Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 June 22, 2020 10CFR50.54(q) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the Sequoyah Nuclear Plant (SQN)

Radiological Emergency Plan. The affected documents are the SQN Emergency Plan Implementing Procedures (EPIPs) listed below.

EPIP Revision JjtJe Effective Date Notification of Unusual Event June 10, 2020 Medical Emergency Response June 8, 2020 Emergency Exposure Guidelines June 8, 2020 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plan. Details of the revisions are included in the enclosure.

Itwas recently identified that previous revisions of EPIPs have not been submitted to the NRC.

This issue has been entered into the Corrective Action Program. A separate letter will be forthcoming to provide summaries for the previous revisions that were not submitted.

There are no regulatory commitments contained inthis letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.

2 38 10 31 15 12 Respectfully, Matthew Rasmussen Site Vice President Sequoyah Nuclear Plant printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 June 22, 2020

Enclosure:

SQN Units 1 &2 Description of Revision/Change cc: