Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384

April 12, 2022 10 CFR 50.54(q) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

Emergency Plan Implementing Procedure Revision

In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the Sequoyah Nuclear Plant (SQN)

Radiological Emergency Plan. The affected document is the SQN Emergency Plan Implementing Procedure (EPIP) listed below.

EPIP Revision Title Effective Date(s) 737 Activation and Operation of the Operations Support Center (OSC) March 28, 2022

The above referenced revision was evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f) and determined that the change does not reduce the effectiveness of the Emergency Plan. Details of the revision are included in the enclosure.

There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.

Respectfully, Marshall, Digitally signed by Marshall, Thomas B.

Thomas B. Date: 2022.04.12 09:35:15 -04'00' Thomas B. Marshall Site Vice President Sequoyah Nuclear Plant U.S. Nuclear Regulatory Commission Page 2 April 12, 2022

Enclosure:

SQN Units 1 & 2 Description of Revision/Change

cc: NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Director - Division of Fuel Management, NMSS

ENCLOSURE: SQN UNITS 1 & 2 DESCRIPTION OF REVISION/CHANGE

EPIP-7, Revision 37 x Updated reference on the OSC [Operations Support Center] Staging Area Manager checklist on where to get keys for OSC activation.

x Updated all references of Fire Operations to Fire Brigade.