IR 05000261/2008001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 03/03/2008 | | issue date = 03/03/2008 | ||
| title = Annual Assessment Letter (IR 05000261-08-001) | | title = Annual Assessment Letter (IR 05000261-08-001) | ||
| author name = Musser R | | author name = Musser R | ||
| author affiliation = NRC/RGN-II/DRP/RPB4 | | author affiliation = NRC/RGN-II/DRP/RPB4 | ||
| addressee name = Walt T | | addressee name = Walt T | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:rch 3, 2008 | ||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 (NRC INSPECTION REPORT 05000261/2008001) | |||
==Dear Mr. Walt:== | ==Dear Mr. Walt:== | ||
Line 41: | Line 38: | ||
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4603 with any questions you may have regarding this letter or the inspection plan. | If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4603 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects | Sincerely, | ||
/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects | |||
Docket No.: 50-261, Docket No. 72-3 Licensee No.: DPR-23, License No. SNM-2502 Enclosure: Robinson Inspection/Activity Plan | |||
Robinson Inspection/Activity Plan | |||
cc w/encl: (See page 3) | cc w/encl: (See page 3) | ||
Line 93: | Line 88: | ||
State of South Carolina P. O. Box 11649 Columbia, SC 29211 | State of South Carolina P. O. Box 11649 Columbia, SC 29211 | ||
CP&L 4 Report to Tom Walt from Randall A. Musser dated March 3, 2008 | CP&L 4 Report to Tom Walt from Randall A. Musser dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 NRC INSPECTION REPORT 05000261/2008001 | ||
SUBJECT: ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 NRC INSPECTION REPORT 05000261/2008001 | |||
Distribution w/encl | Distribution w/encl | ||
Line 102: | Line 95: | ||
ROP Reports INPO PUBLIC | ROP Reports INPO PUBLIC | ||
Robinson Inspection / Activity Plan 03/03/2008 | Robinson Inspection / Activity Plan 03/03/2008-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 14:51:02 Report 22 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 04/21/2008 04/25/2008 2 71152B IP 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 06/02/2008 06/06/2008 2 71152B IP Baseline Inspections Identification and Resolution of Problems 06/16/2008 06/20/2008 2 71152B IP 1 PSB1-EP-EP INSP EP Baseline Inspection A lert and Notification System Testing 06/16/2008 06/20/2008 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 06/16/2008 06/20/2008 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 06/16/2008 06/20/2008 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 06/16/2008 06/20/2008 2 7111405 IP Baseline Inspections Drill/Exercise Performance 06/16/2008 06/20/2008 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 06/16/2008 06/20/2008 2 71151-EP02 IP Baseline Inspections A lert & Notification System 06/16/2008 06/20/2008 2 71151-EP03 IP 4 OL EXAM-INITIAL EXAM PREP Not Applicable ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 07/28/2008 08/01/2008 2 V23285 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 08/11/2008 08/13/2008 2 7112101 IP 4 OL EXAM-INITIAL EXAM Not Applicable ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 08/18/2008 08/29/2008 2 V23285 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 2 2515/171 IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK1 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/06/2008 10/10/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/06/2008 10/10/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 2 71151-PR01 IP 1 EB3ISI-ISI Baseline Inspections Inservice Inspection Activities - PWR 10/13/2008 10/17/2008 2 7111108P IP 3 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/20/2008 10/24/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/20/2008 10/24/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 2 71151-PR01 IP This report does not include INPO and OUTAGE activities. | ||
-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 14:51:02 Report 22 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 04/21/2008 04/25/2008 2 71152B IP 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 06/02/2008 06/06/2008 2 71152B IP Baseline Inspections Identification and Resolution of Problems 06/16/2008 06/20/2008 2 71152B IP 1 PSB1-EP-EP INSP EP Baseline Inspection A lert and Notification System Testing 06/16/2008 06/20/2008 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 06/16/2008 06/20/2008 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 06/16/2008 06/20/2008 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 06/16/2008 06/20/2008 2 7111405 IP Baseline Inspections Drill/Exercise Performance 06/16/2008 06/20/2008 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 06/16/2008 06/20/2008 2 71151-EP02 IP Baseline Inspections A lert & Notification System 06/16/2008 06/20/2008 2 71151-EP03 IP 4 OL EXAM-INITIAL EXAM PREP Not Applicable ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 07/28/2008 08/01/2008 2 V23285 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 08/11/2008 08/13/2008 2 7112101 IP 4 OL EXAM-INITIAL EXAM Not Applicable ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 08/18/2008 08/29/2008 2 V23285 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 2 2515/171 IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK1 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/06/2008 10/10/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/06/2008 10/10/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 2 71151-PR01 IP 1 EB3ISI-ISI Baseline Inspections Inservice Inspection Activities - PWR 10/13/2008 10/17/2008 2 7111108P IP 3 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/20/2008 10/24/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/20/2008 10/24/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 2 71151-PR01 IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Robinson Inspection / Activity Plan 03/03/2008 | Robinson Inspection / Activity Plan 03/03/2008-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 14:51:02 Report 22 5 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 10/20/2008 10/24/2008 2 7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/03/2008 11/07/2008 2 7111117B IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 10/27/2008 10/31/2008 2 2515/172 IP 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 12/15/2008 12/17/2008 2 7112101 IP 4 PSB1-RP-RADIATION PROTECTION PUBLIC CORNERSTONE Baseline Inspections A ccess Control to Radiologically Significant Areas 01/12/2009 01/16/2009 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 2 71151-PR01 IP 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/02/2009 03/06/2009 2 7111111B IP 3 PSB1EP-EP EXERCISE EP Baseline Inspection Exercise Evaluation 05/18/2009 05/22/2009 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 2 7111404 IP Baseline Inspections ERO Drill Participation 05/18/2009 05/22/2009 2 71151-EP02 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP 1 EB3-HS-HEAT SINK Baseline Inspections Heat Sink Performance 06/01/2009 06/05/2009 2 7111107B IP This report does not include INPO and OUTAGE activities. | ||
-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 14:51:02 Report 22 5 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 10/20/2008 10/24/2008 2 7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/03/2008 11/07/2008 2 7111117B IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 10/27/2008 10/31/2008 2 2515/172 IP 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 12/15/2008 12/17/2008 2 7112101 IP 4 PSB1-RP-RADIATION PROTECTION PUBLIC CORNERSTONE Baseline Inspections A ccess Control to Radiologically Significant Areas 01/12/2009 01/16/2009 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 2 71151-PR01 IP 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/02/2009 03/06/2009 2 7111111B IP 3 PSB1EP-EP EXERCISE EP Baseline Inspection Exercise Evaluation 05/18/2009 05/22/2009 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 2 7111404 IP Baseline Inspections ERO Drill Participation 05/18/2009 05/22/2009 2 71151-EP02 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP 1 EB3-HS-HEAT SINK Baseline Inspections Heat Sink Performance 06/01/2009 06/05/2009 2 7111107B IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
}} | }} |
Revision as of 14:14, 12 July 2019
ML080630484 | |
Person / Time | |
---|---|
Site: | Robinson, 07200003 |
Issue date: | 03/03/2008 |
From: | Randy Musser NRC/RGN-II/DRP/RPB4 |
To: | Walt T Carolina Power & Light Co |
References | |
IR-08-001 | |
Download: ML080630484 (7) | |
Text
rch 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 (NRC INSPECTION REPORT 05000261/2008001)
Dear Mr. Walt:
On February 06, 2008, the NRC technical staff completed its performance review of the H. B. Robinson Steam Electric Plant for the period from January 1 through December 31, 2007. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and the enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only- Security-Related Information" will include the security cornerstone review and a resultant inspection plan.
Overall, Robinson operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Robinson Unit 2 for the most recent quarter, as well as the first three quarters of the assessment cycle, was in the Licensee Response Column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include operator licensing, and Temporary Instructions 171 (B.5.b) and 172 (Reactor Coolant System Dissimilar Metal Butt Welds).
CP&L 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4603 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket No.: 50-261, Docket No. 72-3 Licensee No.: DPR-23, License No. SNM-2502 Enclosure: Robinson Inspection/Activity Plan
cc w/encl: (See page 3)
_________________________ OFFICE RII:DRP RII:DRP SIGNATURE RAM GJW NAME RMusser GWilson DATE 03/03/2008 02/12/2008 E-MAIL COPY? YES N O YES N O YES N O YES N O YES N O YES N O YES N O CP&L 3 cc w/encl:
William G. Noll Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Ernest J. Kapopoulos, Jr.
Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Paul Fulford, Manager Performance Evaluation and
Regulatory Affairs PEB 5 Electronic Mail Distribution
C. T. Baucom, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution
J. F. Lucas, Manager Support Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental
Control Electronic Mail Distribution R. Mike Gandy
Division of Radioactive Waste Mgmt.
S. C. Department of Health and Environmental Control Electronic Mail Distribution
Beverly Hall, Chief Radiation
Protection Section N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution
David T. Conley Associate General Counsel - Legal Dept. Progress Energy Service Company, LLC Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center
Raleigh, NC 27699-4326
Public Service Commission
State of South Carolina P. O. Box 11649 Columbia, SC 29211
CP&L 4 Report to Tom Walt from Randall A. Musser dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 NRC INSPECTION REPORT 05000261/2008001
Distribution w/encl
Robinson Inspection / Activity Plan 03/03/2008-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 14:51:02 Report 22 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 04/21/2008 04/25/2008 2 71152B IP 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 06/02/2008 06/06/2008 2 71152B IP Baseline Inspections Identification and Resolution of Problems 06/16/2008 06/20/2008 2 71152B IP 1 PSB1-EP-EP INSP EP Baseline Inspection A lert and Notification System Testing 06/16/2008 06/20/2008 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 06/16/2008 06/20/2008 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 06/16/2008 06/20/2008 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 06/16/2008 06/20/2008 2 7111405 IP Baseline Inspections Drill/Exercise Performance 06/16/2008 06/20/2008 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 06/16/2008 06/20/2008 2 71151-EP02 IP Baseline Inspections A lert & Notification System 06/16/2008 06/20/2008 2 71151-EP03 IP 4 OL EXAM-INITIAL EXAM PREP Not Applicable ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 07/28/2008 08/01/2008 2 V23285 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 08/11/2008 08/13/2008 2 7112101 IP 4 OL EXAM-INITIAL EXAM Not Applicable ROBINSON/AUGUST 2008 EXAM AT POWER FACILITIES 08/18/2008 08/29/2008 2 V23285 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 2 2515/171 IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK1 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/06/2008 10/10/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/06/2008 10/10/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/06/2008 10/10/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/06/2008 10/10/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/06/2008 10/10/2008 2 71151-PR01 IP 1 EB3ISI-ISI Baseline Inspections Inservice Inspection Activities - PWR 10/13/2008 10/17/2008 2 7111108P IP 3 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/20/2008 10/24/2008 2 7112101 IP Baseline Inspections A LARA Planning and Controls 10/20/2008 10/24/2008 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 2 71151-PR01 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 03/03/2008-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 14:51:02 Report 22 5 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 10/20/2008 10/24/2008 2 7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 11/03/2008 11/07/2008 2 7111117B IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 10/27/2008 10/31/2008 2 2515/172 IP 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 12/15/2008 12/17/2008 2 7112101 IP 4 PSB1-RP-RADIATION PROTECTION PUBLIC CORNERSTONE Baseline Inspections A ccess Control to Radiologically Significant Areas 01/12/2009 01/16/2009 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 2 7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 2 7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 2 71151-PR01 IP 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/02/2009 03/06/2009 2 7111111B IP 3 PSB1EP-EP EXERCISE EP Baseline Inspection Exercise Evaluation 05/18/2009 05/22/2009 2 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 2 7111404 IP Baseline Inspections ERO Drill Participation 05/18/2009 05/22/2009 2 71151-EP02 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2 71151-EP03 IP 1 EB3-HS-HEAT SINK Baseline Inspections Heat Sink Performance 06/01/2009 06/05/2009 2 7111107B IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.