ML071350651
| ML071350651 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/08/2007 |
| From: | Ted Sullivan Office of Nuclear Reactor Regulation |
| To: | |
| Mensah T | |
| References | |
| Download: ML071350651 (5) | |
Text
Category 2 Public Meeting with NEI on the Category 2 Public Meeting with NEI on the Implications of the Wolf Creek Implications of the Wolf Creek Dissimilar Metal Weld Inspections Dissimilar Metal Weld Inspections Ted Sullivan, NRR May 8, 2007
2 U.S. Nuclear Regulatory Commission Purpose Purpose
- Industry will present a matrix of potential modeling cases for the Phase II sensitivity, benchmarking, and validation calculations in their Advanced Finite Element Fracture Mechanics Analyses
- NRC staff will provide comments or concerns regarding their modeling plans
3 U.S. Nuclear Regulatory Commission Public Participation Public Participation
- This is a Category 2 meeting
- The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated times during the meeting
4 U.S. Nuclear Regulatory Commission Agenda Agenda Introductions (Industry & NRC)
Status of industry work & Response to April 4, 2007 NRC letter (Industry)
Status of NRC Confirmatory Research (NRC)
Proposed Case Matrix (Industry)
Plant Specific Loads and Geometries Proposed Weld Residual Stresses Summary of May 1 Meeting Fabrication steps affecting WRS Repairs Crack Growth Rates Single Crack Growth Calculations Axisymmetric WRS field Axisymmetric + Repair WRS field Multiple Crack Growth Calculations
5 U.S. Nuclear Regulatory Commission Agenda Agenda
- Additional topics:
- Critical Crack Size Calculations (Industry)
- Validation studies and WRS mockups (Industry)
- Benchmarking K Solutions for the Advanced FEA Calculations (Industry)
- Leak-rate Calculations (Industry)
- Plans for next meeting(s) (Industry & NRC)
- Alloy 600 Conference
- Meeting Summary & Conclusions (Industry & NRC)