IR 05000348/1985025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20137U799
| number = ML20151N977
| issue date = 02/13/1986
| issue date = 12/27/1985
| title = Ack Receipt of 860115 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-348/85-25 & 50-364/85-25
| title = Discusses 851211 Meeting at Facility Re Items Identified in Insp Repts 50-348/85-25,50-364/85-25,50-348/85-30, 50-364/85-30,50-348/85-32 & 50-364/85-32.Lists of Resolutions & Attendees Encl
| author name = Walker R
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Mcdonald R
| addressee name = Mcdonald R
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8602190335
| document report number = NUDOCS 8601030260
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 5
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ - . ..
{{#Wiki_filter:yn
Febuary 13. 1986 Alabama Power Company
    .b. . , __.4 -
  > ATTN: Mr. R. P. Mcdonald Senior Vice President P. O. Box 2641 Birmingham, AL 35291 Gentlemen:
      ..-4 - , _- ,J :m., ,a__.-.+. ___. .___ __m..,y _ , , _ . .. j_ .+ . , _ . . . _ p A
SUBJECT: REPORT NOS. 50-348/85-25AND50-364/85-25 Thank you for your response of January 15, 1986, to our Notice of Violation issued on July 18, 1985, and our letter of December 27, 1985, concerning activities conducted at your Farley facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
-
    .
.
DEC 2 71985-l Alabama Power Company ATTN: Mr. R. P. Mcdonald Senior Vice President       ,
P. O. Box 2641 Birmingham, AL 35291 Gentlemen:         ,
SUBJECT: MEETING SUMMARY - DOCKET NOS. 50-348 AND 50-364 This letter refers to a r eeting conducted at your request at the Farley nuclear facility on December 11, 1985. This meeting was held to discuss items identified in NRC Inspection Report Nos. 50-348, 364/85-25; 50-348, 364/85-30; and 50-348, 364/85-32. Alabama Po'.or Company (APC) presented information regarding these items. Specific iten resolutions are discussed in Enclosure An attendance list is contained in Enclosure It is our understanding that APC will respond with additional information as delineated in Enclosure 1 within 20 days of receipt of this letter.


Sincerely,
;
;
Roger D. Walker, Director Division of Reactor Projects cc: 4. O. Whitt, Executive Vice President
It is our opinion that the meeting was beneficia It provided a better understanding of actions being taken to resolve these items.
  .J. D. Woodard, General Manager -
 
Nuclear Plant M G. Hairston, III, General Nuclear Support d. Manager-W. McGowan, Manager-Safety Audit
!    In accordance with Section 2.790 of NRC's Rules of Practice, Part 2, Title 10, l    Code of Federal Regulations, a copy of this letter and enclosures will be placed    i l
  ,and Engineering Review
in the NRC's Public Document Room,      r Should you have any questions concerning these matters, we will be pleased to discuss the
  'W. G. Ware, Supervisor-Safety Audit and Engineering Review occ:vNRC Resident Inspector
 
  <E. Reeves Project Manager, NRR Document Control Desk State of Alabama RII RII RI RI! RI!    RIl J5' Ad CJ l an d0cv HDance Ss '$
Sincerely, bY hbt-    .
VP ciera MRunyan:cdg ABelisle  AGibson 02/6/86 02/ 6 /86 02//g/86 02//g/86 02/p /86   02////86 Pa"Ta!! 8tS* gy g      i,
J. Nelson Grace Regional Administrator Enclosures:
          '
;    1. Item Resolutions
. - -     _ _ . . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
!    2. Attendance List cc w/encis: Deepage2)
          .reo i
l 9601030240 851227 PDR ADOCM 05000348 l    0  PDR      j l
_ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
            'O p4f
 
-
,.
..
DEC 2 7 1985 Alabama Power Company  2
/cw/encls:
W. O. Whitt, Executive Vice President
/J.D.Woodard,GeneralManager-jW.Nuclear Plant G. Hairston, III, General Manager -
Nuclear Support
./J.W.McGowan, Manager-SafetyAudit 3.andEngineeringReview 4 G. Ware, Supervisor-Safety Audit and Engineering Review cc w/encls:
RC Resident Inspector
. Reeves, Project Manager, NRR Document Control Desk State of Alabama
.RII RII RI RII  RII RIL[ h (b0 ABelisle:11 t
CAJulian hW no son VP 'ibra
    '$
DVerrplli [wRWal ker 12/d/85 12/g85 12/fd/85 12/ /85 12/fj/85 12/2f/85 RI RII GJenkins (jJ01shinski a 12/g[/85 Y12/p/85
  -
   >
N, a
 
'
'
.
.
ENCLOSURE 1 ITEM RESOLUTION 1. NRC Inspection Report Nos. 50-348,364/85-25 With regard to Violation 1, part a, we have concluded that this violation will be changed to an unresolved item pending further review by NRC and be identified as unresolved item 348, 364/85-25-0 With regard to Violation 1, part b, we have concluded that this example of a violation remains valid. It is our understanding that applicable procedures will be revised to clarify the evaluation process and that applicable personnel will be retrained in this clarified proces With regard to Violation 1, part c, we have concluded that this example of a violation remains valid. It is our understanding that applicable procedures will be revised to specify more clearly a time limit when evaluations must be performe With regard to the assigned severity level for Violation 1, we have concluded that a Severity Level 5 category is more appropriate. Our records will be adjusted accordingl With regard to Violation 2, we have concluded that example a of the violation remains valid. It is our understanding that applicable procedures will be revised to require verification and documentation of proper environmental conditions prior to measuring and test equipment calibration for equipment that is sensitive to temperature and humidit With regard to the assigned severity level for Violation 2, we have concluded that a Severity Level 5 category is more appropriate. Our records will be adjusted accordingl With regard to Violation 3, we have concluded that the violation remains valid. We have concluded that your proposed corrective action as discussed during the meeting appeared satisfactory. We also understand that the corrective action due date will have to be revised and that you will advise us of the revised dat With regard to Violation 4, Alabama Power Company contends that the normal plant security is sufficient to protect the equipment in the I&C la Licensee representatives also stated that procedure FN-0-AP-11, section was not intended to require more security control than normal plant securit We have concluded that additional information presented during the meeting resolves this issue; conseqJently, this violation will be withdrawn. Our records will be adjusted accordingl l
 
-
.
,
.
Enclosure 1  2 NRC Inspection Report Nos. 50-348, 364/85-30 With regard to this violation, we have concluded that additional inspection in this area is require The violation is withdrawn pending further inspection and this will be identified as Inspector Followup Item 348, 364/85-30-0 . NRC Inspection Report Nos. 50-348, 364/85-32 With regard to this violation, we have concluded that there may be some ambiguity as to the intent of the Technical Specifications. The violation will be withdrawn and an unresolved item identified pending further review by the NRC. This will be identified as Unresolved Item 348,364/85-32-0 ..
.-     ]
,
ENCLOSURE 2 ATTENDEES NRC Meeting with Alabama Power Company, December 11, 1985 Alabama Power Company G. Hairston, General Manager Nuclear Support J. Woodward, Plant Manager J. McGowan, Manager Safety Audit and Engineering Review (SAER)
D. Money, Assistant Plant Manager Operations W. Ware, SAER Supervisor Nuclear Regulatory Commist. ion A. Gibson, Director, Division of Reactor Safety (DRS)
A. Belisle, Acting Chief, Quality Assurance Programs, DRS C. Julian, Acting Chief, Operations Branch, DRS F. Cantrell, Section Chief, Division of Reactor Projects (DRP)
V. Panciera, Section Chief, DRP B. Bonser, Resident Inspector
}}
}}

Latest revision as of 01:19, 25 October 2020

Discusses 851211 Meeting at Facility Re Items Identified in Insp Repts 50-348/85-25,50-364/85-25,50-348/85-30, 50-364/85-30,50-348/85-32 & 50-364/85-32.Lists of Resolutions & Attendees Encl
ML20151N977
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/27/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8601030260
Download: ML20151N977 (5)


Text

yn

.b. . , __.4 -

..-4 - , _- ,J :m., ,a__.-.+. ___. .___ __m..,y _ , , _ . .. j_ .+ . , _ . . . _ p A

-

.

.

DEC 2 71985-l Alabama Power Company ATTN: Mr. R. P. Mcdonald Senior Vice President ,

P. O. Box 2641 Birmingham, AL 35291 Gentlemen: ,

SUBJECT: MEETING SUMMARY - DOCKET NOS. 50-348 AND 50-364 This letter refers to a r eeting conducted at your request at the Farley nuclear facility on December 11, 1985. This meeting was held to discuss items identified in NRC Inspection Report Nos. 50-348, 364/85-25; 50-348, 364/85-30; and 50-348, 364/85-32. Alabama Po'.or Company (APC) presented information regarding these items. Specific iten resolutions are discussed in Enclosure An attendance list is contained in Enclosure It is our understanding that APC will respond with additional information as delineated in Enclosure 1 within 20 days of receipt of this letter.

It is our opinion that the meeting was beneficia It provided a better understanding of actions being taken to resolve these items.

! In accordance with Section 2.790 of NRC's Rules of Practice, Part 2, Title 10, l Code of Federal Regulations, a copy of this letter and enclosures will be placed i l

in the NRC's Public Document Room, r Should you have any questions concerning these matters, we will be pleased to discuss the

Sincerely, bY hbt- .

J. Nelson Grace Regional Administrator Enclosures:

1. Item Resolutions

! 2. Attendance List cc w/encis: Deepage2)

l 9601030240 851227 PDR ADOCM 05000348 l 0 PDR j l

_ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'O p4f

-

,.

..

DEC 2 7 1985 Alabama Power Company 2

/cw/encls:

W. O. Whitt, Executive Vice President

/J.D.Woodard,GeneralManager-jW.Nuclear Plant G. Hairston, III, General Manager -

Nuclear Support

./J.W.McGowan, Manager-SafetyAudit 3.andEngineeringReview 4 G. Ware, Supervisor-Safety Audit and Engineering Review cc w/encls:

RC Resident Inspector

. Reeves, Project Manager, NRR Document Control Desk State of Alabama

.RII RII RI RII RII RIL[ h (b0 ABelisle:11 t

CAJulian hW no son VP 'ibra

'$

DVerrplli [wRWal ker 12/d/85 12/g85 12/fd/85 12/ /85 12/fj/85 12/2f/85 RI RII GJenkins (jJ01shinski a 12/g[/85 Y12/p/85

-

>

N, a

'

'

.

.

ENCLOSURE 1 ITEM RESOLUTION 1. NRC Inspection Report Nos. 50-348,364/85-25 With regard to Violation 1, part a, we have concluded that this violation will be changed to an unresolved item pending further review by NRC and be identified as unresolved item 348, 364/85-25-0 With regard to Violation 1, part b, we have concluded that this example of a violation remains valid. It is our understanding that applicable procedures will be revised to clarify the evaluation process and that applicable personnel will be retrained in this clarified proces With regard to Violation 1, part c, we have concluded that this example of a violation remains valid. It is our understanding that applicable procedures will be revised to specify more clearly a time limit when evaluations must be performe With regard to the assigned severity level for Violation 1, we have concluded that a Severity Level 5 category is more appropriate. Our records will be adjusted accordingl With regard to Violation 2, we have concluded that example a of the violation remains valid. It is our understanding that applicable procedures will be revised to require verification and documentation of proper environmental conditions prior to measuring and test equipment calibration for equipment that is sensitive to temperature and humidit With regard to the assigned severity level for Violation 2, we have concluded that a Severity Level 5 category is more appropriate. Our records will be adjusted accordingl With regard to Violation 3, we have concluded that the violation remains valid. We have concluded that your proposed corrective action as discussed during the meeting appeared satisfactory. We also understand that the corrective action due date will have to be revised and that you will advise us of the revised dat With regard to Violation 4, Alabama Power Company contends that the normal plant security is sufficient to protect the equipment in the I&C la Licensee representatives also stated that procedure FN-0-AP-11, section was not intended to require more security control than normal plant securit We have concluded that additional information presented during the meeting resolves this issue; conseqJently, this violation will be withdrawn. Our records will be adjusted accordingl l

-

.

,

.

Enclosure 1 2 NRC Inspection Report Nos. 50-348, 364/85-30 With regard to this violation, we have concluded that additional inspection in this area is require The violation is withdrawn pending further inspection and this will be identified as Inspector Followup Item 348, 364/85-30-0 . NRC Inspection Report Nos. 50-348, 364/85-32 With regard to this violation, we have concluded that there may be some ambiguity as to the intent of the Technical Specifications. The violation will be withdrawn and an unresolved item identified pending further review by the NRC. This will be identified as Unresolved Item 348,364/85-32-0 ..

.- ]

,

ENCLOSURE 2 ATTENDEES NRC Meeting with Alabama Power Company, December 11, 1985 Alabama Power Company G. Hairston, General Manager Nuclear Support J. Woodward, Plant Manager J. McGowan, Manager Safety Audit and Engineering Review (SAER)

D. Money, Assistant Plant Manager Operations W. Ware, SAER Supervisor Nuclear Regulatory Commist. ion A. Gibson, Director, Division of Reactor Safety (DRS)

A. Belisle, Acting Chief, Quality Assurance Programs, DRS C. Julian, Acting Chief, Operations Branch, DRS F. Cantrell, Section Chief, Division of Reactor Projects (DRP)

V. Panciera, Section Chief, DRP B. Bonser, Resident Inspector