Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000261/2023004 | 31 January 2024 | Integrated Inspection Report 05000261/2023004 | |
ML24009A243 | 25 January 2024 | Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
ML24009A271 | 24 January 2024 | Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule | |
ML23354A005 | 8 January 2024 | Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 | |
ML23342A090 | 8 December 2023 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Condition Adverse to Quality Operability Determination License Renewal Maintenance Rule Program |
IR 05000261/2023420 | 30 November 2023 | Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) | Safeguards Contingency Plan |
IR 05000261/2023010 | 28 November 2023 | Fire Protection Team Inspection Report 05000261/2023010 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management |
ML23317A346 | 14 November 2023 | Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Fire Protection Program |
IR 05000261/2023003 | 7 November 2023 | Integrated Inspection Report 05000261 2023003 and 07200060 2023001 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Overtravel Maintenance Rule Program Fire Protection Program Substantial potential for overexposure Power change Overexposure |
ML23226A086 | 12 October 2023 | Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b | Anticipated operational occurrence Surveillance Frequency Control Program |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Fire Protection Program Unidentified leakage Operational leakage |
ML23235A055 | 23 August 2023 | Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) | Safe Shutdown Fitness for Duty Exemption Request COVID-19 Fire Protection Program |
IR 05000261/2023005 | 21 August 2023 | Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) | Commercial Grade Dedication |
IR 05000261/2023002 | 7 August 2023 | Integrated Inspection Report 05000261/2023002 | Enforcement Discretion Fire impairment Operating Basis Earthquake Temporary Modification Functionality Assessment Aging Management Operability Determination Earthquake Maintenance Rule Program Continuous fire watch Fire Protection Program Downpower |
IR 05000261/2023402 | 30 May 2023 | Cyber Security Inspection Report 05000261/2023402 | Cyber Security Affidavit |
ML23145A160 | 25 May 2023 | Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality | |
IR 05000261/2023001 | 2 May 2023 | Integrated Inspection Report 05000261/2023001 | Temporary Modification Emergency Lighting Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Reverse polarity |
ML23118A076 | 1 May 2023 | Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML22332A493 | 10 March 2023 | William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility | Health Physics Network High winds Minimum staff |
IR 05000261/2022006 | 1 March 2023 | Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML23047A451 | 21 February 2023 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 | Cyber Security |
ML23041A227 | 13 February 2023 | 2022 Q4 Robinson_Workflow Final | Boric Acid High Radiation Area Stroke time Weld Overlay Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Aging Management Significance Determination Process Operability Determination License Renewal Maintenance Rule Program Liquid penetrant Fire Protection Program Overexposure Eddy-Current Testing |
ML22329A298 | 19 January 2023 | Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 | Qualified Offsite Circuit Surveillance Frequency Control Program Offsite Circuit |
ML22294A092 | 15 December 2022 | Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 | Nondestructive Examination Foreign Material Exclusion Stress corrosion cracking Operational leakage |
ML22339A136 | 1 December 2022 | 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant | |
ML22322A132 | 18 November 2022 | 301, NRC Operator License Examination Report & Cover Letter Merged | |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal |
ML22256A253 | 14 November 2022 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
IR 05000261/2022003 | 3 November 2022 | Integrated Inspection Report 05000261 2022003 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Earthquake Fire Protection Program Power change Overspeed trip |
IR 05000261/2022402 | 19 October 2022 | Security Baseline Inspection Report 05000261/2022402 | |
IR 05000261/2022010 | 26 September 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 | Ultimate heat sink FLEX Large early release frequency Battery sizing |
IR 05000261/2022301 | 23 September 2022 | 301 Operator License Exam Approval Letter (05000261/2022301) | |
ML22258A030 | 15 September 2022 | Evacuation Time Estimate Reports | |
ML22231B136 | 1 September 2022 | Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi | Decommissioning Funding Plan |
IR 05000261/2022005 | 26 August 2022 | Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final | Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
IR 05000261/2021404 | 10 August 2022 | Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 | |
IR 05000261/2022002 | 9 August 2022 | Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion | Unanalyzed Condition Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Severe Accident Management Guideline Earthquake Continuous fire watch Fire Protection Program Fire Watch |
ML22213A068 | 5 August 2022 | Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 | Affidavit |
ML22193A212 | 4 August 2022 | Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections | Coatings Incorporated by reference Moisture barrier |
ML22159A295 | 3 August 2022 | Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves | |
IR 05000261/2022011 | 19 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 | Boric Acid Internal Flooding Cyber Security Condition Adverse to Quality Significance Determination Process Operability Determination Power change Unidentified leakage |
ML22167A170 | 14 July 2022 | Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid High Radiation Area Safe Shutdown Earthquake Coatings Finite Element Analysis Design basis earthquake Foreign Material Exclusion Time Critical Operator Action |
ML22046A022 | 14 June 2022 | Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Time of Discovery Surveillance Frequency Control Program Offsite Circuit Fire Protection Program |
ML22125A194 | 12 May 2022 | Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 | Affidavit |
IR 05000261/2022001 | 2 May 2022 | Integrated Inspection Report 05000261/2022001 | High winds Internal Flooding Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000261/2022401 | 19 April 2022 | Security Baseline Inspection Report 05000261/2022401 | Fitness for Duty |
ML22098A226 | 11 April 2022 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Operability Determination Maintenance Rule Program Coronavirus COVID-19 |
ML22083A003 | 29 March 2022 | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | Open Phase Condition |