ML21152A167

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML21152A167
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/27/2021
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML21152A167 (3)


Text

TENNESSEE VALLEY AUTHORITY Tennessee Valley Authority, PostOffice Box2000,SoddyDaisy, Tennessee 37384 May27,2021 10CFR50.54(q) 10CFR72.44(f)

ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.

20555-0001 Sequoyah Nuclear

Plant, Units 1and2 RenewedFacility Operating License Nos.

DPR-77 andDPR-79 NRCDocket Nos.50-327, 50-328, and72-034

Subject:

Emergency PlanImplementing Procedure Revisions Inaccordance with therequirements of10CFR50.54(q) and 10CFR72.44(f),

theTennessee Valley Authority issubmitting adescription ofchanges tothe Sequoyah Nuclear Plant (SQN)

Radiological Emergency Plan.Theaffected documents are the SQN Emergency Plan Implementing Procedures (EPIPs) listed below.

8 23 Personnel Accountability andEvacuation May 19,2021 10 34 Medical Emergency

Response

May 19,2021 Theabovereferenced revisions wereevaluated inaccordance with10CFR50.54(q)(3) and 10CFR72.44(f).

Itwasdetermined that thechanges donotreduce the effectiveness ofthe Emergency Plan.Details oftherevisions areincluded intheenclosure.

Therearenonewregulatory commitments contained inthis letter.

Should youhaveany questions concerning this submittal, please contact Mr.PaulGain, Site Emergency Preparedness

Manager, at(423) 843-7088.

Respectfully,

Reneau, William Wa*ct"s",dper"*"*""'

Christopher

.Doajeo:c2o21.os.2816:26:,2 ThomasB.Marshall Site VicePresident Sequoyah Nuclear Plant

U.S.

Nuclear RegulatoryCommission Page 2

May27, 2021

Enclosure:

SQN Units 1&2Description ofRevision/Change cc:

NRCRegional Administrator

- Region II NRCSenior Resident Inspector

- Sequoyah Nuclear Plant NRCDirector Division ofFuel Management, NMSS

ENCLOSURE:

SQNUNITS1&2DESCRIPTION OFREVISION/CHANGE EP[P-8 Rimilion 23 a

Appendix C,page18,Step[10),

corrected theCECC(Central Emergency Control Center) Director's phonenumber.

EP1P-10 Rimfilog.34 a

Page7,added anotetoclarify that theMERT(Medical Emergency

Response

Team)

Leader andthe Emergency Medical Professional role canbeperformed bythesame individual.

Page29,updatedcontact information forSQNMedical Staff.