ES-301 Administrative Topics Outline Form ES-301-1 Facility: Sequoyah Unit 1 & 2 Date of Examination: 7/25/2016 Examination Level:

RO Operating Test Number: 2016-302 Administrative Topic (see Note)

Type Describe activity to be performed Code*

Conduct of Operations R, M Determine Maintenance of Active License Status. 0 2.1.4 (3.0)

Perform a Reactivity Balance Calculation from Conduct of Operations R, D 25% to 100% using 0-SO-62-7, Appendix E. G 2.1.25 (3.9)

Perform a System Operability Checklist when Equipment Control 5, M the ID AFW pump is being removed from service and determine the required protected train tag placement. G 2.2.14 (3.7)

Radiation Control N/A Not examined Determine the required Operator allocation and Emergency Plan R, D make a report to the SM for an Emergency Plan turnover to the OSC Ops Advisor SRO. G 2.4.25 (3.3)

NOTE:

All items (five total) are required for SROs. RD applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RD retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

A.1.a Given a situation with four different Reactor Operators that are not currently on shift, the Examinee will assess the work schedules for four different operators and using OPDP 10 License Status Maintenance, Reactivation and Proficiency for Non-Licensed Positions determines Operator A, C and D have maintained an active license status and that Operator B has not accumulated sufficient time required to maintain an active license status.

A.1.b While acting as an extra RO, the examinee will perform a Reactivity Balance for a power ascension using 0-S0-62-7, Boron Concentration Control Appendix E, Reactivity Balance.

A.2 Given an emergent condition the Unit I TD AFW pump is declared to be INOPERABLE. The examinee will identify the equipment required to be administratively protected to maintain configuration control and determine the placement of protected train tags using 0-GO-16 SYSTEM OPERABILITY CHECKLISTS. The examinee will then place the required tags on components in the simulator.

A3 Not examined.

A.4 Given a major plant fire is in progress in the Auxiliary Building 690 elevation penetration room with the Site Emergency Plan in progress. The examinee will direct Assistant Unit Operators (AUD) to perform local actions as required by the location of the fire. The examinee will select the correct appendix based on location for the AUO task assignment and will determine which AUO will perform the specified task based on the level of AUO qualification using AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN.

ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 Facility: Sequoyah Unit 1 & 2 Date of Examination: 7/25/2016 Examination Level:

RO Operating Test Number: 2016-302 Control Room Systems:* 8 for RO; 7 for SRO-l; 2 or 3 for SRO-U System I JPM Title Type Code*

Safety Function

a. Emergency Borate the RCS with Multiple Control Rods Not Fully A D S Inserted. APE 024 AA 1.04 (3.6)
b. Depressurize an Unisolable Cold Leg Accumulator during a A D EN L 2

SBLOCA. 006 A4.02 (4.0)

c. Transfer ECCS to Hot Leg Recirculation. EPE 011 EA1.11 (4.2)

D, EN, L, S 3

d. Secure RCPs During a LBLOCA. 003 A2.02 (3.7)

A, N, S 4P

e. Respond to an ERCW Pump Trip. 076 A2.01 (3.5)

D, S 4S

f. Recover from a Containment Ventilation Isolation (CVI) Actuation.

D S 5

103 A4.04(3.5)

g. Transfer lA-A 6.9 KV SD Board from Alternate to Normal Supply.

A D 5 6

064 A4.01 (4.0)

h. Respond to a Failure of Power Range Instrument N-44 K/A 015 D

7 A3.02(3.7)

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Perform a Local EDG Start with a Failure of ERCW Valve to Auto Open. K/A 062 A4.07 (3.1)

D, A, E 6

j. Operate Steam Generator Atmospheric Dump PCV-1-12 Locally.

D E 8

APE 068 AA1.01 (4.3)

k. Locally Control Charging Flow Using 1-FCV-62-93. APE 028 M R 2

AA1.07 (3. 3)

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-l / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irectfrombank (E)mergency or abnormal in-plant 1 I 1 /

1 (EN)gineered safety feature 1 / 1 /

1 (control room system) fL)ow-Power / Shutdown 1 I 1 I 1

fN)ew or (M)odified from bank including 1(A) 2 /

2 /

1 (P)revious 2 exams 3 /

3 /

2 (randomly selected)

(R)CA (S)im ulator

ES-301 Control Roomlln-Plant Systems Outline Form ES-301-2 a.

The examinee will assume the shift in MODE 3 following a Reactor Trip with multiple Control Rods that are not fully inserted. The examinee will be directed to initiate emergency boration from the A BAT using EA-68-4 Emergency Boration. The examinee will not be able to establish emergency boration using the CHARGING FLOW CONTROL valve and will implement the alternate path to establish emergency boration through the Charging Pump ECCS Discharge (CCPIT) valves.

b.

The examinee will assume the shift during an event with E-1 LOSS OF REACTOR OR SECONDARY COOLANT in progress. The examinee will isolate the Loop 1, 2 and 3 Cold Leg Accumulators (CLA) but discovers the Loop 4 CLA discharge valve will not close. The Examinee will implement the alternate path and vent the Loop 4 CLA using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

c.

The examinee will assume the shift five hours after a LOCA with the ECCS placed in Cold Leg Recirculation using ES-i.3, Transfer to RHR Containment Sump. The examinee will align the ECCS in Hot Leg Recirculation using ES-i.4, Transfer to Hot Leg Recirculation.

U.

The examinee will assume the shift when the Reactor automatically trips. The examinee will use E-O Reactor Trip or Safety Injection to manually initiate Safety Injection and secure Reactor Coolant Pumps 1, 2, and 3 from panel M-5. The examinee will then use the alternate path to secure Reactor Coolant Pump 4 by de-energizing Unit Board 1 D. (This is a new action due to a recent revision to the EOPs.)

e.

The examinee will assume the shift when the Q-A ERCW pump trips. The examinee will use AOP-M.O1 LOSS OF ESSENTIAL RAW COOLING WATER, to manually start another A Train ERCW pump and transfer the emergency power selector away from the Q-A ERCW pump.

1.

The examinee will assume the shift following a Containment Vent Isolation event which subsequently cleared. The examinee will use O-S0-30-3, section 8.4, Recovery From a Containment Vent System Isolation Actuation to reset the Containment Vent Isolation and align the Containment Air radiation Monitors.

g.

The examinee will assume the shift in MODE I with the 1A 6.9 kV Shutdown Board aligned to the alternate power source. The examinee will be directed to transfer lA-A 6.9 kV Shutdown Board to Normal Feeder at 1-M-1 using 0-S0-202-4, 6900V Shutdown Boards, Section 8.1.5. The transfer to the normal power supply will fail, and the 1A Emergency Diesel Generator (EDG) will fail to auto start resulting in a loss of power to the 1A 6.9 Ky Shutdown Board. The examinee will use the alternate path to manually start the 1A EDG using O-S0-202-4, 6900V Shutdown Boards.

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 h.

The examinee will assume the shift when a failure of Power Range Monitor N-44 occurs.

The examinee will place control rods in manual using AOP-C.O1 Rod Control Malfunctions.

The examinee will then use AOP-l.O1 NUCLEAR INSTRUMENT MALFUNCTION to defeat N-44 control functions, and prepare for removal from service.

i.

The examinee will perform a normal, local start of the 1A Diesel Generator using O-SO-82-1 Diesel Generator lA-A section 8.2. While performing the start of the 1A Diesel Generator, the examinee will determine FCV-67-66 A Train Emergency Diesel HX Cooling Isolation fails to open. The examinee will use the alternate path and locally open 1-FCV-67-68D B Train Emergency Diesel HX Cooling Isolation to establish cooling water flow to the 1A Diesel Generator.

j.

The examinee will assume the shift in MODE 3 and a Control Room Evacuation in progress.

The examinee will be directed to take local control of PCV-l-12, S/G 2 Atmospheric Dump valve using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1.

The examinee will take local control of PCV-l-12, S/G 2 Atmospheric Dump valve.

k.

The examinee will place 1-FCV-62-93 Pressurizer level Control valve in local manual and control charging and seal flow within normal values using l-S0-62-1, Chemical Volume and Control System.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.1.a

2016-302 JPM A.1.a Page 2 of 10 SRO JOB PERFORMANCE MEASURE Task:

Determine Maintenance of Active License Status Task #:

3410970302 Task Standard:

The Examinee determines that Operator A, C and D have maintained an active license status and that Operator B has not accumulated sufficient time required to maintain an active license status.

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

2.1.4 (3.3/3.8)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator In-Plant Classroom X

Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

20 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM A.1.a Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/Equipment/Procedures Needed:

1. Non LAN connected computer

References:

Reference Title Rev No.

1.

OPDP 10 License Status Maintenance, Reactivation and Proficiency for Non-Licensed Positions 8

Read to the examinee:

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Four Reactor Operators have the following license status and time on shift for this quarter is as listed as below.

Operator A License was active on June 1, 2016 6/02/16 worked 0700-1900 shift as Unit 2 OATC 6/03/16 worked 0700-1900 shift as Unit 1 OATC 6/04/16 worked 0700-1900 shift as Unit 1 CRO 6/05/16 worked 0700-1900 shift as Unit 2 OATC 6/14/16 worked 1900-0700 shift as Unit 2 OATC 6/15/16 worked 1900-0700 shift in the Tagging Office.

7/17/16 worked 1900-0700 shift as Unit 1 CRO Operator B License was active on June 1, 2016 6/28/16 worked 0700-1900 shift as Unit 1 OATC 7/03/16 worked 0700-1900 shift as Unit 1 OATC 7/05/16 worked 0700-1900 shift as Unit 1 OATC 7/14/16 worked 0700-1900 shift as Unit 1 OATC 8/02/16 worked 0700-1900 shift in the Tagging Office.

2016-302 JPM A.1.a Page 4 of 10 Operator C License was inactive on June 1, 2016 7/12/16 thru 7/16/16 7/12/16 thru 7/16/16 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 1 OATC and completed all requirements for license reactivation.

8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.

8/31/16 worked 1900-0700 shift as Unit 1 OATC Operator D Issued a new NRC License June 1, 2016 8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.

8/31/16 worked 1900-0700 shift as Unit 1 OATC

2. None of the operators work on shift for the rest of this quarter.

INITIATING CUES:

1. Accounting only for on shift time, determine the status of each Reactor Operators License Status at the beginning of the fourth quarter of 2016.
1. Notify the Examiner the results when complete.

2016-302 JPM A.1.a Page 5 of 10 Start Time STEP 1

Obtain a copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions.

SAT UNSAT Standard:

Copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions is obtained.

Cue Provide a copy of OPDP-10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions.

Comment

2016-302 JPM A.1.a Page 6 of 10 STEP 2

SAT UNSAT Standard:

The Examinee reviews OPDP 10 License Status Maintenance, reactivation and Proficiency for Non-Licensed Positions.

Comment

2016-302 JPM A.1.a Page 7 of 10 STEP 3

Status of Operator A License.

SAT UNSAT Standard:

The Examinee determines Operator A license status will be active in the fourth quarter of 2016 because Operator A worked the required 5 twelve hour shifts in a license position during the current quarter.

CRITICAL Comment STEP 4

Status of Operator B License.

SAT UNSAT Standard:

The Examinee determines Operator B license status will NOT be active in the fourth quarter of 2016 because Operator B worked only four twelve hour shifts in a license position during the current quarter in a required position.

CRITICAL Examiner Note:

The operator worked one 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift in the tagging office which is not a required licensed position.

Comment STEP 5

Status of Operator C License.

SAT UNSAT Standard:

The Examinee determines Operator C license status will be active in the fourth quarter of 2016 because Operator C was reactivated in the previous quarter.

CRITICAL Comment

2016-302 JPM A.1.a Page 8 of 10 STEP 5

Status of Operator D License.

SAT UNSAT Standard:

The Examinee determines Operator D license status will be active in the fourth quarter of 2016 because Operator D was issued a license in the third quarter of 2016.

CRITICAL Comment Terminating Cue:

The JPM is complete when the Examinee returns the cue sheet to the Evaluator.

STOP

1.

Stop Time

2016-302 JPM A.1.a JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:

The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Four Reactor Operators have the following license status and time on shift for this quarter as listed as below.

Operator A License was active on June 1, 2016 6/02/16 worked 0700-1900 shift as Unit 2 OATC 6/03/16 worked 0700-1900 shift as Unit 1 OATC 6/04/16 worked 0700-1900 shift as Unit 1 CRO 6/05/16 worked 0700-1900 shift as Unit 2 OATC 6/14/16 worked 1900-0700 shift as Unit 2 OATC 6/15/16 worked 1900-0700 shift in the Tagging Office.

7/17/16 worked 1900-0700 shift as Unit 1 CRO Operator B License was active on June 1, 2016 6/28/16 worked 0700-1900 shift as Unit 1 OATC 7/03/16 worked 0700-1900 shift as Unit 1 OATC 7/05/16 worked 0700-1900 shift as Unit 1 OATC 7/14/16 worked 0700-1900 shift as Unit 1 OATC 8/02/16 worked 0700-1900 shift in the Tagging Office.

2016-302 JPM A.1.a Operator C License was inactive on June 1, 2016 7/12/16 thru 7/16/16 7/12/16 thru 7/16/16 worked 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> under the direction of the Unit 1 OATC and completed all requirements for license reactivation.

8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.

8/31/16 worked 1900-0700 shift as Unit 1 OATC Operator D Issued a new NRC License June 1, 2016 8/6/16 worked 0700-1900 shift as Unit 1 OATC 8/12/16 worked 0700-1900 shift as Unit 2 CRO 8/14/16 worked 1900-0700 shift as Unit 2 OATC 8/15/16 worked 1900-0700 shift in the Tagging Office.

8/31/16 worked 1900-0700 shift as Unit 1 OATC

2. None of the operators work on shift for the rest of this quarter.

INITIATING CUES:

2. Accounting only for on shift time, determine the status of each Reactor Operators License Status at the beginning of the fourth quarter of 2016.
3. Notify the Examiner the results when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.1.b

2016-302 JPM A.1.b Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task:

Perform a Reactivity Balance Calculation using 0-SO-62-7, Attachment 9 Task #:

0040070101 Task Standard:

Examinee performs 0-SO-62-7 Attachment 9, Reactivity Balance Calculation and determines a dilution is required to reduce RCS boron concentration by 102 ppm. (98 to 110 is allowed)

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

2.1.25 (3.9/4.2)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator In-Plant Classroom X

Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

30 minutes Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM A.1.b Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/Equipment/Procedures Needed:

1. 0-SO-62-7 Boron Concentration Control Attachment 9

References:

Reference Title Rev No.

1.

0-SO-62-7 Boron Concentration Control Appendix 80

========================================================================

Read to the examinee:

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1, Cycle 21 with initial conditions as follows:

2.

Time in Core Life is 200 MWD/MTU.

3.

Power is at 25%.

4.

Boron Concentration 1400 ppm.

5.

CB D 185 steps.

6.

Current Xenon concentration is -2430 pcm FINAL CONDITIONS:

1.

Power 100%.

2.

CB D 228 steps.

3.

Final projected Xenon concentration will be -2250 pcm.

4.

Power change rate is 3%/hour.

INITIATING CUES:

1.

Perform steps 1 and 2 of 0-SO-62-7, BORON CONCENTRATION CONTROL Attachment 9, Reactivity Balance calculation.

2.

Determine the change in boron concentration, round to the nearest whole number ppm.

2016-302 JPM A.1.b Page 4 of 9 Start Time STEP 1

Obtain a copy of 0-SO-62-7 Boron Concentration Control, Attachment 9 Reactivity Balance Calculation.

SAT UNSAT Standard:

Copy of 0-SO-62-7 Boron Concentration Control, Attachment 9 Reactivity Balance Calculation is obtained.

Cue Provide a copy of 0-SO-62-7 Boron Concentration Control, Attachment 9 Reactivity Balance Calculation.

Comment STEP 2

SAT UNSAT Standard:

Examinee records the data from 0-SO-62-7 Boron Concentration Control, Attachment 9 Reactivity Balance Calculation.

Comment Examiner Note:

The start data is provided to the examinee on the JPM briefing sheet.

2016-302 JPM A.1.b Page 5 of 9 STEP 3

SAT UNSAT Standard:

Examinee determines reactivity change for power defect is -1100 pcm (-

1125 to -1100 allowed)

CRITICAL Comment Examiner Note:

Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure

1.

Examiner Note:

Initial and final power levels were given in the initial conditions.

2016-302 JPM A.1.b Page 6 of 9 STEP 4

SAT UNSAT Standard:

Examinee determines reactivity change for xenon is +180 pcm.

CRITICAL Comment Examiner Note:

Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure

4.

Examiner Note:

Initial and final xenon levels were given in the initial conditions.

STEP 5

SAT UNSAT Standard:

Examinee determines reactivity change for control rods is +275 pcm. (250 to -300 allowed)

CRITICAL Comment Examiner Note:

Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure

4.

Examiner Note:

Initial and final rod positions were given in the initial conditions.

2016-302 JPM A.1.b Page 7 of 9 STEP 6

SAT UNSAT Standard:

Examinee determines the total reactivity change is -645 pcm (-620 to -695 is allowed).

CRITICAL Comment STEP 7

SAT UNSAT Standard:

Examinee determines the total boron reactivity change is 645 pcm (620 to 695 is allowed).

CRITICAL Comment

2016-302 JPM A.1.b Page 8 of 9 STEP 8

SAT UNSAT Standard:

Examinee determines the total boron concentration change is-102 ppm. (-

98 to -110 is allowed)

CRITICAL Comment Examiner Note:

Refer to 0-SO-62-7 Boron Concentration Control, Attachment 9 Figure 7 to determine the differential boron worth of -6.34 pcm/ppm.

Examiner Note:

Initial boron concentration was given in the initial conditions.

Terminating Cue:

The JPM is complete when the examinee returns the JPM briefing sheet to the Examiner.

STOP

1.

Stop Time

2016-302 JPM A.1.b JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:

The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1, Cycle 21 with initial conditions as follows:

2.

Time in Core Life is 200 MWD/MTU.

3.

Power is at 25%.

4.

Boron Concentration 1400 ppm.

5.

CB D 185 steps.

6.

Current Xenon concentration is -2430 pcm FINAL CONDITIONS:

1.

Power 100%.

2.

CB D 228 steps.

3.

Final projected Xenon concentration will be -2250 pcm.

4.

Power change rate is 3%/hour.

INITIATING CUES:

1.

Perform steps 1 and 2 of 0-SO-62-7, BORON CONCENTRATION CONTROL Attachment 9, Reactivity Balance calculation.

2.

Determine the change in boron concentration, round to the nearest whole number ppm.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.2

2016-302 JPM A.2 Page 2 of 9 RO JOB PERFORMANCE MEASURE Task:

Perform a System Operability Checklist when Unit 1 Turbine Driven Auxiliary Feed Pump is inoperable.

Task #:

0001360301 Task Standard:

The examinee will perform a System Operability Checklist when the Unit 1 Turbine Driven Auxiliary Feed pump becomes inoperable and determines the required protected train tag placement for configuration control. The examinee will then place the protected tags on the required components in the simulator.

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

2.2.14 (3.7/4.1)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

10 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM A.2 Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/Equipment/Procedures Needed:

1. Non LAN connected computer

References:

Reference Title Rev No.

1.

0-GO-16 System Operability Checklists 22

========================================================================

Read to the examinee:

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. Unit 1 Turbine Driven Auxiliary Feed Pump is out of service and will remain out of service past the end of the shift.

INITIATING CUES:

1. The SRO has directed you to determine which control room components (if any) need to be designated as Protected Equipment.
2. Once you determine the designated equipment, place the required tags on the designated equipment in the simulator.
3. Notify the Examiner of results when complete.

2016-302 JPM A.2 Page 4 of 9 Start Time STEP 1

Obtain a copy of 0-GO-16, System Operability Checklists.

SAT UNSAT Standard:

Copy of 0-GO-16, System Operability Checklists is obtained.

Cue Provide a copy of 0-GO-16, System Operability Checklists.

Comment STEP 2

SAT UNSAT Standard:

The examinee determines "PROTECTED EQUIPMENT" tags are required for the opposite train equipment.

Comment

2016-302 JPM A.2 Page 5 of 9 STEP 3

SAT UNSAT Standard:

The examinee selects Appendix J for AFW Unit 1.

Comment STEP 4

SAT UNSAT Standard:

The examinee determines MDAFW Pump A requires a Protected Equipment tag and places a protected equipment tag on 1-HS-3-118A MDAFW Pump A.

CRITICAL Comment STEP 5

SAT UNSAT Standard:

The examinee determines MDAFW Pump B requires a Protected Equipment tag and places a protected equipment tag on 1-HS-3-128A MDAFW Pump B.

CRITICAL Comment

2016-302 JPM A.2 Page 6 of 9 STEP 6

SAT UNSAT Standard:

The examinee determines D/G 1A-A requires a Protected Equipment tag and places a Protected Equipment tag on 1-HS-57-46A 1912 DG to SD BD 1A-A.

CRITICAL Examiner Note:

The examinee may also choose any of the following locations Comment

2016-302 JPM A.2 Page 7 of 9 STEP 7

SAT UNSAT Standard:

The examinee determines D/G 1B-B requires a Protected Equipment tag and places a Protected Equipment tag on 1-HS-57-73A 1914 DG to SD BD 1B-B.

CRITICAL Examiner Note:

The examinee may also choose any of the following locations Comment

2016-302 JPM A.2 Page 8 of 9 Terminating Cue:

The JPM is complete when the Examinee returns the cue sheet to the Evaluator.

STOP

1.

Stop Time

2016-302 JPM A.2 JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:

The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. Unit 1 Turbine Driven Auxiliary Feed Pump is out of service and will remain out of service past the end of the shift.

INITIATING CUES:

1. The SRO has directed you to determine which control room components (if any) need to be designated as Protected Equipment.
2. Once you determine the designated equipment, place the required tags on the designated equipment in the simulator.
3. Notify the Examiner of results when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC ADMIN A.4

2016-302 JPM A.4 Page 2 of 8 RO JOB PERFORMANCE MEASURE Task:

Perform RO responsibilities during Emergency Plan implementation.

Task #:

0001460501 Task Standard:

The examinee will select the correct appendix based on location for the AUO task assignment and will determine which AUO will complete the appropriate checklist based on qualification level.

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

2.4.25 (3.3/3.7)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom X

Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

15 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM A.4 Page 3 of 8 SPECIAL INSTRUCTIONS TO EVALUATOR:

Tools/Equipment/Procedures Needed:

1. Non LAN connected computer

References:

Reference Title Rev No.

1.

AOP-N.08 APPENDIX R FIRE SAFE SHUTDOWN 40

========================================================================

Read to the examinee:

DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 was in MODE 1.
2. A major plant fire is in progress in the Unit 1 Auxiliary Building Elevation 690 Penetration Room.
3. AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN has been implemented.
4. You are the CRO.

INITIATING CUES:

1. The SRO has directed you to dispatch AUOs to perform the required time critical local actions of AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN.
2. Determine which Appendix and subsection is required to be performed.
3. Prepare a report for the Shift Manager listing the following:
a.

The number and location of each AUO.

b.

Which task each AUO is required to perform.

c.

Required AUO qualifications.

4. Notify the Examiner of your results when complete.

2016-302 JPM A.4 Page 4 of 8 Start Time STEP 1

Obtain a copy of AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN.

SAT UNSAT Standard:

Copy of AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN is obtained.

Cue Provide a copy of AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN.

Examiner Note:

The examinee will go to AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN Appendix Z.

Comment STEP 2

SAT UNSAT Standard:

The examinee goes to step 4 due to the fire location of Unit 1 Elevation 690 Penetration Room.

CRITICAL Comment

2016-302 JPM A.4 Page 5 of 8 STEP 3

SAT UNSAT Standard:

The examinee determines action is required in section Z.11 due to the fire location of Unit 1 Elevation 690 Penetration Room.

CRITICAL Comment

2016-302 JPM A.4 Page 6 of 8 STEP 4

SAT UNSAT Standard:

The examinee assigns 1 AUO to perform checklist 5, Locally control Unit 1 Train B MD AFW flow.

AND The examinee determines the AUO that performs checklist 5 require SCBA Qualification.

CRITICAL Examiner Note Comment STEP 5

SAT UNSAT Standard:

The examinee assigns one AUO to perform checklist 6, Locally control Unit 1 S/G #3 and 4 atmospheric reliefs.

AND The examinee determines the AUO that performs checklist 6 does not require SCBA Qualification.

CRITICAL Comment

2016-302 JPM A.4 Page 7 of 8 Terminating Cue:

The JPM is complete when the Examinee returns the cue sheet to the Evaluator.

STOP

1.

Stop Time

2016-302 JPM A.4 JPM BRIEFING SHEET DIRECTIONS TO TRAINEE:

The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 was in MODE 1.
2. A major plant fire is in progress in the Unit 1 Auxiliary Building Elevation 690 Penetration Room.
3. AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN has been implemented.
4. You are the CRO.

INITIATING CUES:

1. The SRO has directed you to dispatch AUOs to perform the required time critical local actions of AOP-N.08, APPENDIX R FIRE SAFE SHUTDOWN.
2. Determine which Appendix and subsection is required to be performed.
3. Prepare a report for the Shift Manager listing the following:
a. The number and location of each AUO.
b. Which task each AUO is required to perform.
c. Required AUO qualifications.
4. Notify the Examiner of your results when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC PLANT JPM I

2016-302 JPM I Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:

Local Operation of 1A-A D/G (Idle Start & Stop)

Task #:

0640020104 Task Standard:

D/G 1A-A is successfully started using local controls and cooling is established by local operation of the ERCW FCV using 0-SO-82-1 Diesel Generator 1A-A.

Alternate Path:

YES:

X NO:

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

062 A4.07 (3.1/3.1)

Method of Testing:

Simulated Performance:

X Actual Performance:

Evaluation Method:

Simulator In-Plant X

Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

15 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM I Page 3 of 10 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

0-SO-82-1 section 8.2 and Attachments 4 and 5.

References:

Reference Title Rev No.

0-SO-82-1 Diesel Generator 1A-A 55

2016-302 JPM I Page 4 of 10 READ TO OPERATOR HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step
4.
4. Both of the Unit SROs have given approval to perform this procedure.
5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.

INITIATING CUES:

1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 Idle Start and Raise to Rated Speed, starting at step 5.
2. Inform the SRO when complete.

2016-302 JPM I Page 5 of 10 Start Time STEP 1

Obtain a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Attachments 4 and 5.

SAT UNSAT Standard:

Examinee obtains a copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Attachments 4 and 5.

Cue Provide a marked up copy of 0-SO-82-1 Diesel Generator 1A-A section 8.2 and Attachments 4 and 5.

Comment STEP 2

SAT UNSAT Standard:

Examinee simulates depressing 0-HS-82-22 CRITICAL Cue:

Provide the following cue, 0-HS-82-22 went in and returned to out.

Comment

2016-302 JPM I Page 6 of 10 STEP 3

SAT UNSAT Standard:

Examinee verifies LRX1A TRIPPED to local.

Cue:

Provide the following cue, LRX1A relay switch is 45 degrees clockwise from 12 oclock position AND red flag above handswitch is present.

Comment STEP 4

SAT UNSAT Standard:

Examinee addresses the procedure step.

Examiner Note:

The step was addressed in the initial conditions.

Comment

2016-302 JPM I Page 7 of 10 STEP 5

SAT UNSAT Standard:

Examinee simulates placing HS-82-23 in the MAINTENANCE (clockwise) position.

CRITICAL Cue:

Provide the following cue, Red light above HS-82-23 is ON green light is OFF.

Comment STEP 6

SAT UNSAT Standard:

Examinee addresses the procedure step.

Cue:

Provide the following cue, The UO will place out-of-service time in the SI.

Comment STEP 7

SAT UNSAT Standard:

Examinee simulates depressing HS-82-25.

CRITICAL Cue:

Provide the following cue, You hear a rumbling rotational sound from the diesel engines.

Comment

2016-302 JPM I Page 8 of 10 STEP 8

SAT UNSAT Standard:

Examinee addresses the procedure step.

Cue:

Provide the following cue, The UO will log the time.

Comment STEP 9

SAT UNSAT Standard:

Examinee addresses the procedure step.

Cue:

Provide the following cue, Engine speed is ~ 400 rpm.

Comment

2016-302 JPM I Page 9 of 10 Cue:

Provide the following cue, When Examinee looks at position indicator (or flow indicator), state valve indicates closed (or flow is 0 gpm).

STEP 10 SAT UNSAT Standard:

Examinee recognizes FCV-67-66 closed by use of position indicator on the valve motor OR recognizes no flow indicated on FI-67-69, &

277 and attempts to open the valve.

Cue:

Provide the following cue, Both lights above HS-67-66 are OFF. If the examinee attempts to manually open FCV-67-66 provide the following cue, The valve position does not change.

Comment STEP 11

ALTERNATE PATH SAT UNSAT Standard:

Examinee simulates opening FCV-67-68 Emerg Dsl Htxs A1 & A2 Sup Vlv From Hdr B by placing HS-67-68 clockwise or simulates rotating hand wheel for FCV-67-68 CCW.

CRITICAL Cue:

Before FCV-67-68 operation provide the following cue, Green light above HS-67-68 is ON, red light is OFF.

Cue:

After FCV-67-68 operation provide the following cue, Green light above HS-67-68 is OFF, red light is ON.

Comment Terminating Cue:

Provide the following cue; Another operator will complete the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM I JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 1.
2. 1A-A D/G has now been declared INOPERABLE for scheduled maintenance.
3. 0-SO-82-1 Diesel Generator 1A-A section 8.2 is in progress and has been completed through step
4.
4. Both of the Unit SROs have given approval to perform this procedure.
5. All prerequisites of 0-SO-82-1 Diesel Generator 1A-A are complete.

INITIATING CUES:

1. You have been directed to perform 0-SO-82-1 Diesel Generator 1A-A section 8.2 Idle Start and Raise to Rated Speed, starting at step 5.
2. Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC PLANT JPM J

2016-302 JPM J Page 2 of 7 RO/SRO JOB PERFORMANCE MEASURE Task:

OPERATE PCV-1-12.

Task #:

0000680501 Task Standard:

Examinee establishes local control of PCV-1-12.

Alternate Path:

YES:

NO:

X Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

APE 068 AA1.01 (4.3/4.5)

Method of Testing:

Simulated Performance:

X Actual Performance:

Evaluation Method:

Simulator In-Plant X

Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

15 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM J Page 3 of 7 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM Appendix K.1

References:

Reference Title Rev No.

AOP-C.04 SHUTDOWN FROM AUXILIARY CONTROL ROOM 38

========================================================================

READ TO EXAMINEE HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, is in progress.

INITIATING CUES:

1. The Operator in the ACR has directed you to take local control of PCV-1-12 (S/G #2) using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1 starting at step 5.
2. Inform the Operator in the ACR when complete.

2016-302 JPM J Page 4 of 7 Start Time STEP 1

Obtain a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1.

SAT UNSAT Standard:

Examinee obtains a copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1.

Cue Provide an in-progress copy of AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1.

Comment STEP 2

SAT UNSAT Standard:

Examinee simulates placing the handle for [1-VTIV-1-12F], Vent Valve in the CW position.

CRITICAL Cue If asked provide the following cue, Valve turns CW 90 degrees, no further movement noted.

Comment

2016-302 JPM J Page 5 of 7 STEP 3

SAT UNSAT Standard:

Examinee simulates placing the knob [1-PREG-1-12], Pressure Regulator in the CCW position.

CRITICAL Cue If asked provide the following cue, Regulator turns CCW several turns until no further movement noted.

Comment STEP 4

SAT UNSAT Standard:

Examinee simulates placing the handle for [1-ISIV-32-12K], Isolation Valve in the CCW position.

CRITICAL Cue If asked provide the following cue, Valve turns CCW 90 degrees, no further movement noted.

Comment

2016-302 JPM J Page 6 of 7 STEP 5

SAT UNSAT Standard:

Examinee simulates placing the handle for [1-ISIV-1-12G], Isolation Valve in the CCW position.

CRITICAL Cue If asked provide the following cue, Valve turns CCW 90 degrees, no further movement noted.

Comment STEP 6

SAT UNSAT Standard:

Examinee simulates placing the knob for [1-PREG-1-12], Pressure Regulator, slowly in clockwise direction.

CRITICAL Cue Provide the following cue The ACR directs you to SLOWLY OPEN 1-PCV-1-12 until I direct you to stop.

Cue When the Examinee has simulated opening 1-PCV-12, provide the following cue, ACR Examinee has directed you to maintain 1-PCV-12 in the current position.

Comment Terminating Cue:

Provide the following cue, another Examinee will complete the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM J JPM BRIEFING SHEET DIRECTIONS TO EXAMINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in MODE 3.
2. AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, is in progress.

INITIATING CUES:

1. The Operator in the ACR has directed you to take local control of PCV-1-12 (S/G #2) using AOP-C.04, SHUTDOWN FROM AUXILIARY CONTROL ROOM, Appendix K.1 starting at step 5.
2. Inform the Operator in the ACR when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC PLANT JPM K

2016-302 JPM K Page 2 of 9 RO/SRO JOB PERFORMANCE MEASURE Task:

Local Control of Charging Flow (1-FCV-62-93)

Task #:

0040390104 Task Standard:

1-FCV-62-93 placed in local manual control and charging/seal flow has been adjusted to nominal values.

Alternate Path:

YES:

NO:

X Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

APE 028 AA1.07 (3.3/3.3)

Method of Testing:

Simulated Performance:

X Actual Performance:

Evaluation Method:

Simulator In-Plant X

Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

10 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM K Page 3 of 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

1. 1-SO-62-1, section 8.5

References:

Reference Title Rev No.

1-SO-62-1 CVCS 70

========================================================================

READ TO OPERATOR HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

DIRECTIONS TO OPERATOR:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in Mode 1
2. Pressurizer level is on program.
3. Normal letdown and charging are in service with 1A-A CCP running
4. 1-HIC-62-93 charging flow controller is failing to properly control pressurizer level in automatic.
5. All prerequisite actions are completed.

INITIATING CUES:

1. The Unit 1 RO has directed you to establish local control of 1-FCV-62-93 using 1-SO-62-1, CVCS section 8.5.
2. Adjust charging flow as directed by the control room operator.
3. Inform the RO when complete.

2016-302 JPM K Page 4 of 9 STEP 1

Obtain a copy of 1-SO-62-1, CVCS section 8.5.

SAT UNSAT Standard:

Operator obtains a copy of 1-SO-62-1, CVCS section 8.5.

Cue Provide a copy of 1-SO-62-1, CVCS section 8.5.

Comment STEP 2

SAT UNSAT Standard:

Operator obtains permission from Unit 1 SRO to locally control 1-FCV 93.

Cue:

If asked provide the following cue, The Unit 1 SRO has given you permission to locally control 1-FCV-62-93.

Examiner note:

Permission was implied during the initiating cue Comment

2016-302 JPM K Page 5 of 9 STEP 3

SAT UNSAT Standard:

Operator simulates establishing radio communications between UO and local operator.

Cue If asked acknowledge establishing communications with the Control Room.

Comment STEP 4

SAT UNSAT Standard:

Operator simulates contacting the Control Room and determines a CCP is in service.

Cue If asked provide the following cue, Normal charging is in service with 1A-A CCP running.

Comment

2016-302 JPM K Page 6 of 9 STEP 5

SAT UNSAT Standard:

Operator simulates turning 1-HIC-62-93B CHARGING HEADER FLOW CONT. clockwise to raise the setpoint (red pen).

CRITICAL Cue:

When the Operator locates 1-HIC-62-93B CHARGING HEADER FLOW CONT. provide the following cue, The black indicator is 34%

and the red indicator is 0%.

Cue:

After the Operator simulates rotating 1-HIC-62-93B CHARGING HEADER FLOW CONT. clockwise provide the following cue, The black indicator is 34% and the red indicator is 34%.

Examiner note:

Turning knob clockwise will raise setpoint. (Direction to turn during JPM depends on "as found" position of red pen in relation to black pen)

Comment STEP 6

SAT UNSAT Standard:

Operator simulates contacting the Control Room.

Cue If asked acknowledge communications with the Control Room.

Comment

2016-302 JPM K Page 7 of 9 STEP 7

SAT UNSAT Standard:

Operator simulates placing 1-HIC-62-93B CHARGING HEADER FLOW CONT. to MANUAL (right).

CRITICAL Cue:

When the Operator simulates placing 1-HIC-62-93B provide the following cue, 1-HIC-62-93B has been placed to the right.

Comment STEP 7

SAT UNSAT Standard:

Operator simulates contacting the Control Room and determines 1-XI-62-93 on panel 1-M-5 is illuminated.

Cue:

If asked provide the following cue, 1-XI-62-93 on panel 1-M-5 is illuminated.

Comment

2016-302 JPM K Page 8 of 9 STEP 8

SAT UNSAT Standard:

Operator simulates raising flow by turning knob for 1-HIC-62-93B CHARGING HEADER FLOW CONT. clockwise.

CRITICAL Cue:

When asked provide the following cue, The Unit 1 RO reports charging flow is 80 gpm and directs you to raise flow to 87 gpm.

Cue:

After the flow adjustment provide the following cue, Another operator will complete the remaining steps of this procedure.

Examiner note:

Turning knob for 1-HIC-62-93B CHARGING HEADER FLOW CONT.

clockwise will raise flow, counterclockwise will reduce flow.

Examiner note:

Operator may observe 1-FI-62-93B CHARGING HEADER FLOW while monitoring flow.

Comment Terminating Cue:

The task is complete when the Operator returns the JPM briefing sheet to the examiner STOP Stop Time

2016-302 JPM K JPM BRIEFING SHEET DIRECTIONS TO OPERATOR:

I will explain the initial conditions, and state the task to be performed. All steps shall be simulated for this JPM. DO NOT TOUCH ANY PLANT EQUIPMENT. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in Mode 1
2. Pressurizer level is on program.
3. Normal letdown and charging are in service with 1A-A CCP running
4. 1-HIC-62-93 charging flow controller is failing to properly control pressurizer level in automatic.
5. All prerequisite actions are completed.

INITIATING CUES:

1. The Unit 1 RO has directed you to establish local control of 1-FCV-62-93 using 1-SO-62-1, CVCS section 8.5.
2. Adjust charging flow as directed by the control room operator.
3. Inform the RO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR JPM A

2016-302 JPM A Page 2 of 8 RO/SRO JOB PERFORMANCE MEASURE Task:

Initiate Emergency Boration from the RWST.

Task #:

0000980501 Task Standard:

Examinee initiates an emergency boration to the RCS from the RWST through the CCPIT valves using EA-68-4 section 4.3.

Alternate Path:

YES:

X NO:

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

APE 024 AA 1.04 (3.6/3.7)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

8 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM A Page 3 of 8 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 285
3. If IC 285 is not available perform the following:

PLACE SIMULATOR IN RUN IMF RD14A f:228 IMF RD14B f:228 IMF ZDIHS62138A f:0 IMF CV42AUTO f:80 IMF CV42COMP f:80 TRIP the Reactor

4. PLACE SIMULATOR IN RUN
5. An extra operator will be required to acknowledge alarms.
6. ACKNOWLEDGE ALARMS
7. FREEZE SIMULATOR.
8. Save as a temporary IC, if repeat runs of JPM will be desired.
9. PLACE SIMULATOR IN RUN
10. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, if a temporary IC has been deleted.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

EA-68-4 Emergency Boration 13

2.

2016-302 JPM A Page 4 of 8 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 3 following a Reactor Trip.

2.

Two Control Rods are not fully inserted.

3.

Flow from the BAT cannot be established.

INITIATING CUES:

1.

The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.

2.

Inform the SRO when complete.

2016-302 JPM A Page 5 of 8 Start Time STEP 1

Obtain a copy of EA-68-4, EMERGENCY BORATION.

SAT UNSAT Standard:

Examinee obtains a copy of EA-68-4, EMERGENCY BORATION section 4.3.

Cue:

Provide an in progress copy of EA-68-4, EMERGENCY BORATION section 4.3.

Comment STEP 2

SAT UNSAT Standard:

Examinee places HS-62-135A AND/OR HS-62-136A, RWST to CCP to IN and OPEN CRITICAL Comment STEP 3

SAT UNSAT Standard:

Examinee places HS-62-132 AND/OR HS-62-133 VCT OUTLET TO CCP to IN and CLOSE CRITICAL Comment

2016-302 JPM A Page 6 of 8 STEP 4

SAT UNSAT Standard:

Examinee addresses the procedure step as N/A and proceeds to step

4.

Comment STEP 5

SAT UNSAT Standard:

Examinee determines sufficient flow through FCV-62-93 CHARGING FLOW CONTROL cannot be attained and goes to the alternate path.

Comment STEP 6

ALTERNATE PATH SAT UNSAT Standard:

Examinee places HS-63-26 CCPIT OUTLET ISOL OR HS-63-25 CCPIT OUTLET ISOL to OPEN.

CRITICAL Comment

2016-302 JPM A Page 7 of 8 STEP 7

ALTERNATE PATH SAT UNSAT Standard:

Examinee places HS-63-39 CCPIT INLET ISOL OR HS-63-40 CCPIT INLET ISOL to OPEN.

CRITICAL Comment Terminating Cue:

When CCPIT valves have been opened provide the following cue, Another operator will complete the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM A JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 3 following a Reactor Trip.

2.

Two Control Rods are not fully inserted.

3.

Flow from the BAT cannot be established.

INITIATING CUES:

1.

The SRO has directed you to initiate emergency boration from the RWST using EA-68-4 Emergency Boration Section 4.3.

2.

Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM B

2016-302 JPM B Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:

Vent an unisolable Cold Leg Accumulator.

Task #:

0060060101 Task Standard:

The examinee vents the #4 Cold Leg Accumulator using EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Alternate Path:

YES:

X NO:

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

006 A4.02 (4.0/3.8)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

8 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM B Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 286
3. If IC 286 is not available perform the following.

Reset to IC 24 Complete ES-1.3 Transfer to RHR Containment Sump.

IOR ZDIHS6367A f:1 IRF IAR06 f:2 IRF SIR01 f:1

4. PLACE SIMULATOR IN RUN
5. Place MODE 1 sign on the simulator.
6. Place an in-progress copy of E-1 on the operators desk.
7. An extra operator will be required to acknowledge alarms.
8. ACKNOWLEDGE ALARMS
9. FREEZE SIMULATOR.
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN
12. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.
13. When directed enter IRF IAR06 f:2 to supply non-essential air to the containment.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

EA-63-1 VENTING UNISOLATED COLD LEG ACCUMULATOR.

0

2.

E-1 Loss of Reactor or Secondary Coolant 28

2016-302 JPM B Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 was in MODE 1 prior to an event.

2.

The event is still in progress.

3.

E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.

INITIATING CUES:

1.

You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.

2.

Inform the SRO when complete.

2016-302 JPM B Page 5 of 14 Start Time STEP 1

Obtain a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

SAT UNSAT Standard:

Examinee obtains a copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Cue:

Provide an in progress copy of E-1, LOSS OF REACTOR OR SECONDARY COOLANT.

Comment STEP 2

SAT UNSAT Standard:

The examinee determines RHR Spray will not be placed in service and proceeds to step 18.

Cue:

If asked provide the following cue, It has been greater than one hour since shutdown.

Comment

2016-302 JPM B Page 6 of 14 STEP 3

SAT UNSAT Standard:

The examinee determines RCS pressure is less than 175 psig by observing installed instrumentation.

Comment STEP 4

SAT UNSAT Standard:

The examinee dispatches personnel to restore power to the CLA Isolation valves.

Cue:

Provide the following cue, Another operator will perform EA-201-1.

Time has been compressed; power has been restored to the CLA Isolation valves.

Comment STEP 5

SAT UNSAT Standard:

Examinee depresses HS-63-134A and HS-63-134B SIS RESET TRAIN 1A and 1B.

Examiner Note:

The examinee may not depress the SIS RESET TRAIN 1A and 1B pushbuttons but instead may verify Annunciator M4A Window C-4 AUTO SI BLOCKED is LIT and Window D-4 SI ACTUATED is OFF.

Comment

2016-302 JPM B Page 7 of 14 STEP 6

SAT UNSAT Standard:

The examinee places HS-63-118A, HS-63-98A, and HS-63-80A NO 1, 2, and 3 CL ACCUM OUTLET ISOL to CLOSE.

CRITICAL Comment STEP 7

ALTERNATE PATH SAT UNSAT Standard:

The examinee places HS-63-67A NO 4 CL ACCUM OUTLET ISOL to CLOSE, observes RED light above HS and proceeds to the RNO.

Comment

2016-302 JPM B Page 8 of 14 STEP 8

SAT UNSAT Standard:

The examinee dispatches personnel to close the CLA Isolation valve locally.

Cue:

Provide the following cue, Another operator will perform EA-201-3.

Time has been compressed; FCV-63-67 cannot be closed locally.

Comment

2016-302 JPM B Page 9 of 14 STEP 9

ALTERNATE PATH SAT UNSAT Standard:

The examinee depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.

CRITICAL Cue If asked provide the following cue, The TSC has performed an evaluation and concurs restoring non-essential air to containment.

Comment

2016-302 JPM B Page 10 of 14 STEP 10 SAT UNSAT Standard:

The examinee addresses the procedure step.

Cue:

Direct the simulator operator to align Non-Essential Control Air to the Containment.

Cue:

Booth operator when directed enter IRF IAR06 f:2 to supply non-essential air to the containment.

Cue:

Provide the following cue, Another operator will perform EA-32-1.

Time has been compressed, Non-Essential Air has been supplied to the Containment.

Comment STEP 11 SAT UNSAT Standard:

The examinee goes to EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Comment

2016-302 JPM B Page 11 of 14 STEP 12 Obtain a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

SAT UNSAT Standard:

Examinee obtains a copy of EA-63-1, VENTING UNISOLATED COLD LEG ACCUMULATOR.

Comment STEP 13 SAT UNSAT Standard:

The examinee addresses the procedure step.

Comment STEP 14 SAT UNSAT Standard:

The examinee simultaneously depresses HS-30-64D and HS-30-64D PHASE B ISOL RESET TR-A and TR-B.

Examiner Note The examinee reset Containment Isolation Phase B in JPM Step 9.

Comment

2016-302 JPM B Page 12 of 14 STEP 15 SAT UNSAT Standard:

The examinee addresses the procedure step.

Cue:

Provide the following cue, Time has been compressed, Non-Essential Air has been supplied to the Containment.

Comment STEP 16 SAT UNSAT Standard:

The examinee verifies valves closed by observing green lights above valve handswitches ON.

Comment

2016-302 JPM B Page 13 of 14 STEP 17 SAT UNSAT Standard:

The examinee rotates HIC-63-65 CL ACCUM N2 HDR VENT FLOW CONTROL fully CCW.

CRITICAL Comment STEP 18 SAT UNSAT Standard:

The examinee places HS-63-63A NO 4 CL ACCUM N2 SUPPLY ISOL to OPEN.

CRITICAL Comment Terminating Cue:

Provide the following cue, Another operator will address the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM B JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 was in MODE 1 prior to an event.

2.

The event is still in progress.

3.

E-1, LOSS OF REACTOR OR SECONDARY COOLANT is in progress complete through step 16.

INITIATING CUES:

1.

You have been directed to perform E-1, LOSS OF REACTOR OR SECONDARY COOLANT starting at step 17.

2.

Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM C

2016-302 JPM C Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:

Transfer to Hot Leg Recirculation Task #:

0000790501 Task Standard:

The examinee completes alignment of A Train RHR and both Trains Safety Injection to the hot leg recirculation flow path.

Alternate Path:

YES:

NO:

X Time Critical Task:

YES:

NO:

X K/A Reference/Ratings: EPE 011 EA1.11 (4.2/4.2)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

18 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM C Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 286
3. If IC 286 is not available, perform the following.
4. Reset to IC 24 a) Place operating power on FCV-63-1 (remote function IRF RHR14 f:0) b) after automatic containment sump swapover is initiated, perform required alignment of ECCS to Containment Sump per ES-1.3.

c) Perform GO-12 for secondary equipment.

5. If IC 24 is not available then reset to IC 16 and complete the following setup:

a) Insert - IMF TH01A f:10 (10% LOCA on Loop #1 Hot Leg), and Trip RCPs.

b) Place operating power on FCV-63-1 (remote function IRF RHR14 f:1) c) after automatic containment sump swapover is initiated, perform required alignment of ECCS to Containment Sump per ES-1.3.

d) Place operating power on FCV-63-22 (remote function IRF SIR06 f:0).

6. To keep out nuisance alarms: insert overrides on following alarms IMF AN_OV_304 f:3 (Containment Moisture High)

IMF AN_OV_420 f:3 (Saturation Monitor)

IMF AN_OV_96 f:3 (Turbine Zero Speed)

7. PLACE SIMULATOR IN RUN
8. An extra operator will be required to acknowledge alarms.
9. ACKNOWLEDGE ALARMS
10. FREEZE SIMULATOR.
11. Save as a temporary IC, if repeat runs of JPM will be desired.
12. PLACE SIMULATOR IN RUN
13. After JPM is complete, delete the temporary IC, if used. Delete the contents of the recycle bin, If a temporary IC has been deleted.

2016-302 JPM C Page 4 of 14 Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

ES-1.4 Transfer to Hot Leg Recirculation 6

2016-302 JPM C Page 5 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 5 following an event that occurred 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ago.

2.

All ECCS components and Containment Spray pumps are aligned and taking suction from Containment sump using ES-1.3.

3.

Both RHR pumps are in service.

INITIATING CUES:

1.

The SRO has directed you to transfer to Hot Leg Recirculation using ES-1.4, Transfer to Hot Leg Recirculation, starting at step 1.

2.

Inform the SRO when complete.

2016-302 JPM C Page 6 of 14 Start Time STEP 1

Obtain a copy of ES-1.4, Transfer to Hot Leg Recirculation.

SAT UNSAT Standard:

Operator obtains a copy of ES-1.4, Transfer to Hot Leg Recirculation.

Cue Provide a copy of ES-1.4, Transfer to Hot Leg Recirculation.

Comment STEP 2

SAT UNSAT Standard:

Operator verifies FCV-72-40 and 41 are closed and goes to step 2 Comment STEP 3

SAT UNSAT Standard:

Operator observes A train RHR running by RED lights above HS 10A ON Comment

2016-302 JPM C Page 7 of 14 STEP 4

SAT UNSAT Standard:

Operator places RHR Train A cold leg isolation valve HS-63-93A to CLOSE.

CRITICAL Comment STEP 5

SAT UNSAT Standard:

Operator observes green lights above RHR Train B discharge crosstie valve FCV-74-35 ON.

Comment STEP 6

SAT UNSAT Standard:

Operator places RHR Train A discharge crosstie valve HS-74-33A to OPEN.

CRITICAL Comment

2016-302 JPM C Page 8 of 14 STEP 7

SAT UNSAT Standard:

Operator places RHR hot leg injection valve HS-63-172A to OPEN.

CRITICAL Comment STEP 8

SAT UNSAT Standard:

Operator observes RHR HL flow established as indicated on control room indicator [FI-63-173].

Examiner Note No minimum flow specified Comment STEP 9

SAT UNSAT Standard:

Operator places RHR Train B cold leg isolation valve HS-63-94 to CLOSE.

CRITICAL Comment

2016-302 JPM C Page 9 of 14 STEP 10 SAT UNSAT Standard:

Operator transitions to step 11.

Comment STEP 11 SAT UNSAT Standard:

Operator observes SI Pump A-A running as indicated by red indicating light above HS-63-10A ON.

Comment STEP 12 SAT UNSAT Standard:

Operator places SI pump A-A HS-63-10A STOP.

CRITICAL Comment

2016-302 JPM C Page 10 of 14 STEP 13 SAT UNSAT Standard:

Operator places SI Train A crosstie HS-63-152A to CLOSE.

CRITICAL Comment STEP 14 SAT UNSAT Standard:

Operator places SI Train A hot leg injection HS-63-156A to OPEN.

CRITICAL Comment

2016-302 JPM C Page 11 of 14 STEP 15 SAT UNSAT Standard:

Operator places SI pump A-A HS-63-10A START.

CRITICAL Cue:

If asked provide the following cue, The 1A SI pump is ready for start.

Comment STEP 16 SAT UNSAT Standard:

Operator observes SI Train A flow established as indicated on control room indicator [FI-63-151].

Comment STEP 17 SAT UNSAT Standard:

Operator observes SI Pump B-B running as indicated by red indicating light above HS-63-15A ON.

Comment

2016-302 JPM C Page 12 of 14 STEP 18 SAT UNSAT Standard:

Operator places HS-63-15A, SI pump B-B to STOP CRITICAL Comment STEP 19 SAT UNSAT Standard:

Operator places SI Train B crosstie HS-63-153A to CLOSE.

CRITICAL Comment STEP 20 SAT UNSAT Standard:

Operator places SI Train B hot leg injection HS-63-157A to OPEN.

CRITICAL Comment

2016-302 JPM C Page 13 of 14 STEP 21 SAT UNSAT Standard:

Operator places SI pump B-B HS-63-15A START CRITICAL Cue:

If asked provide the following cue, The 1B SI pump is ready for start.

Comment STEP 22 SAT UNSAT Standard:

Operator observes SI Train B discharge flow on control room indicator

[FI-63-20].

Comment No minimum flow specified Terminating Cue:

Provide the following cue, Another operator will complete the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM C JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 5 following an event that occurred 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ago.

2.

All ECCS components and Containment Spray pumps are aligned and taking suction from Containment sump using ES-1.3.

3.

Both RHR pumps are in service.

INITIATING CUES:

1.

The SRO has directed you to transfer to Hot Leg Recirculation using ES-1.4, Transfer to Hot Leg Recirculation, starting at step 1.

2.

Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM D

2016-302 JPM D Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task:

Secure Reactor Coolant Pumps.

Task #:

0030020101 Task Standard:

The examinee will manually initiate Safety Injection, secures Reactor Coolant Pumps 1, 2, & 3 from panel M-5 and secures Reactor Coolant Pump #4 by de-energizing the 1D 6.9Kv Unit Board.

Alternate Path:

YES:

X NO:

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

003 A2.02 (3.7/3.9)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

10 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM D Page 3 of 11 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 16.
3. IMF TH01A 1.5
4. IMF RP02 f:1
5. IOR ZDIHS6873A f:3
6. PLACE SIMULATOR IN RUN
7. An extra operator will be required to acknowledge alarms.
8. ACKNOWLEDGE ALARMS
9. FREEZE SIMULATOR.
10. Save as a temporary IC, if repeat runs of JPM will be desired.
11. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

E-0 REACTOR TRIP OR SAFETY INJECTION 39

2.

2016-302 JPM D Page 4 of 11 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1.

2.

The Unit Supervisor has temporarily left the Control Room.

INITIATING CUES:

1.

Respond to plant conditions

2016-302 JPM D Page 5 of 11 Start Time STEP 1

Perform Immediate Operator Actions.

SAT UNSAT Standard:

The examinee performs Immediate Operator Actions of E-0, REACTOR TRIP OR SAFETY INJECTION.

The examinee manually initiates Safety Injection by placing HS-63-133A and /or 133B SIS ACTUATE TRAIN A&B to ACTUATE.

CRITICAL Examiner Note:

If the examinee implements the foldout page go to JPM step 11 Comment STEP 2

Obtain a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

SAT UNSAT Standard:

Examinee obtains a copy of E-0, REACTOR TRIP OR SAFETY INJECTION.

Comment

2016-302 JPM D Page 6 of 11 STEP 3

SAT UNSAT Standard:

The examinee determines the Reactor Tripped by observing installed instrumentation.

Comment STEP 4

SAT UNSAT Standard:

The examinee determines the Turbine Tripped by observing installed instrumentation.

Comment STEP 5

SAT UNSAT Standard:

The examinee determines that at least one 6.9KV shutdown board ENERGIZED on this unit by observing installed instrumentation.

Comment

2016-302 JPM D Page 7 of 11 STEP 6

SAT UNSAT Standard:

The examinee manually initiates Safety Injection by placing HS 133A and /or 133B SIS ACTUATE TRAIN A&B to ACTUATE.

CRITICAL Examiner Note The examinee may have manually actuated safety Injection in JPM step 1.

Comment STEP 7

SAT UNSAT Standard:

The examinee addresses the Foldout Page.

Examiner Note:

Foldout Page action items are contained in JPM steps 8, 11 and 12.

Comment

2016-302 JPM D Page 8 of 11 STEP 8

SAT UNSAT Standard:

The examinee places HS-68-8A, 31A and 50A RCP 1, 2, & 3 to STOP.

CRITICAL Examiner Note:

The examinee will place HS-68-73A, RCP 4 to STOP but the handswitch will not function.

Comment

2016-302 JPM D Page 9 of 11 STEP 9

ALTERNATE PATH SAT UNSAT Standard:

The examinee dispatches an operator to the Unit 1 6.9KV Unit Boards and proceeds to Appendix G, Contingency Actions for RCP Trip Failure.

Comment STEP 10 SAT UNSAT Standard:

The examinee determines RCP 4 is powered from Unit Board 1D which does not supply power to any Shutdown Board and proceeds to step 2.

Comment

2016-302 JPM D Page 10 of 11 STEP 11 SAT UNSAT Standard:

The examinee places XS-57-79 6.9 Unit Bd 1D AUTO/MAN SEL to MANUAL.

CRITICAL Comment STEP 12 SAT UNSAT Standard:

The examinee places HS-57-80 1124 USST 1B TO 6.9 UNIT BD 1D to TRIP.

CRITICAL Comment Terminating Cue:

Provide the following cue, Another operator will complete the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM D JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1.

2.

The Unit Supervisor has temporarily left the Control Room.

INITIATING CUES:

1.

Respond to plant conditions Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR SIM E

2016-302 JPM E Page 2 of 11 RO/SRO JOB PERFORMANCE MEASURE Task:

Respond to ERCW Pump Trip Task #:

0000620501 Task Standard:

The examinee starts an A TRAIN ERCW Pump and places the auto start selection switch away from the Q-A ERCW Pump position.

Alternate Path:

YES:

NO:

X Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

076 A2.01 (3.5/3.7)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

10 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM E Page 3 of 11 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Initialize to IC 16
3. Ensure Q-A pump is in service and the selector switch is selected for Q-A pump.
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. PLACE SIMULATOR IN RUN
8. When directed, IMF #RW01G f:1 (Trips Q-A ERCW Pump)

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

0-AR-M27-B-A COMPONENT COOLING 12

2.

AOP-M.01 Loss of ERCW 28

2016-302 JPM E Page 4 of 11 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1, 100% power.

INITIATING CUES:

1.

Respond to plant conditions.

2016-302 JPM E Page 5 of 11 Start Time STEP 1

Window E-4 SAT UNSAT Standard:

Examinee acknowledges alarm and transitions to AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER Comment STEP 2

Obtain a copy of AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER.

SAT UNSAT Standard:

Cue Examinee obtains a copy of AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER.

Comment

2016-302 JPM E Page 6 of 11 STEP 3

SAT UNSAT Standard:

Examinee observes no indication of ERCW flooding and goes to step

4.

Comment STEP 3

SAT UNSAT Standard:

Examinee observes a green light indication for ERCW pump Q-A and goes to Section 2.1 ERCW Pump Failure Comment

2016-302 JPM E Page 7 of 11 STEP 4

SAT UNSAT Standard:

Examinee places 0-HS-67-460A ERCW pump Q-A in Pull-to-Lock.

Comment Examiner Note:

The indicating lights for ERCW pump Q-A will go out when the handswitch is placed in PTL.

STEP 5

SAT UNSAT Standard:

Examinee places 0-HS-67-432A for the J-A OR 0-HS-67-436A for the K-A ERCW pump to START as required to maintain Supply header pressures [between 78 psig and 124 psig] as indicated on 1-PI-67-493A or 2-PI-67-493A.

CRITICAL Comment STEP 6

SAT UNSAT Standard:

Examinee verifies two A Train powered ERCW Pumps available by observing indicating light indication above the A Train handswitches.

Comment

2016-302 JPM E Page 8 of 11 STEP 7

SAT UNSAT Standard:

Examinee observes 1A and 2A ERCW supply header pressures at 110 psig and Unit 1A supply header flow approx. 2700 gpm and Unit 2A supply header flow approx. 13,500 gpm.

Comment STEP 8

SAT UNSAT Standard:

Examinee observes 1B and 2B ERCW supply header pressures at 120 psig and Unit 1B supply header flow approx. 1500 gpm and Unit 2B supply header flow approx. 11,500 gpm.

Comment

2016-302 JPM E Page 9 of 11 STEP 9

SAT UNSAT Standard:

Examinee dispatches an AUO to locally inspect the Q-A ERCW pump.

Cue Respond as AUO Acknowledge inspect the Q-A ERCW pump and/or breaker.

Comment STEP 10 SAT UNSAT Standard:

Examinee notifies an SRO to evaluate Tech Specs.

Comment Cue Respond as SRO Acknowledge evaluate Tech Specs.

STEP 11 SAT UNSAT Standard:

Examinee places the 0-XS-67-285 ERCW Pumps J-A & Q-A D/G Power Select to J-A CRITICAL Comment

2016-302 JPM E Page 10 of 11 STEP 12 SAT UNSAT Standard:

Examinee observes the running ERCW pump amps less than 60 amps Comment Terminating Cue:

Provide the following cue Another operator will perform the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM E JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1, 100% power.

INITIATING CUE:

1.

Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT 2016-302 NRC SIMULATOR JPM F

2016-302 JPM F Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:

Recover from a Containment Ventilation Isolation (CVI) Actuation Task #:

0290100101 Task Standard:

The examinee resets the Containment Vent Isolation signal and aligns the Containment Upper and Lower Compartment radiation monitor for service.

Alternate Path:

YES:

NO:

X Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

103 A4.04 (3.5/3.5)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

10 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM F Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 16 Insert malfunction RM90130 to 100,000 (cause RM-90-130 to alarm).

Insert remote function RMR07 to TRIP (trips off 106/112 pumps).

Delete RM90130 malfunction and reset annunciator.

Close ALL Containment rad Monitor Isolation Valves on 0-M-12 Freeze the simulator until ready for the JPM to begin.

3. PLACE SIMULATOR IN RUN
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. Save as a temporary IC, if repeat runs of JPM will be desired.
8. PLACE SIMULATOR IN RUN Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

0-SO-30-3 CONTAINMENT PURGE SYSTEM OPERATION 52

2.

2016-302 JPM F Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1.

2.

A high radiation signal was detected by RM-90-130, causing a Containment Ventilation Isolation.

3.

0-SO-30-3, Section 8.3 Containment Ventilation System Isolation Actuation has been performed.

4.

The cause of the high radiation signal has been determined and corrected.

5.

All initiating signals have been confirmed to be RESET.

INITIATING CUES:

1.

The SRO has directed you to perform 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation actions to recover from the containment vent isolation.

2.

Inform the SRO when the recovery is complete.

2016-302 JPM F Page 5 of 10 Start Time STEP 1

Obtain a copy of 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation.

SAT UNSAT Standard:

Examinee obtains a copy of 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation.

Comment STEP 2

SAT UNSAT Standard:

The examinee places HS-30-1A, Containment Purge Supply and Exhaust Fan 1A in Pull to Lock.

Comment STEP 3

SAT UNSAT Standard:

The examinee places HS-30-4A, Containment Purge Supply and Exhaust Fan 1B in Pull to Lock.

Comment

2016-302 JPM F Page 6 of 10 STEP 4

SAT UNSAT Standard:

The examinee places HS-30-11A, Incore Instrument Room Purge Supply and Exhaust Fan in Pull to Lock.

Comment

2016-302 JPM F Page 7 of 10 STEP 5

SAT UNSAT Standard:

The examinee verifies all dampers closed by observing green lights above handswitches ON.

Comment

2016-302 JPM F Page 8 of 10 STEP 6

SAT UNSAT Standard:

The examinee addresses the procedure step.

Cue:

When asked provide the following cue, Independent verifications have been completed.

Comment STEP 7

SAT UNSAT Standard:

The examinee depresses HS-30-65A Containment Vent Isolation Train A.

CRITICAL Cue:

When asked provide the following cue, Concurrent verifications have been completed.

Comment

2016-302 JPM F Page 9 of 10 STEP 8

SAT UNSAT Standard:

The examinee depresses HS-30-65B Containment Vent Isolation Train B.

Cue:

When asked provide the following cue, Concurrent verifications have been completed.

Comment STEP 9

SAT UNSAT Standard:

The examinee places ALL lower compartment air monitor RM-90-106 and upper compartment air monitor RM-90-112 isolation handswitches to OPEN.

CRITICAL Comment Terminating Cue:

Provide the following cue, Another operator will complete the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM F JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Unit 1 is in MODE 1.

2.

A high radiation signal was detected by RM-90-130, causing a Containment Ventilation Isolation.

3.

0-SO-30-3, Section 8.3 Containment Ventilation System Isolation Actuation has been performed.

4.

The cause of the high radiation signal has been determined and corrected.

5.

All initiating signals have been confirmed to be RESET.

INITIATING CUES:

1.

The SRO has directed you to perform 0-SO-30-3, Section 8.4 Recovery From a Containment Vent System Isolation Actuation actions to recover from the containment vent isolation.

2.

Inform the SRO when the recovery is complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR JPM G

2016-302 JPM G Page 2 of 10 RO/SRO JOB PERFORMANCE MEASURE Task:

Transfer 1A-A 6.9 KV SD Bd from Alternate to Normal Supply Task #:

0620520201 Task Standard:

1A-A 6.9 kv Shutdown Board is energized by manually starting the 1A-A EDG.

Alternate Path:

YES:

X NO:

Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

064 A4.01 (4.0/4.3)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

7 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM G Page 3 of 10 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Reset to IC 16
3. Transfer 1A-A 6.9 Kv Shutdown Board to the alternate feeder.
4. Insert IMF EG08A f:1 D/G 1A-A Fails to Auto Start.
5. Insert Override ZDIHS5744A f:3 Trip 6.9 KV SD Bd 1A-A Alt. Fdr. Bkr. 1716.
6. An extra operator will be required to acknowledge alarms.
7. Place simulator in RUN.
8. Insert AN_OV_325 to OFF
9. ACKNOWLEDGE ALARMS
10. FREEZE SIMULATOR.
11. Provide a copy of 0-SO-202-4, 6900V Shutdown Boards completed through 8.1.5 step 2.
12. PLACE SIMULATOR IN RUN SPECIAL INSTRUCTIONS TO EVALUATOR:
1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

0-SO-202-4, 6900V Shutdown Boards

References:

Reference Title Rev No.

1.

0-SO-202-4 6900V Shutdown Boards 50

2016-302 JPM G Page 4 of 10 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1.

Units 1 and 2 are in MODE 1.

2.

1A-A 6.9 kV Shutdown Board is on the ALTERNATE power supply.

3.

Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.

4.

1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.

INITIATING CUES:

1.

You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.

2.

0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.

3.

Inform the SRO when complete.

2016-302 JPM G Page 5 of 10 Start Time STEP 1

Obtain a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 SAT UNSAT Standard:

Examinee obtains a copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 Cue Provide a marked up copy of 0-SO-202-4 6900V Shutdown Boards, Section 8.1.5 completed through step 2 Comment STEP 2

SAT UNSAT Standard:

Examinee observes 1-XS-57-39 6.9kV Shutdown Board 1A-A voltmeter selector switch in the SDBD 1A position.

Comment

2016-302 JPM G Page 6 of 10 STEP 3

SAT UNSAT Standard:

Examinee places 1-HS-57-44A control switch for [1718] to CLOSE and HOLD.

CRITICAL Comment STEP 4

SAT UNSAT Standard:

Examinee places 1-HS-57-41A control switch for [1716] to TRIP.

CRITICAL Comment

2016-302 JPM G Page 7 of 10 STEP 5

SAT UNSAT Standard:

Examinee observes ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A.

Comment Examiner Note ACB 1718 fails to close resulting in a loss of 6.9 KV SD Bd. 1A-A followed by failure of D/Gs to auto start and re-energize SD Bd. 1A-A.

STEP 6

SAT UNSAT Standard:

Examinee observes no bus voltage indicated on 6.9 kv SD Bus 1A-A voltmeter 1-EI-57-39.

Comment STEP 7

SAT UNSAT Standard:

Examinee releases 1-HS-57-44A control switch for [1718] to MID position Comment

2016-302 JPM G Page 8 of 10 STEP 8

SAT UNSAT Standard:

Examinee observes diesel generators did not start, recognizes DG RUN green light ON. [M-1]

Comment STEP 9

ALTERNATE PATH SAT UNSAT Standard:

Examinee places 1-HS-82-15, D/G EMERG START 1A-A, 2A-A, 1B-B, 2B-B to EMERG START position OR Examinee places 0-HS-82-16A, DG 1A-A Emergency Start, to EMERG START position.

CRITICAL Comment

2016-302 JPM G Page 9 of 10 STEP 10 SAT UNSAT Standard:

Examinee verifies DG emergency breaker 1912 closed, by observing red light above 1-HS-57-46A ON [M-26] or Breaker 1912 indicating light ON

[M-1]

Comment Terminating Cue:

Provide the following cue Another operator will perform the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM G JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1.

Units 1 and 2 are in MODE 1.

2.

1A-A 6.9 kV Shutdown Board is on the ALTERNATE power supply.

3.

Relay testing has been completed on normal feeder to 1A-A 6.9 Kv Shutdown Board.

4.

1B-B, 2A-A, and 2B-B 6.9kV Shutdown Boards are aligned to Normal Power supply.

INITIATING CUE:

1.

You have been directed to transfer 1A-A 6.9kV Shutdown Board to Normal Feeder at 1-M-1 using 0-SO-202-4, 6900V Shutdown Boards, Section 8.1.5, starting at step 3.

2.

0-SO-202-4, 6900V Shutdown Boards, Section 8.1.1 has been completed.

3.

Inform the SRO when complete.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE 2016-302 NRC SIMULATOR SIM H

2016-302 JPM H Page 2 of 14 RO/SRO JOB PERFORMANCE MEASURE Task:

Respond to a Failure of PRM N-44 Task #:

3210140401 Task Standard:

The examinee determines Power range D instrument N-44 fails, places Rod Control to MANUAL, defeats control functions, and prepares for removal from service.

Alternate Path:

YES:

NO:

X Time Critical Task:

YES:

NO:

X K/A Reference/Ratings:

015 A3.02 (3.7/3.9)

Method of Testing:

Simulated Performance:

Actual Performance:

X Evaluation Method:

Simulator X

In-Plant Classroom Main Control Room Mock-up Performer:

Trainee Name Evaluator:

/

Name / Signature DATE Performance Rating:

SAT:

UNSAT:

Validation Time:

11 min Total Time:

Performance Time:

Start Time:

Finish Time:

COMMENTS

2016-302 JPM H Page 3 of 14 SPECIAL INSTRUCTIONS:

1. Ensure Simulator Operator Checklist is complete
2. Initialize IC #14 (75%, BOL).
3. Select N45 to one PR channel and I channel
4. An extra operator will be required to acknowledge alarms.
5. ACKNOWLEDGE ALARMS
6. FREEZE SIMULATOR.
7. PLACE SIMULATOR IN RUN
8. When directed, approximately 1 minute after operator assumes shift, IMF NI07D f:100.

SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified in step SAT/UNSAT column by bold print Critical Step.
2. Any UNSAT requires comments.

Tools/Equipment/Procedures Needed:

References:

Reference Title Rev No.

1.

AOP-I.01 Nuclear Instrument Malfunction 13

2.

AOP-C.01 Rod Control Malfunctions 26

2016-302 JPM H Page 4 of 14 DIRECTIONS TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

HAND JPM BRIEFING SHEET TO EXAMINEE AT THIS TIME!

INITIAL CONDITIONS:

1. Unit 1 is operating at 75% reactor power.

INITIATING CUES:

1. Respond to plant conditions.

2016-302 JPM H Page 5 of 14 Start Time STEP 1

Examinee recognizes uncontrolled control rod insertion (rod movement NOT due to actual T-avg/T-ref mismatch or change in reactor/turbine power) due to instrument failure of N-44.

SAT UNSAT Standard:

Examinee places Rod Control Mode Selector Switch 1-HS-85-10 to MAN based on immediate operator actions.

CRITICAL Comment Examiner Note Direct the facility operator to insert MF NI07D @ 100%.

STEP 2

SAT UNSAT Standard:

Examinee transitions to section 2.1 page 4.

Comment

2016-302 JPM H Page 6 of 14 STEP 3

SAT UNSAT Standard:

Examinee places 1-HS-85-5110, Rod Control Mode Selector Switch in MANUAL.

CRITICAL Examiner Note:

May have been previously performed in JPM step 1.

Comment STEP 4

SAT UNSAT Standard:

Examinee verifies control rod motion stopped by observing individual rod position indication and group step counters.

Comment

2016-302 JPM H Page 7 of 14 STEP 5

SAT UNSAT Standard:

Examinee verifies reactor power and T-avg stable by using installed instrumentation.

Comment STEP 6

SAT UNSAT Standard:

Examinee verifies reactor power less than 90% and goes to step 3..

Comment STEP 7

SAT UNSAT Standard:

Examinee verifies.VITAL POWER BOARD UV OR BREAKER TRIP alarms [M-1C windows A-7, B-7, C-7, and D-7] DARK.

Comment

2016-302 JPM H Page 8 of 14 STEP 8

SAT UNSAT Standard:

Examinee verifies the failure of N-44 and transitions to AOP-I.01 Nuclear Instrument Malfunction.

Comment STEP 9

SAT UNSAT Standard:

Examinee goes to AOP-I.01 Nuclear Instrument Malfunction section 2.3.

Comment

2016-302 JPM H Page 9 of 14 STEP 10 SAT UNSAT Standard:

Examinee verifies 1-HS-85-5110, Rod Control Mode Selector Switch MANUAL.

Comment STEP 11 SAT UNSAT Standard:

Examinee determines a power increase was NOT in progress and goes to step 3.

Comment

2016-302 JPM H Page 10 of 14 STEP 12 SAT UNSAT Standard:

Examinee addresses Tech Specs for applicability.

Cue Respond as Unit Supervisor I will EVALUATE Tech Specs for applicability.

Comment STEP 13 SAT UNSAT Standard:

Examinee determines three power range channels OPERABLE by observing channels N-41, N-42, and N-43.

Comment

2016-302 JPM H Page 11 of 14 STEP 14 SAT UNSAT Standard:

Examinee places Detector Current comparator Upper Section switch in the PR N-44 position.

CRITICAL Cue If directed, acknowledge Examinee is leaving the At the Controls Area.

Comment STEP 15 SAT UNSAT Standard:

Examinee places Detector Current comparator Lower Section switch in the PR N-44 position.

CRITICAL Comment

2016-302 JPM H Page 12 of 14 STEP 16 SAT UNSAT Standard:

Examinee places Rod Stop Bypass switch in the Bypass PR N-44 position.

CRITICAL Comment STEP 17 SAT UNSAT Standard:

Examinee places Power Mismatch Bypass switch in the Bypass PR N-44 position.

CRITICAL Comment

2016-302 JPM H Page 13 of 14 STEP 18 SAT UNSAT Standard:

Examinee places Comparator Channel Defeat switch in the N-44 position.

CRITICAL Comment Terminating Cue:

Provide the following cue Another operator will perform the remaining steps of this procedure.

STOP Stop Time

2016-302 JPM H JPM BRIEFING SHEET The examiner will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

1. Unit 1 is operating at 75% reactor power.

INITIATING CUES:

1. Respond to plant conditions.

Acknowledge to the examiner when you are ready to begin.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.