ML22095A263

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations
ML22095A263
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/05/2022
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2022-01
Download: ML22095A263 (4)


Text

Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 April 05, 2022 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations

References:

1. NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations, dated February 17, 2022
2. TVA letter to NRC, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations, dated April 20, 2021 The Nuclear Regulatory Commissions (NRC) Regulatory Issue Summary (RIS) 2022-01 (Reference 1) requested specific information regarding Sequoyah Nuclear Plants (SQN) projected operator licensing examination schedules and the estimated number of applicants.

The enclosure to this letter provides the information to address the NRCs request and provides an estimate of the examination requirements for SQN on NRC Form 536, Operator Licensing Examination Data. The information provided in this enclosure updates the information previously provided in Reference 2.

There are no commitments contained in this submittal. Should you require additional information regarding this matter, please contact Mr. Jeffrey Sowa, SQN Licensing Manager at (423) 843-8129.

Sincerely, Thomas Marshall Site Vice President Sequoyah Nuclear Plant

Enclosure:

NRC Form 536, Operator Licensing Examination Data

U.S. Nuclear Regulatory Commission Page 2 April 05, 2022 cc (Enclosure)

NRC Regional Administrator - Region II, ATTN: Operations Branch NRC Senior Resident Inspector - Sequoyah Nuclear Plant

ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328