IR 05000382/2022301: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML22082A198 | ||
| issue date = | | issue date = 03/28/2022 | ||
| title = | | title = NRC Examination Report 05000382/2022301 | ||
| author name = | | author name = Gepford H | ||
| author affiliation = NRC/RGN-IV/ | | author affiliation = NRC/RGN-IV/DORS/OB | ||
| addressee name = Ferrick J | | addressee name = Ferrick J | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
Line 10: | Line 10: | ||
| license number = NPF-038 | | license number = NPF-038 | ||
| contact person = | | contact person = | ||
| document type = Letter, License-Operator | | document report number = 50-382/22-301 | ||
| page count = | | document type = Letter, License-Operator Examination Report | ||
| page count = 9 | |||
}} | }} | ||
Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 28, 2022 | ||
==SUBJECT:== | ==SUBJECT:== | ||
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - | WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC EXAMINATION REPORT 05000382/2022301 | ||
==Dear Mr. Ferrick:== | ==Dear Mr. Ferrick:== | ||
On February 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at your Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on February 24, 2022, with Mr. V. Ford, Operations Training Superintendent, and other members of your staff. A telephonic exit meeting was conducted on March 17, 2022, with Mr. V. Ford, who was provided the NRC licensing decisions. | |||
The examination included the evaluation of four applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses. The license examiners determined that all nine applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55 and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report. | |||
No findings were identified during this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, Signed by Gepford, Heather on 03/28/22 Heather J. Gepford, Chief Operations Branch Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38 | |||
===Enclosure:=== | |||
Examination Report 05000382/2022301, w/attachment: Supplemental Information | |||
==Inspection Report== | |||
Docket Number: 05000382 License Number: NPF-38 Report Number: 05000382/2022301 Enterprise Identifier: L-2022-OLL-0014 Licensee: Entergy Operations, Inc. | |||
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, Louisiana Inspection Dates: February 21, 2022, to March 17, 2022 Inspectors: K. Clayton, Chief Examiner, Senior Operations Engineer C. Osterholtz, Senior Operations Engineer B. Bergeon, Operations Engineer M. Doyle, Operations Engineer R. Clagg, Senior Resident Inspector, Examiner Under Instruction Approved By: Heather J. Gepford, Chief Operations Branch Division of Reactor Safety Enclosure | |||
=SUMMARY= | |||
Examination Report 05000382/2022301; February 21, 2022-March 17, 2022; Waterford Steam | |||
Electric Station, Unit 3; Initial Operator Licensing Examination Report The NRC examiners evaluated the competency of four applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses at Waterford Steam Electric Station, Unit 3. | |||
The NRC developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on March 9, 2022. The NRC examiners administered the operating tests on February 21-24, 2022. | |||
The NRC examiners determined that all the applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. | |||
===NRC-Identified and Self-Revealing Findings=== | |||
None. | |||
===Licensee-Identified Violations=== | |||
None. | |||
=REPORT DETAILS= | |||
==OTHER ACTIVITIES== | |||
- INITIAL LICENSE EXAM | |||
===.1 License Applications=== | |||
====a. Scope==== | |||
The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. | |||
====b. Findings==== | |||
No findings were identified. | |||
===.2 Examination Development=== | |||
====a. Scope==== | |||
The exams were originally scheduled to be administered in January 2022, but due to damage to the area around New Orleans from Hurricane Ida the licensee requested the operating test and written examination dates be moved to February 21-24, 2022, and March 9, 2022, respectively. The NRC agreed to these dates. | |||
The NRC examiners developed the outlines, operating tests, and written examinations using the requirements of NUREG-1021, Revision 11. The NRC examiners conducted an onsite validation of the operating tests the week of January 24, 2022. Two complete written examination validations were completed by the licensee in December 2021. | |||
====b. Findings==== | |||
The NRC examiners provided draft examination and post-validation comments to the licensee. All comments were satisfactorily resolved between the licensee and NRC on January 12, 2022. The licensee satisfactorily completed comment resolution prior to examination administration. | |||
===.3 Operator Knowledge and Performance=== | |||
====a. Scope==== | |||
On March 9, 2022, the licensee proctored the administration of the written examinations to all nine applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on March 15, 2022. The NRC completed two independent gradings of the written examinations on March 16, 2022. | |||
The NRC examination team administered the operating tests to all applicants on February 21-24, 2022. | |||
====b. Findings==== | |||
No findings were identified. | |||
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal. | |||
The examination team noted one generic weakness associated with applicant performance on the dynamic scenarios and it is listed below: | |||
Two of three crews failed to identify valves that failed to reposition on a safety injection actuation signal and required manual operations. | |||
This deficiency was captured in the licensees corrective action program as Condition Report CR-WF3-2022-01417. | |||
Post-examination analysis revealed eight generic weaknesses associated with applicant performance on the written examination and they are listed below: | |||
1) Question 27 - 77 percent answered incorrectly due to applicant knowledge weakness on the topic of function and alarm setpoint for N-16 main steam line radiation monitors. | |||
2) Question 36 - 55 percent answered incorrectly due to applicant knowledge weakness on the topic of indications of a tube rupture on the affected steam generator. | |||
3) Question 39 - 66 percent answered incorrectly due to applicant knowledge weakness on the topic of failure modes/design of main feedwater isolation valves. | |||
4) Question 46 - 55 percent answered incorrectly due to applicant knowledge weakness on the topic of operations of the main control room fire detection panel. | |||
5) Question 70 - 88 percent answered incorrectly due to applicant knowledge weakness on the topic of the requirements to enter a radiologically controlled area without a brief. | |||
6) Question 71 - 66 percent answered incorrectly due to applicant knowledge weakness on the topic of the definition of the most affected steam generator during multiple plant casualties. | |||
7) Question 83 - 60 percent answered incorrectly due to applicant knowledge weakness on the topic of technical specifications associated with pressurizer pressure. | |||
8) Question 96 - 60 percent answered incorrectly due to applicant knowledge weakness on the topic of temporary modifications. | |||
All eight questions were determined to be valid and free of flaws per the licensees procedures. These deficiencies were captured in the licensees corrective action program as Condition Report CR-WF3-2022-01417. | |||
Copies of all individual examination reports were sent to the operations training superintendent for evaluation and determination of appropriate remedial training. | |||
===.4 Simulation Facility Performance=== | |||
====a. Scope==== | |||
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | |||
====b. Findings==== | |||
No findings were identified. | |||
===.5 Examination Security=== | |||
====a. Scope==== | |||
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel. | |||
====b. Findings==== | |||
No findings were identified. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
===Exit Meeting Summary=== | |||
The chief examiner presented the preliminary examination results to Mr. V. Ford, Operations Training Superintendent, and other members of the staff on February 24, 2022. A telephonic exit was conducted on March 17, 2022, between Mr. K. Clayton, Chief Examiner, and Mr. V. Ford, Operations Training Superintendent. The licensee did not identify any information or materials used during the examination as proprietary. | |||
=SUPPLEMENTAL INFORMATION= | |||
==KEY POINTS OF CONTACT== | |||
===Licensee Personnel=== | |||
: [[contact::J. Ferrick]], Site Vice-President | |||
: [[contact::M. Lewis]], General Manager of Plant Operations | |||
: [[contact::J. Clavelle]], Operations Director | |||
: [[contact::R. Ledet]], Training Manager | |||
: [[contact::S. Cooper]], Shift Manager of Training | |||
: [[contact::J. Lewis]], Regulatory Assurance Manager | |||
: [[contact::V. Ford]], Operations Training Superintendent | |||
: [[contact::W. Wesley]], Operations Training Supervisor | |||
: [[contact::D. Cornett]], Exam Writer | |||
: [[contact::R. Peter]], Exam Writer | |||
===NRC Personnel=== | |||
: [[contact::C. Stott]], Acting Senior Resident Inspector | |||
==ADAMS DOCUMENTS REFERENCED== | |||
}} | }} |
Latest revision as of 19:35, 5 April 2022
ML22082A198 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 03/28/2022 |
From: | Heather Gepford NRC/RGN-IV/DORS/OB |
To: | Ferrick J Entergy Operations |
References | |
50-382/22-301 | |
Download: ML22082A198 (9) | |
Text
March 28, 2022
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC EXAMINATION REPORT 05000382/2022301
Dear Mr. Ferrick:
On February 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at your Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on February 24, 2022, with Mr. V. Ford, Operations Training Superintendent, and other members of your staff. A telephonic exit meeting was conducted on March 17, 2022, with Mr. V. Ford, who was provided the NRC licensing decisions.
The examination included the evaluation of four applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses. The license examiners determined that all nine applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55 and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Gepford, Heather on 03/28/22 Heather J. Gepford, Chief Operations Branch Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38
Enclosure:
Examination Report 05000382/2022301, w/attachment: Supplemental Information
Inspection Report
Docket Number: 05000382 License Number: NPF-38 Report Number: 05000382/2022301 Enterprise Identifier: L-2022-OLL-0014 Licensee: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, Louisiana Inspection Dates: February 21, 2022, to March 17, 2022 Inspectors: K. Clayton, Chief Examiner, Senior Operations Engineer C. Osterholtz, Senior Operations Engineer B. Bergeon, Operations Engineer M. Doyle, Operations Engineer R. Clagg, Senior Resident Inspector, Examiner Under Instruction Approved By: Heather J. Gepford, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY
Examination Report 05000382/2022301; February 21, 2022-March 17, 2022; Waterford Steam
Electric Station, Unit 3; Initial Operator Licensing Examination Report The NRC examiners evaluated the competency of four applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses at Waterford Steam Electric Station, Unit 3.
The NRC developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on March 9, 2022. The NRC examiners administered the operating tests on February 21-24, 2022.
The NRC examiners determined that all the applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES
- INITIAL LICENSE EXAM
.1 License Applications
a. Scope
The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
The exams were originally scheduled to be administered in January 2022, but due to damage to the area around New Orleans from Hurricane Ida the licensee requested the operating test and written examination dates be moved to February 21-24, 2022, and March 9, 2022, respectively. The NRC agreed to these dates.
The NRC examiners developed the outlines, operating tests, and written examinations using the requirements of NUREG-1021, Revision 11. The NRC examiners conducted an onsite validation of the operating tests the week of January 24, 2022. Two complete written examination validations were completed by the licensee in December 2021.
b. Findings
The NRC examiners provided draft examination and post-validation comments to the licensee. All comments were satisfactorily resolved between the licensee and NRC on January 12, 2022. The licensee satisfactorily completed comment resolution prior to examination administration.
.3 Operator Knowledge and Performance
a. Scope
On March 9, 2022, the licensee proctored the administration of the written examinations to all nine applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on March 15, 2022. The NRC completed two independent gradings of the written examinations on March 16, 2022.
The NRC examination team administered the operating tests to all applicants on February 21-24, 2022.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted one generic weakness associated with applicant performance on the dynamic scenarios and it is listed below:
Two of three crews failed to identify valves that failed to reposition on a safety injection actuation signal and required manual operations.
This deficiency was captured in the licensees corrective action program as Condition Report CR-WF3-2022-01417.
Post-examination analysis revealed eight generic weaknesses associated with applicant performance on the written examination and they are listed below:
1) Question 27 - 77 percent answered incorrectly due to applicant knowledge weakness on the topic of function and alarm setpoint for N-16 main steam line radiation monitors.
2) Question 36 - 55 percent answered incorrectly due to applicant knowledge weakness on the topic of indications of a tube rupture on the affected steam generator.
3) Question 39 - 66 percent answered incorrectly due to applicant knowledge weakness on the topic of failure modes/design of main feedwater isolation valves.
4) Question 46 - 55 percent answered incorrectly due to applicant knowledge weakness on the topic of operations of the main control room fire detection panel.
5) Question 70 - 88 percent answered incorrectly due to applicant knowledge weakness on the topic of the requirements to enter a radiologically controlled area without a brief.
6) Question 71 - 66 percent answered incorrectly due to applicant knowledge weakness on the topic of the definition of the most affected steam generator during multiple plant casualties.
7) Question 83 - 60 percent answered incorrectly due to applicant knowledge weakness on the topic of technical specifications associated with pressurizer pressure.
8) Question 96 - 60 percent answered incorrectly due to applicant knowledge weakness on the topic of temporary modifications.
All eight questions were determined to be valid and free of flaws per the licensees procedures. These deficiencies were captured in the licensees corrective action program as Condition Report CR-WF3-2022-01417.
Copies of all individual examination reports were sent to the operations training superintendent for evaluation and determination of appropriate remedial training.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
Exit Meeting Summary
The chief examiner presented the preliminary examination results to Mr. V. Ford, Operations Training Superintendent, and other members of the staff on February 24, 2022. A telephonic exit was conducted on March 17, 2022, between Mr. K. Clayton, Chief Examiner, and Mr. V. Ford, Operations Training Superintendent. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Ferrick, Site Vice-President
- M. Lewis, General Manager of Plant Operations
- J. Clavelle, Operations Director
- R. Ledet, Training Manager
- S. Cooper, Shift Manager of Training
- J. Lewis, Regulatory Assurance Manager
- V. Ford, Operations Training Superintendent
- W. Wesley, Operations Training Supervisor
- D. Cornett, Exam Writer
- R. Peter, Exam Writer
NRC Personnel
- C. Stott, Acting Senior Resident Inspector