ML17125A079
| ML17125A079 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/04/2017 |
| From: | Anthony Williams Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS-17-003 | |
| Download: ML17125A079 (4) | |
Text
Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 May 4, 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 10CFR50.4 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
Reference:
1.
NRC Regulatory Issue Summary 2017-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 5, 2017 2.
TVA letter to NRC, "Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations," dated July 18, 2016 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2017-03 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.
The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for SQN on NRC Form 536, "Operator Licensing Examination Data."
The information provided in this enclosure updates the information previously provided in Reference 2.
There are no commitments contained in this submittal. Should you require additional information regarding this matter, please contact Mr. Michael McBrearty, SQN Licensing Manager at (423)843-7170.
lony L. Williams
'Site Vice President Sequoyah Nuclear Plant
Enclosure:
NRC Form 536, Operator Licensing Examination Data printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 May 4, 2017 cc (Enclosure)
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant
ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328
NRCFORM 536 U.S. NUCLEAR REGULATORYCOMMISSION (05-2016) i\\*tiS*
OPERATOR LICENSING
- >>/
EXAMINATION DATA APPROVED BY OMB: NO. 3160-0131 EXPIRES: 10/31/2017 Estimated burden per response tocomply with this voluntary information collection request 1hour. This information coflectfon is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate tothe FOIA, Privacy, and Information CoHecticns Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001. or by e-mail to lnfocoOects.Resource@nrc.gov, and tothe Desk Officer, Office ofInformation and Regulatory Mate, NEO6-10202, (3150-0131). Office ofManagement and Budget. Washington. DC 20503.
Ifa means used toimpose aninformation collection does not display a currently vaBd OMB control number, the NRC may not conduct orsponsor, and a person isnotrequired torespond to,thecrrfcrmatjon collection.
FACILITY NRC REGION Sequoyah Unit 1 and Unit 2 Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1
0 1
0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0
0 0
0 B. INITIAL OPERATOR LICENSE EXAMI NATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 NUMBER OF REACTOR OPERATORS 10 0
10 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 1
0 5
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 4
0 1
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 09/09/2019 N/A 09/13/2021 N/A ALTERNATE DATE 09/16/2019 N/A 09/20/2021 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 18 CY 20 MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRCFORM536 (05-2016 )