April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301 - Draft JPMs and Outlines (Part 1 of 3) (Section 3 of 3)
ML072980432
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/09/2007
From:
Tennessee Valley Authority
To:
NRC/RGN-II
References
50-327/07-301, 50-328/07-301 EPIP-1, Rev 39, EPIP-4, Rev 30
Download: ML072980432 (62)


See also: IR 05000327/2007301

Text

(l TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING

PROCEDUREEPIP-1 EMERGENCY PLAN CLASSIFICATION

MATRIXRevision39QUALITYRELATED

PREPARED BY: Bill Peggram RESPONSIBLE

ORGANIZATION:

Emergency Preparedness

APPROVED BY: Kevin WilkesEFFECTIVEDATE:

01/23/2007

Level of Use: Reference

(ISEQUOYAH EMERGENCY PLAN CLASSIFICATION

MATRIX Revision History I EPIP-1 I l R ev Oa te Re vised Pages Reason forRevision 3 6 02/10/2005 9 ,10 Revision Change:RevisedRVLlS

equivalenttocor e damagefrom40%to42%(DCN20591APER75249).Removed duplicate word" exists"inEAL1.3.3L 37 01/1812006 8 ,1 0 ,12 ,13 , Rev i s ionChange:EAL 1.3.4 to incorp orat e huma n factor in g 20 ,24 ,27 ,28 , wording.EAL 2.1 wordingclarification , ad ded annunc iator 2 9 , 3 2, 38 , 42 , CRT.Changed plantcomputertoICS.R ev is ed EALs4.6 , 4 4,47 4.7oftheEvent ClassificationMatri x t o incorporate

the gu idance found inNRCBu lletin 2005-02(BL2005-02)for

security-basedEALs.Table4

-3 , Securit y Events wasadded.Also , revised EALsinportion4.7oftheEven t Classification Matr i xtocapturet he ne w emergencyclassification

definitions

.Th e definitionswererevisedtoa dd new defini ti ons HOSTILE ACTION , andHOSTILEFORCEt

o support impl emen t a t i o nofBL2005-02.EAL 7.3toremove 0-RM-90-3&0-RM-90-4fromTable 7-2 , DC N#: D-21642-AAnnualReview.ChangedSAStoCAS inEAL 7.3d ue to a t ypoinREP ,R56SONchangedEAL7

.3toma tchinR30.3 8 11/22/2006 10 ,46 Ann ual review , changedthe"or" to"and" inEAL 1.3.2L"Cont ainmentpressure notincreasingor

sumplevel no t increasingo n L1-63-178 and[was or]179withaLOCA in progress." EA L 1.3.2P: changed 2.81to2.8duet o setpo int changesinDCNE21988;PER97896:changed PSID to psigtobeconsistentwithC MT status tr ee;changed CMTspray wording.ValuesinTable7-

1 chang ed due tothe changeoutforRM-90-212,TurbineBuiidingSump[DCN21837].

3 9 01/23/200746Pl an eff e ctiveness detenminat

ion reviewsindicate the follow ing revisionsdonotreduce thelevelo f effectivenesso

f theprocedureo r REP.RevisedeffluentradiationmonitorEAL valuesfo r RM-90-2 12.Page 2of47Revision39

I EPIP-1 I EMERGENCY PLAN CLASSIFICATION

MATRIX TABLEOFCONTENTS

1.0 Purpose.4 2.0 References

.4 2.1 D evelopmental

References

,.4 3.0 I nst ructions.4 3.1REPActi vation.4 3.2EALInterpretation 5 3.3 Validation

of Information

, 5 3.4 C lassi ficat ion Deter m ina tion 5 4.0 Records Retent ion 6 4.1Recordso f Classified

Em ergencies 6 4.2DrillandE xercise Records , , 6 I SEQUOYAH I---'-----J (EALS ect ion 1-F ISSION PRODUCT BARRIER MATRIX 7EALSec t ion 2-SYSTEM DEGRADATION

11 EAL Sect ion3-LOSS OF POWER 19EALSection 4-HAZARDS and SED JUDGMENT..

23EALSection5-DESTRUCTIVE

PHENOMENON

3 1EALSection 6-SHUTDOWN SYSTEM DEGRADATION

3 7 EAL Section7-RADIOLOGICAL

EFFLUENTS.4 1 l P ag e 3 of 4 7 Revisi on 39

1.0 PURPOSE I EPIP-1 I EMERGENCY PLAN CLASSIFICATION

MATRIX I SEQUOYAH I--'---J (This procedureprovidescriteriatotheShift

Manager(SM)orSite

Emergency Director (SED)tobeusedinclassifyinganddeclaringan

emergencybasedonplant

condit ions.The responsibilityfordeclaringan

emergency ,basedonthe

criteriai n this procedure , belongs totheSMorSED

,thedesignatedUnitSuperv

isor whenactingas theSM ,ortheTSCSED

.This responsibility

cannotbedelega ted.2.0 REFERENCES

2.1 Developmental

DocumentsA.10CFR50, DomesticLicensingofProductionand

Utilization

Facilities

.B.Reg Guide 1.101 ,EmergencyPlanningand

Preparedness

For Nuclear Power Reactors endors ingNEI99-0 1 Me t hodology For DevelopmentOfEmergency

Action Leve ls*Revision4 , January 2003.C.Sequoyah Techn ical Specificat

ions(TechSpecs

), Abnormal Operating Procedures

(AOPs), Eme rgency Operat ing Procedures (EOPs), Funct ional Restoration

Guidelines (FRGs), Techn ical Ins tructions (TI), Surveillance

Instructions (SI),andtheUpdatedFinalSafetyAnalysisReport (UFSAR)are also referencedinAppendixBoftheRadiological

Emergency Plan.D.LettertoBruceA.Boger

, DirectorofInspectionProgram

Management

, USNRC , December 8 ,2001fromLynne

tte Hend ricks , NEI , Recom mended Act ionsinResponsetoaS

ite Specific Credible Threatata Nuclear Power Plant(1A-01-1).3.0 INSTRUCTIONS

3.1 REP Activation

The Nuclear Power (NP)Radiological EmergencyPlan(REP)willbeactivatedwhen

anyoneoftheconditionslistedinth

is matrix is detected and declared.TheREP i snotac t ivatedbasedonareport

ingofpastconditions.Th is procedurewillbeusedin

conjunctionwiththeREP

Appendix B.Ifthe event is determ inedtobeoneofthefour

emergency classifications

t hen implement EPIP-2 ,-3 ,-4 ,or-5as applicable

.l Page 40147 Revision 3 9

EMERGENCYPLAN

CLASSIFICATION

MATRIX 3.0 INSTRUCTIONS (Continued)

3.2 EAL InterpretationThecriteriainSQNEPIP-1aregivenforreference

knowledgeofactual

plant conditionsorthe extentoftheemergencymayrequirethataddit

ionalstepsbetaken.Inallcases

,thislogicprocedureshouldbecombinedwiththesound

jUdgmentoftheSMorSEDtoarriveatan

appropriateclassificationforaparticu

larsetof circumstances

.ThesecriteriaapplytobothUnit1andUnit2

.TheSEDmustbeawareoftheaffectsof

simultaneouseventsonbothunits.

I SEQUOYAH 1 1 EPIP-1 I (3.3 ValidationofInformationIfthereisareasonto

doubtifagiveninitiatingconditionhasactuallyoccurred

, theSMorSEDshallfollowind

ications provided.Unlessa suspectedspuriousor

otherw isefalsealarmcanbesubstantiatedwith

inanacceptabletimeframe

(basedonpotentialseverityoftheevent),theSMorSED

istoproceedwithactionsasrequ

iredbythis procedure unt ilsucht imeasthealarmisverifiedtobefalse.

3.4 Classification

Determination3.4.1To determinetheclassificationoftheemergency

,reviewtheInitiating

Conditionsoftherespectivestatustreecriteriathatwillbemonitoredandused

to determinetheeventclassificationforthemodeslistedontheclassification

mat rix.3.4.2IfaCritica

lSafetyFunction

(CSF)is listedasanInitiatingConditionthe

respectivestatustreecriteriaw

illbemonitoredandusedto

determine the event classificationforthemodeslistedontheclassificationmatri

x.3.4.3Declarethe

highest emergencyclassbasedon

events thatarein progress atthetimethattheclassificationismade

.3.4.4If, during an ongoing event, investigationshowsthatahigherclassification

was previously

met ,thenreportthat

,asinformationonly,totheOperat

ion Duty Specialist

(ODS)andtheNRC.Dono

tdeclareorupgradetoah

igher eme rgency class iftheconditionsdonote

xistunlessitisanoted

exception (I.e.,EAL2.3).3.4.5 If.following termination

of an emergency declaration, investigat

ion showsthatahigher

classificationwasmet ,thenreportthat

,asinformationonly

,totheODSandtheNRC

.Donotdeclareorupgradetoahigheremergencyclassif

the condit ionsdonotexist.l 3.4.6 If conditions

have returnedtoa non-emergency

statebeforeany emergencycanbeclassified

, thentheh ighestemergencyc

lass tha t was appropria teshallbe reported ,asinformat

ion only , totheODSandNRCandshallnotbedeclaredun

lessitisanotedexception(l.e.,EAL2.3).Page5of47 Revision 3 9

3.0 INSTRUCTIONS (Continued)

3.4.7TheNRCshallbenotifiedwithinonehourofallclassifications.Oncemadeandreported

,adeclarationcannotbecanceledorrescindedevenifitislater

determinedtobeinvalid

.Ifthereisreasontodoubtthatagivenconditionhas

occurred ,theSMorSEDshallfollowindicationsandproceedwith

classification

,asrequiredbythisprocedure,untilotherwiseprovenfalse.3.4.8TheStateshallbenotifiedbytheODSwithin15minutesofanydeclarationandnotified

,forin formation only , wi thinonehourofanyclassificationthatwasmetbutnotdeclaredasallowedabove

.IftheStateisnotifiedofa

declarat ionthatis invalidated

before theNRCis notified , terminatetheclassification

, if not already done ,andreportthedeclarationtotheNRC.

3.4.9 The ACCEPTABLEtimeframeforinitiatingnotificationtotheODSofan

emergency declarationisconsideredtobefive(5)minutes

.Thisisthetimeperiodbetweendecla

rationoftheemergencyandcontact

ingtheODS.4.0RECORDSRETENTION

(ISEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I (4.1RecordsofClassifiedEmergencies

The materialsgeneratedin

supportofkeyact ionsduringanactualemergency

class ifiedasNOUEorhigherareconsideredLifetimeretention

Non-QA records.MaterialsshallbeforwardedtotheEPManagerwhoshallsubmitanyrecords

deemed necessarytodemonstrateperformancetotheCorpora

te EP Manager for storage.4.2Drilland

Exercise Records The materialsdeemednecessarytodemonstrateperformanceofkeyactionsdur

ingdrillsare consideredNon-QArecords

.TheserecordsshallbeforwardedtotheEP

Managerwhoshallretainrecordsdeemednecessaryto

demonstrate

s ix-year plan performanceforsixyears

.TheEP Managershallreta inotherrecordsinthiscategoryforthreeyears

.Page6of47 Revision 39

ISEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I (FISSIONPRODUCT

BARRIER MATRIX (Modes 1-4)1 1.1FuelC lad Barrier 1.2RCSBarr ier 1.3 Containment

Barr ier SYSTEM DEGRADATION

2 2.1Lossof Instrumentation

2.5RCSUnidentifiedLea

kage 2.2 LossofCommunication

2.6 R CSIdentifiedLeakage

2.3Failureo fReactorProtection2.7UncontrolledCoolDo

wn2.4FuelC lad Deg radation 2.8 Turb ine Fa ilure 2.9SafetyLimi

t LOSSOFPOWER 3 3.1LossofAC(PowerOps)

3.2LossofAC (Shutdown)3.3Loss of DC HAZARDS and SED JUDGMENT 4 4.1 FireTable4-1 4.2 E xplosionTable4-2 4.3F lammable Gas F igure 4-A4.4ToxicGaso

r SmokeFigure4-B 4.5ControlRoo

m Evacuation4.6Security 4.7 SED Judgment DESTRUCTIVE

PHENOMENON

5 5.1 Ear thquake 5.5RiverLeve l Lo w5.2Tornado

5.6 Watercraft

Crash 5.3 Aircraft/Projectile Table5-1 5.4 R iverLevelHighFigure5-A SHUTDOWN SYSTEM DEGRADATION

6 6.1LossofShutdownSystems

6.2 LossofSh utdown Capability 6.3LossofRCS Inventory RADIOLOGICAL

EFFLUENTS 7 7.1GaseousEffluentTable7-17.2Liqu id EffluentTable7-2 7.3 Radiation LevelsFigure7-A 7.4FuelHandling

l 7.5SpentFuelStorage

Pag e7of47Revision39

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX EPIP-1 l Definit ions and Abbreviations:

BOMB: An explosive device.(SeeEXPLOSION)C IVIL DIS TURBANCE:A g roup of tw e nty (20)Of moreperson s within the EAB vi olent ly prote s ting e nsue operations o r activitie s at the site.CONFINEMENTBOUNDAR

Y: SpentFuelStorageCask

CONFINEMENT BOUNDARY cons ists of MP C shell , bottom basep lat e, MP C lid(incl u d ingthe ve nt a nd drain po rt cover pl ate s), MP C closure ri ng , andassociatedwelds CRITICAL-SAFETY FUN C llQN tCSFs): A pla nt saf ety f u fld ion req uir ed to prevent significantrel

ease of core radioac:tlvity t o theenvironment

.There a re six CSF s;Sutx:riti ca lity , C ore Cooling , H eatSink, Pressuriz ed Th e rmal$hock.Integrity (Cont a i n ment)a nd In ventory (R e S).E VENT;Assess me nt of an EVENTcommen ces when recognition i s made th at on e or m oreof theinitia ting conditions associatedwiththe event exist.I m pl i cit inthis definiti on i s the need f o r t ime l y assessmentwith

in 15 m inutes.E XCLUSION AREA BOUNDAR Y (EAS):Thatarea surrounding the r eactor,I n whichthereactor licenses ha s the authority to determine all act ivities indudin g exdusion or rerroval of pe rsonnel andproperty f ro m t h e a re a.F o r purpose s of Emerge n cy Action Levels.based on ra diological field measurement s a nd d ose assessment s , an d f o r desig n calCIJ atio ns, th e S it e Boundary shall be d e fi nedasthe EAB.EXPLOSION: Ra p i d , viol ent , uncon fin ed combustio n , Ofacatastrophic

failu re of pressurized or elecmce t eq uipment thatirnparts en erg y d sufficientforcet o poten tia lly damage permanen t st r uctureso r eq u ipme nt.EXTORT10N: A n attempt 1 0 causea n actionatthes itebythr eat o r force.FAULTED:(SteamGenerat o r)Exist ence ofse condaryside l e a k a g e (e.g., st eamorfeed li ne br eak)t hat results in a n un controll ed decrease i n steam ge nerator pr essure or th e steamge n erator bei ng oom pl et e l y d e pressurized.ARE: Combust ion characterized by heat and light.So urces of smoke such a s slippingdrivebe l ts o r overheat ed electri cal components

donot con sUMe a fi re.Obs ervation offlameis pr eferredbuti s NO T req u i redif l a rgequantities of smok e and/or h eatareobs e rvedFLAMMABLEGAS:Combu st ib le gases at concentrations>thanth e L 01JliE R EX P L OS IV ELIMIT(LEL).HOSTAGE: A pe rso n(s)h eldasleverageagai

nst t h esitetoensure

th at demandswillbe

met by t h e s ite.HOSTlLE ACTlO N: A n ad tow a rd a nud e ar plant o r it s personnel th ai i ndudestheu se of viol entforcetodestroyeq uipment , take ho stage s , and/or intirrldale the licensee to ach iev e an e nd.Thi s i n d ude s attack by air , l a nd or water;usin g gun s , explosives.pro;ect iles , ve h icles , o r other de vices use d to delive r destructive force.Ot her act s t hat satisfy the overallintent ma y be i ncl uded.HOSTllE ACTlONsho uld N OT be construed to indude a ds of civ i l disobed ienceorf elon io us actsthata re not part ofaco ncertedattack onth enuclearpow

er plant.HOST ILE F ORCE: On eormor e i nd i vi dualswho ar e e n g ag edinad etermined assault , O'Vertly o r by st eal th a nd dece pt ion.equippe d with s uitableweapon s capable 01 kill ing.maiming , orca usi ng destructio

n.IMMINENT: Wllh in t wo hou rs.INEFFECTlVE: VVhe n t he specified restoralion act i on(s)doesnotr e su ltina reductioni n the l evel of severity of theREDo r ORANGEPATHcondition wit h i n15minutes from i dentificatio n oftheCSFStatusTreeRED o r O RANGEPATH.INIT1ATlNGCONDIT10N$:PlantParameters,rad iation monitorreadingso r personnel observa tions t hat identif y a n Eventfor purpose s of Emergency Pla n C lassificat ion.INTRUSlONnNTRUDER:Suscect ed host i l e individu a l p resent i n t h e protected area withoutauthorization.ISFS I: I ndependent

Spen t F u el Stor age I nst all atio n.ODCM: Offsil e Dose C alculationManual isasupporting docume nt t o the T ech Sp ecs.thatcontainRed Efflu en t Controls , Environs M on itoring control s.and methodologyforcalculatingrouti

n e gaseous an dliquidefflue

nt offsit edosesa nd rT'ICIl'l itor ererrrstn p s et oco te.ORA NGE PAT1-I: Monitoring of oneormoreCSFsb y F R-o whichin d icate s t hat the CSF(s)is underseverechallenge;prompt ope rator actionisrequi red.PROJECTILE:An

objectejected.thrownorlaunched towardsapla n t structure result i ng in damage sufficie n t 1 0 causeconcernregard ingthe i nteg ri t y of t he affected structure or the o perat:ilit y or relia bili ty of safe ty equipment contai ned t h erein.Thesour ce of t he project il e ma y be cost e or otfs ite.PR OTECTED AREA: Th e ar ea e rcorncessedby t he security fen ce a nd to w hich acce ss i s controll ed.Res: TheR CS primary sideand it s connectio ns u p 1 0 an d i n d u di ng th e pressu ri ze r safety a ndr el iefvalve s , a n d other connections up to an d i n dudi ng t he pri maryandsecondary isol at i o n val ves.RED PATH: Monitoring of oneor more CSFsby FR-O wh i ch indicate s tha t the CSF(s)i s u nd e r e xtreme ch a llenge;prompt o pe r atoractionis r equir e d.RUPTURED: (Stea m Gen erat or)Exi st.enc:e ofprimaryt o seco ndary lea kage of a magnitude greater than the capacity one charging pu mp.SABOT AGE: Del iberate da mag e , misalignment.or

misoperation

of pl ant eq uip merrt wi t h t he intenttor endert he eq ui pment in oper-ab l e.SIGNIFICANTTRANSIENT

An UNPLANNED event involving on e o r m o re of thef ol lowt ng:(1)Ana utomatic turbinerunback>15%thermalreact o r power;(2)E lectri ca l l oadre jection>25%full electrica l l oa d: (3)R e ad or Trip;(4)S afe ty In jection SystemAct ivation;(5)Thermal PowerOscillat ionsSTRIKE ACTION:Aworkstoppage wit h i n t h e PR OTECTED AR EA by a body of w or1c:e r s t o enforce com pl ia nce with d ema ndsmadeonTV A.The STRIKE ACTIONm u st.th reatent o interrupt normal plant operations.TOXIC GAS: A ga s t hat i s d CVlQ erou s t o l ifeor limb by reason of in halation or ski n cont act (e.g.*ch l orine , CO:.r: , etc.)UNPLANNED:Ane ve n t o r act ionthati s not thee xpect ed resulto f norma l operation s.testing or m ai ntenance.Eventsth at r esulti n c orrective o r mitigative act io ns being ta ken in a ccordancewi t h abnorm a loremergency p rocedures are UNPLANNED.U NPLANNED RElEASE: A rel ease of radioactivity

i s UNPlANNEDifthe r e l ease h as not bee n auth ori zed b y a Di SCha rge Pe rmit (CPl.Implicit i n t h i s definition are uninten tional releases , unmonitor ed releases , or pl an ned releases th at exceedacondition specified on the DP.(e.g., alarm setpoint s , minimu m dilution flow, minimum releaseti mes.maxim umrelea se rates.and/ordischarg e at incorrect tan k).VALID: A n indication.reporto rconditionisco

ns id e re d t o b e VALID wh en i t i s co ndusivelyve

rifiedb y (1)a n instrument

channel check,o r (2)indication o nrelatedo r redundantindicators, o r (3)by direct observation by pla nt personnel.Impl icit inth is d efinitioni s the need for timely as sessment wi t hi n 15 mi nut es.Vl SlBLE DAMAGE: Damage t o equipment that i s read il y observabl e w itho ut measurements.testing ,oranalysis.Damage is sufficie nttocause concern regardingthe continuedoperability o r r eliabi lity of affected saf ety structu re.system ,orcomponent

.Examp le damage inclu d esdeformationduet o he al or impa ct, d enti ng , pe netration.ru pture , cr aclOng , o r pai nt b li stering.Su rface blem ishes(e.g., pai nt chipping , s c ratches.etc.)shouldNO T be i n d uded as vi si bl e damage.VITALAREA:

A nyareawithinthePR OTEC TED AREAw hich contains equ ipm ent , system s , devices , ormaterial whichthefa ilu re , destructio n , o r release of.coul d directly o r i ndireclly endang e r thep ubl i c health and safety b y exposure t o radi ation.Page8of4 7 Revision3 9

(ISEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 IRCSleakageresultsinentryintoE-1NonIsolatableRCSleak

e xceedingthecapacityofonechargingpumpinthenorma l charging al ignment Pressur ized ThermalShockRed (FR-P.1)ORHeatSin k RED (FR-H.1)andRHRShutdownCoolinnotinservice-OR--OR-Function Status Potent ial LOSS e I LOCA_-=:--:-....,.,....,..,...==--I

3.Steam Generator Tube:..;R:..:u::Jp",t:::u.:.:re:"""",.,.,-c-=-=

_-l*Potential LOSSSGTRthatresultsinaNotApplicableSafetyInjection

actuation Entry intoE-3RCSleakresultsin

subcooling

<40 o f as indicatedonXI-94-101or102 (EXOSENSOR)NotApplicable

Co reCoolingOrange (FR-C.2)HeatSinkRED

(FR-H.1)andRHRShutdownCoolinnotinserv ice_.;.-OR--OR--OR-Function Status Potential LOSS Coolant Activi==Le",v,.,e::-I-:;,....,-,==_-J

Potential LOSS-OR-5.Containment

-::,-,,-,,.,==----I

  • Potential LOSSVALIDreadingofNotApplicablegreaterthan
4.Reactor Vessel Water Level*='-==p""o""'te-n"::tl""a'"'l

L'"'O=-S=-S=-


lNotApplicable

VAliDRVLiSlevel

<42%onLi-68-368orLi-68-371withnoRCP

runnin 3.Incore ThermocoupleHIQuad Avera e*Potential LOSSGreaterthan1200

o fonGreaterthanorequaltoXI-94-101or102700

o fonXI-94-101or

EXOSENSOR102EXOSENSORCoreCoolingRed (FR-C.1)2.8E+01Rem/hron RM-9Q-271or-272-OR-4 LOSS Potential LOSS 2.9E+0 1 Rem/hro n RM-90-273 o r-274 VAliDRVLiSlevel

<42%onLi-68-368or

Li-68-371withnoRCP runn inNotApplicable

-OR-6.SED JudgmentAnyconditionthat

,inthe judgmentoftheSMorSED,indicateslossofpotentiallossoftheFuelCladBarriercomparabletotheconditionslisted

above.-OR-5.SED JudamentAnyconditionthat,inthejUdgmentoftheSMorSED,indicateslossofpotentiallossoftheRCSBarriercomparab

letothecond itions listed above.lPage9of47Revision39

EMERGENCYPLANCLASSIFICATION

MATRIX (ISEQUOYAH Po tential LOSS C ontainmen t Red (FR-Z.l)OR Actionsof FR-C.1 (RedP ath)a re INEFFECT IVE (i.e.: co re Testrendtnu I EPIP-1 I INSTRUCTIONS

Note:A condit ioniscons idered to b e MET if , inthe judgmentofthe SED , the conditionw ill be MET IMMINENTLY (i.e.: with two ho urs).Theclassification

shallbemadeassoonas this determination

is made.-OR-Not e: MONITOR the respective

status tree criteriaifaCSF isl is ted a s an INITIATtNG CONDITION.3.COMPAREthe number of barr ier Losses and Potentiall osses\0 the criteriabelow

andmaketh e appropriate

declaration.2.Ineachofthethr

ee barriercolumns , IDE N TIFYifanyLo ss o r Potential Loss INITIAT ING CONDITIONS

havebeen MET.1.Inthe matri xtothe left.REVIEWthe initiatingconditions ina llthreebarrier

columnsandcirc lethecond itions th at a re ME T.Emergency Class Criteria General Emergency LOSSofa nytwobarriers and Potentia l LOSSofthird barrier Site A rea Eme rgency LOSS or Potential LOSS of anytwo barr iers AlertAnyLOSS or Poten tialLOSSo f FuelClad ba rr i er OR An yLOSSorPo tential LOSS of RCS barrier Unusual Ev ent LOSS o r Potent ialLOSSofConta in ment barrier Potentia l LOSS N ot Applicable Potentia l LOSS Une xpected VALID increasein a rea o r ventilation RAD mo nitors adjace nt to containme nt (with LOCAin progres s).-O R--OR-6.SED Judament An y condition th at.int hejudgmentoftheSMorSE

D.indicateslossofpote

nt iallosso ftheContainment Barrier comparable

t otheconditions l isted above.RUPTURED S IG thatisa lso faulted outside cont ainment (E2 and E3)OR>4 h ourse condary side r e lease outs id e conta inment from a S IG withaS IG tube leak>T I S limitsAOPR.01AA)5.Si nificant Rad iation in*Potential LOSSNotApplicableVALIDread ingofg reate r than: 36 E+02R emlhr o n RM-90-271and272 OR 2.8 E+02 Remlhro n RM-90-273and274 3.Con ta inment Isolat ion Sta:;tu:;s'--;:;:=====,--_---j*C o ntainment isolation , when require d is incompleteanda releasepathtotheenviro

nment e xists.-OR--O R-2.Conta inmen t Pressure I

__--I*Po tent ial LOSSRapidu nexplainedpressu reContainmentHydrogendecreasefollow

i ng initial increasesto>4%b y volumeon increase onPDI-30-44or4 5 H 21-43-200or2 10 OR OR Conta i nmen t pressureorsump Pressure>2.8 PSIG (Phase B)leveln ot in creasing on L1-63-with<one fu ll tr ai n of178and179w

ithaLOCAincontainment sprayprress l P age 100f4 7 Revision39

[SEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1[(FISSIONPRODUCT

BARRIER MATRIX (Modes 1-4)1 1.1FuelC lad Barrier 1.2RCSBarrier

1.3 Containmen

t Barrier SYSTEM DEGRADAT ION 2 2.1Lossof Instrumentation

2.5RCSUnident

ified Lea kage 2.2Lossof Communication

2.6RCSIdentifiedLeakage2.3FailureofReactorProtection

2.7UncontrolledCoolDown2.4FuelC lad Degradation

2.8 Turbine Failure 2.9SafetyLimitLOSSOFPOWER

33.1Loss ofAC(PowerOps)

3.2 Loss ofAC(Shutdown)3.3LossofDC

HAZARDSandSED JUDGMENT 4 4.1 FireTable4-1 4.2 ExplosionTable4-2 4.3FlammableGasFigure4-A4.4ToxicGasorSmokeFigure4-B 4.5ControlRoomEvacuation

4.6 Security4.7SED Judgment DESTRUCTIVE

PHENOMENON

5 5.1 Earthquake

5.5RiverLevelLow5.2Tornado

5.6 Watercraft

C rash5.3AircrafUProjectileTable5-1 5.4RiverLeve l H igh F igure 5-ASHUTDOWNSYSTEM

DEGRADATION

6 6.1Losso fShutdownSystems

6.2Lossof Shutdown Capability 6.3LossofRCSInventory

RADIOLOGICAL

EFFLUENTS 7 7.1GaseousEffluentTable7-1 7.2 LiquidEffluen

tTable7-2 7.3 Radiation LevelsFigure7-A7.4FuelHand

ling 7.5 Spent Fue l Storage l Page11of4 7Revision39

Definitionsa

nd A bbrev iations: (ISEQUOYAHEMERGENCYPLANCLASSIFICATIONMATR

IX EP IP-1 l BOMB:An explosive de vice.(See EXPLOS ION)CIVIL DI S TURBANCE: A group of twenty (20)ormor e persons withi n the E A B'Iiolerrtl

y prot esting ensil e operations

o r act iviti es a t the site.CONFINEMENT

BOUNDARY:S pent Fuel Sto rage C ask C ONFINEMENT B O UNDAR Y consists 01 MPCshel l, bott om baseplate , MPCti d (includ ingt he ve nt an d drainpo rt coverpl ates), MPC closurering, a n d associatedweld s.CRI11CAL*$AFETYFUN C nO N ICSFsj=A p la n t safety functi on req u ired1 0 prevent significant release of co re r ad i oadivrtytotheenvironment.

There aresixCS Fs;SubcriticalitV

, Core Cool ing , Heat S i nk.Press urized Th erma l Shock , Integrity (Cont a inment)a nd Inventory (ReS).EVENT: Assessment

of a n EVEN T commences wh e n recognition

i s made that one or more of the i n itiating condition s eescce ted wit h the even t e s tst.Implicitinth is defin i tion is t he need for timely assessmentwi thin1 5 m inutes.EXCLUSIONAREABO U NDAR Y (EAB): Thatarea surrounding

the reactor , i n whic h the r e a c to r licenses h asthea uthority todete rm ine a ll activities i nduding exct uston o r r e m oval of pe rs onn e landpr op erty fromt he area.Forpurposeso f Eme rg encyActionLevels , bas ed onr ad i o logi calfieldmeas urements a nd dos e asses sments,andfo r desig n calcu l ations , t h e SiteBoundary shall be d efined as t he EAB.EXPLOS IO N:Rapid , viol ent , un confine d combustioo.or a cat astrophic f ailure of pressurized or el ectJiCal eq uipm ent that i mpartsenergy

d sufficient

f orce to potenti a lly d am age permane nt structures

or eq uipment.EXTORTION:Anat t empt t o ca use ana ction at t he s ite b y th reat o r force.FAULTED: (S teamGene rato r)Existence of s econdaryside leakage (e.g., steam orfeedline break)tha t re su lts inanun co ntro ll e d decreaseinsteam generat or p r essure or theste am generato r bei ng compl etelydepres surized.FIRE: Combust io n characte rized byhea t and lig ht.Sources of s mokes uchas sl ipping drive belts orov ert reated e lectrica l com ponents do I"IOt constitute

a fi r e Observa tion of name i s prefe rred but isNOTr e qui red if larg e quan t it i e s Of smok e and/o r heatare observed.FLA M MABLE G AS: Combustible gases at concentrations>t hanthe LO WER EX P LOSN E LIM I T (L El).HOSTAGE: A person(s)h e ld asl everagea g a i ns t the site to e nsureth at demands will b emetbyt he s i te.HOSTILEACTION: An a d towardanu de a r plantor its pel"SOI'lnei

that includes t h e u se d viole nt force to de st roy eq u ipme nt , ta ke h ostages.an d/or int i mi d a l e the licen see to achieveanen d.Th is includes at tack by air , landorwa te r;u sing guns.explosiv e s , pro;eetiles , vehid es , or other devicesusedto deliver d estructive

f orce.Other act s t hat satisfy the overall intent may be included.HOSTILEACTION shouldNO T be co n suuec 10include act s of e vil d isobed ienceor felonious a ct s t ha t a r e not panofacon certed att ack 00 t he nudearpowerplant.HOSTILE FORCE: One ormore ind ividual s w h o are engaged i n a determined assault , overtly orb y stea lthanddeception , equippedwit h s u it able weapons capable of killi ng , maiming.o r causingdestructio n.I MMINEN T: Wll hin two ho u rs.INEFFEC TI VE: When th e speci fi ed r est oration adi on(s)does n ot r esulti n a reductioninth e l evel o f severity oftheR E DorORA NGE PATH concf rtion within 1 5 minutes f rom identif ication o f t h e CS F StatusTree R EO 0(ORANG E P ATH.I NITIATING CONDITIONS

PlantPar amet ers , r adiationmonito r readings o r perso nnelo bservatio n s t hat identifyanE ven t fo r p u rposes of Emergen c y Plan C l assificatio n.INTRUS 10N/IN TRUCER: S uspected h ost i l e individu al presen t int hep rotected are a w it ho ut a uthoriz ation.ISFSI: Ind ependent Spent FuelSt orage Inst a ll ation.ODCM: Offs iteDoseCa l cu l at ion Manual isa s u p porting doc u me nt t o t he Tech Specs.thatco ntain R ed Effluent Cootrols, E nvi rons M OOitoring contr o l s , and methodology

fO(calcula t ing routine g aseou s and liqUid effluent offsit e doses and monit or alarm'trip

setpoint s.ORA NGE PATH: Mo rVIoring of on e o r mo re CS F s by F R-O w hi ch indi cates that th e CS F (s)is under sev e r e ch a llenge;p rom pt operato r act i on is required.PROJECTILE:AnObject ejected, thrown o r launchedtowardsaplan t s tr ucture re s ulti n g i n damage su ffi cie nt tocauseconcernregar di ngthei ntegrityofthe affected s tru cture o r theopera bility or reliabili ty o f safetyequipmentcont

ained therein.The sourceofthep ro ject i le ma y be o nsile or offsile.PROTEC TED AREA: Th e are a encompassed

bythesecurityfenceandt o wtli<:h acces s i s control l ed.RC S: T he RC S primary si de andits con necti ons up to and indu cing t he press urizersafetya nd r el i ef va lves,andother connecti ons upto and Includ in g th a primary an d seco nd ary isolationv alves.REOPATH: M onitori ng of oneo r m ore CSFs b y FR-O whi ch ind icate s thatthe CS F (s)is under extremechall en g e;promptoperator acti o n is re qu ired.RUPTU RED:(Steam Generator)Existenceof primaryto secondary leakage of a mag n itude gre ater thanth e capaci ty o ne chargi ng pum p.SABOT AGE: Del iberate da mage.rrisali gnme nt.Of misoperatio

n of plant equipment with t he int enttorender the e q u ipme nt in oper a ble.SIGNIFICANT TRANSIENT: A n U N PLANNED event i nvol vi ngoneormore of t he fo llowing: (1)An a utomati c t urtli ne runback>15%t h e rmal rea ctorpower;(2)Electrica l lo a d rejection>25%fu ll electrical load;(3)R eactor Trip;(4)Safety I nj e ctionSyste m Activation;(5)Thermal Powe r Oscillations?:10%.STRIKEACTION: A w o rk st oppage wi thin t heP ROTEC TED AREA by a bod y of work ers toenfo rce compliance wit h dem a nds made o n TVA.T heSTR I KE AC T ION mu st threaten t o inte rrup t nonn al plant oper atio ns.TO XIC GAS: A gas thai i s dangerou s to lifeorlimb by reasonof inhalationor

skin contact (e.g., chl orine ,, et c.)UN PlANNED: A n even torecnon t hat i snotthee xpected result of n onnal ope rati ons , testi ng o r maintenance.Eve nts t hatres u lt i n ccr r ec n ve or mitigati ve actions be ingtake n in a ccordance with abn orm a l o r emergency proceduresare

UNPLANNED.UNPlANNED RE LEASE: A relea se of radioadi vityisUN PLANNEDif the release has not bee n a ut horized byaDisc hargePermit (D P).I m pliciti n t h i s de fin iti on are un inte ntiona l r e leases.unmonitore d re leases, or pla nned r elea ses that exceed a co ndi t io n specifiedonthe

D P.(e.g., alarm setpo ints.m inim u m d ilution fl ow , minimum rel ease times , maximum release r ates , and/or d ischarge of incorr ect tank).VA LID:An indi cation , report or condition i s conside red t o be VAll O w hen it i s oond usivelyv e rified by (1)an instrument chan nel ch eck, o r (2)ind ication on r e lat edorredund a nt in dicators , or (3)b y d irect o bservat io n b y pl a nt per son nel.ImplicitI n thi s definitionistheneedf or timelyassessment within1 5 minutes.VISIBLE DAMAGE: Damage to equipmentthati s r ead ilyobservable without me as urements , testi ng.or a nalysis.Damage i s suffi cie nttocau se concern r eg a r d i ng t h e cont i n ue d operabi l ity or r el ia bi l ity d affectedsaf ety structure , syst e m.or component.Exa mple damage i nclud e s defonnatioo

dueto heator i m pact dentin g , penetration.rupture , cracking.or paint blistering.Surf aoe bl e mishes (e , g., pa i nt chipping , scr at ches.et c.)shou ld N OT be i oo ud ed as visibl e d ama ge.VITALAREA: A ny area wit h in thePR O TE C TED AREA which conta ins equipment , systems.d e vices , orma terialwh ich the fa i l ure,d estruction, or rele as e of , coulddirectlyo r indi rectlye nd angerthepublic health andsaf ety b y exposuretoradiation.Pag e 12of47 Revision3 9

EMERGENCYPLAN

CLASSIFICATION

MATRIX___________1 EPIP-1 I ISEQUOYAH (2.UNPLANNED loss of all offsite communication

capabilities

listed below: (a and band c anddand.andQ a.UNPLANNED loss of all EPABXpho nes b.UNPLANNED Joss of alloffsiterad

io frequencies

c.UNPLANNED lossofall OPX (Microwav e)system d.UNPLANNED loss ofall1-FB*BeIilines e.UNPLANNED kissofallNRC ENSandHPNline

s 1.UNPLANNED lossofall sa tellite phonesNotApplica

ble.Significant

Loss of Communications

(1 or 2)1.UNPLANNED loss of allin-plant

communication

capabi lities listed below (a and b and c): a.UNPLANNEDlossof EPABX phones.b.UNPLANNEDlossofallsound

powered phones.c.UNPLANNED loss of a ll in-plant rad io frequencies

.No r Ap p licable.Initlatin I Condition 3.TheICSiscapableofdisplayingrequesteddata

.On either unit an UNPLANNED loss of>75%of the MeR annunciators

and annunciator

printeror>75%of safety system Indications

for>15 minutes with a SIGNIFICANT

TRANSIENT in progress or ICS unavailable.

(1 and 2 and 3): 1.UNPLANNED lossof>75%ofboth channelsofMCR annunciator

windows ANDtheannuncia

t or printer AND the annunciatorCRTin the horseshoe fo r::>15 minutes OR::>75%of safety systemindicators lo r>15min utes.2.SM/SED judgm entthatincreasedsurveillancei

s r equired (>shift complement)t

o safely operatethe u nit.On either unit an UNPLANNED loss of>75%of the MeR annunciators

or>75%of safety system indicat ions for>15 minutesandICS ava ilable.(1and 2 and 3): 3.(a o rb)a.SIGNIFICANT

TRANSIENT i n progress.OR b.L oss o f ICS.1.UNPLANNED lossof>75%ofboth channels of MeR annunciator windowsANDtheannunciator

printer AND th e a nnunciato r CRTi n the hors eshoe fo r>1 5 min utes OR>75%ofsafetysystemindicatorsfo

r>15 minutes.2.SM/SED judgment thatincreasedsurveilla

nce is required (>s hift complement)tosa felyoperatet he unit.3.Inability to directly mon itor any ofthefo llowing CS Fs: SubcriticalityPTSCor e Cooling ContainmentHeatSinkInv

entory 4.SIGNIFICANT TRANSIENT inprogress.2.Lossof ICS.3, 2, 4 2 , 2 , Refer t o*F i ssion P roduct Bam"er Matri x*(Section 1)and"Radiological Effluents*(Section7)andContinue

in This Column.4 4 1 , 3 , 3, 1 , On either unit an Inability to mon itor a SIGNIFICANT

TRANS IENT In progress (1 and 2 and3and 4): 1.Loss of>7 5%of MeR annunciator

windowsAND the annunciatorprinterAND t he annunciator CRT inthe1, horseshoe OR>75%ofsafetysystem indications.Page 130f47Revision39

EMERGENCYPLAN

CLASSIFICATION

MATRIX ISEQUOYAH EPIP-1...-.-..Initiatin I Condition b.Specifi c actN ity>1 D O tE....Cilgm with1.R a dioche mistry analysis indicates(aorb): a.Dose equivalent Iodine(1-131)>0.3 5....Cilgmfor>4 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />sorinexcessofT IS Figu re 3.4-1 with Tave500 o f.Reactor coolant system specific activity e xceeds LeO (Ref.rtoSQN

Tech.Spec.3.4.8): Referto" F ission Product BarrierM atri x*(section 1)an dContinuein

ThisColumn.Refert o" F ission ProductBarrier M atrix" (Section 1)and Continue in Th isColumn.Refer to"Fission Product B a rrie r(Section 1)and Continue in Th isColumn.3 Initiatin I Condition 1.Reacto r power>5%andnotdecrea sing followingaut o tripsignal.Reactor power>5%and not decreas ing aft er VALID auto trip signal but a manual trip from the Control Room Issuccessful.(1 or 2)2.Manua l tripinth e MainContro l Room success fully redu ces react or power 5 5%.Refe r to"Fission Produc t Bamer(Section 1).N OTE: Although a mode changewi ll occur , thisevent w ill sti ll be dassified anddeclaredasan ALER T.b.C S F statustree i ndicates H eatSinkR ed (FR-H.l)a.CSF status tr ee indicatesCoreCoolingR ed (FR-C.l).2.(a or b)1.F R-S.l enteredandimmediateoperator acti onsdidn ot re sultinareactorpowero f s 5%anddecreasing.NOT E: Although a mod e chang emayoccu r before cl assificatio

nthiseve nt will still be classified and declared as SA E.Reactor power>5%a nd not d ecreas ing aft er VALID auto and manual trip signal s.Reactor power>5%and not decreasing

after VALID trip s ignals and lossofcore coo ling capability.

(1 and 2): 2 1 1 1 , (Page 140147Revision39

(ISEQUOYAHEMERGENCYPLANCLASSIF

ICATION MATRIX EPIP-1 l 1 , 2 , 3 , 4 Initia tin I Condition R efer t o" Fission P roduct Barrier Matri x*(Section 1)andContinuei n This Colum n.Ref e r to Product Ba rrier Mat ri x*(Section 1)and Continue inTh isCo lum n.Refer to"Fission Product Barrier Matrix" (Section1)and Conti nue i n This Column.Res unid entifi ed or pressure boundary leakage>10GPM.1.U ni dentifiedorp

re ssure bo undary le akage (asdefined by T ech.Spec.)>10GPM asindicat ed by (a or b): a.SI-O PS-068-137

.0 r esults.b.With ReS temperature

and PZR level s ta ble.the Ve T leve l on 1I-62-129 or 1I-62-130 i s droppingata ra te>10GPM.Refer to'Sh ut downSys tems Degradation" (section 8.3).1 , 2 , 3 , 4 Initiatin I Condit ion Refer to" FissionProductBarrier

Ma trix" (S ection 1)and ContinueinTh is Column.Referto"Fissio n Product Barrier Matrix" (Section 1)and Cont inue i n T hisColumn.R e ferto-Fi ssion P roduct Barrie r Ma trix-(section 1)a nd Cont in ue i n Th i s Column.Res Identified leakage>25GPM.1.Identifi ed ReS l e akage(a s definedbyTe

c h.S pec.)>25 GPM as I ndicatedby(ao r b): a.SI-Q P S-Q6ll-137.0 results.b.L e v el riseinexcess o f 25GPMinto P R T , R CDT o r ev e s holdup ta n k (Re fertoT I-28).Referto*Shutdown Systems Degradation

" (Section6.3).Pag e15of4 7 Revision 39

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX EPIP-1 D ie se l Genera tor Bld g.RWST Intake P um ping S tation Comrron S ta.Se rv o Xfmr's Condensat e Storage Tanks Iniliatin I Condilion ControlBuilding Auxi liary B u il d ing Un it#1Con ta i nment Un it#2 Co ntai nment ER CW Pumping Statio n Addl EquipmentB ldgs.Tu rbine failure resultsIncas ing penetration

or main generator sea l damage.1.Turbin e failure which res ultsinpenetra tion o f the turbine casing or dam age tomaingenerat

o r seals.Refert o" H azardsand SED Judgmen t" (Section 4.3)Turbine failure hasgen erated pro jectiles that caus e vis ible damage to any area conta in ing sa f ety relat ed equipment.Refer to" F ission Prod uct BarrierMa trix" (S ection1)and ContinueinTh isColumn.Refert o" F issionProductBarrier

Mat rix*(Section 1)and ContinueinThis Column.1.Turbine generated PROJECTILES

have result ed in VISIBLE DAMAGE toany ofth e followingareas: 3 3 1,****Inilialin I Condilion 2.Safe tyinjectionhasi

nitiated o risrequ i red.UNPLANNED rapid depressurization

o f the main steam system resu lting inarapidReS

cooldown and safety injection InJtlatlon.

(1 and 2): 1.Ra pid depressurizationo fanyo rallsteam genera torsorth e mainstea m systemt o<6 00 psigo n PI*1-2 A , 28 or9 A , 9 6or20A.208or2 7A , 276.Refer t o" Fission Product Bam"e r(S ectio n 1)and Continue i n T h isCo lumn.R efer to" F issionProductBarri

e r M atri x" (Section 1)andContinuei nThisColumn.Refer to*F ission Product Barrier(S e cti o n 1)and Con t in u e in Th i s Column.3 2, 1, l Page16of47Revision39

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I l 1 , 2 , 3, 4 Inltlatin I ConditionNotApplicab le.N ot Applicabl e.Not App licable.Saf ety Limitshavebeen exceeded.(1 or 2): 1.The cc mbinatonofthermalpowe

r , Res temperature an d ReS pressure>safetylim it indicatedbySO N T ec h.Spec.Figure 2.1-1"React o r Co reSa f ety limit" , 2.ReS/Pre ssurizerpressureexcee d s safetylimi t (>2735 p sig).Page17of47Revision39

(l ISEQUOYAH I EMERGENCY PLAN CLASSIFICATION

MATRIXThisPage Intentionally

BlankPage18of47

I EPIP-1 IRevision39

ISEQUOYAH I EMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I (FISSION PRODUCT BARRIER MATRIX (Modes 1-4)1 1.1FuelCladBarrier 1.2RCSBarrier

1.3 Containment

Barrier SYSTEM DEGRADATION

2 2.1 L oss of Instrumentation

2.5 RC SUnidentifiedLeakage

2.2Lossof Communication

2.6RCSIdentifiedLeakage

2.3 Fa ilure of Reacto r Protect ion 2.7 UncontrolledCoolDown2.4FuelCladDegradation

2.8TurbineFailure

2.9SafetyLim itLOSSOF POWER 3 3.1 Loss of AC (PowerOps)3.2Loss ofAC (Shutdown)3.3LossofDC

HAZARDS and SED JUDGMENT 44.1Fi reTable4-1 4.2 E xplosionTable4-2 4.3FlammableGas

F igure 4-A 4.4ToxicGasorSmoke

Figu re 4-B4.5C ontro lRoomEvacuation

4.6 Security 4.7 SEDJUdgment

DESTRUCTIVE

PHENOMENON

5 5.1 Earthquake

5.5RiverLevelLow

5.2 Tornado 5.6 Watercraft

Crash5.3A ircraft/ProjectileTable5-1 5.4RiverLevelHighFigure5-A SHUTDOWN SYSTEM DEGRADATION

6 6.1 Loss ofShutdown Systems 6.2LossofShutdownCapability6.3LossofRCS

Inventory RADIO LOGICAL EFFLUENTS 7 7.1GaseousEffluent

Table7-1 7.2 Liq uid EffluentTable7-2 7.3 Radiatio n LevelsFigure7-A7.4FuelHandling

7.5 Spent Fuel Storage lPage19 of47Revision39

Definitions and Abbreviations: (ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX EPIP-1 l BOMB: An explosive device.(SeeEXP LOSION)CIVIL DISTURBANCE:A group of tw enty (20)ormore persons within t he EAB violentlyprotesting cnslt e operations o r activities

a t thes ite.CONF INEMEN T BOUNDARY:SpentFuel

Storage Ca sk CON F INEMENT BOUNQARY co nsists of MPC shell , bottom baseplate.MP C l id (induding the ve nt and drai n port cov er plates).MPC closure ri ng, a nd associated

welds.CRIn CAL-SAF ETV FUNCTION (CSFs):Ap lant safety function reql.ired to prevent si g nificant release of core radioactivity

tothe environmen

t.There aresixCS Fs;Subcrilica lily.Core Cooling ,HeatSink.,P

ressuri zed Thermal Shock , I ntegrity (Containment)

and Inventory (ReS).EVENT: Assessment

of a n EVENT commences when recognit ion is made thatoneormore of the initiating co ndi tio ns assodate d withtheeventexist.Implicitinthi s defi ni tion i s the need fo r time l y assessment

wit hin 15 minutes.E XCLUSION AREA BOUNDARY (EAB):Thatareasurroundingthe r eactor , in which thereacl.or licenses h as the authority 10 determil'le

all acti vities including e xdusionor remova l of personnel and property from t hearea.F or pu rpose s of Emergency Action Levels , based 00 rad i ological fi eld measurements

and dose assess ments ,andfo r design calculations

, t he Site Boundaryshallbedefined asthe EAB.EXPLOSION: Rapid ,¥iden!.unconfined combustion

.ora catastroph

ic failu re d pres surized o r electrical equ ipmentthat imparts energy of sufficient

force t o poten tia ll y damage pernenent structuresor eq u ipment.EXTORnON:An anempt to cause a n act io n at the sitebyt hreat or f orce.FAUL TE.D: (S teamGenerator)Exist ence of secondary side leakage(e,g., steamorfeed li ne b reak)th at resultsinan un controll ed decreaseinsteam generator p ressureorthe steam ge nerator being completely

d epressurized

.FIRE: Combust ion characterized

byheatandlight.Sour ces of smoke such as slippingd rive be lts or overheated electrical componen ts d o not constitute a fi re Obse rvation of n ame is prefe rred but i s NOT required if largequantities of smoke an dlorheatare observed.FLAMMABLE GAS: Combustible gasesatco n centrations>

th an th e LO'vVER EXP LOS IVE LIMIT (LEL).HOSTAGE;Ape rsorqs}held aslev erage againstthesiteto ensurethat demands will be met by the site HOSTILE ACTION: An act toward a n udear plant or its per sonnel t hat includes the use of violent forcet o destroy equ ipment , take hostages,an d/or intimdate the l i cen see to ach ieve anend.Thi s i ndudes attack by air , l a ndor water;using guns , explos ives , projectiles

, vehicles,orotherd evices usedto deliver destru ctive fo rce.Otheractsthatsatisfytheoverallintent

may be induded.HosnLE ACTION shou l d NOT be construed to include actso f civil disobedience

o r felonious ad s tha t are notpartofa concerted attack on the n uclea r powe r plant.HOSnLE FORCE:On eormor e individuals who are engaged inadete r rrined assa ult , o vertly or by ste alth and dece ption , equ ipped w ith s uitable weap ons capa ble of k i lling, maiming , or causing des truction.IMMINENT: Withintwohours.INEFFECTIVE

Wlen the specifi ed re st or ation acncnts)does notr esu ltina reduct ion i n t he level of seven ty of t he RED or ORANG E PA TH condition wit h in 15m inutes f rom identification

of the CSF Status Tree RED or ORANGE P ATH.I NI TIATING CONDITIONS:Plant P a rameters.radiation monito r readingsor personnel observati ons that identifya n E ven t for p u rpose s of Emerg ency P lan Classificatio

n.INTRUSION/INTRUDER:

Su spectedhostile individual

presentinthe pr otected area without authorizat ion.ISFSI:I nd ependent Spen t Fuel Storage Installat io n ODCM: OffsiteDoseCalculation M anual is a suPPOrt ing d OOJmerTI tothe Tech Specs.th a t contai n Red Effluent Controls , Environ s Monitoring

controls, and methodo logy for calClJlating ro utine gaseous and liqu i d effluent otfsite doses and monitor alarmttrip set points.ORANGEPATH:MonitoringofoneormoreCS

Fs by FR-o which i ndicate s thattheCSF(s)i s under severe ch a llenge;prompt opera tor acti on i s required PROJECTILE:An ObjeCt ejected , th rown or l au nched toward saplantstructure res Liting i n damage s uff ICient to cause coocem r egardingth e i nt egrity of the affected struct ureorthe operabilityorreliability 01 sa fety eq u ipment oontained the rein.Th e sou rce of the projeclile ma y be onsite o r off site.PROTECTE.D

AREA: The area encompassedbythe security fence and to whid'l accessiscontrolled.RCS: The ReS primary sideandits connectionsuptoandinduding t h e p ressurizer

safetyandrel ief valves, and other connecti ons up t o and including the p rimary and secondary isolatioo valves.RED PATH: Monitoring

cI oneormore CSFs by FR-O which indicates that the C S F(s)isu nder extreme challenge;

pr omptoperator ecnco is requ ired.RUPTURED: (Steam Generator)Exis tence o f primary 10secondaryleakage of a magnitudegreater t han the capacityon e charging pump.SABOTAGE:De l iberate damage , misa li gnmen t , or misoperali

on Of p lant eq l.i pmentwiththe intenttore nder theeq uipme nt inoperable.SIGNIFICANT

TRANSIENT:An UNPLANNED event in vdving oneormor e of the following: (1)Ana utomatic t urbine run back>15%thermal reactorpower;

(2)Electricalload

rejection>25%fun elect rical load;(3)Reactor Tri p;(4)Safety Injection System Act ivation;(5)Therma l Power Oscil l ation s?: 1 0%.STRIKE A CTION:Awo rk sto ppage within the PROTECTED AREA byabody of wor1o: ers 1 0 enforce comp l iance w it h demands made on TVA.The S TR IKE A CTION mustth reaten t o i n terrupt normal plant operation s.TOXIC GAS: A gas that i s dangerous tolifeorl imbby reason of i n halation o r ski n contact (e.g., d1Iorine , C O::,et c.)UNPLANNED:An event or a ct ionthat i s not the expecte d re s ult of norma l operations,testingor maintenance

.Eventsthatresult in corrective or mitigative actions bei ng ta ken in accord ance Voit h ab norma l o r em ergency proced ures are UN PLANN ED.UNPLANNED RELEASE: A re lease d rad ioactivity is UNPLANNED if t he relea se nee not been a uthorized b y a Discharge Permit (DP).Implicit i n this d efinition ar e un intention al rel eases , unmonitoredreleases,or

planned releases that excee d a co nditi on specified o n theDP, (e.g., a larm s etpo i nl.s , minimum dilu tion now , minimum r e lease limes , maximum r ele ase rates , and/or discharge of i ncorrect ta nk).VALID: An indicatio n , repo rt o r cond ition is consideredtobeVALIDwhenit is co ndu sively verified by (1)a n instrume nt cha nl'lel check, o r (2)indicalioo o n rel ated o r redundant in dicatcn , o r (3)by d irect observa tion by plan t person nel.I mplicit i n thisdefinition i s th e need for timelyasse ssment withi n 1 5 minutes.VIS IBLE OAMAGE: Damage to equ ipment thati s readily observable

without measureme nts , t esti ng ,orana lysis.Damage is suffici en t to cause concern regarding the continue d oper ability or reliability

of affected safely structure , system ,orcomponent.E xamp l e damageinc ludesdeformat iond ue toheato r impact , denting , penetrat ion , rupture , cracking ,orpaintblistering.Surface bl emishes (e.g., paint chipping , scratches , et c.)should NOT be includedas visibl e damage.VITAL AREA: Arty a re a withinthePR OT E CTED AR EA which contains eq u ipment , systems , devices , or mat erial wh ichthefai lure , destruction , or release of , couldd irecll yori ndirectly endangerthepublichealthand safety b y exposure to radiation.Page20of47Revision39

EMERGENCYPLAN

CLASSIFICATION

MATRIX ISEQUOYAH (*_.1, 2, 3, 4 3.1 Loss of AC (PowerOps)Initiatin I Condition Prolongedlossofall offsiteandall ans lte AC power to either unit.(1 and 2): 1.Both unit related6.9KVshu tdown bo ards de-energizedfo

r>15minutes.2.laorb)a.CoreCoo ling Status Tree Red Of Orange Path.b.Restorationofeit hera6.9KVshutdown boa rd o r a 6.9 KV unit boardisnot likely within 4hourso f the IOS5.G E N E R A L EPIP-1 3.2LossofAC (Shutdown)Initiatin I Condition N ot App h ca bJe lossofall offslteandall cnelte AC pOWGr to either unit for>15 M inutes.1, 1.Both unitrelated6.9 KV shutdown boards de-energized

for>15 minutes.2, 3, 4 S I T E A R E ANotApplicable

.1 , 2, 3 , 4 Loss of cttaite power to entler unit with degraded onelte AC power for>15 minutes.([1a and1b]or2): la.All four (4)6.9KV un it boards de-energized

for>15 min utes.lb.One(1)unit related 6.9KVshutdown boardde energizedfor>15 minute s.2.AnyACpowerconditionlasting

>15m inuteswherea sing le additional failu re w illresultinaunit

blackout.Loss of off51te power to either unit for>15 minutes.(1 and 2): 5, 6, AL*E R T UNPLANNED loss of all offsite and all ons ite AC power to either unit for>15 minutes.1.Both u nit re lated 6.9KV shutdown boards de-energ ized fo r>15 m inutes.Al so Refer to"Loss of Shutdown S ystems" (6.1)a nd continu e i n t h is co lu mn.UNPLANNED loss of all offslte power to either unit for::0 15 m inutes.(1 and 2): l 1 , 2, 3, 4 1.Allfour (4)6.9KV unit boards de-energizedfo

r>1 5 minutes.2.Both unitrelated 6.9KV sh utdownboardsare energized.N a u E D E F U E L E D 1.A ll fou r (4)6.9KV unit boards de-energized

for>1 5 minutes.2.One (1)unitrelated6

.9KV shutdownboard

energized for>15 minutes.Page 21of47Revision39

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX G E N E R A L Inilialin/Condll ion Refer to" Fission Product Barrier Matri x n{S ection 1)an d"Loss o f Communica tion" (2.2)andCont inu e i n Th i s Co l u m n.3.3LossofDC

Power

-_.1 , 2 , Loss of all vital DC power for>15m inutes.1.Vo ltage<105V DCon125 V DC vitalbattery

board buse s I S!ill!IIandIIIandIVfo r>15min utes.S I T E 3 , 4 Also Refer to" F iss ion Pro duct BarrierMatrix"(Sec tion 1)," L oss of communceuon: (2.2)and ,"Lossof Instrumentation

6 (2.1)and Continue inTh is Colum n.A R E A Refe r to" F i s sionProd u ct B arrier Matrix*(S e cti o n 1 J ,"LossofCommunica

tio n" (2.2), a nd" L o ss of Instrumentation"/2.1).A L E R T UNPLANNED los s o farequired trai n o fDCpow er for>15 minute s: (1 or 2).t.Voltage<'05VDCon125Vd

evitalbattery

board buse s I andIIIfor>15m inutes.5, 6 2.V o ltage<105V DCon125V devitalbatterybo ard busse s II and I V fop15minutes.N o U E l Page 22of47 Revision3 9

ISEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I (FISSIONPRODUCT

BARRIER MATRIX (Modes 1-4)1 1.1 Fue lCladBarr ier 1.2RCSBarrier

1.3 Containment

Barrier SYSTEM DEGRADATION

2 2.1LossofInst

rumentation

2.5RCSUnidentified

Lea kage2.2Lossof Communicat

ion2.6RCSIdentifiedLeakage2.3FailureofReacto

r Protect ion 2.7UncontrolledCoolDown2.4FuelClad

Degradation

2.8TurbineFailure

2.9 SafetyLimitLOSSOFPOWER

3 3.1LossofAC (PowerOps)3.2LossofAC (Shutdown)3.3LossofDC

HAZARDSandSED JUDGMENT 4 4.1 F ireTable4-1 4.2 ExplosionTable4-24.3FlammableGasFigure4-A4.4To xicGasorSmokeFigure4-B4.5ControlRoomEvacuat

ion 4.6 Secu rity 4.7 SED Judgment DESTRUCTIVE

PHENOMENON

5 5.1 Earthqua ke 5.5RiverLevelLow

5.2 Tornado 5.6 Watercraft

Crash 5.3 Aircraft/ProjectileTable5-1 5.4RiverLeve l HighFigure5-A SHUTDOWN SYSTEM DEGRADATION

6 6.1LossofShutdownSystems

6.2LossofShutdownCapability6.3LossofRCS

Inventory RADIOLOGICA

L EFFLUENTS 7 7.1 Gaseous EffluentTable7-1 7.2LiquidEff luentTable7-2 7.3RadiationLevelsFigure7-A 7.4 Fue l Handling 7.5SpentFuel Storage lPage23of47

Revision 3 9

I SEQUOYAH EMERGENCY PLAN CLASSIFICATION

MATRIX EPIP-1 DefinitionsandAbbreviations

BOMB: An explosive devi ce.(SeeEX P LOSION)CM L DISTURBANCE
A g roup of tw enty (20)or more persons within the EAB viol ently protestingonsite operations

or activities atthe sit e.CONFINEMENT

BOUNDARY: Spent F uel St orage Cask CONFINEM EN T B OUNDARY oo nsists ofMPCshell , bottom baseplate,MPCl id (including

t he vent anddrain port cover plates).MPCclosurering, andassociated

welds.CRmCAL*SAFETY

FUNCTION (CSFsl:Ap lant safety functio n required to prevent significant re lease of core radioactivity10theenviron ment.There are six CSFs;Subcriticality

, C ore Coo ling , Heat Sink , Press urized Thermal Shoc k , Integ rity (Con t ainment)an d In ventOfy (ReS).EVE NT: Assessment of an EVENT commences whe n recogn ition ismade that on e o r more of the initiating conditionsassociated wi th the event exi st.Implicitinthisd efinition isth e need fo r timely assessmentwithin15min utes.E XCLUS ION AREA BOUNDAR Y lEAB): Thatareasurrounding the reactor,i n which t he reactor licenseshasthe authoritytodet e rmine a ll activitie s incl uding exclus ion or removal o f personnel andpropertyfromthearea.Fo r purposes of E mergencyActionLevels.basedon radiolog icalfie ld measurementsanddose assessment

s , a ndfordesi gn calcu lations ,theSite Boundary sha ll be definedasthe EA B.EXPLOSION: Rapid , violent , unconfi ned combustion , or a catastrop hic fa ilure of pressurizedor electri cal eq uipment th at imparts energ y of suff ICient force t o pot entiall y damage perman ent structures or eq u ipme nt.EXTORll0N:A n attempt to cause a n acti on 81 the site b y threat or force.FAULTED;(SteamG e nerator)Existence ofsecondary side leakage (e.g., steamorfeedl inebreak)t hat results inan uncontrolled decrease in st eam generator pressu re or the steam generator being comple te ly depressurized

.Combus tion characte rized by he at and light Sources of smoke s uch as slipping d rive belts O r overheated e lectrical componentsd o not constit ute a fi re.Obs ervatio n of name i s preferred but i s N OT required if la rge quantities of sm oke and/or h eat are observed.FLAMMABLE GAS: Combust ible g ases at concentration

s>than the L OweR EXPLOS IVE LIMI T (LEL).HOSTAGE:A perso n(s)heldas leverage against the sil e 10 ensure that demands willbeme l by th e sit e.HOSllLE ACTlON:A n act tCF-Nard a nuclear plantoritspersonnel lhat includes theuse cl viol ent force t o dest roy equipment, take hostage s , and/o r i ntimidate thel ice nsee to achieveanend.Th i s includes attack by air , lando r wate r;u Sing gu ns , explosives , projectiles , vehicles ,oroth er devices used to deliver destructive

force.Otheract s that satisfy t he over all intentma y be inclu ded.HOSTILE ACllON sholAd N OT be oonstruedtoi ndude acts of civil disobedience

or felonious acts that are not part of a conce rted attack o n the nucle ar power plant.HOSTILE FORCE: Oneormo re individuals w ho areengaged i nadet ermined ass ault, overt ly o rbystea lth a nd decept ion , equipped withsuitableweapons capabl e of killing, maiming ,orcaus i ng destruction.IMM INENT:Wrthin two hou rs INEFFECT IVE: lMlen the s pecified rest oration a dion(s)d oes not r esultina r ed uction in the level o f severity c:J1heREDor ORANGE P ATH eonlition withi n 15 min utes from ide ntification

oftheCSF Status TreeREDor ORANGEPATH INlnA TlNG CONDITIONS

P lant P ar ameters , radiation monitor read ings or personn el observatio

ns that identify anEventfor purposes of EmergencyPlan Classification

.INTRUSION/INTRUDER: Suspected hostile in dividual presentinthe protected area without aut ho rization.ISFSI: Independent Spe nt FuelStorage Install ati o n.ODeM: Offs ite Dose Calculation Manua l isasupporting document to the T e ch Specs.t h a t contain Red Effluent Controls , Environs M onitoring co ntrols , a nd me th odology for calaJlating routinega seous and liquid effl uent Offsit e ocses and mon ito(a1arm'trip

setpoint s.ORANGE PATH: Monitoring ofoneor more CSFs by FR-o which i n di cat e s that the CSF{s)is under severe cha llenge;prom pt operatoract io n is required.PROJECT ILE: A n object ejected, thrown or launched towardsapl ant structure res ulting in damage sufficient

to cause concern regarding theintegrityoft he affected structure or th e opera b ility or reliability ofsafety equipment conta i ned therei n.The scarce of the project i le may be onstteor offsite.PROTECTED AREA: Theareae ncompa ssed by the security fence a nd to which acce ss is controll ed.RCS: Th e RCS primary side and it s connectionsup toand includin g the pressurizer safety and relief valves, and ot he r connectionsup

to and includ ing the primary a nd serondary is olation vaves.RED PATH;Mo nito ring of oneormoreC SFs by FR-O whichindicatesthatthe CSF(s)i s under extremechallenge;p rompt operator actioni s requi red.RUPTURED: (Steam Generator)Existence of primary t o secondary leakage of a magnitude greate r than th e capaci ty o ne charging pump.SABOTAGE: De libera te damage , rrisalignmeot, or misoper alion o f plant equipment with t he intent to render theequipment inoper able.SIGN IF ICANT TRANSIENT:

An UNPlANNED event i nvol vi ngoneormo re of the followi ng: (1)A n automati c turbine run ba ck>15%t hermal reactor power;(2)E lectricalloadrejecti

on>25%fun electrical

load;(3)React or Trip;(4)Safety I njection System Activation

(5)Thermal Power Oscillat ions;
0:10%.STRIKE ACTION: A wOl'k stoppage withinthe P R OTECTEDAR EAbyabody of workers t o enforce compliance with demands made onTV A.Th e STRIKE ACTION must threate n t o interru pt normal plant operations.TOXIC GAS: A ga s that isdang erous t o lif eorl imb b y reason of inhalation o r skin co ntact (e.g., chl orin e , CO:z , etc.)UNPlANNED:

A n event or acti on that i s nat th e expected r esult of normal operations

, testi ng o r ma inte nance.Events t hat resulti n cor ecnve or rritiga tive action s be ing taken in accordance

with abnorma l o r emergenc y procedures

are UNPLANN ED.UNPLANNED RELEASE:Areleaseofr adioact ivity is UNPLANNED i f the r elease ha s not been aut horized byaDi scharge Permit (DP).Implicit in t h is definition

are unintent ionalr eleases , unmonito red re leases,orp lanned re leases th at excee d a condi tion specified on t he OP, (e.g., alar m setpoints , minim u m d ilutionnow , m inimum release times , maxim um releaser ates , and/o r d ischarge of incorr ect tank).VAUO:A n indication

, report or conditionisco nsidered to be V A llOwh en it i s con d uSively veri fied by (1)an i nst rument chann el check,or(2)indicatio n on related orredundant indicators,or(3)byd irect observa tio n by pl ant personnel.Impli cit in this definilion

is the need for timely assessment

with in15mi nutes.VISIBLE DAMAGE: Damage 10 equipme ntthatisreadily

observab le without measurements

, testing.or analys is.Da mage issufficient t o cause concern regard ing the cont inued operability

or reliab i lity of affected safe ty structu re , system.or component.Exa mple damage i ncl udesd eformation due to heat or impact , de nting , penetrati on , rupture , aacking , or paint blistering.

Surface blemishes (e.g., paint ctl ipping , sam ches , e tc.)shou l d NOT be indudedas visible damage.VITAL AREA: Any are a withi n thePR OT ECTED AREA w hich contai ns equipmen t, systems, de vices , o r materiel wh ictlthefailu re , destruction, or release of , could directly o r indirectlyend angerthepubli C healthand safely by exposuretoradiation.Page24of47

Revision 3 9

EMERGENCYPLAN

CLASSIFICATION

MATRIX___________

1 EPIP-1 I ISEQUOYAH c l A L L A L L Inltlalln'Condition

Ref er f a'F i s sionProductBarrier(Section1)and Co ntinuei n ThisCol umn.R efer to'ControlR oom Evacuation , U (4.5)a nd FissionProductB arrier Matrix*(Section 1)a nd Con tinu e i n Th is Co lumn.FIREinany oftheareas listedinTable that Is affecting safety related equipment required to establish or ma intain safe shutdown.(1 and 2): 1.FIRE i n a ny ofthearea s listedinTable 4-1.2.(a o r b)a.VISIBLE DAMAGE topermanentstructure

o r safety relatedequipmentinthe

specifieda rea is observeddu e t o the FIRE.OR b.Co nt ro lroomindication of degradedsafety

syste morcomponent respo n se du etotheFIRE.FIRE withinthePROTECTED

AREA (Figure 4-A)threatening

any of th e areas listedinTable4-1 that is not extinguished

within 15 minutes from the time of contro l room not ification or verification

of control room alarm.A L L Inillalln'Condition

Refer to" F issionP roduc t Barrier Matrix." (Sec tio n 1)and Continue in ThisColumn.Referto w FissionProduct Barrier Matrix*(Section 1)and Con tinue in Th is Colum n.EXPLOSIONInanyoftheareas

listedInTable4-1

that is affecting safety related equipment required to establish or mainta in safe shutdown.(1Bnd2): 1.EXPLOSION i n a ny a fth e a reas listed in Table 4-1.2.(ao r b}a.VISIBLE DAMAGE to permanent structures ort o safety rela ted equipmenti n t he spe cified areai s du e t o th e EXPLOSION.b.Control roo m ind icatio nofdeg ra ded saf ety sy stem o r compo nent re spo nse du e t o th e EXPLOSION.Refer to*Security" (Section4.6).UNPLANNEDEXPLOSION

within the PROTECTED AREA (Figure4-A)

resultinginVISIBLE DAMAGE to any permanent structure Q.!equ ipmen t.Refer to"Security" (Section 4.6).Page25 of 4 7 Revision 39

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX EPIP-1 l A L L A L L Initlatln f Condition Refer to"FissionProductBarrier

Matrix*(Secti o n 1)and Cont inueinThis Column.Referto"Fissi onPro duct Ba rrier Matrix" (Section 1)and Continue inThi s Colum n.UNPLANNED release of FLAMMABLE GAS within a facility structure containingsafetyrelated

equipment or associated

with safe operationofthe plant1.Plantpersonnelreporttheaverageoft

hree (3)re adings taken i n an-1 0 ft.Triangular Are a is>25%LowerExplosive Lim it a s indicated on the mon ito ring ins trumentwithinanybuildi

nglistedinTable

4-2.Refer rc th e MSDS fo r th e LEL.A.UNPLANNED release of FLAMMABLE GAS withIntheEXCLUSION

AREA BOUNDARY that may affect normal operations

.1.P lan t personnel reporttheaverageo

f t hree readings take n ina n-1 0 ft.TriangularAreais

>2 5%o f th eLowerExplosive Limit, a s indicatedo n the monitoring instrumentwithintheEXCLUSION

AREA BOUNDARY (Figure 4-B).B.Confirmed report by Local , County , or State off icials that a large offslte FLAMMABLE GAS release has occurred withinone(1)mileofthe site (Figure 4-B)with potential to enter the EXCLUSION AREA BOUNDARY (F lgur.4-B)In concentrations>

25%o f Lower Explos ive Limi t.Refe r 10 t he M SDS for theLE L.A L L Initiatln f Condition Refe r to"FissionProduct

Barrier(Section 1)and ContinueinThisColumn.Refer to'HssionProdu

ct Barrier Matrix-(Section 1)and Continue i n Th is Column.Release ofTOXICGAS or smoke within a facility structure which proh ibits safe operation of systems required to establish gr maintain Cold SID.(1 and 2and3):1.Plant personnel reportTOXICGAS o rsmokewithi

nanybuilding

l isted inTable4-2.2.(ao r b)a.Plantperso nnelreportsevereadversehealth

reactions dueto TOX IC GAS o r smoke (l.e..burningeyes , nose,throat , dizziness).OR b.Sampling indicatio n>Permissible

Exposure Limit (PEL).3.Plantpersonnel una betoperformacti

ons to estab l ish and m a intain ColdShutdow n wh ile utilizing appropriat

e personnel protectio n equipment.Refertothe MS DS fo r the PEL.A.Safeopera tions impededdu e to access res trictions caused byTOXICGASor

smoke con centrati ons within a facility structure l isted i n Tabl e 4-2.B.Confirmed report by Local , County,orState officials that an offaiteTOXICGAS release has occu rred withinone(1)mileofthe sit e (Figure 4-B)w ith potentia l to entertheEXCLUS ION AREA BOUNDARY (Figure 4-8)in concentra tions>the Permissible

Exposure limit(PEL)causing a site evacuation.Ref ertothe MSDSforth e PEL.Page2 6of47Revision39

EMERGENCYPLAN

CLASSIFICATION

MATRIX Refe r to" Fi ssion P roduct Barrier(Secb'on 1)a nd Cont inue i n Th i s C olumn.EPIP-1 4.6 Security Initiatin f Condition Secur ity Event Resulting In Loss of Physical Control o f the Plant: (1 or 2): 1.A HOSTILE FORCEhastak en control o f plant equipment s uch that plant personnel areunable t o operate equipment requiredtomaintain

CRITICAL SAFETY FUNCTIONS.

2.Lossofphysical con trolofthe SpentFu el PoolCooling

systems dueto HOSTILE ACTION s uch that imminent fuel damage i s likely.A L L--G E N E R A L Init iatin f Condition 4.5 Cont rol Room Evacuat ion__:!'I__.ISEQUOYAH (A L L Evacuation

of the control room has been initiatedand

controlofall necessary equ ipment has not been established

within1 5 minutes of staffing the auxiliary control room.(1 and 2): 1.AOP-C.04"ShutdownfromA ux Control Roomentered.2.Controlh a snotbeen established wtthin 1 5 minuteso fstaffingtheauxiliarycontrolroomandcomplet

ing transfe r of switcheso n panels L 11A and L11B to the AUX position.S I T E A R E A Notification

that HOSTlLE ACTlON i s occurring or has occurred within the Pla nt PROTECTED AREA (PA l: (1or 2or 30r4)A 1.Ai r attack (largeframeaircraftimpacting th e PA.)L 2.Land bas ed attack L (HOST ILE FORCE penetratingthePA.)3.\Naterbome

attack (HOSTILE FORCE on wa ter penetrating

th e P A l 4.BOMB exp k>sion breachi ngthePA or with in the PA.Refer to Figure 4-A For B Drawing of PROTECTED AREA.A L

L Evacuat ion of the ControlRoomIs Required.1.AO P-C.04"Sh u t down fromAuxControlRoom"has bee n en tered.A L E R T Notificat ion that HOSTILE ACT ION is occurring or has occurred within the Owner Controlled

Area (OCA Is that area between the EXCLUSION AREA BOUNDARY and tho PROTECTEO AREA): (lor 2)1.A validated notification

from NRC of a large frame aircraft threat lesstha n 30 m inutes away.2.An y of the following:*Airattack (large frame aircraft impact ing the OC A.)La nd based attack (HOSTilE FORCE progressing across OCA o r directing projectilesatthesite.)Wa terborne a ttack (HOSTILEFORCEonwaterattempting forcedentryor directing projectile

satthe site.)BOMB(s)discoveredorexplod ing w ithin the O CA.Refer toF igure4-AFo r a Draw ingo f PROTECTED AREA a nd Figure 4-8 for a Drawingo f EXCLUSION AREA BOUNOARYNotAp pl icable.Confirmed security event wh ich Indicates a potential degradation

In the level of safety of the plant: (lo r 2)N a u E A L L 1.Security S hiftSupervisor repo rts one Q!: mo re o f the events listedi n Table 4-3.2.A v alidated notificat ion from NRC providing infonnation

ofany aircraft threat.lPage27of47Revision39

EMERGENC YPLANCLASS IFICATION MATRIX___________1 EPIP-1 I ISEQUOYAH G E N E R A L*In itlal in I Condi tio n E ve ntsareInprocess Q[have occurredwhi ch i nvolveActua l Q[Imminen t Substantial

Co re Degradation Q[.Melting Wrth Potential fo rLosso f Cont ainment Integrity o r HOS T ilE ACTION that r esultsinanadua llosso fphysicalcontrolofthefacility

.Releases can be reasonably

expect edtoe xceed EPAP lume Protective

ActionGuidelinesExposureLevelsoutsidethe

E XC LUSION AREA BOUNDARY.refe r to F igure 4-8.A L L 4.7 SED Judgment_.A L L Eventsareinprocess

Q[haveoccurred

whidl involve Actua l Q!: Like ly Majo r Failu res o f PlantFunctions needed for the Protectionofth e Publicor HOSTILEACTIO

N that result i n intentio nal d a mageormalicio usacts;(1)toward site pe rsonn e l oreq uipment thatcould l ead t o t he lik elyfailureofo

r;(2)that preventseffectiveacc

ess to equipmentneededfo r the Protectiono

f the Public.A ny rele asesarenotexpectedtoresult

in Exposure Levels which Exceed EPAPlume Protective

Action GuidelinesExposureLevelsbeyondthe

EXC LUSION AREA BOUNDARY.RefertoFigu

re 4-6.S I T E A R E A A L L Eventsare in process Q!:haveoccu rredwhichinvolveActual

Q[PotentialSubstantial

Degradatio

n ofth e Levelo fSafetyo f the PlantoraSecurityEven

t thatinvolves probablelif

ethreateningri

sk to sitepersonnelordama ge tos ite equipmentbecauseofHOSTILEACTION

.Anyreleases a reexpectedto

b e limited to sm all f ractons oftheEP A Plume ProtectiveActionGuidelinesExposure Levels.A L E R T A L L Eve ntsareinprocess

Q[haveoccurredwhichindicatea

Potential Degradationofthe Level of SafetyofthePlantorindicateaSecurityThreatto

facility protection

hasbeen initiated.No releasesof Rad ioactive Material requiringOffsiteResponse

Q!.Monitoringareexpected

un lessfu rthe r degradationo

f Safety Syste ms occu rs.N o U E l Page28 of 47 Revision39

l ISEQUOYAH I EMERGENCY PLAN CLASSIFICATION

MATRIX TABLE 4-1 PLANT AREAS ASSOCIATED

WITHFIREANDEXPLOSIONEALS

Unit#1Conta inment Un it#2Co ntainment Au xiliary Bu ildingDieselGeneratorBuilding

Inta kePumpingStationERCWPumpingStation

Control Building Additional Equipment B uildings CSS Ts RWSTCondensateStoraoeTanks TABLE 4-2 PLANT AREAS ASSOCIATED

WITHTOXICOR FLAMMABLEGASORSMOKE

EALs Unit#1 Containme nt Unit#2Containment Auxil iary Building Turb ine Build ing D iesel Generator BU ildingIntakePump

ing StationERCWPumpingSta

tion C ontrol Build ing Additional Equipment BuildingsCDWEBu i ld inoTABLE4*3 SECURITY EVENTS a.SABOTAGE/INTRUSIONhasoccurredorisoccurring

within thePROTECTED

AREA b.HOSTAGE/EXTORTION

situationthatth reatens to interrupt plantoperations c.CIVIL DISTURBANCEongoingbetweentheEXCLUS ION AREA BOUNDARYandPROTECTED

AREA d.Hostile STRIKEACTIONwithinthePROTECTED

AREA whichth reatens to interruptnorma

lplantoperations

fjudgm ent bas edonbehav iorofstrikers and/orintelligence

received)e.Security force STRIKEACTIONorunavailabilityofs ecurity forc ethatthreatensto

interruptplant

operations.f.Acred ible site-spec ificsecuritythre

at notification

.Page29of47

I EPIP-1 IRevision39

F igure 4-A Protected AreaEMERGENCYPLAN

CLASSIFICATION

MATRIX__------'--1 EPIP-1 I ISEQUOYAH I (Figure 4-B Exclusion Area Boundary l Exclusion Area BoundaryPage30of47Revision39

ISEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I (FISSIONPRODUCT

BARRIER MATRIX (Modes 1-4)1 1.1FuelCladBarrier

1.2RCSBarr ier 1.3 Containment

Barrier SYSTEM DEGRADATION

2 2.1 Loss o f Instrumentat

ion 2.5RCSUnidentifiedLeakage2.2Lossof Communicat

ion 2.6RCSIdentifiedLeakage

2.3FailureofReactorP

rotection2.7UncontrolledCoolDown2.4FuelCladDegradat

ion 2.8TurbineFailure

2.9SafetyLimitLOSSOFPOWER

33.1LossofAC(PowerOps)

3.2LossofAC(Shutdown)

3.3LossofDC HAZARDS and SED JUDGMENT 44.1FireTable4-14.2Exp losionTable4-2 4.3FlammableGas

F igure 4-A4.4ToxicGasorSmo

keFigure4-B 4.5ControlRoomEvacuat

ion 4.6 Security 4.7 SED Judgment DESTRUCTIVE

PHENOMENON

5 5.1 Earthquake

5.5RiverLevelLow

5.2 Tornado 5.6 Waterc raft Crash 5.3 Aircraft/ProjectileTable5-15.4R iver Level HiqhFioure5-A SHUTDOWN SYSTEM DEGRADATION

66.1LossofShutdownSystems

6.2Lossof Shutdown Capabil ity 6.3LossofRCSInventory

RADIOLOGICAL

EFFLUENTS 7 7.1GaseousEffluentTable7-1 7.2 Liquid EffluentTable7-2 7.3RadiationLevelsFigure7-A7.4Fuel Handling 7.5SpentFuel Storage lPage31of47Revision39

EMERGENCYPLAN

CLASSIFICATION

MATRIX (!SEQUOYAH Defin itions a nd Abbrev iations: BO MB:A n explOSive device.(Se e EX P LOSION)CIVIL DISTURBANCE

A group of twenty (20)ormo re persons withintheEAB viole ntl y protesting ensil e operat ion s o r activitie s at the site.CONF INEMENT BO UNDAR Y: SpentFuelStorageCask CONFINEMENT BOUN DARY consists of MPCshell.botto m base p late.M PC li d (in dud ing the ventandd ra i n port cover plates).MPC dcsure ri ng , and assoc iated welds.

FUNCTION(CSFsl:A p lant safetyfunctionrequ

ired to prevent si gnificantr el ease of core radi oacti\lity to th e envi ro n ment.There are six CS F s;Subcriti cality , Core Cooling , HeatSink.Pressurized Thermal Shock , Integrity (Containment)

andInventory(R e S).EVENT: A sse ssment ofanE VENT comm ences when recognition

i smadeth at one o r mor e of the Initiating conditions associated with the ev ente x i st.Irnpl idt i n this defi nit io n i s the need f or timely assess ment within1 5 mi nutes.EXCLUS ION AREA BOUNDARY (EAB): That ar ea surroundi ng the reactor , in which t he r eactor licenses hasth e authority to cIe1 erm i n e al l activiti es i nd udi ng exdusiono r re moval of personnel and properly f rom the a rea.Forpurposes of Emergency Action Levels, based on radiological fie ld measurements

endd ose assessment

s , a nd fo r desig n calculations , t h e Site Boundary s hall be defin ed as1he EAB.EXPLOS ION:Rapi d , violent , u nconfined com bustio n ,ora catastrophic fa il ur e d pressuriz ed or electrical

equipment thatimparts energy d s uffi cient force to polentially

damage pe rmanent st ructures orequipment.E XTORTION:A n attempttoca use a n actio natth e sit e by t hreat or f orce.FAULTED: (SteamGen erator)Exist enceo f secondary side l eakage (e.g., steam o r feed lin e brea k)tha t res ultsina n u ncontroll ed decrease i n steam generator pressure o r thestea m generat or be ing completelyde pr ess urized.FIRE: Combust ion characterizedby

heat and lig ht.Sources of smoke s uch as slipping drive belts or overheat ed e1 edrical component s do not constitute

a fire.Observation

of flame is preferredbutis NOT requ ir ed if large quantit ies 0(smoke andforheatare obs erved.FLAMMAB LE GAS: Combustiblega

ses a t c oncentrations>than the L OVV'ER EXPLOSI VE LIMIT(LEL).HOS TAGE: A persoo (s)held a s l e v erage against 1he site to ensureth at demands wi ll be met by t hesit e HOSTILE ACTION: An a d toward a nudear pl ant or it s personne l that includes th e us e Of violent f orce to destroy eqUipment.take hostages , a nd/or intimidat e the licensee10 achieve an en d.Thisi ncludes attackbye ir.lan d orwater;using guns, explosives , p ro jectiles , v ehid es ,oro ther d evice s u sedtodeliver de structivefor

ce.Otheracts t hat sat isfy theov e r a ll inten t maybel n duded.HOSTILE ACllON s hou ld NOT b e cons1ruedtoi ndude acts of civi l disobedience

0(feloniousact

s tha taren ot pa rt of a concert ed attackon t he nuclea r power plant.HOS TILE FOR CE:On e Of more individua l s'Nho are engaged ina deterrrin ed assault , overtly or by stealth and deception , equipped with suitable weepcos ca pable of killi ng , m aiming , or causing d estr uctio n.IMMINENT: Within two hours.INEFFECTIVE

Whe n thespecifiedrestorationa ction(s)doesnotresultin a reduct i on inthe l evel of severity of the R ED 0(ORANGEP A TH conditio n with in 15mi nutesfromid entif icat ion oft he CSF Status Tree REO or ORANGE PATH.I N InATIN G CONDITIO NS:PlantPara meters , rad i at i on rronftor readings or personnel o bservations t hat iden t ify an Event for purposes Of E mergency Plan C las s ification.INTRUSION/INTRUDER: Suspectedhos1il e individua l present i n theprotectedareawithout authorization

.ISFSt I ndependentSpentF ue l Storage Installation EPIP-1 ODeM: Offsite Dose Ca lcul ation M an ual i s a supporting

document toth e Tech Specs.that contain Rad Effluen t Controls , E n virons M onitoring corrtroIs , a nd meth odolog yforcal cu lating rout i n e gaseous and liqu i d effl u ent otfsit e dos es and monitora l arml1ripsetpoinls.ORANGE PATH: Mon itori ng of on e or mo re CS Fs by FR-Owhich indicates that th e CSF(s)i s un der severe challenge;p rompt oper ato r actio n isrequired.PRO JECTILE:An object ejected.th rown or launched towards a plant s tructure resultingindamage suffici ent to cause conce rn rega rding 1he integrity of the affect:ed struct ur e or the operability

or reliability of saf ety equ i pment contained t h erein.The so urce oftheproj ectile may be oos i te or offsite.PROTECTED A REA: T heareaencompas sedbythesecurity fenceand1 0 w hich access i s co n trolled.RCS: The RCS primarysideanditsco nnections u p toan d i ndudi ngthe pressurizersaf

ety and rel ief v alves , and other conn ections upto a nd indu d ing the primary and secondary isolation valves.RED PATH: Monitoring Of one ormoreCSFsb y F R*O which i ndicat es th a t t he C S F (s)i s u nder extremechallenge;p rom pt operator actio n i s requ i r ed.RUPTURED:(Steam Generator)E xistence of primary t o secondary lea kage of a magn itude g reaterthant he ca pacityonecharging pump.SABOTAGE: Deliberateda mage , misa lig nment.or misoperation

Of plant equipmen twiththeintentto

rendertheequ

ipment inoperabl e.SIGNIAC ANT TRANS IE NT: A n UNPLA NNED event i n volvi ngoneormore of the following: (1)A n a utomatic turtine ru nback>1 5%1hennal reactor powe r;(2)Electrica l l oad re jection>25%fun erectrtceuced: (3)React or T rip;(4)Safety Injection S y st e m Activation;(5)Thermal P ow e r OscillationsSTRIKE ACTION:A wor k stoppage with i n th e P R O TE CTEDAREA by a bOdy of wo r kers 1 0 enforce compliance with demands made 00TVA.TheS TR I KE ACTIONmust threate n to i nterrupt normal plant opera t ions.TOXlC GAS:Ag as that i s dang erous to l if e or limb by r eason of inhalation 0(ski n cont act (e.g., chl ori ne , CCh, et c}UNPLANNE D:Anevent or a ct i on 1h at is n ot t he expected result of norma l operations.testingo r m aintenan ce.Eventst hat res u lt i n correctiv eorm i tigative actio ns bei n g takenin accorda nce w ith abnormalor emergency procedures ar e U N PLANN E D.UNPlANNED R E LEA SE:Arelease of radioactivity

is UNP LANNED if t he rel easehasnot been authori zed by a Disd1arge Permit (DP).Implicit inth i s definitio n ar e unint ention al r elease s , unmonitored

rel eases , or planned releases that ex ceed a co nd itionspecifiedonthe

O P , (e.g., a l a nn setpoints , minimum dilutionflow

, minimumreleasetimes , maxi mum re lease r ates , and/ordischarge of inco rr ect t a n k).VALI D: Anindication , report or condition i s consideredtobeVALIDwhenit i s coocI usively verified by (1)an instrumentchan nel ch eck , or (2)indication o n relatedorred

und ant indicato rs , or (3)by direct obse rvatioo by plant personnel.Impli citinth is defin ition i s the need for timely assess ment wit h in 1 5 m inut es.V IS IBLE DAMAGE: Damagetoequ ipment that isre ad i ly o bservabl e withou t meas u reme n ts , testing , or analysis.Damage issufficienttocausecon cern r eg arding thecontinuedoperability

o r r eli ability of affected safety structure, syst em ,orcomponent.Example damag e includesdeforma tiondue t o heator impad , denting,penetration , rupture , cracking,orpa i nt blistering.Su rface blemishes (e.g., paint chippin g , scratch es , et c.)should N OT bei nduded as visible dam age.VITAL AREA: Any area wit hinthePR OT ECTED AR EA which contains equi pmen t.syst ems, d e vi ces , or materia l wh ich the failure, destruction, o r release Of , could d i red ly or indirectly e ndanger th e pu blic healt h and safety b y e xposure t o radiation.Page32of47 Revision 3 9

5.2 Tornado Inilialin I Condilion Refer to"FissionProductB am"er Mattix" (Section 1)an d ContinueinThis Column...G E N E R A LEMERGENCYPLANCLASSIFICATION

MATRIX___________

1 EPIP-1 1 Initialin I Condilion Refer t o" F ission ProductBarrier Matrix" (Section 1)and Continuei n This Column.5.1 Earthquake

__l!ll__.ISEQUOYAH (Refer to-Fissi o n Prod uct Barrier Ma trix" (Section 1)a nd COnt inu e in Th isCo lumn.S I T E Referto-FisskNl Product Barner Matri x*(sect ion 1)andContinueinThisCo

lumn.A R E AEarthquakedetectedbysi

te seismic I nst rumentation.

(1 and 2): Tornado or high winds strike s any st ructure listed I n Table 5-1 and results In VISIBLE DA MAGE.(1 and 2): A L L 1.Pane l XA-55-15B alarm window30(E-2)plu s w indow 22 (D-l)activated.2.(a orb)a.Ground motionsensedb y plant personnel.A L E R T A L L 1.Tornadoor high wind s (sustained>80rn.p.h.>on e minute ontheplant computer)strikes anystructu relistedin Table 5-1.2.(aorb)a.Confirmed report of a n y VIS IBLE DAMAGE.b.National Earthquak e Information Center at 1-(303)27 3--8500 can confirmtheevent.

b.Controlroomindications ofdegraded safety system or compone n t response d ue to event.Note: NationalWeatherServ

ice Morristown

1-(423)-586-8400 , ca n provide additionalinfo.A L LEarthquakedetected bysiteseismicInstruments.

(1 and 2): 1.Panel XA-55-15B ala rm window 22 (0.1)activated.2.(a or b)a.Ground mo tio n sensed by plant personnel.

N o U E A L

L Tornado within the EXCLUSION AREA BOUNDAR Y.1.Plantpersonnelreporta tornadohasbeensighted within the EXCLUSION AREA BOUNDARY (Figure 5-A)b.N ational Earthquake

Infonnation

Centera t 1-(303)273-8500 can confi rmtheeve nt.Page330147Revision39

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I A L L A L L Init iatin I Condition Ref ertothe" Fission Product Barrier(section 1).Referto the"Fission Product Barrier Ma trix-(section 1).A ircraft o r PROJECT ILE im pacts (strikes)anyplant struc tur e listed in Table 5-1 resultingin VISIBLE DAMAGE.II and 2): 1.Pl antpersonnelreport

air craft o r PROJECnLE ha s impa cted anystructurel i st ed inTab le5-1.2.(8 orb)8.Confirmed repo rt o l V ISIBLE DAMAGE.b.Con trol Roo m indications

of degraded safe ty systemorcomponent r e s pon se duetothe eventwithinany structu re listedinTable 5-1.A ircraft crash or projecti le impact (strikes)within the EXCLUSION AREA BOUNDARY.1.Pl ant personnel r e p ort aircraft crash o r PROJECTILE

impactwith i n t h e EXCLUSION AREA BOUNDARY (Fi g ure 5-A).A L L A L L Initiatin I Condition Referto" F ission ProductBarrier

MatTix*(section 1)and C ontinueinThisColu

mn.Referto"Fis s i onProduct Ba m"er Matri x" (Section 1)andContinueinThis Colum n.River reservoir levelisatStage 11 Flood Warning a s reported by River Operat Ion s.River reservoir level i s a tStageI Flood Warning as reported by River Oper ations.Page 34of47 Revision 3 9

r ISEQUOYAHEMERGENCYPLANCLASSIFICATIONMATRIX

I EPIP-1 I l A L L A L L Init lat ln/Condition Refer to-F issionProductBa rrier Ma trix" (S ection 1)andContinueinTh

is Co lumn.Referto"Fi ssion Product Barrier(S ection 1)andContinuei n This Column.Rtver reservoir level I s<670Feetas reported by Rtver Operations

.River r eservoir l evel i s<673Feet as reportedby Riv er Operations.

A L L Pag e35of4 7 Initiatin/Condition Referto" Fission Produ ct Barrier Matrix*(Section 1)andContinuein This Col umn.Refert o"Fission Product Barrier Matrix*(Section 1)andContinue i n This Column.Refer to"Fission Product Barrier Matrix" (Section 1)andCon tinueinTh is Colum n.Watercraft

strikesth e ERCW pumping station r esulting Ina reduct ion of Essential Raw Cooling Water (ERCW).(1and2): 1.Plant personne l reportawatercrafthasstruckth e E RCW pumping statio n.2.(a orb/a.ERCW supplyheader pressureTrainA

1 (2}-PI-67-4 93A is<15 psi g.OR b.E RCW supp ly h e ad e r pressur e Tra in B 1(2}-PI-67-488A i s<1 5 p sig.Revision3 9

(ISEQUOYAH IEMERGENCYPLAN

CLASSIFICATION

MATRIXTABLE5-1 Plant Structure Assoc iated With Tornado/Hiah

W ind and Aircraft EALs I EPIP-1 I Uni t#1Containmen

t Au xiliary Building lTurbineBuilding

RWSTUnit#2Containment DieselGeneratorBldg.CDWEBuild ing Condensate Sto rage Tan ks Cont rol BuildingERCWPump in g Station Add itional EquipmentBldgsInta ke Pump ing StationCommonSta tion Serv ice Transformer's

F igure 5-ASEQUOYAHEXCLUSIONAREABOUNDARY

Exclusion Area BoundaryPage36of47

Revision 39

ISEQUOYAH I EMERGENCY PLAN CLASSIFICATION

MATRIX I EPIP-1 I FISSION PRODUCT BARRIER MATRIX(Modes1-4)

11.1FuelCladBar

rier 1.2RCSBar rier 1.3 Containment

Barrier SYSTEM DEGRADAT ION 2 2.1Lossof Instrumentat

ion 2.5 RC SUnidentifiedLeakage2.2Lossof Communicat

ion 2.6RCSIdentifiedLeakage2.3Failu reofReactorProtection 2.7UncontrolledCoolDown2.4FuelCladDegradation

2.8 Turb ine Fa ilure 2.9SafetyLim it LOSSOFPOWER 3 3.1 Loss ofAC(PowerOps)3.2LossofAC

(Shutdown)3.3LossofDC

HAZARDSandSED JUDGMENT 4 4.1 FireTable4-1 4.2 E xplos io nTable4-24.3FlammableGasFigure4-A4.4ToxicGasorSmoke

F igure 4-8 4.5ControlRoomEvacua

tion 4.6 Security4.7SED Judgment DESTRUCTIVE PHENOMENON 5 5.1 Earthquake

5.5RiverLevelLow

5.2 Tornado 5.6 Waterc raft Crash5.3Aircraft/ProjectileTable5-15.4RiverLevelH

igh F igure 5-A SHUT DOWN SYSTEM D EGRADATION

6 6.1 Loss ofShutdownSystems6.2Loss of Shutdown Capability

6.3LossofRCSInventory

RADIOLOG ICAL EFFLUENTS 7 7.1 Gaseous EffluentTable7-17.2Liquid Effluent Table7-2 7.3 Radiation LeveisFigure7-A7.4FuelHandling

7.5 SpentFuelSto rage l Page3 7of47Revision39

EMERGENCYPLANCLASSIFICATIONMATRI

X (ISEQUOYAH Definit ionsandAbb reviations:

BOM B:Anexp losive device.(See EXPLOS I ON)C IVIL D IS TUR BANC E:A group of twenty(20)ormo re personswithinthe EAB vio le ntly protesting onslte operations

o r activities atthesite.CONFINEM ENT BOUNDARY: SpentFuelS10rageCaskCONF

INEMEN T BOUNDARY co nsists of MPCsh ell , bottom baseplate.

MPClid (incl udin g the vent and drain port cover plates), MPC closureri ng , a nd associated

we lds.CRITI CAl*SAFETY FUNCTl ON (CSFs):A p lant safety functio n req uiredt o prevent signifICant

re lease d core rad ioactivitytothe environment

.Therea re si x C SFs;S ubcrrticality

, Core Cooling , Heat Sink, Pre ssurized Therma l Shock , Integrity (Containme

nt)andInventory(ReS).EVENT;Assessm ent of an E VENT commenceswh en recognition

i s mad e that one o r more of t he initiating

conditions associated wit h the event ex ist.Implici1 in this defin ition is the need lor time ly assessment

within 15min utes , EX CLUSION AR EA BOUNDAR Y (EAB): That area su rroullCling

the reactor , i n which the reacto r licenses has the auth oritytod e term ine al l activi tie s ind uding e x dusion or removal of personnel and property fromthearea.Forpu rposes of EmergencyActi

on Levels , bas ed on radiolog ical fiel d measur ementsanddose assessments,andfordesigncalculations

, theSit e Boundary shallbed efin e d a s theEAB.E X PLOSI ON: Rapid , violent.unconfined

combustion

, or a catast rop hic failure of pressurized

o r electrical

eq uipme nt thatImp a rts energy of sufficient f orce to potentia l ly damage permanen t st ructure s or equipment.EXT ORnO N: An attempt t o causeanact ion at th e site by threat or force.FAULTED: (SteamGen erator)Exis t ence o f s econdary side leakage (e.g., steamor f eed lin e b reak)that resu lts inanu ncontrolleddecrease ins t eam generator pr essureorth e stea m generat o r being completely

d epres surized.FIRE:Combu stion characteriz

ed by heal and rtght.Sources o f smoke such as slipping drive be lts or o v erheat ed elect rica l components do not COflsti luteafi re.Obse rvatio n of flame i s prefe rredbutisNO T requ ired if large quantit ies of sm ok e andfor heat are obs erved.FLA M MAB LE GAS: Combustible

g ases at concentrations>

thanthe LOIAER EXP LOSIVELIMIT(LEl).HOSTAGE:A person(s)heldasleve

rage against thesitet o e nsure that demands wil l be met bythesite.HOSTlLEA Cn ON: An act toward a nudear plant or i t s personnel th at i rdudes the use cl vi olent force t o destroy equ ipment.take hostages.a nd/or i nti mida t e the licenseetoach ieve a n end.This indudes attack.b y air , land or wate r;usi ng guns , explosives , projecl: iles, vehicles ,orother devices usedtodeliver destructiveforce.Otheracts th at satisfy theovera llintentma y be includ ed HOSnLE ACnON shouldNO Tbeconstruedt o inctude acts of civi l d isobedience

o r felonious ads t hatarenot part o f a conce rted attackonth e nuc ree r power plant.HOSnLE FORCE:Oneor more indivi d u als who are engaged ina determined

assault , overtly or by stealth and deception , equipped wi th suitable weapons capable of ki lling.m aimi ng , or causing destruction

.IMMINENT: 'vVith in two h ours.INE FFE cnvE: VVhe n the specified restoration

action(s)d oesnotre sult ina reduct io nint he l e vel of severity oftheR ED or ORANGEP A TH cond ition within 15 minutes fr om identification of theCSFSta tus Tree RED o r ORANGE PATH.I NITlA nNG C ON OmONS: PlantPa ramete rs , rad iation rTKX'Iitor

read ings or personnel observations

t hat id en tify an Event fo r pu rposes cl Emergency Plan Clas sificat io n.INTRU SION IINTRUDER: S uspected hosti le individua l pr esent i n th e pr ot ected area wit hout authorization.IS FSI: I ndependent

Spe nt Fuel Storage Installation

.E P IP-1 ODCM: Offsite Dose cetcoretcn

Manua l isa supportingd

ocument toth e Tech Specs.that co nt ai n Rad Efflue nt Controls, En vi r ons Monitori ng controls.and methodology

for ca lcu lating rout ine gase o us a nd l iquid effluen t offsitedosesan d mon itor al a rmltrip setpoin ts.ORA NGE PA TH: Monitoringofoneor

more CS Fs by FR-O which indicates t hat t h e CSF (s)i s un der severe challenge;prompt operator action i s requ ired.PROJECnLE: All ob j ect e jected , thrownor lau nched towardsa pl a nt structu re resultingin damage sufficien t t o ca use co ncern regard ing t he integrity ofth e affected st ructur e or the opera bi l ityorreliability aI safety eq uipmentcont a i n ed therein.T he so urce al the projecti lemaybe onsiteoroffsi

te.PROTECTED AREA: The area en compassedbythesac urity fe nceandtowhich a ccess i s controlled.Res: Th e ReS primary s ide and it s conn ections u p t o a nd includingthe

pressurtzer

safety and relie f valves , and other con n ectio nsuptoand includ ing t he primary a nd secondary isolation valves.REDPA TH:Mo nitori ng of one o rmoreCS Fs by FR-o whichindicates that the CS F(s)isu nde r extreme ch al lenge;p rompt operato r actio n is r eqU ired.RUPTURED:(SteamGener ator)E x i ste n ce of pri mary tos econdary leakage of a magnitude greaterthanthecapacity one c harging pump.SABOTAGE: Delibe rate d amage , misalignme

nt , o r misoperat ion of plant equ ipment'Nilh the int ent t o rendertheequ

ip ment i n operable.S IG N IACA NT TRANSIEN T:An UNPlANNED event involving oneor more Of the f ol lowing: (1)A n automatic turbi ne runbac k>15%therma l reacto r powe r;(2)E l ectrica l load re jection>25%fuJi etect ncenoac.(3)Rea ct o r Trip;(4)Safety Injection System Activat io n: (5)Therma l Power OscillationsSTRl KE ACnON: A work sto ppag e within thePROTECTED AR EAbya body Of worke rs t o enforcecom pliance with d emands made on TVA.The STR IKE ACTION must t hreaten 10 i nterrupt n anna l plant operations

.TOXICGA S:Agas that isd ange roustolif e or l imb by reason of in ha latiOn o r skin contac1 (e.g., chlori ne , C O r , et c.)UNPLA NNED:A n even t o r action that is n o t the expectedresult

cl normal operations.testin g or maintena nce.Eventsthatresul t i n c o rrectiveormitigative actions being tak en in accordance with abnormal or e me rgency proc edure s a re UNPLANNED.UNPLANNED R ELEASE: A release of radi oactMt yisU N PlANN E D if t he r e l e asehas not been authori zed byaD ischarge Permit (DP).l fll)li cit int h is defi n ition areunintentionalrelea

ses, unmonitorect

releases , or pla nned releases that e xceed a cooclition

specifi ed ont he DP , (e.g.,a larm setpoin ts , mi nimum dilutionfl ow , m inimum release t imes , max imum releas e rates , and/o r discharg e of incorrect tan k).VAUD: A n i n dicat i o n , report or conditio n is conetcered

t o be VALID whenitis co ndus ively verified by (1)an i nstrument cha nnel check , or (2)indication on related or redundan t indicators

, or (3)by direct observationbyplan t pe rsonnel.Impli cit i n th is defi n it ion i s the need for timely assessment

with in 15 minutes.VISIBLED A MAGE: Damage toequ ipment that i s readily observa ble without measurements

, testing , or analys is.Damage i s suffici enttoca use co ncern regarding the continued oper abilityorre li ability of affected safety structure, system,orcomponent.Example damage includesde formationduet o heato r impact, de nting , penetration , rupture, cracking, orpaint blistering

.Surface blemishes (e.g.,paint chipping , scratches , etc.)should N OTbeincl uded as vi sible damage.VIT A L A REA:An y a rea within the PR OTECTED AREA wh ich contain s eq lipment.s ystems.devices, or materialwhich

the failure, destrucl:i

on , or r elease of , co uld di rectly o r indirectly

endangel'the

pu b l ic health and safety by exposuretorad iation.Page38of4 7 Revision3 9

EMERGENCYPLAN

CLASSIFICATION

MATRIX Refert o"Gas eou s Effluents" (sectio n 7.1)a nd Continue in Th is Co lumn.I EPIP-1 I 6.2LossofSIDCapability Initlatln I Condition No t i'p p (/C8b Je..G E N E R A L Inltlatin I Condition 6.1Losso f Shutdow n Systems_r----mmn-*_.ISEQUOYAH (5, 6 loss of water level inthere ac tor vesse l that has or will u ncover ac tiv e fuelin the reactorvesse

l.(1and2and3)

1.LossofRHRcapability.2.VALID indication that reactorvesselwate

r l e lJ el<el.69 5'.3.Incore TCs (i f available)indicate Res temperature

>200 o f.Note: I f containmen

t is o pen refe r to*Gaseous Effluents*(Se ct i on 7.1)a nd continueinthis co lumn.S I T E A R E A 1, 2 , 3 , 4 Complet e loss of function needed to ach ieve or mainta in hot shutdown.(1and[2aor2b]):1.Hotshutdownrequired.2a.CS F statust ree indicatedCoreCoolingRed(FR-C.1).OR 2b.CSFstatustree

indicatesHeatSinkRed

(FR-H.1)(RHR shutdown roofingno tinservice).Note: Refe r to"ReactorProtectionSystem(Section 2.3)andContinueinThis Column.5, 6 Inab ility to maintain unit in cold shutdown when req uired(1and2): 1.Col d shutdown requiredby Technica l Spe cs.2.lncore'res (if avai lable)indicate coreexitt emperature

>200 o f.Note: If containment i sopenre fer to"Gaseou s Effluen ts*(Section 7.1)and continue in thiscolumn.A L E R T 4 Compiete loss of funct ion needed to achieve cold shutdownwhencoldshutdownrequ

iredbyTech.Specs.(1and2and3)

1.Cold shutdown required by Tech.Specs.2.Lossof RHRshutdown coolingcapability

.3.Loss o f secondaryheat sinkandmainconden

ser Note: Also refer to"Faifure o f Rx Prot ection" (section 2.3)and Continu e i n ThisCo l um n.NotApplicable

.Inabilitytoreach required shutdown within Tech.Spec.IImtts

.N o U E 1.The unit has notbeenp laced i n th e requi red mode withinthetime

prescribed

by the LeO action statemen t.4 l Page 390147Revision39

(ISEQUOYAHEMERGENCYPLANCLASSI

FICATION MATRIX l 5 , 6 I nlt iatin I Condition Refer to

Efflu ents*(Section 7.1)and Continue in This Column.Refer to"Gaseous Effluents" (Section 7.1)and Con tinue inThisColumn

.Refer to"Gaseous Effluents" (Section 7.1)and Cont inue in Th is Column.LossofREACTORCOOLANTSYSTEMinventory w ith Inadequatemakeup.(1 and 2 and3): 1.Reactorcoolant systemispr essurized above afmospbencpressure.2.Unplanneddecreasein ReSorpressurizerleve

l requiringinitiationofmakeuptoth

e ReS.3.Wi t h rea ctor co olantsystemtemperaturestab

le , the pressuriz er levelcontinuest o de crease following initiationof

ReS m akeup.Pag e40of 4 7 Revision3 9

EMERGENCY PLAN CLASSIFICATION

MATRIX I SEQUOYAH 1 1 EPIP-1 I (1 FISSION PRODUCT BARRIER MATRIX 1.1FuelCladBarrier1.2RCSBarr

ier 1.3ContainmentBarrier (Modes 1-4)2 SYSTEM DEGRADATION

2.1LossofInstrumentation

2.2LossofCommunication 2.3FailureofReactorProtection2.4FuelCladDegradation2.5RCSUnidentified

Leakage 2.6RCSIdent ified Leakage2.7UncontrolledCoolDown2.8TurbineFailure

2.9SafetyLimit

3LOSSOF POWER 3.1LossofAC (PowerOps)3.2LossofAC (Shutdown)3.3LossofDC

4 HAZARDSandSED JUDGMENT 4.1 F ire4.2Explosion

4.3FlammableGas

4.4ToxicGasorSmoke

4.5ControlRoomEvacuation4.6Security

4.7 SED JUdgment Table 4-1Table4-2Figure4-AFigure4-B 5 DESTRUCTIVE

PHENOMENON

5.1 Earthquake5.2Tornado5.3Aircraft/Projectile5.4R iverLevelHigh 5.5RiverLevelLow5.6WatercraftCrash

Table 5-1 Fig ure 5-A 6 SHUTDOWN SYSTEM DEGRADATION

6.1LossofShu tdown Systems6.2LossofShutdownCapability

6.3LossofRCSInventory

7 RADIOLOGICAL

EFFLUENTS 7.1GaseousEffluent

7.2 Liqu id Effluent7.3RadiationLevels

7.4FuelHandling

7.5SpentFuelS

torageTable7-1

Table7-2Figure7-APage41of47

Revis ion 39

DefinitionsandAbbreviat ion s: (ISEQUOYAHEMERGENCYPLANCLASSIFICATIONMATRIX

EPIP-1 BOMB:A n expos ive device.(SeeEXPLOSION)CIVIL DISTURBANCE

Agro up ottwenty (20)ormor e persons with intheEAB viole ntl y protesting o nsit e operations Of activi ti e s atthe site.CONFINEMENTBOUNDARY:SpentFuel

S1 0rage Cask CO N FIN E M ENT BOUNDARY consists of MP C shell , bottombaseplate.M PC lid (i nduclingt he venta nd drainpo rt co ver plat es).M PC closure ri ng , a nd e esoctetec wel ds.CRl TlCA L-5AFETY FUNCTION ICSFsl: A plant saf etyfunctioorequiredt o pr event significa nt release d core radi oadMty t o the envi ro nment.Thereare six CS Fs;SUbcriticality

, Core Coo ling.He at Sin k, Pressu rized ThermalShock , Integrity(Containment)and

Inventory (ReS).EVENT: Assessment

of an E VE NT comme nces whenrecognitionismadet hat oneo r mor e d the i nitiating ccodmons a s sociated w ith the eve nt exist.I mplicit i n t his definition i s t he need fO(timely assessment wi t hin15mi nutes.EXCLUSION AREA BOUNDARY (EAB): Thatarea surround i ng t h e r eactor , in wtJch thereect cr uceo ses h as the a ut h ori t ytoeete rm re all activities i ndud ing excl u sio norre mova l of pe rsonnel a nd property from t he area.F or purposes of E mergency Action Levels, based on radiaogicalfieldmeasurementsanddose assessme n t s , andf or designcal culations , th e Sit e Boundaryshall be defined astheEA B.EXPl0$10N:

Rapid, violent , u nconfined combustion , o r a cetasirco hc f ai l u r e of pressurized or electrical eq uipme nt thatimpartsenergy of suffICient

force t o potentially

da mage permanent st ructures or equipment.E XTO RTION: A n attemptt o cau se an action at the sit e by thre at Of f orce.FAULTED;(Steam Generator)Existe n ceofseconda ry side l e akage (e.g., steam or feedline break)t ha t re sultsinanu ncontrolled

decreasei n steam gener atorpres sure orthestea m generatorbeing completel y d epressurize

d.FIRE: Combustio n char acterized by heat a nd lig ht.Sou rces of smokesu ch as slipping dri ve belts o r overtleated el ectrical compcoer te donot:co nstitutea fi re.Observ ation d n ame i s prefe rred but i s NO T requir ed iflargequantities 0(smoke and lorhe at are o bserved.FLAMMABLE GAS: Combustible g ases at concentratio ns>tha n the LO'M:.R EXPLOSIVE LI MIT (LEL).HOSTAGE:A person(s)h eld as l everageagainstt h e Sitet o ensure t hat demandswillb e met bythesit e.HOSTILE A CTION: An a d towardan uclear plantor its personnelthatinclu destheuse of violent for ce to destroy equipment.lake hostages, andlor intimidate t he licen see to ach ieveanend.Thisi nd udes attack by air, l a ndorw ate r;u sing guns , explosives , projectiles

, vehicles , or other d evicesusedto deliver destru ctive force.Oth e r a ct s that satisfy t h e overall intent may be i ncluded.HOSTILE ACTION should NO T beconstruedto include acts o f civil dis obed ienceorf elo niou s a d s that a re n ot part of a concertedattackon

th e nu clearpower plant.HOSTILE FOR CE:On e or mor e individual

s who are engaged ina deterrrin ed ess eu t.overtly o r by stealtha nd deception , equ ipped with suitable weapons capab l e d k illing, maiming , o r causi n g destructio n.IMMINENT: Wrth i n tw o h o urs.INEFFECTIVE

\lVhent he specified restorati o n aclion{s)doesn ot resulti n a reduct ion i n the lev e l o f severity dthe REDorORANGEPATHcondition with i n15minutesf rom identffi catiorl of the CSFStatus TreeREOorORANGEPATH.INIT1ATING

CONDITIONS

P lant Pa rameters, radiationmonitorreadingsor personnel observations that identifya n Eventfor pu rposes d E mergen cy P lan Clas sificat ion.INTRUSIONIINTRUOER:

Suspected ho stileindividual presentin the p ro tected a rea without auth orization.ISFSI: I ndependent SpentFuelStorage Installation ODCM: Offsite Dose Calculation M anual isa supporting docu ment to t he Te ch Specs.thatcontain Rad Effluent Control s , E nvirons Monitoring control s , and methodologyforca lcu lating routine gaseous a nd l iquid effluent offsite doses and monitoralarm/trip setpoin ts.ORANGEPATH:Monit oring of on e ormoreCSFs by FR-Owhich indicates th at the CSF(s)i s undersevere challenge;promptoperatoractio

n i s required.PROJEC TILE: An obj ect e jected ,thrownor lau nched towards a pl ant stru ctur e resUting indamage sufficienttocauseco ncern r egarding th e integrity of the affected st ructureortheoperability'

or r eli ability of saf ety equipment contained therein.The source01the project i lemaybe ensue or offsite.PROTECTED AREA: Thearea encompassed

by the securityfenceand towhich acc ess iscontrol led.RCS: Th e RCS primarysideand itsconnectionsu p t o a nd i nducingthe pressu rizer safetyandrelief valves.andotherco n n ections up toand i n duding t he primary a nd s econdary isolatiOn valve s.REOPA TH: Monitoring Of o ne Of more CSFs by FR-o whi ch indicates th a t the CS F(s)i s under e xt rem e challenge;prompt opera tor actioni s r equired.RUPTURED: (Steam Generator)E xistence of primary t o second ary leakage of a magnitUde greater thanthe capac it y oneChargingpump

.SABOTAGE: Delibera1e damage , misalig nmerrt.Of m isoperation

of pla n t equipment INi th the int ent to rendertheequipment i n operable.SIGNIFICANT

TRANSIENT: An UNPLANNED eve nt involving one Of more of t he followin g: (1)Anautomatic turbine nmback>1 5%t hermal r eactorpowe r;(2)Electrica l l oad rejection>25%full electrical l oa d;(3)R e ac tor Tri p;(4)Safety Injection System Activation;(5)Thermal Power Oscilla tions:l: 10%.STRIKE ACTION: A work stop page with in thePR O TECTED AREA by a bcxl y Of w o rkerst o e nfo rce compliance with d emands made on TV A.T he S T R IK E ACTIONmust threatentoi nterrupt no rmal pa nt operations.TOXlCGAS: A gas t hat i s d an gerous to lif eorlimb by r eason of inhala tio n or skin cont act (e.g., chlorine , C0:2 , et c)UNPLANNED: An event oractionthat

is notthe expect ed result Of normal operatio n s , testing or m a intenan ce.E vents t hat resultinco rrective o r mi tigativ e actions be ing ta ken i n acc o r dan ce w ith ab norma l oremergency proceduresare

U N PLANNED.UNPlANNED RELEASE:A release or radioactivity

i s U N PlANNED if the releasehas n ot bee n euthorized by a Discharge Permit (OP).I mplicit i n thi s definition a-e u rint entional releases , un mo ritored releases , Of p lan n ed relea ses that e xceed a conditio n specified o ntheD P , (e.g., alarmselpoi nt s , minimum dilution flow , minimumrelease time s, maximum r eleaserate s , an d/or d ischarg e of incorr ect lank).VAllO: An indication,reportorcondit

ion i s conside redto be VALI D when it i s conclusively veri fied by (1)an i nstrumentchannel ch eck , o r (2)indicat i on o n r e l ated or redundant indicat ors ,or(3)b y dired.observation

b y plant person nel.Impliciti n this definiti on isthe need forti mely assessme nt with in15minutes.VISIBLE DAMAGE: Damage toequ ipmentthati s readil y observable without measurements

, t e sting , or analysis.Damageissufficientt o cause concer n regardingthecontinued operability o r reliability

of affect ed saf ety structure, system , o r component.Exampl e damage i nc ludesd eformationdue to heator i mpact , denting,penetration , rupture , crac ki ng,orpaintbliste rin g.Surface blemishe s (e.g., paint chipping , sc ratch e s, etc.)should N OT be includedas visible damage.VITAL AREA: Any a rea with in the PR OT ECTED AREA which contains equipment , systems, de vices , or material wtJch the failure,d estruction, o r rel ease of , could directl y or indirectlyendanger the public heal th and safet y by exposure10 radiation.Page4 2of47Revision39

EMERGENCYPLANCLASSIFICATION

MATRIX 7.1 Gaseous EffluentsEABdose, resulting from an actualorimm inent release of gaseous rad ioactivity>1RemTEDEor

>5R em thyroid CDE for the actual or projected durationofrel ease.(1 or 2 or 3): 1.A VAUD f ad monito r r eading exceeds the val ues under Genera l Emergency inTable7-1 for>1 5 m in.u n l ess assessment within t hat 1 5 mi n confi rms t hai the criterion i s not exceeded.Q!l 2.F ield surveysindicate>1Remlhr 9ammaora n 1-1 3 1 concentrat

ion of 3.9E-06).l e i/e m at the EAB (Fi g.7-A)Q!l 3.Dose assessmentresultsind

icate EAB d ose>1Rem TEDE or>5 Rem thy roid COE for the actual or project ed dur ationo f the rel ease (FIQ.7-A).EPIP-1 Initiat in I Condition7.2Liqu id Effluents N ot llcable I!!!!I G E N E R A L*I Condition Inltlatin I A L L III_.[SEQUOYAH (A L L EAB dose resulting from an actual or Imminent release of gaseous radioactivity>100mremTEDE

or>500 mrem thyroid COE for actual or projected durat ionofreleas e.(1 or 2 or 3): 1.A VA LID rad moo ito r reading>Tabl e 7-1values unde r SiteAreafor>15 m n , unless a ssessment withinthat15 min confirms that the criterio n is not exceeded OR 2.Field surveys indicate>100 mremfhr gammaoran 1-1 31 co n e of 3.9 E-07 j.1C ilcm 3 et the EAB (F i g.7-A).OR3.Do s e assessment results indicat e EAB dose>10 0 mrem TE DE or>500m rem t hy roid GDE for a dualo r projected du rat ion of the release (Fig, 7.A).S I T E A R E ANotApplicable.Any UNPLANNED release of gaseous rad ioactivity

that exc eeds 200 times theODCMSec tion 1.2.2.1 limit for>15 minutes.(1 or2or3 or 4)Any UNPLANNED release of liqu id rad ioac tivity that exceeds 200 times the aDCM S ec tion 1.2.1.1 Limit for>15 minutes.(1 or 2)A L L 1.A VALID red monitorread in g>Tab le 7*1 v alues u n derAlert f o r>1 5 minutes , unlessassessment wit h in that 1 5 minut es confirms that t he criterion i s not e xceeded.Q!l 2.Fie ld surveysindicate>10

mremlhr gamm a at the EAB f or>15m inutes (Fig 7*A).OR 3.Doseassessment results indicate EAB dose>10 mrem TEDE f or t he duratio noft he release(Fig.7*A).OR 4.S ample results exceed 200timesthe aDCM lim it va lu e f or a n u nmondored rele ase of gaseous radioactivity

>15 m inutes in duration.A L E R T 1.A VAllO radm onitorreading>Table7-1 values und er A le rt for>1 5 min utes.unlessassessme ntwithi n t hi s timeperiod confirmsthatthecriterionisnot exceeded.OR 2 , Sam p le results indicate an E el>200ti mes theODCMl i mit valueforanunmonit o red r e leaseofliqu id radi oactivity>15 minutesin duration l A L L Any UNPLANNED releas e of gaseou s I1Idioacttvlty

that exceeds2 time stheODCM Section 1.2.2.1 Limit for>60 minutes.(1 or 2 or 3 or 4)1.A VALID radm onit or r ead i ng>T abl e 7-1 v eru e s unde r U E fo r>60 minutes , unlessassessmentwithinthat

6 0 minutes co nfirms t h at the criterion i s not e xceeded.OR 2.Field surveys indicate>0.1 n;r emlhr gamma at t he EAB for>60 rrsrctes (Fig7*A)Q!l 3.Doseassessment r esultsind icate EAB do se>0.1mrem TEDEf or t he duration o f therelease(Fig.7*A).OR 4.Sampleresults e xceed2time s t he aD CMlimitv ene fo r an unrro retcred release of ga seous ra d ioactivity>60 minutes i n duration N o U E A L L Any UNPLANNED re lease of liquid rad ioactivity

to the environment

that exceeds 2 times the aDeM Sec tion1.2.1.1L1mtt

for>60m inutes.(lor 2)1.A VAUD rad monitor r ead in g>Tab le7-1 valu esuncl e r UE for>60 m inutes , u n less assessmen t withi n this lime periodconfirmsthatthe aiterion is not exceeded.2.Sampleresultsindicate a n E eL>2times th e aDeM limitvaluefor anunmonitoredrelease of liquid ra d ioactivity>60min utes induration.Page43of47Revision39

r ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX EPIP-1 Initiatin'Condition

Refer t o-Gas e ousEffluents*(SectJ'on 7.1)andContinu

e in Thi s Section..7.4FuelHand

l ing-_.G E N E R A L Init iatin'Condition

Refer to"Fis s i o n Product Ba m"a f(S ection 1)or"Gaseous(S ecti on 7.1)and Con tinue inThis Section.7.3Rad iation Levels__--..B'IIm]-__.Refert o" F issionProdu

ct Ba lTier(S ection 1)o r"Gaseous Efflu e n ts R (Secti on 7.1)a nd Con t inue inThis sect ion.S I T E Refer t o"GaseousEffluents" (section 7.1)and Continue i n T h is section.A R E A A L L UNPLANNED Increasesin

radiation levels within the facility that impedes safe operations

or establishmentormainten an ce of cold shutdown.(lor2): 1.VA UD a rea radiatio n monitorreadingsorsu

rvey resultsexcee

d 1 5 mrem lhrinthecontrolroo

m o r CAS.2.(aandb): a.VALID a rea radiation monitor readings excee d valueslisted i n Table 7-2.A L E R T A L L Major damage to Irradiated fuel or loss of wa ter l evel th at has or will uncov er irrad iated fuel outside the r e actor vessel.(1 and 2): 1.VALIO alarmonRM*90-1 01orRM-9O-10

2 or RM-90-103 or RM-90-130/131 or RM-90-112.2 l a orb): a.Pla nt personnelreportdamagetoirradiatedfuel sufficie nttorupturef ue l rods.b.Access res trictionsi mpede operatio n of systems neces saryforsa fe operatio n ortheabil ity to e stabli s h cold s hutdown (See Not e Below).b.Plantperson nelreportwate

r level drop hasorwill exceed makeup cap acitysuchthatirradiatedfuel willbeu ncovered in thespe n t fuelpoo l o r tran sfe r canal.A L L UNPLANNED increase inradia tion levels within th e facility.1.A VAUO area radiation mo nito r reading increases by 1000 mre mlhroverth e highestreading i nthepast2 4 h o ursexcludingth e c u rren t pe a k va lue.Not e: I n either th eUEor A LERTE A L ,theS ED mus t dete nnine the cause o f increase in radiationle vels a nd review otherin itiat ing cond mons for app l icab ili ty (e.g., a d ose rate of 15 mremlhr i n th e contro l room could be caused b y a re le ase associated

with a DBA).N o U E UNPLAN NED loss of waterlevelI n spen t fuel poo l o r reactorca v ity ort ra nsfercan al with fuelre maini ng covered.(1 and 2 and3): 1.Plant person nel repo rt water leve ldropinspentfuel poo l orr eactor cavity, o r transfercanal.2.VALIDalarmon R M-90-101o r RM-90-102 or RM-90-103.3.Fue l rema ins covered with water.lPage44of47

Revision 3 9

(ISEQUOYAHEMERGENCYPLAN

CLASSIFICATION

MATRIX I EPIP-1 I A L L Not Applicable

.N ot Applicable

.Damagetoa load&d cask CONFINEMENT

BOUNDAR Y from: (1 or 2 or 31 1.Natural phenomena(e.g.,seismicevent, torna do , flood.l ig htni ng , snowsce accumul ation.etc).2.Accident (e.g: dropped ca sk , tipp ed overca sk , explosion , missile damage, fi re damage ,burialunder debri s , etc).3.Judgment o f theS i t e Emergency D i r ector that th e CONANEMENT

BOUNDARY damage is a degradationi n th e level of safety oftheISFSIPage45of47Revision39

TABLE 7-1 EFFLUENT RADIATIONMONITOREALS

EMERGENCY PLAN CLASSIFICATION

MATRIX___________1 EPIP-1 I ISEQUOYAH (NOTE:Themonitorvalue

s be low.ifmetor exceeded, ind icatetheneedto performtherequ ired assessment.Iftheassessmentca

n notbe completed within1 5 minutes(60 minutesforU E),theappropriate emerge ncy classification

sha ll bemadebase dontheVALIDreading.GASEOUS MONITORS Units(21UEAl ert SAE General S ite Total R elease LImit 4.90E+05 4.90 E+071.31 E+081.31 E+09 1-RI-90 400 (EFF LEVEL)-U-1 Shi eld B ldg 4.90E+05 4.90E+07 1.31 E+0 8 1.31E+09 2-RI-90400 (EFF LEVEL)-U-2 Shield Bldg 4.90E+054.90E+071.31 E+081.31E+09 0-RM-90*1 01B-Au xiliary B ldgcpm1.03E+05 Offscale (')Offsc ale (1)Offscale (1)0-RM-90-1 32B-s ervice Bldg cpm 2.62E+06 Offscale (l)Offsca le l ll Offscale (1)1-RI-90421

thru4 24-U-1MSL Monitors (2) 1.71 E-Q1 1.71 E+0 1 4.58 E+01 4.58E+02 2-RI-90421 thru 4 24-U-2MSL Moni tors (2)

1.71 E-Q1 1.7 1E+014.58E+01 4.58E+02 1-RM-90-255 or 256-U-1 eVE mR/h 4.10E+024.10E+04 1.09E+05 1.09E+06 2-RM-90-255 or256-U-2 eVE mR/h 4.10 E+02 4.10 E+04 1.09 E+05 1.09 E+06 RELEASE DURATION minutes>60>15>15>15 LIQ UID MO NITORS UnitsUEAl ert Si te A rea Gene ral Si te Tot al Releas e LImi t 6.50E-03 6.50E-01 N i A N/A RM-90-122-RadWaste cpm1.45 E+06 Offscale(l)N/A N/A RM-90-120,121-

S IG Bldn cpm 1.0 7E+06 Offsca le (1)N iA N IA R M-90-225-Co nd D emin c pm 1.90E+06 Offsca le (1)N/A N IA R M-90-212-TB Sump cpm 3.28 E+03 3.28 E+05 N IA N/A RELEASE DURATION minutes>60>15>15>15 ASSESSMENT

METHODS:+Ai_ne Dose Ass e ssmentper SON EPIP-13" D os e Assessme nt"*aDe M Liq u id Release Ra tea s sessment pe r SO N O-TI-C EM"{)30.0 30.0*Integ ra tedAirborneReleaseRa te assessmentpe

r SO N 0-T I-GEM-Q 3 0.030.0 (1)The calculatedvalueisoutsideofthe upperr angeforthis detect or.The m a ximum monitoro utpu t wh ichcanberead i s 1.0E+07 c prn.Releases i n e xcess o f monitorcapacitysh

ouldbee va luated fo r proper classification

byuseof Dose Assess ment.(2)Theseunit valuesarebasedonn

ow rates through one PORVof 89 0 ,000 I b/hr at1078.7 ps ia w ith 0.25%carryover (0.99 75qua lity).Bef oreusingthese

values , ensure a releasetothe environmen

tisongo ing , (e.g., PORV).NOTE 1: T hese EALsarebased onthe assump tion that a n emergency re lease isrestrictedtoo

ne pathway from the plan t.Inall cases , the t otalsiteEAListhe

limitingva lue.Therefore , inthecasewheretherearemultip l e release paths fromthe pl ant , it isthetotalreleaseE AL (obtained from ICS and lo rSON0-TI-CEM-03Q-030

,"Manua l Calculation 01 PlantGas , Iodine,and ParticulateReleaseRates forOffsiteDoseCalculationManual (ODCM)C ompli ance")that wi ll determine whether an emergenc y class ification is wa rranted.NOT E 2:Inthe casewhenthere

isn oCECCdoseasses

sment available ,thelengthandre

lati ve rnaqnitudeof the r e lease i s thekeyindetermin ing theclassifi cat ion.For examp l e , i n the caseo f th e NOU EEALof2t imesthe T ech Spec li mit , the classificat io nisbasedmor

e on the f act thatare lease abovethelimit has continued u nabated f or morethan60 minutes ,thanonthe projectedoffsitedose

.N OTE 3: See REP Appendi x B for basisinf o rmati on.l Page 4 6 o f 47 Revision 3 9

Table7-2 ALERT-RAD IATION LEVELS EMERGENCYPLAN

CLASSIFICATION

MATRIX[SEQUOYAH[1 EPIP-1[(Fo r p urposes o f rom>ari ng the meter/monitor read in a valuestothis table ,itcan be assumed th at m Risequivalent to mrem.M onitor No.L ocation-AreaandE levati on Meter Read in!!1.2-RM-90-1 Spent FuelPitARMEI.734.01.5E+03mRlh

r 0-RM-90-5SFPPumpsARMEI.714.0 1.5E+03 mRlhr 1.2-RM-90-6 CCS HXSARM EI.71 4.0 1.5E+03 mRlhr 1.2-RM-9Q-7SampleRmARM

E I.690.0 1.5E+03mR lhr 1 ,2-RM-90-8AFWPumpsARMEI.690.0 1.5E+03mR/hr 0-RM-90-9WasteCndsT

ks ARMEI.669.0 1.5E+03 mRlhr 1 ,2-RM-90-10CVCS BdARMEI.669.01.5E+03mR/hr 0-RM-90-11CSandRHRPump

s RadmonEI.653.0 1.5E+03 mRlhr 0-RM-90-102 Spe nt F uel P i t Radm an E I.7 34.0 1.5E+03 mRl hr 0-RM-90-l03 Scen t Fuel Pit Radman E I.734.0 1.5E+03 mRlhr 0-RM-90-2 30CNDSDeminerali

zer ARM EI.685.0 1.5E+03 mRlhr 0-RM-90-23l Cnds Demine ralizerARM E I.706.0 1.5E+03 mRlhr Note.Allofth e abovemonitors havearangeof0 ,1 to 1E+4 mremlhr , Figure 7-A EXCLUSIONAREA

BOUNDARY Exclusion Area BoundaryPage47of47Revision39

c l TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING

PROCEDURE EPIP-4 SITE AREA EMERGENCYREVISION30

QUALITY-RELATEDPREPAREDBY:BILLPEGGRAM

RESPONSIBLE

ORGANIZATION

EMERGENCYPREPAREDNESS

APPROVED BY:KEVINWILKESEFFECTIVEDATE:

_LEVELOFUSE:REFERENCEUSE

ISEQUOYAHSITEAREAEMERGENCY

Revis ion History EPIP-4 Roy Date Pages Reason fo r Revision Effec ted 2 1 03 130/2001 Revised references 1 0 EPIP-14 f or DoseAssessmenttothenewEPIP-13forDoseAssessment.

Added EP IP.13toreferences.Reformatted substantialty fo r cl arity.Updated Notitcat tcn and Follow-Up formstoPentagen standa rd con te nt 22 0713012002 Substantial

format modifICation

forstanda rdization w ith BFN M'B N was i m plementedinth

is revision.Reformattedand

repaginated a s necessa ry.Reordered actions to be consist ent withEPIPs2.3 , 5.Cha nge d reference of PHYSI-32t o 85 1-1.Add ed section 5.0, lltustrations and AppendicesSectiontoth e bod y oftheprocedure.Added caution concerningconductingassemblyanda ccountabil

ity if itwillpresentadangerto emp loyees.Clarifieduseof5-and 9-te lephone prefixes.Added whatInfonnationisto be provided b y theShift ManagertoChemistry w hen requestingDoseAssessment:t.Typeof Event , 2.ReleasePath

.3.Expected Duration.C la rified how to check ERQpager response.EPIP-4 wa s revised to implementactionstosupporttheNRC

Security Order includingadd

ing"Tw o P erson Une-of-Sight"rulewhendeemed

necessary by security.Clarifiedwha

t MET Data elevationist o be i n duded o n the initial notificationformandthe

fonowup formforSite Area Emergency.2 3 08/2 612002 Added Step2tosection3.1tospeedimplementationifEP S has already been activated.Condensed st eps in 3.1 an d 3.2 o n assembly andaccountability

.Implement ab ility t o Stag e TSC tOSC person nel n ear-si t e wh en it is unsafeto i mmed iately enterthesite du e t o security oon dit ions.Correctedtitleo

f C E CC EPIP-9i n Sections3.1and 3.2.Thisisaintent

revision.24 0412212003

GeneralRevision to restructureEPIPforbetterflow.Moved OD S n otificationearlier inp rocedure.IntentC hange.25 06/25 1200 3 9 N on int entchange.Ph one numbercorrecti

on.26 1012312003

4 ,8,12 I n t ent dlange.Addedstept o recor dtimeof declarationu

pon entry intotheprocedure.Spl it stepthatha d tw o actionsinonestep.Spe cified Security implement EPIP-ll 27 4 12 2 12004 3,6 ,1 3 Intent C hange: CorrectedT O C.Clarified t hai MSSN/INM i n th e OSCi s verifyingEROr e sponseandth at8Mis to EN SUREthatthis i sinprogress.Added SED'sInitials to S ec.3.2.Added guidan cetoutilizeEPIP-6Apd

x B to initiall y b rief NR CusingEN S line.28 912312004 6 ,7 ,9 , 13 IntentC hange: R emove dsatellitephonenumbers

.ad ded val idationstepto Sec.3.2.added ann ouncement to Stafft he TSCandOSCtoAp pA , 29 0412612006

4,14 ,1 5 RevisionChange: replacedSS I-l with 5$1-7.1.Changed App.B,S l e p 9 from beingth e time and date i nto was providedt otheODSt o faxi ng App.B totheODS.MadeApp.CconsistentwithApp.Bbyputting'THI S ISA DRILL'before'THI S I S A REAL E V EN r.30 1 123/2007 8 , 12 , 13 Planeffectivenessdeterminationsreviewsindicate

thefoll ow ing revis ions donotreducet

helevelo feffectivenessoftheprocedu

reofR EP:Annualrev iew.Changedtoc

urrentorgtitles, clari fiedmakingSiteAreaEmergencyannouncementon

Did plan tPAandthe x4800bridge.

Revised responsibili

tyofdoseassessmentfromChemistrvtoRP

.FOR WA RD CO MPLETED PROCEDURE TO EMERGEN CY P REP ARED N ESS MAN A GE R PAGE 2 of 1 5 REVISION 30

!SEQUOYAH SITE AREA EMERGENCY EPIP-4 Table of Contents 1.0 PURPOSE 4 2.0 REFERENCES

4 3.0 INSTRUCTIONS

4 3.1 S i te Area Emergency Dec la ra tio n b ytheM a i n Control Roo m 4 3.2 SiteAreaE mergenc y Declaration

by the TSC 7 3.3 Monito r Cond i t io ns 83.4Term inationoftheEvent.

1 0 4.0 RECORDS RETENTION 11 4.1 R ecordsofC lass i fied Emerge nc ies 1 1 4.2DrillandE x ercise Records 11 5.0 ILLUSTRATIONS

AND APPENDiCES

11 5.1 Appendix A , NotificationsandA

nno uncements 1 2 5.2 Appe nd i x S , TVA Ini tial Notifica tionforS i te Ar ea E me rgency 1 4 5.3 Appe nd i x C , S ite Area Emergency Fo llow-up Informat ion 15 FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MAN AGERPAGE3of15 REVISION 30

EPIP-4SITEAREAEMERGENCY

ISEQUOYAH (1.0PURPOSE1.1Toprovideamethodfortimelynotificationsofappropr

iate indiv idualsororganizationswhentheShiftManager

(SM)/SiteEmergencyDirector(SED)hasdetermined byEPIP-1thateventshaveoccurredthatareclass

ifiedasaSITEAREAEMERGENCY (SAE).1.2ToprovidetheSED/SMamethodforperiodicreanalysisofcurrentconditionstodeterminewhethertheSITEAREAEMERGENCYshouldbeterm

inatedorcontinued

.2.0REFERENCES

2.1 Interface Documents[1]SPP-3.5"RegulatoryReportingRequirements

"[2]EPIP-5 ,"GeneralEmergency

"[3]EPIP-6 ,"ActivationandOperat

ionoftheTechnicalSupport

Cente r"[4]EPIP-7,"ActivationandOperationo

ftheOperat ionsSupportCenter

(OSC)"(5)EPIP-8,"PersonnelAccoun

tabilityandEvacuation

"(6)EPIP-10,"EmergencyMedicalResponse

"(7)EPIP-13,"DoseAssessment

"[8]EPIP-14

,"RadiationProtectionResponse

"[9]EPIP-16

,"TerminationandRecovery

"[10]CECCEPIP-9

,"EmergencyEnv

ironmental

Rad iologicalMonitoringProcedures"[11]SSI-7.1

,"PostRequiremen

tsandResponsibilities

,CentralandSecondaryAla

rm Stat ions"3.0INSTRUCTIONS

NOTE:IFtherearepersonnelinjuries,THENIMPLEMENTEPIP-

10."EmergencyMedical

Response."NOTE:IFthereareimmediatehazardstoplantpersonnel

.THENconsider

immediatelyimplementingEPIP-8"PersonnelAccountabil

ityandEvacuation"inparallelwiththis

procedure 3.1SITEAREAEMERGENCYDECLARATIONBYTHEMAINCONTROLROOMUponclassifyingeventsasaSITEAREAEMERGENCYtheSM/SEDshall

[1]IFTSCisOPERATIONAL

, (SED transferredtoTSC), THENGOTOSect ion 3.2 (Page 7).o[2]RECORD time of Declaration.

Time FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE4of15REVISION30

ISEQUOYAHSITEAREAEMERGENCY

EPIP-4 C'3.1SITE AREA EMERGENCY DECLARATIONBYTHEMAIN CONTROL ROOM (Continued)

[3]ACTIVATEEmergencyPagingSystem

(EPS)asfollows

[a]IFEPShasalreadybeenactivated,THENGOTO

Step 4.[b]IFongoingons

ite Secur ityeventsmaypresen

trisktotheemergencyresponders

, THEN CONSULTwithSecurityto

determineifsiteaccessis

dangeroustothelifeandhealthofemergencyresponders

.[c]IFongoingeventsmakess

iteaccessdangeroustothel

ifeandhealthof

emergency responders

, THEN SELECTSTAGINGAREAbuttonontheterm

inal INSTEADoftheEMERGENCYbutton.

[d]ACTIVATEEPSusingtouchscreenterminal.IFEPSfails

toact ivate ,THENcontinuew

ith step 4.o o o o[4]COMPLETE Appendi x B ,TVAInitialNot

ificationforSiteArea

Emergency.0NOTE:ODSshou

ldbenot ified within 5 minutesafterdeclarationoftheevent.

[5]NOTIFY ODS.InitialT imeODS:RingdownLineor

5-751-1 700 o r 5-751-2495 or 9-785-1700[a]IFEPSfailedtoactivatefromSQNwhenattemptedTHENDIRECTODStoactivateSQNEPS

.0[b]IFODS isalsounabletoac

t ivate EPS ,THENcontinuewith

step[5][b].0[c]READcompletedAppendi

xBtoODS.0[d]FAXcomp

letedAppendixB toODS.0 5-751-8620

(Fax)[e]MONITORforconfi rmationcallfromODSthatState

/Local notifications

comp lete:RECORDtimeStatenot

i fied.Notification

Time FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGER PAGE 5 of 15REVISION30

ISEQUOYAHSITEAREAEMERGENCY

EPIP-4 (3.1SITEAREA

EMERGENCY DECLARATIONBYTHEMAIN CONTROL ROOM (Continued)[6]IF ODS CANNOT be contacted within 10 minutesofthe declaration

, THEN[a]CONTACT Tennessee Emergency Management

Agency (TEMA)ANDREAD Completed Appendix B.InitialTime

9-1-800-262-3300or9-1-615-741-0001

l[b]FAX completed Append i xBtoTEMA.9-1-615-242-9635 (Fax)[7]ENSUREMSSIVVWMintheOSC(x6428)is monitoring

Emergency Response Organizat ion (ERO)responses us ing printed report availab leintheOSC.[a]IFanyERO positionsarenot responding

, THEN DIRECTMSSto CALL personnel to staff TSC/OSC positions.(UseREPDuty RosterandCallList.

)[8]PERFORM AppendixA,No tifications

and Announcements

.(De legate as needed.)[9]GOTO Section 3.3.o o o FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE6of15 REVISION 30

SITEAREA EMERGENCY ISEQUOYAH r 3.2 SITE AREA EMERGENCY DECLARATIONBYTHETSC Upon c lassifying

eventsasaSITEAREA EMERGENCY the SED shall: EPIP-4 NOTE: CECC Director should be notified within 5 minutes after declaration

of the event.[1]RECORD T ime of Dec laration_[2]RECORD EAL(s)_[3]VALIDATEtimeandEAL

numberswiththeOps

Mgr ,SiteVPo r EP Mgr.0[4]CALL CECC Directorandinformofesca

lation , t ime of declaration

, EAL(s)declared, and descr iption of events.SED's Initials Time R ingdow nLineor5-75

1-1614 or 5-751-1680

[5]IF CECC Director CANNOT be contacted within 10 minutesofthe declaration

, THEN[a]COMPLETE Append ix B (In itial Notificat ionforSAE)[b]NOTIFY TEMAANDREAD completed Appendix B.o SED's Initials Time 9-1-800-262-3300

or 9-1-6 15-741-0001[c]FAX completed AppendixBtoTEMA.9-1-615-242-9635 (Fax)[6]IF not previously

implemented

, THEN PERFORM notifications

using Appendix A.o o FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE7 of 15 REVISION 30

SITE AREA EMERGENCY ISEQUOYAH (3.3 MONITOR CONDITIONS[1]MONITOR

radia tionmon itors.E PIP-4[2]WHENindicationex

istsofanunplannedradiological release ,THENENSUREDoseAssessme

nt isperfo rmed.[a]IFtheCECChasnotassumedDose

Assessment

responsibil

i ty,THENNOTIFYRadiationProtectiontoperformadoseassessmentusingEPIP-13

,"DoseAssessmen

t" AND PROVIDE thefollow ing information

1.Type Of Event (SGTR/L , LOCA , WGDT ,CntmtBypass)

2.ReleasePath(SG/PORV

, Aux , Shld , Turb , Serv , Cond)3.Expected Duration(Ifunknownassume4hou

r duration)7865 (RP Lab)o r 6417 (RPLab)orUseREPCallListtocon

tactaqualified

individualin

RP ,whoisonsite,toperformthedose

assessment.

CAUTION: Assemb ly shou ldNOTbe initia tedIFAssemblywillpresenta

danger t o employees-Fore xamp le: A severe weather conditionexistsoris

imminent (suchasa Tornado)An onsite Securi tyriskcondit

ion e xists(Consult withNu clear Security)[3]IFperson

nel accountabilityhasno tbeenprev iously i n itia ted,THEN ACTIVATEassemblyandaccountability us ing EPIP-8 , Appendi x C(maybedelegated

).[4]MONITOR plan t conditions:[a]EVALUATE condit ions us ing EPIP-1: o o o[1]IF conditionssatisfycriteriaof

GENERAL EMERGENCY(s)THENinitiate EPIP-5.o FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE8of15REVISION30

ISEQUOYAHSITEAREA EMERGENCY EPIP-4 (.3.3 MONITOR CONDITIONS

(Continued)[2]IF additional conditions satisfy criteriaofoth erSITEAREA EMERGENCY(s)

THEN Complete AppendixC.0[3]IF cond itionswarrantaneed

for follow-up information

, THENCompleteAppendi

x C.0[b)IF AppendixCcompleted

, THEN[1]REPORT toC ECCforState n ot ification: Init ia l T imeCECCDirector

Ringdo wnLineor 5-751-1614or5-751-1680 OR ODS: RingdownLineo r 5-751-1700 o r 5-751-2495 o r 9-785-1700[2]FAX co mpleted AppendixCtoCECC o CECC: 5-751-1682(Fax)ORODS: 5-751-8620(F

ax)[3]IF neithertheCECCorODScanbereached

, THEN[a]NOTIFY TEMAANDREAD Appendix C.o In itial T ime 9-1-800-262-3300

o r 9-1-615-741-0001[b)FAX completed Appendix C toTE MA.9-1-615-242-9635(Fax)oFORWARDCOMPLETEDPROCEDURETO

E MERGENCY PREPAREDNESS

MANAGER PAGE 9of15REVISION30

SITEAREA EMERGENCY ISEQUOYAH (3.4TERMINATIONOFTHEEVENT[1]WHEN situation no longere xists , THEN[a]TERMINATEemergencyperEPIP-16,"Terminationand

Recovery".[b]COMPLETE

Appendix C includingT ime a nd Da te Event Terminated

.EPIP-4 D[e]FAXcompleted

AppendixCtoCECCDirector

.CECC: 5-751-1682(Fax)OR ODS: 5-751-8620 (Fax)(Backup)D[2]COLLECTallformsand

appendices

and FORWARD all documentat

iontoEmergencyPreparedness.

D FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE10of15REVISION30

(ISEQUOYAH4.0RECORDRETENTIONSITEAREA EMERGENCY EPIP-4 l 4.1 Records of Classified

EmergenciesThematerialsgeneratedinsupportofkeyact

ionsduringanactual

emergency c lassifiedasNOUEorhigherareconsideredLifetimeretentionNon-QArecords.MaterialsshallbeforwardedtotheEPManagerwhoshallsubm

itanyrecordsdeemednecessaryto

demonstrateperformancetotheCorporateEPManagerforstorage.

4.2 Drill and Exercise RecordsThematerialsdeemednecessarytodemonstrateperformanceofkeyactionsduringdrillsareconsideredNon-QArecords

.TheserecordsshallbeforwardedtotheEPManagerwhoshallreta

inrecordsdeemednecessaryto

demonstrate

six-yearplanperformanceforsi

x years.TheEPManagershallretainotherrecords

inth iscategoryforthreeyears.5.0 ILLUSTRATIONSANDAPPENDICES

5.1 AppendixA-Notifications

and Announcements

Append ix A , Not ificationsandAnnouncements

, p rovidesguidancefor

secur ity threats,andforpromptnot

ification of theNRCResidentandplant

personnel.

5.2 AppendixB-TVA Initial Notification

for Site Area EmergencyAppendixS ,TVAInitialNotificationforSiteAreaEmergency

,isusedto init ially not ify the OperationsDutySpec ialistwhonotifiesthe

Tennessee Emergency Management

Agency.5.3 AppendixC*Site Area Emergency Follow-up InformationAppendixC ,SiteA reaEmergencyFollow-upInformation

,isusedtoprovideadditionalinformationconcern

ingotherS iteAreaEmergenciesorotherinfo rmationconcerningadditionalcond

i t ions totheODSforS

tatenotificationandeventterm

ina tion.FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGER PAGE 11of15REVISION30

ISEQUOYAHSITEAREA EMERGENCY EPIP-4 (APPENDIX A NOTIFICATIONS AND ANNOUNCEMENTS

(Page 1 of2)[1]IF there isa secur ity threat , THEN[a]NOTIFY SecurityShiftSupervis

or to implement S SI-1,"SecurityInstructionsForMembers Of The Security Force"andEPIP-11"SecurityandAccess

Control".Initial Time6144or6568

[b)DETERMINEifSecurity

recommends

implementing

the"TwoPersonLineof

Sight"Rule.

D[c)IF Nuclear Security recommends

establish ins the"TwoPersonLineofSight" RUle ,THENINFRM the SM/SED.("TwoPersonLineofSigh

t" requ iresuseof E PIP-8).Initial Time[2]NOTIFY Radiation Protection

[a]STA TE: "ASITEAREA EMERGENCYHASBEEN DECLARED ,BASEDUPON (Describe theconditions), AFFECTING UNIT (s)_." Ini tial Time 7865 (RPLab)or64

17(RPLab)[b)DIRECT RadiationProtectionto

implement EPIP-14,"RadiologicalControlResponse

".D[c)DIRECT Rad iation Protection to implementCECC

EPIP-9 ,"Emergency Environmental

Radiological

Monitoring

Procedures

" wh ich includesactivationoftherad i ological monitoring va n.D[3]NOTIFY personnel inthe Chemistry Lab:[a]STATE: " ASITEAREA EMERGENCYHASBEEN DECLARED ,BASEDU PON (Describethecondit

ions), AFFECTING UNIT (s)_." Initial Time7285(Lab)or6348(Lab)or20126(Pager)

[b)DIRECT Chem istry to implementEPIP-14

,"Rad iologicalCon

trol Response".D l FORWARD COMPLETEDPROCEDURET O PAGE12of15 REVI SION 30 EMERGENCY PRE PAREDNESS MANAGER

(ISEQUOYAH SITE AREA EMERGENCYAPPENDIXANOTIFICATIONSANDANNOUNCEMENTS

(Page 20(2)EPIP-4[4]ANNOUNCE toplantpersonne

lontheo ld plan tPAandthex4800

br idge:[a]" A TIENTIONPLANTPERSONNEL.

ATIENTION PLANTPERSONNEL.ASITEAREAEMERGENCYHASBEENDECLAREDBASEDON

(Describet he conditio n>, AFFECTING UNIT(s).(if notalready staffed , add)STAFFTHETSCAND

OSC." 0[b)REPEATAnnouncement.

0[5]NOTIFYP

lant Management

inaccordancew

ith SPP-3.5ANDPROVIDESAE

Information.

In itial T ime[6]NOTIFYthe

"OnCall"NRCRes identANDPROVIDESAE

Information

.InitialTimeNOTE:NRCENSnotificationshouldbemadeassoonaspract

icable ,butwithin1hou

r of"SITEAREAEMERGENCY

" declaration.WheneverNRC

requests ,aqualifiedpersonmustprovideacontinuousupda

tetoNRCOperationsCenter.Use

EPIP-6, Appendi xBasabriefingguide.[7]NOTIFYNRCofplanact

ivationusingENSphone.InitialTime

9-1-(301)816-5100 (Main)9-1-(301)951-0550(Backup)9-1-(301)816-5151(Fax)[8]NOTIFYtheSM/SEDthatnotificationsarecomplete

.In itial T ime FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE13of15REVISION30

ISEQUOYAHSITEAREAEMERGENCY

EPIP-4 APPENDIXB TVA INITIAL NOTIFICATIONFORSITE AREA EMERGENCYTVA INITIAL NOTIFICATIONFORSITE AREA EMERGENCY 1.0 Th is i saDrill o ThisisanActual Event*R epeat-ThisisanActuai Event 2.Th is isSED , Sequoyah hasdeclaredaSITEARE A EMERGENCY affecti ng: o Unit1 o Uni t2 o Both U n it1andUn it 2 3.EAL Design a tor(sl: 4.Brief Description

of the Event: 5.Radiologica

l Cond itions: (Checkoneb o x undereach Airborne A ND Liquidcol umn.)Airbo rne Re lease s Offsi te Liquid ReleasesOffs ite o Minorreleaseswithin federailyapprovedlimits'o Minor releases wit h infederally approvedlimits 1 o Releases ab ove federa ily a pproved limits'o Releases above federailyapprovedlimits'o Release informationnotknown o Releaseinformationnotknown ('TechSpecs)('TechSpecs)6.E vent Declared: T ime: Date: 7.Provide Protective

Action Recommendation:

0 None 8.Please repeatbackthe

informationyouhave received t o ensurea c curacy.0 9.When comple ted , FAX this information

to theODS.0FORWARDCOMPLETEDPROCEDURETO

EMERGENCY PREPAREDNESS

MANAGERPAGE14 of 15REVISION30

(ISEQUOYAHSITEAREA EMERGENCY APPENDIXCSITEAREA EMERGENCY FOLLOW*UP INFORMATION

EPIP-4 1.0 TH IS IS A DR il l o THISIS AREALEVENT 2.Therehasbee

n a S ITEAREAEMERGENCY

dec lared a t Seq uoy a h affecti n g: o Unit 1 0 Unit2 0 Both U n it1andUn it 2 3.Reactor Status: Unit1: 0 Shu t Do wn Unit2: 0ShutDo wn o A t Power oAtPo wer o Refueling o Refueling D N/A DN/A 8.O nsite Protect ive A ct ions: Assembly andAcco untab ility S ite Evacuation 4.Addi t ional EAL Designators

5.Signif icant Changes inPlant Conditions:

6.Signi f icant Changesi n Radiolog ical Cond i tions: 7.Oftsite P rotec tive Action Recommenda

tion: o N on e o No 0 In itiate d 0 Completed o No 0 Initiated 0 Completed 9.The Meteorological

Condi tions are: (Use46 m e ter d a ta on t he Met Tower)Wind Speed: m.p.h , Wind Direction isf rom: degrees 1 0.Event Term inated: DatelTime_1 1.Pleaserepeatback the i n formationyou haverece i ve d t o ensure accuracy.0 1 2.FAXtoODS a t 5-751-8620orCECCD

irectorat5-751-1682 aftercompleting thenotification

.0 Comp leted b y:_Dme mm e_FORWARD COMPLETEDPROCEDURETO

EMERGENCY PREPARED NESS MANAGER PAGE150f15

REVISION 30