ML21256A203
| ML21256A203 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/13/2021 |
| From: | Marshall T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML21256A203 (3) | |
Text
TENNESSEE VALLEY AUTHORITY SequoyahNuclear Plant,PostOffice Box2000,SoddyDaisy, Tennessee 37384 September 13,2021 10CFR50.54(q) 10CFR72.44(f)
ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.
20555-0001 Sequoyah Nuclear
- Plant, Units 1and2 RenewedFacility Operating License Nos. DPR-77 andDPR-79 NRCDocket Nos.50-327, 50-328, and72-034
Subject:
Emergency PlanImplementing Procedure Revision Inaccordance with therequirements of10CFR50.54(q)and 10CFR72.44(f),
theTennessee Valley Authority issubmitting adescription ofchanges tothe Sequoyah Nuclear Plant(SQN)
Radiological Emergency Plan.
Theaffected document istheSQN Emergency Plan Implementing Procedure (EPIP) listed below.
15 13 Emergency Exposure Guidelines August 26,2021 Theabovereferenced revision wasevaluated inaccordance with10CFR50.54(q)(3) and 10CFR72.44(f) anddetermined that thechangedoesnotreduce theeffectivenessof the Emergency Plan.
Details oftherevision areincluded intheenclosure.
Therearenonewregulatory commitments contained inthis letter.
Should youhaveany questions concerning this submittal, please contact Mr.PaulGain, Site Emergency Preparedness
- Manager, at(423) 843-7088.
Respectfully,
- Marshall, Thomasg9;tag signed byMarshall, B.
Dae:2021.09.13 14:27:21
-04'00' ThomasB.Marshall Site VicePresident Sequoyah Nuclear Plant
U.S.
Nuclear RegulatoryCommission Page 2 September 13,2021
Enclosure:
SQN Units 1&2DescriptionofRevision/Change cc:
NRCRegional Administrator
- Region II NRCSenior Resident Inspector
- Sequoyah Nuclear Plant NRCDirector Division ofFuelManagement, NMSS
ENCLOSURE:
SQNUNITS1&2DESCRIPTION OFREVISION/CHANGE EP1P-11Reyision 13 Updated andrenumbered allappendices andreferences toattachments perthe Procedure Writers Guide.
=
Updated the reference inSection 4.1.M toEPIP-14, Section 3.7.