SUMMARY OF PUBLIC MEETING TO DISCUSS AN APPARENT VIOLATION IDENTIFIED AT WOLF CREEK GENERATING STATION   
 
==SUMMARY==
OF PUBLIC MEETING TO DISCUSS AN APPARENT VIOLATION IDENTIFIED AT WOLF CREEK GENERATING STATION   


==Dear Mr. Heflin,==
==Dear Mr. Heflin,==
Line 26: Line 28:
: 1. List of Attendees 2. WCNOC Presentation Slides     
: 1. List of Attendees 2. WCNOC Presentation Slides     


SUNSI Review MSH By:    Non-Sensitive Sensitive Publicly Available MSH  Non-Publicly Available Keyword:  OFFICE DRS/PSB1 DRP/PBB DRP/PBB DRS/PSB1 ACES DRP/CPBB DRS/CPSB1 NAME P. Elkmann C. Peabody D. Proulx G. Guerra R. Browder MHaire/VGaddy SIGNATURE
SUNSI Review MSH By:    Non-Sensitive Sensitive Publicly Available MSH  Non-Publicly Available Keyword:  OFFICE DRS/PSB1 DRP/PBB DRP/PBB DRS/PSB1 ACES DRP/CPBB DRS/CPSB1 NAME P. Elkmann C. Peabody D. Proulx G. Guerra R. Browder MHaire/VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 5/6/14 5/8/14 5/6/14 5/8/14 5/7/14 5/7/14 5/9/14 Enclosure 1 List of Attendees  NRC  Mr. S. Reynolds, Deputy Regional Administrator Ms. K. Fuller, Regional Counsel Mr. J. Clark, Acting Division Director, Division of Reactor Safety Mr. T. Pruett, Deputy Division Director, Division of Reactor Projects Mr. M. Haire, Branch Chief, Plant Support Branch 1, Division of Reactor Safety Mr. N. O Ms. V. Campbell, Branch Chief, Allegation and Enforcement Branch Mr. R. Kahler, Branch Chief, DPR, Office of Nuclear Security and Incident Response Mr. P. Elkmann, Senior Inspector, Plant Support Branch 1, Division of Reactor Safety Mr. C. Peabody, Senior Resident Inspector, Branch B, Division of Reactor Projects Mr. S. LaVie, Senior Specialist, DPR, Office of Nuclear Security and Incident Response Mr. D. Proulx, Senior Project Engineer, Branch B, Division of Reactor Projects Mr. J. Wray, Senior Enforcement Specialist, Office of Enforcement Mr. G. Guerra, Inspector, Plant Support Branch 1, Division of Reactor Safety Ms. R. Browder, Senior Enforcement Specialist, Allegation and Enforcement Branch  Wolf Creek Nuclear Operating Corporation  Mr. R. Smith, Chief Nuclear Officer Mr. M. Westman, Manager, Regulatory Affairs Mr. T. East, Superintendent, Emergency Planning Mr. W. Ketchum, Supervisor, Engineering Mr. W. Muilenburg, Supervisor, Licensing  M. D. Michel, Instructor, Chemistry W o l f C reek Nu c lear O p e r atin g C o rp o r a ti on    
/RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 5/6/14 5/8/14 5/6/14 5/8/14 5/7/14 5/7/14 5/9/14 Enclosure 1 List of Attendees  NRC  Mr. S. Reynolds, Deputy Regional Administrator Ms. K. Fuller, Regional Counsel Mr. J. Clark, Acting Division Director, Division of Reactor Safety Mr. T. Pruett, Deputy Division Director, Division of Reactor Projects Mr. M. Haire, Branch Chief, Plant Support Branch 1, Division of Reactor Safety Mr. N. O Ms. V. Campbell, Branch Chief, Allegation and Enforcement Branch Mr. R. Kahler, Branch Chief, DPR, Office of Nuclear Security and Incident Response Mr. P. Elkmann, Senior Inspector, Plant Support Branch 1, Division of Reactor Safety Mr. C. Peabody, Senior Resident Inspector, Branch B, Division of Reactor Projects Mr. S. LaVie, Senior Specialist, DPR, Office of Nuclear Security and Incident Response Mr. D. Proulx, Senior Project Engineer, Branch B, Division of Reactor Projects Mr. J. Wray, Senior Enforcement Specialist, Office of Enforcement Mr. G. Guerra, Inspector, Plant Support Branch 1, Division of Reactor Safety Ms. R. Browder, Senior Enforcement Specialist, Allegation and Enforcement Branch  Wolf Creek Nuclear Operating Corporation  Mr. R. Smith, Chief Nuclear Officer Mr. M. Westman, Manager, Regulatory Affairs Mr. T. East, Superintendent, Emergency Planning Mr. W. Ketchum, Supervisor, Engineering Mr. W. Muilenburg, Supervisor, Licensing  M. D. Michel, Instructor, Chemistry Wolf Creek Nuclear Operating Corporation    


Regulatory Conference Inspection Report 05000482/201 3-502 Preliminary White Finding     Enclosure 2 Wolf Creek Representatives
R egu l a t o r y C on f e rence Inspec t i on R epo r t 05000482/201 3-5 0 2 P reli mina r y W h i t e F i nd i ng     Enclosure 2 W ol f C r ee k Rep r e s en t a t i v es
* Russell Smith - Site Vice President
* R usse l l Sm it h - S it e V i c e P r es i dent
* Mike Westman - Manager Regulatory Affairs
* M i k e W es t ma n - Manage r R egu l a t o r y A f f a ir s
* Timothy East - Superintendent EP
* T i mo t h y East - Supe ri n tenden t E P
* Bill Muilenburg - Supervisor Licensing
* B il l Mu ilenbu r g - Supe r v i so r L i cens i ng
* Bill Ketchum - Supervisor Engineer
* B il l Ke tchu m - Supe r v i so r Eng i neer
* Dan Michel - Instructor II               Enclosure 2
* D a n M iche l - I nstr uc t o r I I               Enclosure 2


NRC's Preliminary finding
NRC's Preli m i nary f i nding
* An apparent violation of 10 CFR 50.54(q)(2) was identified involving the failure to maintain adequate methods for assessing the actual or potential consequences of a radiological emergency between September 2012 and November 2013, in accordance with the requirements of 10 CFR 50.47(b)(9).
* An appa r ent viola tion of 10 CFR 50.54 (q)(2) w as iden t i fied in v ol ving t he f a i lu r e t o ma i n t a in adequa t e me thods f or a ss e ssing t he a c t ual or po t en tial c on sequen c es of a r ad i o l ogi c al eme r gen c y be t ween S ep tember 2012 and N o vember 2013, in a cc o rdan c e w i t h t he r equi remen t s of 10 CFR 50.47 (b)(9).
* The inaccurate calculation was corrected on February 25, 2014.
* The ina cc u r a t e c al cula tion w as c o rr e c t ed on Feb r ua r y 25, 2014.
* The inspectors determined the failure to maintain a Dose Assessment Process capable of providing a technically adequate estimate of offsite dose. This issue has been entered into the licensee's corrective action system as Condition Report 2013-0076247. Enclosure 2 Root Cause Evaluation Findings
* The in s pe c t o r s de t e rmined t he failu r e t o ma i n tain a D o s e A ss e ss me nt P r o c e s s capab l e of p r o vid i ng a t e c hn i cally adequa t e e s tima t e of o f f s i t e do s e. This i ss ue has been en t e r ed in t o t he li c en s ee's c o rr e ct i v e a c tion s y s t em as Condition Repo r t 2013-0076 2 47. Enclosure 2 Roo t Cau se Ev alua t io n Findings
* ROOT CAUSE - Information Systems (IS) procedures and guidance did not require comprehensive verification and validation for risk significant software.
* R OO T CAUS E - I n f o rm a t i on S ys t e m s (I S) p rocedu res and gu idance d i d not r equ i r e co m p r ehens i ve ve r i f i ca t i on and va li da t i on f or r i sk s i gn i f icant so ft w a r e.
* CONTRIBUTING CAUSE 1 - Less than adequate EP oversight of risk significant drill-identified issues.
* C O N T R I BU T I N G CAUS E 1 - Less t han adequa t e E P ove r s i ght of r i sk s i gn i f icant d r ill-i den t i f i ed issues.
* Also determined the EDCP Containment Spray Filtration Toggle was not functional.
* Also de t e rm i ned t he EDC P C on t a i n ment S p r ay F il tr a t i on T ogg l e was not f unc t i ona l.
* Determined the EDCP deficiencies were introduced with Version 3.6 issued in February 2003. Enclosure 2 Key Corrective Actions
* D e t e rm ined t he EDC P de f i c i enc i es w e r e i n troduced wi t h V e r s i on 3.6 issued i n Feb r ua ry 2003. Enclosure 2 K e y Co rrect i v e Act io ns
* Improve Emergency Planning ownership of risk significant issues.
* I m prov e E mergenc y P l ann i n g o wnersh ip o f r isk s i gn i f i can t i ssues.
* Improve Computer Software verification and validation (V&V).
* I m prov e C o m pu t e r Soft w ar e ver i f i cat i o n and va li da ti o n (V&V).
* EDCP was corrected and issued February 25, 2014 including both filter factor and containment spray toggles. Enclosure 2 EDCP          Field Team Data 11Other Event Trees  Calculated Value  SGTR Rad Mon    Unit Vent & RWVent Rad Mon    DBA          Meteorology EAL                         
* EDC P w a s correc t e d an d i ssue d Februar y 25, 201 4 i nc l ud i n g bo th f il te r facto r an d con t a i n ment spra y togg l es. Enclosure 2 EDCP          Field Team Data 1 1Other Event Trees  Calculated Value  SGTR Rad Mon    Unit Vent & RWVent Rad Mon    DBA          Meteorology EAL                         


Enclosure 2 Vent Rad Monitor Detail (normal mode)                                                                                                                                                                                                                                                                                                                                                                                                                                                              Enclosure 2
Enclosure 2 V en t R a d Monito r Detai l (no r ma l mode)                                                                                                                                                                                                                                                                                                                                                                                                                                                              Enclosure 2


Vent Rad Monitor Detail (accident mode)       
V en t R a d Monito r Detai l (a cciden t mode)       


Enclosure 2 Affect of the Deficiencies
Enclosure 2 A f f e ct o f t h e De f i cien c ies
* Iodine concentration can be overestimated by a factor of ten
* Iodine c on c en t r a tion c an be o v e r e s tima t ed by a f a c t or of t en
* However, concentration is not the only input to calculating dose
* H o w e v e r , c on c en t r a tion is not t he only input t o c al cula ting do s e
* The EDCP deficiencies affect the dose
* The EDC P de f i cien cies a f f e c t t he do s e
* Containment Spray operation > 30 minutes
* C on tainment S p r ay ope r a tion > 30 minu t es
* Unit Vent is in accident mode with operable HEPA
* Unit V ent is in a ccident mode w i th ope rable H E P A
* In these cases, the Iodine concentration is determined using an Iodine to Noble Gas ratio
* I n t he s e c a s e s , t he I od i ne c on c en t r a tion is de t e rmined u sing an Iodine t o Noble Gas r a tio
* So, the result is dependent upon the Noble Gas concentration rather than the iodine concentration               Enclosure 2 Affect of the Deficiencies (cont.)
* S o, t he r e s u l t is dependent upon t he N ob l e Gas c on c en t r a tio n r a ther than t he iodine c on c en t r a tion               Enclosure 2 A f f e ct o f t h e De f i cien c ie s (c on t.)
* The ten Design Basis Accidents in EDCP were reviewed to determine the significance of the deficiencies. o LOCA and Fuel Handling Accident o No credible scenarios for combining deficiencies     Containment Spray TEDE Factor CDE Factor LOCA 1.5 1.5 Unit Vent Filtration TEDE Factor CDE Factor Fuel Handling Acc. 1.0 1.1 LOCA 3.0 3.8                Enclosure 2 Summary
* T h e ten D e si gn Ba si s Acc i d e nts i n ED CP w e r e r e viewed t o d e t ermi n e the si gn i f i c a nce of t h e d e f i c i e nc i e s. o L O CA a n d Fu el Ha nd li n g Acc i d e n t o N o c r e d i b le s c e n ari os f or c o m b i n i n g d e f i c i e nc i es     C o n t a i n m e n t S p ra y T E D E F a c t o r C D E F a c t or L O CA 1.5 1.5 U n it V e n t Filt r a ti o n T E D E F a c t o r C D E F a c t or Fu e l H andli n g Acc. 1.0 1.1 L O CA 3.0 3.8                Enclosure 2 S ummary
* EAL decision making was unaffected by these deficiencies o In order to have a dose assessment large enough to cause an EAL declaration, plant conditions will drive declarations o EDCP calculations lag plant conditions
* EA L de c i sion ma king w as una f f e c t ed by t he s e de f i cien cies o I n o r de r t o ha ve a dose a ss e ssm en t la r g e enoug h t o c au se an EAL de c la r a tion , plan t c ondi tion s w il l d r i ve de c la r a tions o E DC P c al cula tion s la g plan t c ondi tions
* PAR decision making was unaffected by these deficiencies o Initial PARs are plant condition based o Dose assessment is used for follow-up PARs or to prove initial PARs
* P AR de c i sion ma king w as una f f e c t ed by t he s e de f i cien cies o I ni t ia l P A R s are plan t c ondi t io n ba s ed o Do se a ss e ssm en t i s u s e d f o r follo w-u p P A R s o r t o p r o ve ini tial P A R s
* One of five EDCP calculation methods was affected with the largest impact involving a LOCA o Had this event actually occurred, a GE would have been declared based on plant conditions and a corresponding plant condition PAR evacuating 0-2 miles around and 10 miles downwind would be made o The EDCP deficiencies would not have any impact because they would not have been used to develop these PARs Enclosure 2 Wolf Creek Closing Remarks Russell Smith - Site Vice President & CNOO              
* One of f i v e EDC P c al cula tion me thods w as a f f e c t ed w i t h t he la r ge s t impa c t in v ol ving a LO C A o Ha d t hi s e v en t a c tuall y o cc u rr ed , a G E woul d ha ve bee n de c la r ed ba s e d o n plan t c ondi tion s and a c o rr e spondin g plan t c ondi tion P AR e v a c ua t in g 0-2 m ile s a r oun d an d 1 0 m ile s do w n w in d w oul d b e m ade o T h e E DC P de f i cien c ie s woul d no t ha ve an y i m pa ct be c au se they woul d no t ha ve bee n u s e d t o de velo p t he se P A R s Enclosure 2 Wolf C r eek Cl os i ng R e m a r ks Ru ss el l S m i t h - Si t e V ice P r e siden t & CN O O              


Enclosure 2
Enclosure 2


Acronym list
A c ro n y m li s t
* EP - Emergency Planning
* EP - E mergen c y P l ann i ng
* EDCP - Emergency Dose Calculation Program
* EDCP - E mergen c y D o s e C a lc u l at i on Program
* HEPA - High Efficiency Particulate Air
* H E P A - H i gh E f fici en c y Part ic u l ate A i r
* LOCA - Loss of Coolant Accident
* L OC A - Lo s s of C oo l ant A cci dent
* TEDE - Total Effective Dose Equivalent
* T E D E - Total E f fe c t i v e D o s e Equ i v a l ent
* CDE - Committed Dose Equivalent
* CDE - C o mm i tted D o s e Equ i v a l ent
* EAL - Emergency Action Level
* EAL - E mergen c y A c t i on Le v el
* PAR - Protective Action Recommendation
* P AR - Prote c t i v e A c t i on R e c o mmendat i on
* GE - General Emergency
* G E - General E mergen c y
* CNOO - Chief Nuclear Operating Officer   Enclosure 2}}
* CNO O - C h i ef N u cl ear Operat i ng O f f ic er   Enclosure 2}}

Revision as of 15:54, 9 July 2018

04/30/2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station
ML14134A184
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/14/2014
From: Haire M S
Plant Support Branch-1
To: Heflin A C
Wolf Creek
P. Elkmann
References
Download: ML14134A184 (16)


Text

May 14, 2014 Mr. Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

SUMMARY

OF PUBLIC MEETING TO DISCUSS AN APPARENT VIOLATION IDENTIFIED AT WOLF CREEK GENERATING STATION

Dear Mr. Heflin,

On April 30, 2014, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives of Wolf Creek Nuclear Operating Corporation at the Region IV office in Arlington, Texas, to discuss an apparent violation identified at Wolf Creek Generating Station. The apparent violation concerned the accuracy of the licand was discussed in NRC Inspection Report 05000482/2013502 (ADAMS ML14092A618). The licensee presented its perspective on the circumstances of the violation and the safety significance. The list of attendees and enclosed. made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Sincerely, /RA/ V.Gaddy for Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-482 License No. NPF-42

Enclosures:

1. List of Attendees 2. WCNOC Presentation Slides

SUNSI Review MSH By: Non-Sensitive Sensitive Publicly Available MSH Non-Publicly Available Keyword: OFFICE DRS/PSB1 DRP/PBB DRP/PBB DRS/PSB1 ACES DRP/CPBB DRS/CPSB1 NAME P. Elkmann C. Peabody D. Proulx G. Guerra R. Browder MHaire/VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 5/6/14 5/8/14 5/6/14 5/8/14 5/7/14 5/7/14 5/9/14 Enclosure 1 List of Attendees NRC Mr. S. Reynolds, Deputy Regional Administrator Ms. K. Fuller, Regional Counsel Mr. J. Clark, Acting Division Director, Division of Reactor Safety Mr. T. Pruett, Deputy Division Director, Division of Reactor Projects Mr. M. Haire, Branch Chief, Plant Support Branch 1, Division of Reactor Safety Mr. N. O Ms. V. Campbell, Branch Chief, Allegation and Enforcement Branch Mr. R. Kahler, Branch Chief, DPR, Office of Nuclear Security and Incident Response Mr. P. Elkmann, Senior Inspector, Plant Support Branch 1, Division of Reactor Safety Mr. C. Peabody, Senior Resident Inspector, Branch B, Division of Reactor Projects Mr. S. LaVie, Senior Specialist, DPR, Office of Nuclear Security and Incident Response Mr. D. Proulx, Senior Project Engineer, Branch B, Division of Reactor Projects Mr. J. Wray, Senior Enforcement Specialist, Office of Enforcement Mr. G. Guerra, Inspector, Plant Support Branch 1, Division of Reactor Safety Ms. R. Browder, Senior Enforcement Specialist, Allegation and Enforcement Branch Wolf Creek Nuclear Operating Corporation Mr. R. Smith, Chief Nuclear Officer Mr. M. Westman, Manager, Regulatory Affairs Mr. T. East, Superintendent, Emergency Planning Mr. W. Ketchum, Supervisor, Engineering Mr. W. Muilenburg, Supervisor, Licensing M. D. Michel, Instructor, Chemistry W o l f C reek Nu c lear O p e r atin g C o rp o r a ti on

R egu l a t o r y C on f e rence Inspec t i on R epo r t 05000482/201 3-5 0 2 P reli mina r y W h i t e F i nd i ng Enclosure 2 W ol f C r ee k Rep r e s en t a t i v es

  • R usse l l Sm it h - S it e V i c e P r es i dent
  • M i k e W es t ma n - Manage r R egu l a t o r y A f f a ir s
  • T i mo t h y East - Supe ri n tenden t E P
  • B il l Mu ilenbu r g - Supe r v i so r L i cens i ng
  • B il l Ke tchu m - Supe r v i so r Eng i neer
  • D a n M iche l - I nstr uc t o r I I Enclosure 2

NRC's Preli m i nary f i nding

  • An appa r ent viola tion of 10 CFR 50.54 (q)(2) w as iden t i fied in v ol ving t he f a i lu r e t o ma i n t a in adequa t e me thods f or a ss e ssing t he a c t ual or po t en tial c on sequen c es of a r ad i o l ogi c al eme r gen c y be t ween S ep tember 2012 and N o vember 2013, in a cc o rdan c e w i t h t he r equi remen t s of 10 CFR 50.47 (b)(9).
  • The ina cc u r a t e c al cula tion w as c o rr e c t ed on Feb r ua r y 25, 2014.
  • The in s pe c t o r s de t e rmined t he failu r e t o ma i n tain a D o s e A ss e ss me nt P r o c e s s capab l e of p r o vid i ng a t e c hn i cally adequa t e e s tima t e of o f f s i t e do s e. This i ss ue has been en t e r ed in t o t he li c en s ee's c o rr e ct i v e a c tion s y s t em as Condition Repo r t 2013-0076 2 47. Enclosure 2 Roo t Cau se Ev alua t io n Findings
  • R OO T CAUS E - I n f o rm a t i on S ys t e m s (I S) p rocedu res and gu idance d i d not r equ i r e co m p r ehens i ve ve r i f i ca t i on and va li da t i on f or r i sk s i gn i f icant so ft w a r e.
  • C O N T R I BU T I N G CAUS E 1 - Less t han adequa t e E P ove r s i ght of r i sk s i gn i f icant d r ill-i den t i f i ed issues.
  • Also de t e rm i ned t he EDC P C on t a i n ment S p r ay F il tr a t i on T ogg l e was not f unc t i ona l.
  • D e t e rm ined t he EDC P de f i c i enc i es w e r e i n troduced wi t h V e r s i on 3.6 issued i n Feb r ua ry 2003. Enclosure 2 K e y Co rrect i v e Act io ns
  • I m prov e E mergenc y P l ann i n g o wnersh ip o f r isk s i gn i f i can t i ssues.
  • I m prov e C o m pu t e r Soft w ar e ver i f i cat i o n and va li da ti o n (V&V).
  • EDC P w a s correc t e d an d i ssue d Februar y 25, 201 4 i nc l ud i n g bo th f il te r facto r an d con t a i n ment spra y togg l es. Enclosure 2 EDCP Field Team Data 1 1Other Event Trees Calculated Value SGTR Rad Mon Unit Vent & RWVent Rad Mon DBA Meteorology EAL

Enclosure 2 V en t R a d Monito r Detai l (no r ma l mode) Enclosure 2

V en t R a d Monito r Detai l (a cciden t mode)

Enclosure 2 A f f e ct o f t h e De f i cien c ies

  • Iodine c on c en t r a tion c an be o v e r e s tima t ed by a f a c t or of t en
  • H o w e v e r , c on c en t r a tion is not t he only input t o c al cula ting do s e
  • The EDC P de f i cien cies a f f e c t t he do s e
  • C on tainment S p r ay ope r a tion > 30 minu t es
  • Unit V ent is in a ccident mode w i th ope rable H E P A
  • I n t he s e c a s e s , t he I od i ne c on c en t r a tion is de t e rmined u sing an Iodine t o Noble Gas r a tio
  • S o, t he r e s u l t is dependent upon t he N ob l e Gas c on c en t r a tio n r a ther than t he iodine c on c en t r a tion Enclosure 2 A f f e ct o f t h e De f i cien c ie s (c on t.)
  • T h e ten D e si gn Ba si s Acc i d e nts i n ED CP w e r e r e viewed t o d e t ermi n e the si gn i f i c a nce of t h e d e f i c i e nc i e s. o L O CA a n d Fu el Ha nd li n g Acc i d e n t o N o c r e d i b le s c e n ari os f or c o m b i n i n g d e f i c i e nc i es C o n t a i n m e n t S p ra y T E D E F a c t o r C D E F a c t or L O CA 1.5 1.5 U n it V e n t Filt r a ti o n T E D E F a c t o r C D E F a c t or Fu e l H andli n g Acc. 1.0 1.1 L O CA 3.0 3.8 Enclosure 2 S ummary
  • EA L de c i sion ma king w as una f f e c t ed by t he s e de f i cien cies o I n o r de r t o ha ve a dose a ss e ssm en t la r g e enoug h t o c au se an EAL de c la r a tion , plan t c ondi tion s w il l d r i ve de c la r a tions o E DC P c al cula tion s la g plan t c ondi tions
  • P AR de c i sion ma king w as una f f e c t ed by t he s e de f i cien cies o I ni t ia l P A R s are plan t c ondi t io n ba s ed o Do se a ss e ssm en t i s u s e d f o r follo w-u p P A R s o r t o p r o ve ini tial P A R s
  • One of f i v e EDC P c al cula tion me thods w as a f f e c t ed w i t h t he la r ge s t impa c t in v ol ving a LO C A o Ha d t hi s e v en t a c tuall y o cc u rr ed , a G E woul d ha ve bee n de c la r ed ba s e d o n plan t c ondi tion s and a c o rr e spondin g plan t c ondi tion P AR e v a c ua t in g 0-2 m ile s a r oun d an d 1 0 m ile s do w n w in d w oul d b e m ade o T h e E DC P de f i cien c ie s woul d no t ha ve an y i m pa ct be c au se they woul d no t ha ve bee n u s e d t o de velo p t he se P A R s Enclosure 2 Wolf C r eek Cl os i ng R e m a r ks Ru ss el l S m i t h - Si t e V ice P r e siden t & CN O O

Enclosure 2

A c ro n y m li s t

  • EP - E mergen c y P l ann i ng
  • EDCP - E mergen c y D o s e C a lc u l at i on Program
  • H E P A - H i gh E f fici en c y Part ic u l ate A i r
  • L OC A - Lo s s of C oo l ant A cci dent
  • T E D E - Total E f fe c t i v e D o s e Equ i v a l ent
  • CDE - C o mm i tted D o s e Equ i v a l ent
  • EAL - E mergen c y A c t i on Le v el
  • P AR - Prote c t i v e A c t i on R e c o mmendat i on
  • G E - General E mergen c y
  • CNO O - C h i ef N u cl ear Operat i ng O f f ic er Enclosure 2