ML091120528

From kanterella
Jump to navigation Jump to search
Summary of Annual Performance Assessment Meeting for Wolf Creek Generating Station
ML091120528
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/21/2009
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-B
To: Muench R
Wolf Creek
References
Download: ML091120528 (22)


Text

UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 April 21, 2009 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

SUMMARY

OF ANNUAL PERFORMANCE ASSESSMENT MEETING FOR WOLF CREEK GENERATING STATION

Dear Mr. Muench:

This refers to the meeting conducted in Burlington, Kansas, on April 16, 2009, to discuss the safety performance at Wolf Creek Generating Station between January 1 and December 31, 2008.

Topics discussed during the meeting included the Reactor Oversight Process, the safety performance at Wolf Creek Generating Station, and discussions of your improvement initiatives.

Members of the public present at the meeting were allowed to ask questions and comment on the proceedings.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document management system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief Project Branch B Division of Reactor Projects Docket: 50-482 License: NPF-42 cc w/

Enclosures:

1. Attendance List
2. NRC Presentation Slides
3. Licensee Presentation Slides

Wolf Creek Generating Station Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612-1590 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Chief, Radiation and Asbestos Control Section Bureau of Air and Radiation Kansas Department of Health and Environment 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366

Wolf Creek Generating Station Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov)

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Site Secretary, DRP/B (Shirley.Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

K. S. Fuller (Karla.Fuller@nrc.gov)

OEMail Resource Senior Enforcement Specialist (Mark.Haire@nrc.gov)

OEDO RIV Coordinator (John.Adams@nrc.gov)

ROPreports SUNSI Review Completed: _VGG__ ADAMS: Yes No Initials: _VGG__

Publicly Available Non-Publicly Available Sensitive Non-Sensitive R:\_REACTORS\EOC and Midcycle\EOC Meeting Summary\2009\WC MS 41609.doc SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials VGG Publicly Avail Yes No Sensitive Yes No Sens. Type Initials VGG DRP/BC/B VGaddy

/RA/

4/20/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax