ML21152A167

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML21152A167
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/27/2021
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML21152A167 (3)


Text

TENNESSEE VALLEY AUTHORITY Tennessee Valley Authority, PostOffice Box2000, SoddyDaisy, Tennessee 37384 May27,2021 10CFR50.54(q) 10CFR72.44(f)

ATTN:Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units1and2 Renewed Facility Operating License Nos. DPR-77 andDPR-79 NRCDocket Nos. 50-327, 50-328, and72-034

Subject:

Emergency Plan Implementing Procedure Revisions Inaccordance with therequirements of10CFR50.54(q) and 10CFR72.44(f), the Tennessee Valley Authority issubmitting a description ofchanges tothe Sequoyah Nuclear Plant(SQN)

Radiological Emergency Plan. Theaffected documents arethe SQN Emergency Plan Implementing Procedures (EPIPs) listedbelow.

8 23 Personnel AccountabilityandEvacuation May 19,2021 10 34 Medical Emergency Response May 19,2021 Theabove referenced revisions wereevaluated inaccordance with 10CFR50.54(q)(3) and 10CFR72.44(f). It wasdetermined that the changes donotreduce theeffectiveness ofthe Emergency Plan. Details oftherevisions areincluded intheenclosure.

There arenonewregulatory commitments contained inthis letter.Should youhaveany questions concerning this submittal, please contact Mr.Paul Gain, Site Emergency Preparedness Manager, at(423) 843-7088.

Respectfully, Reneau, William Wa*ct"s",dper"*"*""'

Christopher .Doajeo:c2o21.os.2816:26:,2 ThomasB.Marshall Site Vice President Sequoyah Nuclear Plant

U.S. Nuclear Regulatory Commission Page 2 May27, 2021

Enclosure:

SQN Units 1& 2 Description ofRevision/Change cc: NRCRegional Administrator -

RegionII NRCSenior Resident Inspector -

Sequoyah Nuclear Plant NRCDirector -

Division ofFuel Management, NMSS

ENCLOSURE: SQNUNITS1& 2 DESCRIPTION OFREVISION/CHANGE EP[P-8 Rimilion 23 a Appendix C,page18,Step [10), theCECC(Central corrected Emergency Control Center) Director's phone number.

EP1P-10 Rimfilog.34 a Page7,added a notetoclarify that theMERT(Medical Emergency

Response

Team)

Leader andthe Emergency Medical Professional role canbe bythesame performed individual.

  • Page29,updatedcontact information forSQNMedical Staff.