ML20138R595: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.
      *
              .        -
        -
    -
          .;'
          ,                                                                          .
                    - Docket Sio.' 50-362      .
                                                      ,    ,
                                                                :DEC 1119c6
                                    ~
                    -SouthernCalifornia'Edis'onCobpany
                      P. O. Box 800a              ,
                      2244 Walnut Grove Aven'ue_                        ,
                      Rosemead, California 91770;              .
                                                                            .,
                                  .
                                              -  .
                                                      .'.        ,
                                                                          '
                      Attention: eMr. -Kenneth P. Baskin, Vice President
                                      Nuclear Engineering, Safety. and Licensing Department
                                                                    ''
                      Gentlemen:          '
                                                -  -
                  '
                    ' Subj ect: NRC Inspection'of Containment Integrated Leak Rate Test, San Onofre
                                  UnitL3 -
                      This refers to the inspection conducted by Mr. C. Clark of this office on
                    -November 22 - December 6, 1985, of activities authorized by NRC License No.
                      NPF-15, and to'the' discussion of our findings held with members of your staff
                      on November 26, 1985.
                    -Areas examined during this inspection are described in the enclosed inspection
                      report. Within these areas, the inspection consisted of selected examinations
                      of procedures and representative records, interviews with personnel, and
                      observations by the inspector.
                      No violations with NRC requirements or deviations were identified.
                      In accordance with 10 CFR 2.790(a), a copy of'this. letter and the enclosure
                      will be placed in the NRC Public Document Room.
                      Should you have any questions concerning this inspection we will be glad to
                      discuss them with you.
I
                                                                      Sincerely,
'
                                                                      Criginal signed liy
i                                                                      D. f'. FK OsN, Acting Director
                                                                      Division of Reactor Safety and Projects
                      Enclosure:
                      Inspection Report No. 50-362/85-35
                      cc w/ enclosure:
                      D. J. Fogarty, SCE
                      H. B. Ray, SCE (San Clemente)
                      H. E. Morgan, SCE (San Clemente)
                      State of CA
                      bec w/ enclosure: RSB/ Document Control Desk (RIDS); Mr. Martin; Mr. Cook;
                      Mr. Faulkanberry; ResMent Inspector; Project Inspector;
i                    bec w/o enclosure:      LFMb *
                      REGION V/ dot t
                      CLARKdt'.  YOUNG      P.        SON
                                                                      7
                                                                      PA E
                                                                                        [
                                                                                    KIRSCH
;                    12/1/85    12/f/85 12/fo 5                      12//0 /85 12/j3/ /85
                                                                                                                  1 0
'
              9512310387 851211
              PDR      ADOCK 05000362                                                                      ,,
                                                                                                                j, ];/
                G                      PDR
'
}}
}}

Latest revision as of 06:42, 22 July 2020

Forwards Insp Rept 50-362/85-35 on 851122-1206.No Violation or Deviation Noted
ML20138R595
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/11/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20138R597 List:
References
NUDOCS 8512310387
Download: ML20138R595 (1)


See also: IR 05000362/1985035

Text

.

. -

-

-

.;'

, .

- Docket Sio.' 50-362 .

, ,

DEC 1119c6

~

-SouthernCalifornia'Edis'onCobpany

P. O. Box 800a ,

2244 Walnut Grove Aven'ue_ ,

Rosemead, California 91770; .

.,

.

- .

.'. ,

'

Attention: eMr. -Kenneth P. Baskin, Vice President

Nuclear Engineering, Safety. and Licensing Department

Gentlemen: '

- -

'

' Subj ect: NRC Inspection'of Containment Integrated Leak Rate Test, San Onofre

UnitL3 -

This refers to the inspection conducted by Mr. C. Clark of this office on

-November 22 - December 6, 1985, of activities authorized by NRC License No.

NPF-15, and to'the' discussion of our findings held with members of your staff

on November 26, 1985.

-Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selected examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No violations with NRC requirements or deviations were identified.

In accordance with 10 CFR 2.790(a), a copy of'this. letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection we will be glad to

discuss them with you.

I

Sincerely,

'

Criginal signed liy

i D. f'. FK OsN, Acting Director

Division of Reactor Safety and Projects

Enclosure:

Inspection Report No. 50-362/85-35

cc w/ enclosure:

D. J. Fogarty, SCE

H. B. Ray, SCE (San Clemente)

H. E. Morgan, SCE (San Clemente)

State of CA

bec w/ enclosure: RSB/ Document Control Desk (RIDS); Mr. Martin; Mr. Cook;

Mr. Faulkanberry; ResMent Inspector; Project Inspector;

i bec w/o enclosure: LFMb *

REGION V/ dot t

CLARKdt'. YOUNG P. SON

7

PA E

[

KIRSCH

12/1/85 12/f/85 12/fo 5 12//0 /85 12/j3/ /85

1 0

'

9512310387 851211

PDR ADOCK 05000362 ,,

j, ];/

G PDR

'