ML17193A963
ML17193A963 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 07/12/2017 |
From: | NRC/RGN-II |
To: | Tennessee Valley Authority |
References | |
Download: ML17193A963 (151) | |
Text
SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.1.a
2016-302 JPM A.1.a Page 2 of 10 SRO JOB PERFORMANCE MEASURE Task: Determine Maintenance of Active License Status Task #: 3410970302 Task Standard:
The Examinee determines that Operator A, C and D have maintained an active license status and that Operator B has not accumulated sufficient time required to maintain an active license status.
Time Critical Task: YES: NO: X K/A Reference/Ratings: 2.1.4 (3.3/3.8)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator In-Plant Classroom X Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 20 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM A.1.a Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
References:
Reference Title Rev No.
- 1. License Status Maintenance, Reactivation and OPDP 10 8 Proficiency for Non-Licensed Positions Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Four Reactor Operators have the following license status and time on shift for this quarter is as listed as below.
Operator A 7/01/16 License was active 7/02/16 worked 0700-1900 shift as Unit 2 OATC 7/03/16 worked 0700-1900 shift as Unit 1 OATC 7/04/16 worked 0700-1900 shift as Unit 1 CRO 7/05/16 worked 0700-1900 shift as Unit 2 OATC 7/14/16 worked 1900-0700 shift as Unit 2 OATC 7/15/16 worked 1900-0700 shift in the Tagging Office.
7/17/16 worked 1900-0700 shift as Unit 1 CRO Operator B 7/01/16 License was active 7/03/16 worked 0700-1900 shift as Unit 1 OATC 7/05/16 worked 0700-1900 shift as Unit 1 OATC 7/14/16 worked 0700-1900 shift as Unit 1 OATC 7/28/16 worked 0700-1900 shift as Unit 1 OATC 8/02/16 worked 0700-1900 shift in the Tagging Office.
2016-302 JPM A.1.a Page 4 of 10 Operator C 7/01/16 License inactive 7/12/16 thru 7/12/16 thru 7/16/16 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 7/16/16 1 OATC and completed all requirements for license reactivation.
8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.
8/31/16 worked 1900-0700 shift as Unit 1 OATC Operator D 7/01/16 Issued a new NRC License 8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.
8/31/16 worked 1900-0700 shift as Unit 1 OATC
- 2. None of the operators work on shift for the rest of this quarter.
INITIATING CUES:
- 1. Accounting only for on shift time, determine the status of each Reactor Operators License Status at the beginning of the fourth quarter of 2016.
- 1. Notify the Examiner the results when complete.
2016-302 JPM A.1.a Page 5 of 10 Start Time STEP 1 : SAT Obtain a copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions. UNSAT Copy of OPDP-10 License Status Maintenance, reactivation and Standard:
Proficiency for Non-Licensed Positions is obtained.
Provide a copy of OPDP-10 License Status Maintenance, reactivation Cue and Proficiency for Non-Licensed Positions.
Comment
2016-302 JPM A.1.a Page 6 of 10 STEP 2 : SAT UNSAT The Examinee reviews OPDP 10 License Status Maintenance, Standard:
reactivation and Proficiency for Non-Licensed Positions.
Comment
2016-302 JPM A.1.a Page 7 of 10 Status of Operator A License.
STEP 3 : SAT UNSAT The Examinee determines Operator A license status will be active in the Standard: fourth quarter of 2016 because Operator A worked the required 5 CRITICAL twelve hour shifts in a license position during the current quarter.
Comment Status of Operator B License.
STEP 4 : SAT UNSAT The Examinee determines Operator B license status will NOT be active in the fourth quarter of 2016 because Operator B worked only four Standard: CRITICAL twelve hour shifts in a license position during the current quarter in a required position.
Examiner The operator worked one 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift in the tagging office which is Note: not a required licensed position.
Comment Status of Operator C License.
STEP 5 : SAT UNSAT The Examinee determines Operator C license status will be active in the Standard: fourth quarter of 2016 because Operator C was reactivated in the CRITICAL previous quarter.
Comment
2016-302 JPM A.1.a Page 8 of 10 Status of Operator D License.
STEP 5 : SAT UNSAT The Examinee determines Operator D license status will be active in the Standard: fourth quarter of 2016 because Operator D was issued a license in the CRITICAL third quarter of 2016.
Comment Terminating The JPM is complete when the Examinee returns the cue sheet to Cue: STOP the Evaluator.
1.
Stop Time
2016-302 JPM A.1.a JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Four Reactor Operators have the following license status and time on shift for this quarter as listed as below.
Operator A 7/01/16 License was active 7/02/16 worked 0700-1900 shift as Unit 2 OATC 7/03/16 worked 0700-1900 shift as Unit 1 OATC 7/04/16 worked 0700-1900 shift as Unit 1 CRO 7/05/16 worked 0700-1900 shift as Unit 2 OATC 7/14/16 worked 1900-0700 shift as Unit 2 OATC 7/15/16 worked 1900-0700 shift in the Tagging Office.
7/17/16 worked 1900-0700 shift as Unit 1 CRO Operator B 7/01/16 License was active 7/03/16 worked 0700-1900 shift as Unit 1 OATC 7/05/16 worked 0700-1900 shift as Unit 1 OATC 7/14/16 worked 0700-1900 shift as Unit 1 OATC 7/28/16 worked 0700-1900 shift as Unit 1 OATC 8/02/16 worked 0700-1900 shift in the Tagging Office.
2016-302 JPM A.1.a Operator C 7/01/16 License inactive 7/12/16 thru 7/12/16 thru 7/16/16 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 7/16/16 1 OATC and completed all requirements for license reactivation.
8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.
8/31/16 worked 1900-0700 shift as Unit 1 OATC Operator D 7/01/16 Issued a new NRC License 8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.
8/31/16 worked 1900-0700 shift as Unit 1 OATC
- 2. None of the operators work on shift for the rest of this quarter.
INITIATING CUES:
- 2. Accounting only for on shift time, determine the status of each Reactor Operators License Status at the beginning of the fourth quarter of 2016.
- 3. Notify the Examiner the results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.1.b
2016-302 JPM A.1.b Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Perform a Reactivity Balance Calculation using 0-SO-62-7, Attachment 9 Task #: 0040070101 Task Standard: Examinee performs 0-SO-62-7 Attachment 9, Reactivity Balance Calculation and determines a dilution is required to reduce RCS boron concentration by -222 ppm. (-219 to -231 is allowed)
Time Critical Task: YES: NO: X K/A Reference/Ratings: 2.1.25 (3.9/4.2)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator In-Plant Classroom X Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 30 minutes Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM A.1.b Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. 0-SO-62-7 Boron Concentration Control Attachment 9
References:
Reference Title Rev No.
- 1. 0-SO-62-7 Boron Concentration Control Appendix 80
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1, Cycle 21 with initial conditions as follows:
- 2. Time in Core Life is 200 MWD/MTU.
- 3. Power is at 25%.
- 4. Boron Concentration 1400 ppm.
- 5. CB D 185 steps.
- 6. Current Xenon equilibrium concentration is -1966 pcm FINAL CONDITIONS:
- 1. Power 100%.
- 2. CB D 228 steps.
- 3. Final projected Xenon concentration will be -2554 pcm.
- 4. Power change rate is 3%/hour.
INITIATING CUES:
- 1. Perform steps 1 and 2 of 0-SO-62-7, BORON CONCENTRATION CONTROL Attachment 9, Reactivity Balance calculation.
- 2. Determine the change in boron concentration, round to the nearest whole number ppm.
- 3. For the purpose of this JPM assume only one calculation will be made.
2016-302 JPM A.1.b Page 4 of 8 Start Time STEP 1 : SAT Obtain a copy of 0-SO-62-7 Boron Concentration Control, Attachment 9 Reactivity Balance Calculation. UNSAT Copy of 0-SO-62-7 Boron Concentration Control, Attachment 9 Standard:
Reactivity Balance Calculation is obtained.
Provide a copy of 0-SO-62-7 Boron Concentration Control, Attachment Cue 9 Reactivity Balance Calculation.
Comment STEP 2 : SAT UNSAT Examinee records the data from 0-SO-62-7 Boron Concentration Standard:
Control, Attachment 9 Reactivity Balance Calculation.
Comment Examiner The start data is provided to the examinee on the JPM briefing sheet.
Note:
2016-302 JPM A.1.b Page 5 of 8 STEP 3 : SAT UNSAT Examinee determines reactivity change for power defect is -1100 pcm (-
Standard: CRITICAL 1125 to -1100 allowed)
Comment Examiner Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure Note: 1.
STEP 4 : SAT UNSAT Standard: Examinee determines reactivity change for xenon is -588 pcm. CRITICAL Comment Examiner Initial and final xenon levels were given in the initial conditions.
Note:
2016-302 JPM A.1.b Page 6 of 8 STEP 5 : SAT UNSAT Examinee determines reactivity change for control rods is +280 pcm. (250 Standard: CRITICAL to 300 allowed)
Comment Examiner Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure Note: 4.
Examiner Initial and final rod positions were given in the initial conditions.
Note:
STEP 6 : SAT UNSAT Examinee determines the total reactivity change is -1408 pcm (-1388 to -
Standard: CRITICAL 1463 is allowed).
Comment
2016-302 JPM A.1.b Page 7 of 8 STEP 7 : SAT UNSAT Examinee determines the total boron reactivity change is 1408 pcm (1388 Standard: CRITICAL to 1463 is allowed).
Comment STEP 8 : SAT UNSAT Examinee determines the total boron concentration change is -222 ppm.
Standard: CRITICAL
(-219 to -231 is allowed)
Comment Examiner Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure Note: 7 to determine the differential boron worth of -6.34 pcm/ppm.
Examiner Note: Initial boron concentration was given in the initial conditions.
Terminating The JPM is complete when the examinee returns the JPM briefing Cue: STOP sheet to the Examiner.
1.
Stop Time
2016-302 JPM A.1.b JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1, Cycle 21 with initial conditions as follows:
- 2. Time in Core Life is 200 MWD/MTU.
- 3. Power is at 25%.
- 4. Boron Concentration 1400 ppm.
- 5. CB D 185 steps.
- 6. Current Xenon equilibrium concentration is -1966 pcm FINAL CONDITIONS:
- 1. Power 100%.
- 2. CB D 228 steps.
- 3. Final projected Xenon concentration will be -2554 pcm.
- 4. Power change rate is 3%/hour.
INITIATING CUES:
- 1. Perform steps 1 and 2 of 0-SO-62-7, BORON CONCENTRATION CONTROL Attachment 9, Reactivity Balance calculation.
- 2. Determine the change in boron concentration, round to the nearest whole number ppm.
- 3. For the purpose of this JPM assume only one calculation will be made.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.2
2016-302 JPM A.2 Page 2 of 9 RO JOB PERFORMANCE MEASURE Task: Perform a System Operability Checklist when Unit 1 Turbine Driven Auxiliary Feed Pump is inoperable.
Task #: 0001360301 Task Standard:
The examinee will perform a System Operability Checklist when the Unit 1 Turbine Driven Auxiliary Feed pump becomes inoperable and determines the required protected train tag placement for configuration control. The examinee will then place the protected tags on the required components in the simulator.
Time Critical Task: YES: NO: X K/A Reference/Ratings: 2.2.14 (3.9/4.3)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 10 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM A.2 Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. Non LAN connected computer
References:
Reference Title Rev No.
- 1. 0-GO-16 System Operability Checklists 22
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. Unit 1 Turbine Driven Auxiliary Feed Pump is out of service and will remain out of service past the end of the shift.
INITIATING CUES:
- 1. The SRO has directed you to determine which control room components (if any) need to be designated as Protected Equipment.
- 2. Once you determine the designated equipment, place the required tags (if any) on the designated equipment in the simulator.
- 3. Notify the Examiner of results when complete.
2016-302 JPM A.2 Page 4 of 9 Start Time STEP 1 : SAT Obtain a copy of 0-GO-16, System Operability Checklists.
UNSAT Standard: Copy of 0-GO-16, System Operability Checklists is obtained.
Cue Provide a copy of 0-GO-16, System Operability Checklists.
Comment STEP 2 : SAT UNSAT The examinee determines "PROTECTED EQUIPMENT" tags are Standard:
required for the opposite train equipment.
Comment
2016-302 JPM A.2 Page 5 of 9 STEP 3 : SAT UNSAT Standard: The examinee selects Appendix J for AFW Unit 1.
Comment STEP 4 : SAT UNSAT The examinee determines MDAFW Pump A requires a Protected Standard: Equipment tag and places a protected equipment tag on 1-HS-3-118A CRITICAL MDAFW Pump A.
Comment STEP 5 : SAT UNSAT The examinee determines MDAFW Pump B requires a Protected Standard: Equipment tag and places a protected equipment tag on 1-HS-3-128A CRITICAL MDAFW Pump B.
Comment
2016-302 JPM A.2 Page 6 of 9 STEP 6 : SAT UNSAT The examinee determines D/G 1A-A requires a Protected Equipment Standard: tag and places a Protected Equipment tag on 1-HS-57-46A 1912 DG CRITICAL to SD BD 1A-A.
The examinee may also choose any of the following locations for the tag placement.
Examiner Note:
Comment
2016-302 JPM A.2 Page 7 of 9 STEP 7 : SAT UNSAT The examinee determines D/G 1B-B requires a Protected Equipment Standard: tag and places a Protected Equipment tag on 1-HS-57-73A 1914 DG CRITICAL to SD BD 1B-B.
The examinee may also choose any of the following locations for the tag placement.
Examiner Note:
Comment
2016-302 JPM A.2 Page 8 of 9 Terminating The JPM is complete when the Examinee returns the cue sheet to Cue: STOP the Evaluator.
1.
Stop Time
2016-302 JPM A.2 JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. Unit 1 Turbine Driven Auxiliary Feed Pump is out of service and will remain out of service past the end of the shift.
INITIATING CUES:
- 1. The SRO has directed you to determine which control room components (if any) need to be designated as Protected Equipment.
- 2. Once you determine the designated equipment, place the required tags (if any) on the designated equipment in the simulator.
- 3. Notify the Examiner of results when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.4
2016-302 JPM A.4 Page 2 of 9 SRO JOB PERFORMANCE MEASURE Task: Complete a NRC Event Notification Worksheet Task #: 0001460501 Task Standard: The examinee completes an Appendix D from procedure EPIP-5, General Emergency with no errors on items annotated with an *, selects at least ONE NRC contact number to the NRC as stated in EPIP-5, and notifies the facility operator of the completed EPIP-5 Appendix D within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of starting the task.
Time Critical Task: YES: X NO:
K/A Reference/Ratings: 2.4.39 (3.9)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 15 minutes Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM A.4 Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
Tools/Equipment/Procedures Needed:
- 1. In progress copy of EPIP 5, GENERAL EMERGENCY
References:
Reference Title Rev No.
- 1. EPIP-5 GENERAL EMERGENCY 47
========================================================================
Read to the examinee:
DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 has experienced an event today at 1500.
- 2. Unit 1 was in MODE 1, 100% before the event.
- 3. Unit 1 is in MODE 3, 0% after the event.
- 4. The event was a LBLOCA with a failure of Containment.
- 5. EPIP-5, GENERAL EMERGENCY, is in-progress and has been completed up to Section 3.6 step [1].
- 6. All previously made emergency classifications have been communicated as required.
INITIATING CUES:
- 1. You have been directed to continue in EPIP-5, starting at Section 3.6 step [2].
- 2. Notify the Examiner of your results.
- 3. There is (are) an element (s) of this task that is (are) time critical.
2016-302 JPM A.4 Page 4 of 9 Start Time STEP 1 : SAT Obtain a copy of the in progress EPIP-5, GENERAL EMERGENCY.
UNSAT Standard: Copy of EPIP-5, GENERAL EMERGENCY is obtained.
Cue Provide an in progress copy of EPIP-5, GENERAL EMERGENCY.
Examiner Annotate start time when the examinee acknowledges the task is Note: understood. Start time____________
Comment
2016-302 JPM A.4 Page 5 of 9 STEP 2 : SAT UNSAT Examinee completes EPIP 5, GENERAL EMERGENCY Appendix D with Standard: CRITICAL no errors on items annotated with an *.
Examiner Note; See copy of the key for correct answers.
Comment
2016-302 JPM A.4 Page 6 of 9 STEP 3 : SAT Contact the NRC using ENS.
UNSAT The examinee attempts to contact the NRC using the Emergency Standard: Notification System (ENS) phone but discovers the ENS phone does not work.
Examiner Note; See copy of the key for correct answers.
Comment
2016-302 JPM A.4 Page 7 of 9 STEP 4 : SAT UNSAT The examinee identifies one NRC contact number either Emergency Standard: Notification System (ENS) or others as stated on EPIP-5 GENERAL CRITICAL EMERGENCY Appendix D step 2.
Comment STEP 5 : SAT UNSAT The examinee transmits the data from the completed EPIP 5, GENERAL Standard: EMERGENCY Appendix D annotated with an
- to the facility operator in CRITICAL the Simulator Booth within one hour of starting the JPM.
Examiner Note: Annotate the stop time for the notification here. ______
Comment
2016-302 JPM A.4 Page 8 of 9 STEP 6 : SAT UNSAT Standard: The examinee returns the completed Appendix D to the Examiner.
Comment Terminating The JPM is complete when the examinee returns the completed Cue: STOP Appendix D to the Examiner.
1.
Stop Time
2016-302 JPM A.4 JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:
The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 has experienced an event today at 1500.
- 2. Unit 1 was in MODE 1, 100% before the event.
- 3. Unit 1 is in MODE 3, 0% after the event.
- 4. The event was a LBLOCA with a failure of Containment.
- 5. EPIP-5, GENERAL EMERGENCY, is in-progress and has been completed up to Section 3.6 step [1].
- 6. All previously made emergency classifications have been communicated as required.
INITIATING CUES:
- 1. You have been directed to continue in EPIP-5, starting at Section 3.6 step [2].
- 2. Notify the Examiner of your results.
- 3. There is (are) an element (s) of this task that is (are) time critical.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC PLANT JPM I
2016-302 JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Local Operation of 1A-A D/G (Idle Start & Stop)
Task #: 0640020104 Task Standard: D/G 1A-A is successfully started using local controls and cooling is established by local operation of the ERCW FCV using 0-SO-82-1 Diesel Generator 1A-A.
Alternate Path: YES: X NO:
Time Critical Task: YES: NO: X K/A Reference/Ratings: 062 A4.07 (3.1/3.1)
Method of Testing:
Simulated Performance: X Actual Performance:
Evaluation Method:
Simulator In-Plant X Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 15 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM I Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
- 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
0-SO-82-1 section 8.2 and Attachments 4 and 5.
References:
Reference Title Rev No.
0-SO-82-1 Diesel Generator 1A-A 55
2016-302 JPM I Page 4 of 10 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
- 3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
- 4. Both of the Unit SROs have given approval to perform this procedure.
- 5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.
INITIATING CUES:
- 1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 Idle Start and Raise to Rated Speed, starting at step 5.
- 2. Inform the SRO when complete.
2016-302 JPM I Page 5 of 10 Start Time STEP 1 : SAT Obtain a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Attachments 4 and 5. UNSAT Standard: Examinee obtains a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Attachments 4 and 5.
Cue Provide a marked up copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Attachments 4 and 5.
Comment STEP 2 : SAT UNSAT Standard: Examinee simulates depressing 0-HS-82-22 CRITICAL Cue: Provide the following cue, 0-HS-82-22 went in and returned to out.
Comment
2016-302 JPM I Page 6 of 10 STEP 3 : SAT UNSAT Standard: Examinee verifies LRX1A TRIPPED to local.
Provide the following cue, LRX1A relay switch is 45 degrees Cue: clockwise from 12 oclock position AND red flag above handswitch is present.
Comment STEP 4 : SAT UNSAT Standard: Examinee addresses the procedure step.
Examiner Note: The step was addressed in the initial conditions.
Comment
2016-302 JPM I Page 7 of 10 STEP 5 : SAT UNSAT Standard: Examinee simulates placing HS-82-23 in the MAINTENANCE CRITICAL (clockwise) position.
Cue: Provide the following cue, Red light above HS-82-23 is ON green light is OFF.
Comment STEP 6 : SAT UNSAT Standard: Examinee addresses the procedure step.
Cue: Provide the following cue, The UO will place out-of-service time in the SI.
Comment STEP 7 : SAT UNSAT Standard: Examinee simulates depressing HS-82-25. CRITICAL Cue: Provide the following cue, You hear a rumbling rotational sound from the diesel engines.
Comment
2016-302 JPM I Page 8 of 10 STEP 8 : SAT UNSAT Standard: Examinee addresses the procedure step.
Cue: Provide the following cue, The UO will log the time.
Comment STEP 9 : SAT UNSAT Standard: Examinee addresses the procedure step.
Cue: Provide the following cue, Engine speed is ~ 400 rpm.
Comment
2016-302 JPM I Page 9 of 10 Provide the following cue, When Examinee looks at position Cue: indicator (or flow indicator), state valve indicates closed (or flow is 0 gpm).
STEP 10 : SAT UNSAT Examinee recognizes FCV-67-66 closed by use of position indicator Standard: on the valve motor OR recognizes no flow indicated on FI-67-69, &
277 and attempts to open the valve.
Provide the following cue, Both lights above HS-67-66 are OFF. If Cue: the examinee attempts to manually open FCV-67-66 provide the following cue, The valve position does not change.
Comment ALTERNATE PATH STEP 11 : SAT UNSAT Examinee simulates opening FCV-67-68 Emerg Dsl Htxs A1 & A2 Sup Standard: Vlv From Hdr B by placing HS-67-68 clockwise or simulates rotating CRITICAL hand wheel for FCV-67-68 CCW.
Cue: Before FCV-67-68 operation provide the following cue, Green light above HS-67-68 is ON, red light is OFF.
Cue: After FCV-67-68 operation provide the following cue, Green light above HS-67-68 is OFF, red light is ON.
Comment Terminating Provide the following cue; Another operator will complete the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM I JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
- 3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step 4.
- 4. Both of the Unit SROs have given approval to perform this procedure.
- 5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.
INITIATING CUES:
- 1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 Idle Start and Raise to Rated Speed, starting at step 5.
- 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC PLANT JPM J
2016-302 JPM J Page 2 of 7 RO/SRO JOB PERFORMANCE MEASURE Task: OPERATE PCV-1-12.
Task #: 0000680501 Task Standard: Examinee establishes local control of PCV-1-12 and simulates fully opening the valve.
Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 068 AA1.01 (4.3/4.5)
Method of Testing:
Simulated Performance: X Actual Performance:
Evaluation Method:
Simulator In-Plant X Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 15 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM J Page 3 of 7 SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
- 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
- 1. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM Appendix K.1
References:
Reference Title Rev No.
AOP-C.04 SHUTDOWN FROM AUXILIARY CONTROL 39 ROOM
========================================================================
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 3.
- 2. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, is in progress.
INITIATING CUES:
- 1. The Operator in the ACR has directed you to take local control of PCV-1-12 (S/G #2) using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1 starting at step 5.
- 2. Inform the Operator in the ACR when complete.
2016-302 JPM J Page 4 of 7 Start Time STEP 1 : SAT Obtain a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1. UNSAT Standard: Examinee obtains a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1.
Cue Provide an in-progress copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1.
Comment STEP 2 : SAT UNSAT Examinee simulates placing the handle for [1-VTIV-1-12F], Vent Valve Standard: CRITICAL in the CW position.
If asked provide the following cue, Valve turns CW 90 degrees, no Cue further movement noted.
Comment
2016-302 JPM J Page 5 of 7 STEP 3 : SAT UNSAT Standard: Examinee simulates placing the knob [1-PREG-1-12], Pressure CRITICAL Regulator in the CCW position.
Cue If asked provide the following cue, Regulator turns CCW several turns until no further movement noted.
Comment STEP 4 : SAT UNSAT Examinee simulates placing the handle for [1-ISIV-32-12K], Isolation Standard: CRITICAL Valve in the CCW position.
If asked provide the following cue, Valve turns CCW 90 degrees, no Cue further movement noted.
Comment
2016-302 JPM J Page 6 of 7 STEP 5 : SAT UNSAT Examinee simulates placing the handle for [1-ISIV-1-12G], Isolation Standard: CRITICAL Valve in the CCW position.
If asked provide the following cue, Valve turns CCW 90 degrees, no Cue further movement noted.
Comment STEP 6 : SAT UNSAT Examinee simulates placing the knob for [1-PREG-1-12], Pressure Standard: CRITICAL Regulator, in the full clockwise direction.
Provide the following cue The ACR directs you to fully OPEN 1-PCV-Cue 1-12.
Comment Terminating Provide the following cue, another Examinee will complete the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM J JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 3.
- 2. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, is in progress.
INITIATING CUES:
- 1. The Operator in the ACR has directed you to take local control of PCV-1-12 (S/G #2) using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1 starting at step 5.
- 2. Inform the Operator in the ACR when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC PLANT JPM K
2016-302 JPM K Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task: Local Control of Charging Flow (2-FCV-62-93)
Task #: 0040390104 Task Standard: 2-FCV-62-93 is simulated in local manual control and charging/seal flow has been adjusted to nominal values.
Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 028 AA1.07 (3.3/3.3)
Method of Testing:
Simulated Performance: X Actual Performance:
Evaluation Method:
Simulator In-Plant X Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 10 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM K Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
- 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
- 1. 2-SO-62-1, section 8.4
References:
Reference Title Rev No.
2-SO-62-1 CVCS 70
========================================================================
READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 2 is in Mode 1
- 2. Pressurizer level is on program.
- 4. 2-HIC-62-93 charging flow controller is failing to properly control pressurizer level in automatic.
- 5. All prerequisite actions are completed.
INITIATING CUES:
- 1. The Unit 2 RO has directed you to establish local control of 2-FCV-62-93 using 2-SO-62-1, CVCS section 8.4.
- 2. Adjust charging flow as directed by the control room operator.
- 3. Inform the RO when complete.
2016-302 JPM K Page 4 of 9 STEP 1 : SAT Obtain a copy of 2-SO-62-1, CVCS section 8.4.
UNSAT Standard: Examinee obtains a copy of 2-SO-62-1, CVCS section 8.4.
Cue Provide a copy of 2-SO-62-1, CVCS section 8.4.
Comment STEP 2 : SAT UNSAT Standard: Examinee obtains permission from Unit 2 SRO to locally control 2-FCV-62-93.
Cue: If asked provide the following cue, The Unit 2 SRO has given you permission to locally control 2-FCV-62-93.
Examiner note: Permission was implied during the initiating cue Comment
2016-302 JPM K Page 5 of 9 STEP 3 : SAT UNSAT Standard: Examinee simulates establishing radio communications between Unit Operator and local operator.
Cue If asked acknowledge establishing communications with the Control Room.
Comment STEP 4 : SAT UNSAT Standard: Examinee simulates contacting the Control Room and determines a CCP is in service.
Cue If asked provide the following cue, Normal charging is in service with 2A-A CCP running and [2-FCV-62-98] and [2-FCV-62-99] are OPEN.
Comment
2016-302 JPM K Page 6 of 9 STEP 5 : SAT UNSAT Standard: Examinee simulates turning 2-HIC-62-93B CHARGING HEADER CRITICAL FLOW CONT. clockwise to raise the setpoint (red pen).
When the Examinee locates 2-HIC-62-93B CHARGING HEADER Cue: FLOW CONT. provide the following cue, The black indicator is 34%
and the red indicator is 0%.
After the Examinee simulates rotating 2-HIC-62-93B CHARGING Cue: HEADER FLOW CONT. clockwise provide the following cue, The black indicator is 34% and the red indicator is 34%.
Examiner Turning knob clockwise will raise setpoint. (Direction to turn during note: JPM depends on "as found" position of red pen in relation to black pen)
Comment STEP 6 : SAT UNSAT Standard: Examinee simulates placing 2-HIC-62-93B CHARGING HEADER CRITICAL FLOW CONT. to MANUAL (right).
Cue: When the Examinee simulates placing 2-HIC-62-93B provide the following cue, 2-HIC-62-93B has been placed to the right.
Comment STEP 7 : SAT UNSAT
2016-302 JPM K Page 7 of 9 Standard: Examinee simulates contacting the Control Room and determines 2-XI-62-93 on panel 2-M-5 is illuminated.
Cue: If asked provide the following cue, 2-XI-62-93 on panel 2-M-5 is illuminated.
Comment
2016-302 JPM K Page 8 of 9 STEP 8 : SAT UNSAT Standard: Examinee simulates raising flow by turning knob for 2-HIC-62-93B CRITICAL CHARGING HEADER FLOW CONT. clockwise.
Cue: When asked provide the following cue, The Unit 2 RO reports charging flow is 80 gpm and directs you to raise flow to 87 gpm.
Cue: After the flow adjustment provide the following cue, Another operator will complete the remaining steps of this procedure.
Examiner Turning knob for 2-HIC-62-93B CHARGING HEADER FLOW CONT.
note: clockwise will raise flow, counterclockwise will reduce flow.
Examiner Examinee may observe 2-FI-62-93B CHARGING HEADER FLOW note: while monitoring flow.
Comment Terminating The task is complete when the Examinee returns the JPM briefing Cue: STOP sheet to the examiner Stop Time
2016-302 JPM K JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- 1. Unit 2 is in Mode 1
- 2. Pressurizer level is on program.
- 4. 2-HIC-62-93 charging flow controller is failing to properly control pressurizer level in automatic.
- 5. All prerequisite actions are completed.
INITIATING CUES:
- 1. The Unit 2 RO has directed you to establish local control of 2-FCV-62-93 using 2-SO-62-1, CVCS section 8.4.
- 2. Adjust charging flow as directed by the control room operator.
- 3. Inform the RO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR JPM A
2016-302 JPM A Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task: Initiate Emergency Boration from the RWST.
Task #: 0000980501 Task Standard: Examinee initiates an emergency boration to the RCS from the RWST through the CCPIT valves using EA-68-4 section 4.3.
Alternate Path: YES: X NO:
Time Critical Task: YES: NO: X K/A Reference/Ratings: APE 024 AA 1.04 (3.6/3.7)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 8 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM A Page 3 of 8 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Reset to IC 285 Password 1503AUDIT
- 3. If IC 285 is not available perform the following:
- PLACE SIMULATOR IN RUN
- IMF RD14A f:228
- IMF RD14B f:228
- IMF ZDIHS62138A f:0
- IMF CV42AUTO f:80
- IMF CV42COMP f:80
- TRIP the Reactor
- 4. PLACE SIMULATOR IN RUN
- 5. An extra operator will be required to acknowledge alarms.
- 6. ACKNOWLEDGE ALARMS
- 7. FREEZE SIMULATOR.
- 9. PLACE SIMULATOR IN RUN
- 10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, if a temporary IC has been deleted.
Tools/Equipment/Procedures Needed:
References:
Reference Title Rev No.
- 1. EA-68-4 Emergency Boration 13 2.
2016-302 JPM A Page 4 of 8 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 3 following a Reactor Trip.
- 2. Two Control Rods are not fully inserted.
- 3. Flow from the BAT cannot be established.
INITIATING CUES:
- 1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.
- 2. Inform the SRO when complete.
2016-302 JPM A Page 5 of 8 Start Time STEP 1 : SAT Obtain a copy of EA-68-4, EMERGENCY BORATION.
UNSAT Standard: Examinee obtains a copy of EA-68-4, EMERGENCY BORATION section 4.3.
Cue: Provide an in progress copy of EA-68-4, EMERGENCY BORATION section 4.3.
Comment STEP 2 : SAT UNSAT Standard: Examinee places HS-62-135A AND/OR HS-62-136A, RWST to CCP CRITICAL to IN and OPEN Comment STEP 3 : SAT UNSAT Standard: Examinee places HS-62-132 AND/OR HS-62-133 VCT OUTLET TO CRITICAL CCP to IN and CLOSE Comment
2016-302 JPM A Page 6 of 8 STEP 4 : SAT UNSAT Standard: Examinee addresses the procedure step as N/A and proceeds to step 4.
Comment STEP 5 : SAT UNSAT Examinee determines sufficient flow through FCV-62-93 CHARGING Standard: FLOW CONTROL and/or FCV 62-89 CHARGING SEAL WATER FLOW CONTROL cannot be attained and goes to the alternate path.
Comment ALTERNATE PATH STEP 6 : SAT UNSAT Standard: Examinee places HS-63-26 CCPIT OUTLET ISOL OR HS-63-25 CRITICAL CCPIT OUTLET ISOL to OPEN.
Comment
2016-302 JPM A Page 7 of 8 ALTERNATE PATH STEP 7 : SAT UNSAT Standard: Examinee places HS-63-39 CCPIT INLET ISOL OR HS-63-40 CCPIT CRITICAL INLET ISOL to OPEN.
Comment STEP 7 : SAT UNSAT Standard: The Examinee places Charging Isolation valves HS-62-90 OR HS CRITICAL 91 to CLOSE.
Comment Terminating When The Examinee closes Charging Isolation valves [FCV Cue: 90] or [FCV-62-91] provide the following cue, Another operator STOP will complete the remaining steps of this procedure.
Stop Time
2016-302 JPM A JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 3 following a Reactor Trip.
- 2. Two Control Rods are not fully inserted.
- 3. Flow from the BAT cannot be established.
INITIATING CUES:
- 1. The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.
- 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR JPM B
2016-302 JPM B Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Establish Excess Letdown Task #: 0040160101 Task Standard: The examinee will place Excess Letdown in service at a rate to cause pressurizer level to be stable or lowering.
Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 004 A2.07 (3.4/3.7)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 10 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM B Page 3 of 10 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Reset to IC 303
- 3. If IC 303 is not available then perform the following:
a) Reset to IC 16.
b) Ensure normal letdown ISOLATED (FCVs-62-69, 70, 72, 73, 74 & 77 CLOSED) c) Place charging in manual and run to minimum flow approx 30 gpm.
- 4. An extra operator will be required to acknowledge alarms.
- 5. ACKNOWLEDGE ALARMS
- 6. FREEZE SIMULATOR.
- 7. Provide a copy of EA-62-3 ESTABLISHING EXCESS LETDOWN.
- 8. PI-62-64 CAN BE MONITORED BY VIEWING POINT CVPSWHXIN AND SUBTRACTING 14.7
- 10. PLACE SIMULATOR IN RUN
Tools/Equipment/Procedures Needed:
EA-62-3 ESTABLISHING EXCESS LETDOWN
References:
Reference Title Rev No.
EA-62-3 ESTABLISHING EXCESS LETDOWN 3
2016-302 JPM B Page 4 of 10 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO THE EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. NORMAL letdown has been isolated in response to indications of a small leak on the RCS using AOP-R.05.
- 3. The leak has been isolated by taking letdown out of service.
INITIATING CUES:
- 1. The SRO has directed you to place excess letdown in service using EA-62-3.
- 2. All prerequisites are complete
- 3. Inform the SRO when excess letdown is in service and pressurizer level is constant or lowering.
2016-302 JPM B Page 5 of 10 Start Time STEP 1 : SAT Obtain a copy of EA-62-3 ESTABLISHING EXCESS LETDOWN UNSAT Standard: The Examinee obtains a copy of EA-62-3 ESTABLISHING EXCESS LETDOWN Cue Provide a marked up copy of EA-62-3 ESTABLISHING EXCESS LETDOWN.
Comment STEP 2 : SAT UNSAT The Examinee maintains charging near minimum (<30 gpm). The Standard: Examinee will ensure expeditious procedure performance prevents Pressurizer level exceeding Hi Level Alarm.
Comment
2016-302 JPM B Page 6 of 10 STEP 3 : SAT UNSAT Standard: The Examinee determines by observation of rad monitors that high activity is not suspected and N/As step.
If asked provide the following cue, Radcon/Chemistry has determined Cue:
that no high RCS activity is present.
Comment STEP 4 : SAT UNSAT The Examinee verifies FCV-70-143 is OPEN, by observing red light Standard:
above 1-HS-70-143A is ON.
Comment STEP 5 : SAT UNSAT The Examinee places HS-70-85 CCS outlet to excess letdown heat Standard: CRITICAL exchanger to OPEN.
HS-70-85 needs to be maintained in the OPEN position momentarily Examiner since it is an air operated valve, there is no malfunction inserted for note:
this JPM.
Comment
2016-302 JPM B Page 7 of 10 STEP 6 : SAT UNSAT The Examinee verifies CCS flow to excess letdown heat exchanger Standard:
greater than 230 gpm by observing 1-FI-70-84.
Comment STEP 7 : SAT UNSAT The Examinee verifies FCV-62-59 excess letdown divert valve is in the Standard: NORMAL position, by observing the left red light above 1-HS-62-59A is ON.
Comment STEP 8 : SAT UNSAT Standard: The Examinee places HS-62-54 excess letdown isolation valve to CRITICAL OPEN.
Comment
2016-302 JPM B Page 8 of 10 STEP 9 : SAT UNSAT Standard: The Examinee places HS-62-55 excess letdown isolation valve to CRITICAL OPEN.
Comment STEP 10 : SAT UNSAT The Examinee OPENS FCV-62-56A by rotating HIC-62-56A CCW to Standard: increase excess letdown flow so as NOT to exceed 240oF on 1-TI CRITICAL 58.
If asked provide the following cue, AUO has been dispatched and is Cue:
on station.
Examiner Have the booth operator monitor computer point for indication of PI-Note 62-64.
Comment
2016-302 JPM B Page 9 of 10 STEP 11 : SAT UNSAT Standard: The Examinee notifies RADCON excess letdown has been placed in service.
Cue: Acknowledge communication.
Comment STEP 12 : SAT UNSAT Standard: The Examinee addresses the procedure step.
Comment Terminating The task is complete when the Examinee returns the JPM briefing Cue: STOP sheet to the examiner.
Stop Time
2016-302 JPM B JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Assume all independent and concurrent verifications are completed when called for by the procedure.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. NORMAL letdown has been isolated in response to indications of a small leak on the RCS using AOP-R.05
- 3. The leak has been isolated by taking letdown out of service.
INITIATING CUES:
- 1. The US has directed you to place excess letdown in service using EA-62-3.
- 2. All prerequisites are complete
- 3. Inform the US when excess letdown is in service and pressurizer level is constant or lowering.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM C
2016-302 JPM C Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Vent an unisolable Cold Leg Accumulator.
Task #: 0060060101 Task Standard: The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Alternate Path: YES: X NO:
Time Critical Task: YES: NO: X K/A Reference/Ratings: EPE 009 EK 3.21 (4.2/4.5)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 8 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM C Page 3 of 14 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Reset to IC 255 PW 2014DONOTLOOK
- 3. If IC 255 is not available perform the following.
- Reset to IC 24
- IOR ZDIHS6367A f:1
- IRF IAR06 f:2
- IRF SIR01 f:1
- 4. PLACE SIMULATOR IN RUN
- 5. Place MODE 1 sign on the simulator.
- 6. Place an in-progress copy of E-1 on the operators desk.
- 7. When directed insert the following
- IMF AN_OV_604 f:2 k:1
- IOR ZLOHS6367A_GREEN f:0 k:1
- IOR ZLOHS6367A_RED f:0 k:1
- 8. An extra operator will be required to acknowledge alarms.
- 9. ACKNOWLEDGE ALARMS
- 10. FREEZE SIMULATOR.
- 12. PLACE SIMULATOR IN RUN
- 13. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment.
Tools/Equipment/Procedures Needed:
References:
Reference Title Rev No.
- 1. EA-63-1 VENTING UNISOLATED COLD LEG ACCUMULATOR. 0
- 2. E-1 Loss of Reactor or Secondary Coolant 28
2016-302 JPM C Page 4 of 14 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 was in MODE 1 prior to an event.
- 2. The event is still in progress.
- 4. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.
INITIATING CUES:
- 1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
- 2. Inform the SRO when complete.
2016-302 JPM C Page 5 of 14 Start Time STEP 1 : SAT Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT. UNSAT Standard: Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.
Cue: Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.
Comment STEP 2 : SAT UNSAT Standard: The examinee determines RHR Spray will not be placed in service and proceeds to step 18.
Cue: If asked provide the following cue, It has been greater than one hour since shutdown.
Comment
2016-302 JPM C Page 6 of 14 STEP 3 : SAT UNSAT Standard: The examinee determines RCS pressure is less than 175 psig by observing installed instrumentation.
Comment STEP 4 : SAT UNSAT Standard: The examinee dispatches personnel to restore power to the CLA Isolation valves.
Cue: Provide the following cue, Time has been compressed; power has been restored to the CLA Isolation valves.
Comment STEP 5 : SAT UNSAT Standard: Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B.
Examiner The examinee may not depress the SIS RESET TRAIN 1A and 1B Note: pushbuttons but instead may verify Annunciator M4A Window C-4 AUTO SI BLOCKED is LIT and Window D-4 SI ACTUATED is OFF.
Comment
2016-302 JPM C Page 7 of 14 STEP 6 : SAT UNSAT Standard: The examinee places HS-63-118A, HS-63-98A, and HS-63-80A NO 1, 2, CRITICAL and 3 CL ACCUM OUTLET ISOL to CLOSE.
Comment ALTERNATE PATH STEP 7 : SAT UNSAT Standard: The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.
Comment
2016-302 JPM C Page 8 of 14 STEP 8 : SAT UNSAT Standard: The examinee dispatches personnel to close the CLA Isolation valve locally.
Examiner Note DIRECT BOOTH OPERATOR TO INSERT KEY 1 Cue: Provide the following cue, Time has been compressed; FCV-63-67 cannot be closed locally.
Comment
2016-302 JPM C Page 9 of 14 ALTERNATE PATH STEP 9 : SAT UNSAT Standard: The examinee may depress HS-30-64D and HS-30-64E PHASE B ISOL RESET TR-A and TR-B.
Examiner Note; Non-essential air is aligned to containment.
If asked provide the following cue, The TSC has performed an Cue evaluation and concurs restoring non-essential air to containment.
Comment
2016-302 JPM C Page 10 of 14 STEP 10 : SAT UNSAT Standard: The examinee addresses the procedure step.
Cue: Provide the following cue, Time has been compressed, Non-Essential Air has been supplied to the Containment.
Comment STEP 11 : SAT UNSAT Standard: The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Comment
2016-302 JPM C Page 11 of 14 STEP 12 : SAT Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR. UNSAT Standard: Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.
Comment STEP 13 : SAT UNSAT Standard: The examinee addresses the procedure step.
Comment STEP 14 : SAT UNSAT Standard: The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.
Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 9.
Comment
2016-302 JPM C Page 12 of 14 STEP 15 : SAT UNSAT Standard: The examinee addresses the procedure step.
Cue: Provide the following cue, Time has been compressed, Non-Essential Air has been supplied to the Containment.
Comment STEP 16 : SAT UNSAT Standard: The examinee verifies valves closed by observing green lights above valve handswitches ON.
Comment
2016-302 JPM C Page 13 of 14 STEP 17 : SAT UNSAT Standard: The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CRITICAL CONTROL fully CCW.
Comment STEP 18 : SAT UNSAT Standard: The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL CRITICAL to OPEN.
Comment Terminating Provide the following cue, Another operator will address the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 was in MODE 1 prior to an event.
- 2. The event is still in progress.
- 4. E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.
INITIATING CUES:
- 1. You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.
- 2. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM D
2016-302 JPM D Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task: Secure Reactor Coolant Pumps.
Task #: 0030020101 Task Standard: The examinee will manually initiate Safety Injection, secures Reactor Coolant Pumps 1, 2, & 3 from panel M-5 and secures Reactor Coolant Pump #4 by de-energizing the 1D 6.9Kv Unit Board.
Alternate Path: YES: X NO:
Time Critical Task: YES: NO: X K/A Reference/Ratings: 003 A2.02 (3.7/3.9)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 10 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM D Page 3 of 11 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Reset to IC 16.
- 3. IMF TH01A 1.5
- 4. IMF RP02 f:1
- 5. IOR ZDIHS6873A f:3
- 6. PLACE SIMULATOR IN RUN
- 7. An extra operator will be required to acknowledge alarms.
- 8. ACKNOWLEDGE ALARMS
- 9. FREEZE SIMULATOR.
- 11. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:
References:
Reference Title Rev No.
- 1. E-0 REACTOR TRIP OR SAFETY INJECTION 39 2.
2016-302 JPM D Page 4 of 11 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. The Unit Supervisor has temporarily left the Control Room.
INITIATING CUES:
- 1. Respond to plant conditions
2016-302 JPM D Page 5 of 11 Start Time STEP 1 : SAT Perform Immediate Operator Actions.
UNSAT The examinee performs Immediate Operator Actions of E-0, REACTOR TRIP OR SAFETY INJECTION.
Standard:
The examinee manually initiates Safety Injection by placing HS-63-133A CRITICAL and /or 133B SIS ACTUATE TRAIN A&B to ACTUATE.
Examiner Note: If the examinee implements the foldout page go to JPM step 11 Comment STEP 2 : SAT Obtain a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
UNSAT Standard: Examinee obtains a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.
Comment
2016-302 JPM D Page 6 of 11 STEP 3 : SAT UNSAT Standard: The examinee determines the Reactor Tripped by observing installed instrumentation.
Comment STEP 4 : SAT UNSAT Standard: The examinee determines the Turbine Tripped by observing installed instrumentation.
Comment STEP 5 : SAT UNSAT Standard: The examinee determines that at least one 6.9KV shutdown board ENERGIZED on this unit by observing installed instrumentation.
Comment
2016-302 JPM D Page 7 of 11 STEP 6 : SAT UNSAT The examinee manually initiates Safety Injection by placing HS Standard: 133A and /or 133B SIS ACTUATE TRAIN A&B to ACTUATE. (If not CRITICAL already performed.)
Examiner The examinee may have manually actuated safety Injection in JPM Note step 1.
Comment STEP 7 : SAT UNSAT Standard: The examinee addresses the Foldout Page.
Examiner Note: Foldout Page action items are contained in JPM steps 8, 11 and 12.
Comment
2016-302 JPM D Page 8 of 11 STEP 8 : SAT UNSAT Standard: The examinee places HS-68-8A, 31A and 50A RCP 1, 2, & 3 to STOP. CRITICAL Examiner The examinee will place HS-68-73A, RCP 4 to STOP but the Note: handswitch will not function.
Comment
2016-302 JPM D Page 9 of 11 ALTERNATE PATH STEP 9 : SAT UNSAT The examinee dispatches an operator to the Unit 1 6.9KV Unit Boards Standard: and proceeds to Appendix G, Contingency Actions for RCP Trip Failure.
Comment STEP 10 : SAT UNSAT The examinee determines RCP 4 is powered from Unit Board 1D Standard: which does not supply power to any Shutdown Board and proceeds to step 2.
Comment
2016-302 JPM D Page 10 of 11 STEP 11 : SAT UNSAT Standard: The examinee places XS-57-79 6.9 Unit Bd 1D AUTO/MAN SEL to CRITICAL MANUAL.
Comment STEP 12 : SAT UNSAT Standard: The examinee places HS-57-80 1124 USST 1B TO 6.9 UNIT BD 1D to CRITICAL TRIP.
Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM D JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. The Unit Supervisor has temporarily left the Control Room.
INITIATING CUES:
- 1. Respond to plant conditions Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR SIM E
2016-302 JPM E Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to ERCW Pump Trip Task #: 0000620501 Task Standard: The examinee starts an A TRAIN ERCW Pump and places the auto start selection switch away from the Q-A ERCW Pump position.
Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 076 A2.01 (3.5/3.7)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 10 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM E Page 3 of 11 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Initialize to IC 16
- 3. Ensure Q-A pump is in service and the selector switch is selected for Q-A pump.
- 4. An extra operator will be required to acknowledge alarms.
- 5. ACKNOWLEDGE ALARMS
- 6. FREEZE SIMULATOR.
- 7. PLACE SIMULATOR IN RUN
- 8. When directed, IMF #RW01G f:1 (Trips Q-A ERCW Pump)
SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
- 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
References:
Reference Title Rev No.
- 1. 0-AR-M27-B-A COMPONENT COOLING 12
2016-302 JPM E Page 4 of 11 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1, 100% power.
INITIATING CUES:
- 1. Respond to plant conditions.
2016-302 JPM E Page 5 of 11 Start Time STEP 1 : SAT UNSAT Window E-4 Standard: Examinee acknowledges alarm and transitions to AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER Comment Obtain a copy of AOP-M.01 LOSS OF ESSENTIAL RAW COOLING STEP 2 : SAT WATER.
UNSAT Standard: Examinee obtains a copy of AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER.
Comment
2016-302 JPM E Page 6 of 11 STEP 3 : SAT UNSAT Standard: Examinee observes no indication of ERCW flooding and goes to step 4.
Comment STEP 3 : SAT UNSAT Standard: Examinee observes a green light indication for ERCW pump Q-A and goes to Section 2.1 ERCW Pump Failure Comment
2016-302 JPM E Page 7 of 11 STEP 4 : SAT UNSAT Standard: Examinee places 0-HS-67-460A ERCW pump Q-A in Pull-to-Lock.
Comment Examiner The indicating lights for ERCW pump Q-A will go out when the Note: handswitch is placed in PTL.
STEP 5 : SAT UNSAT Examinee places 0-HS-67-432A for the J-A OR 0-HS-67-436A for Standard: the K-A ERCW pump to START as required to maintain Supply CRITICAL header pressures [between 78 psig and 124 psig] as indicated on 1-PI-67-493A or 2-PI-67-493A.
Comment STEP 6 : SAT UNSAT Standard: Examinee verifies two A Train powered ERCW Pumps available by observing indicating light indication above the A Train handswitches.
Comment
2016-302 JPM E Page 8 of 11 STEP 7 : SAT UNSAT Examinee observes 1A and 2A ERCW supply header pressures at Standard: 110 psig and Unit 1A supply header flow approx. 2700 gpm and Unit 2A supply header flow approx. 13,500 gpm.
Comment STEP 8 : SAT UNSAT Examinee observes 1B and 2B ERCW supply header pressures at Standard: 120 psig and Unit 1B supply header flow approx. 1500 gpm and Unit 2B supply header flow approx. 11,500 gpm.
Comment
2016-302 JPM E Page 9 of 11 STEP 9 : SAT UNSAT Standard: Examinee dispatches an AUO to locally inspect the Q-A ERCW pump.
Cue Respond as AUO Acknowledge inspect the Q-A ERCW pump and/or breaker.
Comment STEP 10 : SAT UNSAT Standard: Examinee notifies an SRO to evaluate Tech Specs.
Comment Cue Respond as SRO Acknowledge evaluate Tech Specs.
STEP 11 : SAT UNSAT Standard: Examinee places the 0-XS-67-285 ERCW Pumps J-A & Q-A D/G CRITICAL Power Select to J-A Comment
2016-302 JPM E Page 10 of 11 STEP 12 : SAT UNSAT Standard: Examinee observes the running ERCW pump amps less than 60 amps Comment Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM E JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1, 100% power.
INITIATING CUE:
- 1. Respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM F
2016-302 JPM F Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task: Recover from a Containment Ventilation Isolation (CVI) Actuation Task #: 0290100101 Task Standard: The examinee resets the Containment Vent Isolation signal and aligns the Containment Upper and Lower Compartment radiation monitor for service.
Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 103 A4.04 (3.5/3.5)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 10 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM F Page 3 of 10 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Reset to IC 16
- Insert malfunction RM90130 to 100,000 (cause RM-90-130 to alarm).
- Insert remote function RMR07 to TRIP (trips off 106/112 pumps).
- Delete RM90130 malfunction and reset annunciator.
- Close ALL Containment rad Monitor Isolation Valves on 0-M-12
- Freeze the simulator until ready for the JPM to begin.
- 3. PLACE SIMULATOR IN RUN
- 4. An extra operator will be required to acknowledge alarms.
- 5. ACKNOWLEDGE ALARMS
- 6. FREEZE SIMULATOR.
- 8. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:
References:
Reference Title Rev No.
- 1. 0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION 52 2.
2016-302 JPM F Page 4 of 10 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. A high radiation signal was detected by RM-90-130, causing a Containment Ventilation Isolation.
- 3. 0-SO-30-3, Section 8.3 Containment Ventilation System Isolation Actuation has been performed.
- 4. The cause of the high radiation signal has been determined and corrected.
- 5. All initiating signals have been confirmed to be RESET.
INITIATING CUES:
- 1. The SRO has directed you to perform 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation actions to recover from the containment vent isolation.
- 2. Inform the SRO when the recovery is complete.
2016-302 JPM F Page 5 of 10 Start Time STEP 1 : SAT Obtain a copy of 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation. UNSAT Standard: Examinee obtains a copy of 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation.
Comment STEP 2 : SAT UNSAT Standard: The examinee verifies HS-30-1A, Containment Purge Supply and Exhaust Fan 1A in Pull to Lock.
Comment STEP 3 : SAT UNSAT Standard: The examinee verifies HS-30-4A, Containment Purge Supply and Exhaust Fan 1B in Pull to Lock.
Comment
2016-302 JPM F Page 6 of 10 STEP 4 : SAT UNSAT Standard: The examinee verifies HS-30-11A, Incore Instrument Room Purge Supply and Exhaust Fan in Pull to Lock.
Comment
2016-302 JPM F Page 7 of 10 STEP 5 : SAT UNSAT Standard: The examinee observes the Control Switches for all dampers are in the CLOSED position.
Comment
2016-302 JPM F Page 8 of 10 STEP 6 : SAT UNSAT Standard: The examinee addresses the procedure step.
Cue: When asked provide the following cue, Independent verifications have been completed.
Comment STEP 7 : SAT UNSAT Standard: The examinee depresses HS-30-65A Containment Vent Isolation Train CRITICAL A.
Cue: When asked provide the following cue, Concurrent verifications have been completed.
Comment
2016-302 JPM F Page 9 of 10 STEP 8 : SAT UNSAT Standard: The examinee depresses HS-30-65B Containment Vent Isolation Train B.
Cue: When asked provide the following cue, Concurrent verifications have been completed.
Comment STEP 9 : SAT UNSAT The examinee places ALL lower compartment air monitor RM-90-106 Standard: and upper compartment air monitor RM-90-112 isolation handswitches CRITICAL to OPEN.
Comment Terminating Provide the following cue, Another operator will complete the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM F JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is in MODE 1.
- 2. A high radiation signal was detected by RM-90-130, causing a Containment Ventilation Isolation.
- 3. 0-SO-30-3, Section 8.3 Containment Ventilation System Isolation Actuation has been performed.
- 4. The cause of the high radiation signal has been determined and corrected.
- 5. All initiating signals have been confirmed to be RESET.
INITIATING CUES:
- 1. The SRO has directed you to perform 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation actions to recover from the containment vent isolation.
- 2. Inform the SRO when the recovery is complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR JPM G
2016-302 JPM G Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task: Transfer 1A-A 6.9 KV SD Bd from Alternate to Normal Supply Task #: 0620520201 Task Standard: 1A-A 6.9 kv Shutdown Board is energized by manually starting the 1A-A EDG.
Alternate Path: YES: X NO:
Time Critical Task: YES: NO: X K/A Reference/Ratings: 064 A4.01 (4.0/4.3)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 7 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM G Page 3 of 11 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Reset to IC 16
- 3. Transfer 1A-A 6.9 Kv Shutdown Board to the alternate feeder.
- 4. Insert IMF EG08A f:1 D/G 1A-A Fails to Auto Start.
- 6. An extra operator will be required to acknowledge alarms.
- 7. Place simulator in RUN.
- 8. Insert AN_OV_325 to OFF
- 9. ACKNOWLEDGE ALARMS
- 10. FREEZE SIMULATOR.
- 11. Provide a copy of 0-SO-202-4, 6900V Shutdown Boards completed through 8.1.5 step 2.
- 12. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
- 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
0-SO-202-4, 6900V Shutdown Boards
References:
Reference Title Rev No.
- 1. 0-SO-202-4 6900V Shutdown Boards 50
2016-302 JPM G Page 4 of 11 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Units 1 and 2 are in MODE 1.
- 2. 1A-A 6.9 kV Shutdown Board is on the ALTERNATE power supply.
- 3. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
INITIATING CUES:
- 1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
- 2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
- 3. Inform the SRO when complete.
2016-302 JPM G Page 5 of 11 Start Time STEP 1 : SAT Obtain a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 UNSAT Standard: Examinee obtains a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 Cue Provide a marked up copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 completed through step 2 Comment STEP 2 : SAT UNSAT Standard: The examinee addresses the procedure step.
Cue If required provide the following cue Section 8.1.1 of is complete.
Comment
2016-302 JPM G Page 6 of 11 STEP 3 : SAT UNSAT Standard: The examinee addresses the procedure step.
Cue Provide the following cue: Breaker is ready to close.
Comment STEP 4 : SAT UNSAT Standard: Examinee observes 1-XS-57-39 6.9kV Shutdown Board 1A-A voltmeter selector switch in the SDBD 1A position.
Comment
2016-302 JPM G Page 7 of 11 STEP 5 : SAT UNSAT Standard: Examinee places 1-HS-57-44A control switch for [1718] to CLOSE and CRITICAL HOLD.
Comment STEP 6 : SAT UNSAT Standard: Examinee places 1-HS-57-41A control switch for [1716] to TRIP. CRITICAL Comment
2016-302 JPM G Page 8 of 11 STEP 7 : SAT UNSAT Standard: Examinee observes ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A.
Comment Examiner ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A Note followed by failure of D/Gs to auto start and re-energize SD Bd. 1A-A.
STEP 8 : SAT UNSAT Standard: Examinee observes no bus voltage indicated on 6.9 kv SD Bus 1A-A voltmeter 1-EI-57-39.
Comment STEP 9 : SAT UNSAT Standard: Examinee releases 1-HS-57-44A control switch for [1718] to MID position Comment
2016-302 JPM G Page 9 of 11 STEP 10 : SAT UNSAT Standard: Examinee observes diesel generators did not start, recognizes DG RUN green light ON. [M-1]
Comment ALTERNATE PATH STEP 11 : SAT UNSAT Examinee places 1-HS-82-15, D/G EMERG START 1A-A, 2A-A, 1B-B, 2B-B to EMERG START position Standard: OR CRITICAL Examinee places 0-HS-82-16A, DG 1A-A Emergency Start, to EMERG START position.
Comment
2016-302 JPM G Page 10 of 11 STEP 12 : SAT UNSAT Examinee verifies DG emergency breaker 1912 closed, by observing red Standard: light above 1-HS-57-46A ON [M-26] or Breaker 1912 indicating light ON
[M-1]
Comment Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM G JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Units 1 and 2 are in MODE 1.
- 2. 1A-A 6.9 kV Shutdown Board is on the ALTERNATE power supply.
- 3. Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.
INITIATING CUE:
- 1. You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.
- 2. 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.
- 3. Inform the SRO when complete.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR SIM H
2016-302 JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task: Respond to a Failure of PRM N-44 Task #: 3210140401 Task Standard: The examinee determines Power range D instrument N-44 fails, places Rod Control to MANUAL, defeats control functions, and prepares for removal from service.
Alternate Path: YES: NO: X Time Critical Task: YES: NO: X K/A Reference/Ratings: 015 A3.02 (3.7/3.9)
Method of Testing:
Simulated Performance: Actual Performance: X Evaluation Method:
Simulator X In-Plant Classroom Main Control Room Mock-up Performer:
Trainee Name Evaluator: /
Name / Signature DATE Performance Rating: SAT: UNSAT:
Validation Time: 11 min Total Time:
Performance Time: Start Time: Finish Time:
COMMENTS
2016-302 JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:
- 1. Ensure Simulator Operator Checklist is complete
- 2. Initialize IC #14 (75%, BOL).
- 3. Select N45 to one PR channel and I channel
- 4. An extra operator will be required to acknowledge alarms.
- 5. ACKNOWLEDGE ALARMS
- 6. FREEZE SIMULATOR.
- 7. PLACE SIMULATOR IN RUN
- 8. When directed, approximately 1 minute after operator assumes shift, IMF NI07D f:100.
SPECIAL INSTRUCTIONS TO EVALUATOR:
- 1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
- 2. Any UNSAT requires comments.
Tools/Equipment/Procedures Needed:
References:
Reference Title Rev No.
- 1. AOP-I.01 Nuclear Instrument Malfunction 13
- 2. AOP-C.01 Rod Control Malfunctions 26
2016-302 JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!
INITIAL CONDITIONS:
- 1. Unit 1 is operating at 75% reactor power.
INITIATING CUES:
- 1. Respond to plant conditions.
2016-302 JPM H Page 5 of 14 Start Time STEP 1 : Examinee recognizes uncontrolled control rod insertion (rod movement SAT NOT due to actual T-avg/T-ref mismatch or change in reactor/turbine power) due to instrument failure of N-44. UNSAT Standard: Examinee places Rod Control Mode Selector Switch 1-HS-85-10 to CRITICAL MAN based on immediate operator actions.
Comment Examiner Note Direct the facility operator to insert MF NI07D @ 100%.
STEP 2 : SAT UNSAT Standard: Examinee transitions to AOP-C.01, Rod Control Malfunctions section 2.1.
Comment
2016-302 JPM H Page 6 of 14 STEP 3 : SAT UNSAT Standard: Examinee places 1-HS-85-5110, Rod Control Mode Selector Switch in CRITICAL MANUAL.
Examiner Note: May have been previously performed in JPM step 1.
Comment STEP 4 : SAT UNSAT Standard: Examinee verifies control rod motion stopped by observing individual rod position indication and group step counters.
Comment
2016-302 JPM H Page 7 of 14 STEP 5 : SAT UNSAT Standard: Examinee verifies reactor power and T-avg stable by using installed instrumentation.
Comment STEP 6 : SAT UNSAT Standard: Examinee verifies reactor power less than 90% and goes to step 3..
Comment STEP 7 : SAT UNSAT Standard: Examinee verifies .VITAL POWER BOARD UV OR BREAKER TRIP alarms [M-1C windows A-7, B-7, C-7, and D-7] DARK.
Comment
2016-302 JPM H Page 8 of 14 STEP 8 : SAT UNSAT Standard: Examinee verifies the failure of N-44 and transitions to AOP-I.01 Nuclear Instrument Malfunction.
Comment STEP 9 : SAT UNSAT Standard: Examinee goes to AOP-I.01 Nuclear Instrument Malfunction section 2.3.
Cue: If asked provide the following cue, A CR has been generated regarding the page number in this procedure.
Comment
2016-302 JPM H Page 9 of 14 STEP 10 : SAT UNSAT Standard: Examinee verifies 1-HS-85-5110, Rod Control Mode Selector Switch MANUAL.
Comment STEP 11 : SAT UNSAT Standard: Examinee determines a power increase was NOT in progress and goes to step 3.
Comment
2016-302 JPM H Page 10 of 14 STEP 12 : SAT UNSAT Standard: Examinee addresses Tech Specs for applicability.
Cue Respond as Unit Supervisor I will EVALUATE Tech Specs for applicability.
Comment STEP 13 : SAT UNSAT Standard: Examinee determines three power range channels OPERABLE by observing channels N-41, N-42, and N-43.
Comment
2016-302 JPM H Page 11 of 14 STEP 14 : SAT UNSAT Standard: Examinee places Detector Current comparator Upper Section switch CRITICAL in the PR N-44 position.
Cue If directed, acknowledge Examinee is leaving the At the Controls Area.
Comment STEP 15 : SAT UNSAT Standard: Examinee places Detector Current comparator Lower Section switch CRITICAL in the PR N-44 position.
Comment
2016-302 JPM H Page 12 of 14 STEP 16 : SAT UNSAT Standard: Examinee places Rod Stop Bypass switch in the Bypass PR N-44 CRITICAL position.
Comment STEP 17 : SAT UNSAT Standard: Examinee places Power Mismatch Bypass switch in the Bypass PR N-CRITICAL 44 position.
Comment
2016-302 JPM H Page 13 of 14 STEP 18 : SAT UNSAT Standard: Examinee places Comparator Channel Defeat switch in the N-44 CRITICAL position.
Comment Terminating Provide the following cue Another operator will perform the Cue: STOP remaining steps of this procedure.
Stop Time
2016-302 JPM H JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
- 1. Unit 1 is operating at 75% reactor power.
INITIATING CUES:
- 1. Respond to plant conditions.
Acknowledge to the examiner when you are ready to begin.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.