.

l hh

~

  • **r"'"

9512190211 951214 PDR ADOCK 05000369 j( ;

p_ PDR

i l

US NRC l December 14, 1995 l Page 2  !

GL 94-01 requires licensees who remove the TS provisions for l accelerated DG testing and special reporting to implement within 90 days of the issuance of the license amendment a maintenance program for monitoring and maintaining DG performance consistent I with the provisions of 10 CFR 50.65, " Requirements for Monitoring I the Effectiveness of Maintenance at Nuclear Power Plants," and the guidance (as applicable to DGs) of Regulatory Guide (RG) 1.160, " Monitoring the Effectiveness of Maintenance at Nuclear i Power Plants." These maintenance programs will be implemented at  !

McGuire and Catawba no later than July 10, 1996 as required by 10 CFR 50.65. It is requested that the implementation date for these TS amendments be within 90 days of the issuance of the mmendments to provide enough time to implement the changes.

Attachments 2a and 2b contain the marked TS pages for McGuire and Catawba, respectively. Attachment 3 contains the item-by-item technical justification for the proposed changes for both McGuire and Catawba. Attachment 4 contains the safety analysis for both McGuire and Catawba. Pursuant to 10 CFR 50.91, Attachment 5 provides the analysis performed in accordance with the standards contained in 10 CFR 50.92. This analysis concludes that the

,roposed amendments do not involve a significant hazards  !

consideration for either McGuire or Catawba. Attachments 6a and l 6b contain the final TS pages for McGuire and Catawba, respectively. By copy of this submittal, this amendment request application and No Significant Hazards Consideration Evaluation are being forwarded to the appropriate North Carolina and South Carolina State' Officials.

Please contact P. T. Vu at (704) 875-4302 or Larry Rudy at (803) 831-3084 if there are any questions regarding this license amendment submittal.

Very truly yours,

~

$ W (h6 #

M.S. Tuckman Attachments

I US NRC December 14,:1995 Page 3 i xc: (w/ attachments)-

Mr. S.D. Ebneter i i

Administrator, Region II U.S. Nuclear Regulatory Commission 1101 Marietta St., NW, Suite 2900 l

Atlanta, GA. 30323

! Mr. V. Nerses

Senior. Project Manager  ;

i

' Office of U.S.-Nuclear Reactor Regulation l' One White Flint North, Mail Stop 14H25 Washington, D.C. 20555  ;

+

i l

~

Mr. R.E. Martin '

Senior Project Manager i

Office of U.S. Nuclear Reactor Regulation.

One White Flint North, Mail Stop 14H25 '

- Washington, D.C. 20555  ;

Mr. G. Maxwell  ;

NRC Senior Resident Inspector McGuire Nuclear Station j t

Mr.'R.J. Freudenberger NRC. Senior Resident Inspector  !

' Catawba Nuclear Station  ;

Mr. Dayne Brown, Director i Division of Radiation Protection P.O. Box 27687 l Raleigh,-N.C. 27611-7687 l

Mr. Max Batavia, Chief Bureau of Radiological Health '

l 2600 Bull Street i

Columbia, S.C. 29201 o

e i.

I 1

s l

US NRC December 14, 1995 l Page 4 l l

'I M.S. Tuckman, being duly sworn, states that he is Senior Vice President of Duke Power Company; that he is authorized on the part of said company to sign and file with-the U.S. Nuclear Regulatory Commission these revisions to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and Catawba Nuclear Station i License Nos NPF-35 and NPF-52; and, that all statements and .

matters set forth therein are true and correct to the best of his )

knowledge.

i i

~

Ff. S . Tuckman, Senior Vice President Subscribed and sworn to before me this fourteenth day of December l 1995.  !

l t

M Notah P lic l

My Commission Expires:

cdhu 22,/W6 i

l 4

. .. . . . . ~ .. - . . - . . . . - .. . - ~ . . . _ . . - . - . . .

HUS NRC ,

December 14, 1995 l j

l Page 5 I

bxc: (w.. attachments)  : )

T.C.'McMeekin (MG01VP)  ;

-W.R.-McCollum .(CN01VP)

E.M. Geddie (MG01VP)

G.R. Peterson-(CN01VP) l B.J. Dolan (MG01VP)

J.E. Snyder-(MG01RC) i T.D. Curtis-(MG01SE) '

D.M. Jamil ~!MG01EE)

.R.A. Jones'(MG010P)

J.W. Boyle (MG01WC)

M.K. Nazar (MG01IE)

R.B. White (MG01VP).

. P.R. Newton-(PB05A) l L G.A. Copp (EC05N) j Z.L.' Taylor (CN01RC) '

L.J. Rudy (CN01RC)

R.A. Kayler (CNO3SE)

M.J. Brady (CN02OP) ,

, J.E. Burchfield (ONO3RC) )

l J. Silver (MG010P) i

R.M. Roberts-(MG01SE) l R.A.'Johansen (MG010P) l l J. Policke (MG01EE)

! B.M. Gragg (MG01EE) i l W.W. Gallman (ECII-07)  !

L D. Baxter.(MG010P) l W. Griffin (MG01IE) l D. Bunch (MG010P) i- T. 'Pedersen (MG02ME)

! C.L._Hathcock (MG03A2)

-N.E. Kunkel (MG01CP) l R.A, Lindsay (MG030T) l C.A. Majure (MG02TR) i MNS.RGC Tech. Spec. Subject File l CNS Master File CN 801.01 l l

Catawba Owners: I l NCMPA-1 NCEMC l PMPA SREC

I i

1 l -

F ATTACHMENT 1 MATRIX SUMMARIZING ALL CHANGES i

i l

l i

l

- )

US NRC Attachment 1 December 14, 1995 Page 1 GL 93-05 PROPOSED MNS SPEC CNS SPEC NEW STS CHANGE (ATTACH. 2a) (ATTACH.2b)

(ATTACH. 3) .

Delete requirement Al 3.8.1.1 Action a 3.8.1.1 Action a 3.8.1 Action A i to test DGs when one offsite circuit is inoperable.

Allow remaining - B2 3.8.1.1 Action b 3.8.1.1 Action b 3.8.1 Action D DG not to be tested C2 3.8.1.1 Action d 3.8.1.1 Action c 3.8.1 Action B ifinoperability of other DG was due to inoperable support system,iPntly testable component, or preplanned testing or maintenance.

Further allow remaining B3 3.8.1.1 Action b 3.8.1.1 Action b 3.8.1 Action D DG not to be tested (after 3.8.1 Action B.3.1 not meeting exceptions 3.8.1 Action B.3.2 above)if can verify that no C3 3.8.1.1 Action d 3.8.1.1 Action c 3.8.1 Action B potential common mode failure 3.8.1 Action B.3.1 exists for remaining DG. 3.8.1 Action B.3.2 Delete requirement to D1 3.8.1.1 Action e 3.8.1.1 Action d 3.8.1 Action C test DGs when two offsite circuits are inoperable.

Allow slowloading of DG (in H: 4.8.1.1.2.a.5 4.8.1.1.2.a.5 3.8.1.3 Note 1 Ewid.sce with

" manufacturer's recommendations")in all tests  ;

< except LOOP tests.  ;

Allow hot restan of DG O2(MNS only) 4.8.1.1.2.e.8 4.8.1.1.231$ 3.8.1.15 Note i even if 24-hour run has not T1 (CNS only) 4.8.1.1.2.e.8 4.8.1.1.2.g.15 3.8.1.15 Note i been completed provided DG l has been run for2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or operating temperature has stabilized.

i

US NRC Attachment 1 December 14, 1995 Page 2 GL 94-01 PROPOSED MNS SPEC CNSSPEC NEW STS l CHANGE (ATTACH. 2a) (ATTACH. 2b)

(ATTACH. 3)

Change F1 4.8.1.1.2.a 4.8.1.1.2.a 3.8.1.2 accelerated 3.8.1.3 testing schedule 3.8.1.4 for DG to once 3.8.1.6 per 31 day 3.8.1.7 ,

schedule F2 Table 4.8-1 Table 4.8-1 Table 3.8.1-1 l (provided maintenance rule is implemented)

Delete special UI 4.8.1.1.3 4.8.1.1.3 5.9.2 reporting requirements for DG (provided maintenance rule is implemented)

NUREG-1431, PROPOSED MNS SPEC CNS SPEC NEW STS MORE CHANGE (ATTACH. 2a) (ATTACH. 2b)

STRINGENT (ATTACH. 3)

Require testing B1 3.8.1.1 Action b 3.8.1.1 Action b 3.8.1 Action B of remaining DG 3.8.1 Action D even ifit was C1 (MNS only) 3.8.1.1 Action d 3.8.1.1 Action c 3.8.1 Action B tested within 3.8.1 Action D

)

previour 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or is operating

US NP.C Attachment 1 DeceF.ber 14, 1995 Page 3 NUREG-1431, PROPOSED MNS SPEC CNS SPEC NEW STS LESS CHANGE (A'ITACH. 2a) (ATTACH. 2b)

STRINGENT (ATTACH. 3)

Allow slow G2 4.8.1.1.2.a.4 4.8.1.1.2.a.4 3.8.1.2 start of DG Allow a steady- G3 (MNS only) 4.8.1.1.2.a.4 - 4.8.1.1.2.a.4 3.8.1.2 state voltage and .

frequency to be verified instead of a minimum voltage and frequency within 11 seconds Allow a power H2 (MNS only) 4.8.1.1.2.a.5 4.8.1.1.2.a.5 3.8.1.3 range instead of L2 (MNS only) 4.8.1.1.2.e.3 4.8.1.1.2.g.3 3.8.1.10 an absolute power 01 (MNS only) 4.8.1.1.2.e.8 4.8.1.1.2.g.7 3.8.1.14 for testing DG 4.8.1.1.2.g.15 Allow H3 4.8.1.1.2.a.5 4.8.1.1.2.a.5 3.8.1.3 Note 2 momentary excursions outside of the required load range without invalidating the DG test Allow relocation I1 4.8.1.1.2.c 4.8.1.1.2.e 3.8.3.3 of DieselFuel Oil Jl 4.8.1.1.2.d 4.8.1.1.2.f 3.8.3.3 properties to TS X1 6.8.4.h 6.8.4.h 5.7.2.17 6.8, Programs, and limits to licensee-controlled Diesel Fuel OilTesting Program.

Allow a minimum M1 (MNS only) 4.8.1.1.2.e.5 4.8.1.1.2.g.5 3.8.1.12 voltage instead of O3 (MNS only) 4.8.1.1.2.e.8 4.8.1.1.2.g.7 3.8.1.14 the nominal 4.8.1.1.2.g.15 voltage to be verified within 11 seconds of an ESF actuation test signal Allow deletion P1 4.8.1.1.2.e.9 4.8.1.1.2.g.8 NONE of verification during RFO of auto-connected -

loads to each DG do not exceed 2-hour rating

I US NRC Attachment 1 ,

December 14, 1995 Page 4 l 1

OTHER PROPOSED MNS SPEC CNS SPEC NEW STS I (TECHNICAL) CHANGE (ATTACH. 2a) (A*ITACH. 2b)

(ATTACH. 3)

Allow air start Ql (MNS only) 4.8.1.1.2.e.15 NONE NONE testing to be done during PM activities Lower air tank Q2(MNS only) 4.8.1.1.2.e.15 NONE NONE pressure for DG start testing Allow one air tank Q4 (MNS only) 4.8.1.1.2.c.15 NONE NONE for diesel start W3 (MNS only) B 3/4.8.1,2,3 B 3/4.8.1,2,3 testing ,

Allow W4 (MNS only) B 3/4.8.1,2,3 B 3/4.8.1.2,3 i

" manufacturer's recommendations" to be "McGuire Engineering's recommendations"  ;

l ADMINISTRATIVE PROPOSED MNS SPEC CNS SPEC NEW STS i CHANGE (ATTACH. 2a) (NITACH. 2b)

(ATTACH. 3) l Changes due to A2 3.8.1.1 Action a 3.8.1.1. Action a 3.8.1 Action A deletion of DG testing when one or two offsite circuits are inoperable  ;

Change "A.C. B4 3.8.1.1 Action b 3.8.1.1 Action b 3.8.1 Action D j Source" to " required l l offsite circuit" l Delete foot- B5 (MNS only) 3.8.1.1 Action b 3.3.1.1 Action b 3.8.1 Action D 1 note concerning C5 (MNS only) 3.8.1.1 Action d 3.8.1.1 Action c 3.8.1 Action B J l dermition of El (MNS only) 3.8.1.1 Action f 3.8.1.1 Action e 3.8.1 Action E l operability for DG Refine Mode change B6 (CNS only) 3.8.1.1 Action b 3.8.1.1 Action b 3.8.1 Action D requirement statement D2 (CNS only) 3.8.l.1 Action e 3.8.1.1 Action d 3.8.1 Action C l

E2 (CNS only) 3.8.1.1 Action f 3.8.1.1 Action e 3.8.1 Action E l Delete footnote F3 (CNS only) 4.8.1.1.2.a 4.8.1.1.2.a 3.8.1.2 i

concerning 3.8.1.3 l explanation of 3.8.1.4 .

! STAGGERED TEST 3.8.1.6 l BASIS 3.8.1.7 Change G1 4.8.1.1.2.a.4 4.8.1.1.2.a.4 3.8.1.3 l

" ambient" to 3.8.1.7

" standby (prelube)" Q3 (MNS only) 4.8.1.1.2.e.15 NONE NONE

i l

US NRC Attachment 1 December 14, 1995 Page 5 ADMINISTRATIVE PROPOSED MNS SPEC CNS SPEC NEW STS (CONTINUED) CHANGE (A'ITACH. 2a) (ATTACH. 2b)

(A'ITACH. 3)

Incorporate G4 4.8.1.1.2.a.4 4.8.1.1.2.a.4 3.8.1.3

" standby 3.8.1.7 (prelube)"into current fast-start footnote Change relay N1 (MNS only) 4.8.1.1.2.e.6.c 4.8.1.1.2.g.6.c 3.8.1.13 nomenclature:" generator i time overcurrent" to

" generator voltage-controlled overcurrent" Change rpm Q5 (MNS only) 4.8.1.1.2.e.15 NONE NONE to Hz R1 (MNS only) 4.8.1.1.2.f 4.8.1.1.2.h 3.8.1.20 Delete footnote S1 (CNS only) 4.8.1.1.2.e 4.8.1.1.2.g.1 3.8.1.9 concerning 4.8.1.1.2.g.4 through applicability of 4.8.1.1.2.g.6.a 3.8.1.19 some of 18-month 4.8.1.1.2.g.6.b surveillances 4.8.1.1.2.g.8 prior to entering 4.8.1.1.2.g.9 Catawba's first 4.8.1.1.2.g.10 RFOs Delete reference V1 4.8.1.2 4.8.1.2 3.8.2.1 to 4.8.1.1.3 " Reports" due to GL 94-01 Delete reference W1 B 3/4.8.1.2.3 B 3/4.8.1,2,3 to potential DG degradation due to excessive testing Add reference W2 B 3/4.8.1,2.3 B 3/4.8.1,2,3 ,

to GL 93-05 and 94-01 l