ML20204A373: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:-
MAY  2 1986 Docket No. 50-322                                          DISTRIBUTION Docket File-  M0'Brien NRC'PDR      ACRS (10)
LPDR          HSmith Mr. John D. Leonard, Jr.                                  PD#4 Reading  SScott Vice President - Nuclear Operations                        RBernero Long Island Lighting Company                              JPartlow Shoreham Nuclear Power Station                            BGrimes P.O. Box 618, North Country Road                          Edordan Wading River, New York 11792                              RLo
 
==Dear Mr. Leonard:==
 
The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation of the status of power reactor licensees' implementation of approved regulatory improvements.
Enclosed please find a list of generic multi-plant actions (MPA) pertaining to Shoreham. To assist me in developing this information for Shoreham, your input on their status is requested. Those generic issues that have already been adequately addressed and resolved in the OL process (i.e., issues addressed in the FSAR, in the licensing SERs or incorporated into the licensing conditions) are not included in the list. Please review the enclosed list, add omitted significant actions to the list, and provide the date when all aspects of each identified requirement were completed / implemented or are expected to be completed.
For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column. For actions that have been completely implemented, readily known or best estimated dates (month and year) will suffice. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked-up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of a safety evaluation so that the estimated schedule may be included in the evaluation.
This request is covered by OMB Clearance Number 3150-0011, v.cich expires September 30, 1986.
Sincerely, 8605120136 860502                                '/
DR ADOCK 0500          2 p                                          Ronnie Lo, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
 
==Enclosure:==
As stated cc: See next page PD#4/PM/          PD#4/D)
RLo:lb            WButler' 05/ 2 /86        05/f/86N
 
y ff      #c o
g g
UNITED STATES NUCLEAR REGULATORY COMMISSION
,, ;                E                    W ASHING TON. D. C. 20555 o                #
* MAY    2W Docket No. 50-322 Mr. John D. Leonard, Jr.
Vice President - Nuclear Operations Long Island Lighting Company Shoreham Nuclear Power Station P.O. Box 618, North Country Road Wading River, New York 11792
 
==Dear Mr. Leonard:==
 
The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is werking on a long-term program which will improve its documentation of the status of power reactor licensees
* implementation of approved regulatory improvements.
Enclosed please find a list of generic multi-plant actions (MPA) pertaining to Shoreham. To assist me in developing this information for Shoreham, your input on their status is requested. Those generic issues that have already been adequately addressed and resolved in the OL process (i.e., issues addressed in the FSAR, in the licensing SERs or incorporated into the licensing conditions) are not included in the list. Please review the enclosed list, add omitted significant actions to the list, and provide the date when all aspects of each identified requirement were completed / implemented or are expected to be completed.
For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For reouirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column. For actions that have been completely implemented, readily known or best estimated dates (month and year) will suffice. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked-up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of a safety evaluation so that the estimated schedule may be included in the evaluation.
This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely, Ronnie Lo, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing
 
==Enclosure:==
As stated cc: See next page
 
i  Mr. John D. Leonard, Jr.                  Shoreham Nuclear Power Station Long Island Lighting Company              (list 1) cc:
Stephen B. Latham, Esq.                  Gerald C. Crotty, Esq.
John F. Shea, III, Esq.                  Ben Wiles, Esq.
Twomey, Latham & Shea                    Counsel to the Governor Attorneys at Law                          Executive Chamber Post Office Box 398                      State Capitol 33 West Second Street                    Albany, New York 12224 Riverhead, New York 11901 Herbert H. Brown, Esq.
Alan S. Rosenthal, Esq., Chairman        Lawrence Coe Lanpher, Esq.
Atomic Safety & Licensing Appeal Board    Karla J. Letsche, Esq.
U.S. Nuclear Regulatory Commission        Kirkpatrick & Lockhart Washington, D.C. 20555                1000 M Street, NW - Sth Floor Wasn Nston, D.C. 20036 W. Taylor Reveley, III, Esq.
Hunton & Williams                        Dr. Mor. roe Schneider 707 East Main Street                      North Shore Committee Post Office Box 1535                      Post Office Box 231 Richmond, Virginia 23212                  Wad; ins River, New York 11792 Howard A. Wilber                          Fabian G. Palomino, Esq.
Atomic Safety & Licensing Appeal Board    Special Counsel to the Governor U.S. Nuclear Regulatory Comission        Executive Chamber - State Capitol Washington, D.C. 20555                    Albany, New York 12224 Atomic Safety & Licensing Board Panel    Anthony F. Earley, Jr., Esq.
U.S. Nuclear Regulatory Comission        General Counsel Washington, D.C. 20555                Long Island Lighting Company 175 East Old County Road Atomic Safety & Licensing Appeal Board    Hicksville, New York 11801 Panel U.S. Nuclear Regulatory Commission        Mr. Lawrence Britt Washingtor., D.C. 20555                  Shoreham Nuclear Power Station Post Office Box 618 Gary J. Edles, Esq.                      Wading River, New York 11792 Atomic Safety & Licensing Appeal Board U.S. Nuclear Regulatory Commission        Martin Bradley Ashare, Esq.
Washington, D.C. 20555                    Suffolk County Attorney H. Lee Dennison Building Richard M. Kessel                        Veteran's Memorial Highway Chairman & Executive Director            Hauppauge, New York 11788 New York State Consumer Protection Board                                          ,
Room 1725                                Resident Inspector 250 Broadway                              Shoreham NPS New York, New York 10007                  U.S. Nuclear Regulatory Commission Post Office Box B Jonathan D. Feinberg, Esq.                Rocky Point, New York 11778 New York State Department of Public Service                      Regional Administrator, Region I Three Empire State Plaza                  U.S. Nuclear Regulatory Comission Albany, New York 12223                    631 Park Avenue King of Prussia, Pennsylvania 19406
 
i                                                Shoreham (1) cc:
Robert Abrams, Esq.                        Mr. Francis J. Gluchowski Attorney General of the State              Assistant Town Attorney of New York                              Town of Brookhaven ATTN:  Peter Bienstock, Esq.              Department of Law Department of Law                          475 East Main Street State of New York                          Patchogue, New York 11772 Two World Trade Center Room 46-14 New York, New York 10047 Mr. William Steiger Plant Manager Shoreham Nuclear Power Station Post Office Box 628 Wading River, New York 11792 MHB Technical Associates 1723 Hamilton Aenue - Suite K San Jose, California 95125 Honorable Peter Cohalan Suffolk County Executive County Executive / Legislative Building Veteran's Memorial Highway Hauppauge, New York 11788 Mr. Jay Dunkleberger New York State Energy Office Agency Building 2
    . Empire State Plaza Albany, New York 12223 Ms. Nora Bredes Shoreham Opponents Coalition 195 East Main Street Smithtown, New York 11787 Chris Nolin New York State Assembly Energy Committee 626 Legislative Office Building Albany, New York 12248 Peter S. Everett, Esq.
Hunton & Williams 2000 Pennsylvania Avenue, NW Washington, D.C. 20036
 
    + .
q.
g    MPA# Title                                        Status A-01 Inservice Inspection A-14 Inservice Testing A-17 Implementation of R.G. 1.97 A-20 10 CFR 50.62 Implementation of Salem ATWS Rules B-41 Fire Protection, Appendix R B-76 Salem ATWS Item 1.1, Post Trip Review B-77 Salem ATWS Item 2.1.1, 2.1.2 Equip. Class / Vendor Interface; Reactor Trip System B-78 Salem ATWS Item 3.1.1, 3.1.2 Post Maintenance Testing Vendor & Engineer Test Guidance, Procedure and T.S. Review B-79 Salem ATWS Item 3.1.3, T.S. Changes B-86 Salem ATWS Item 2.2.1, 2.2.2 Equip. Class / Vendor Interface; Safety Related Components B-87 Salem ATWS Item 3.2.1, 3.2.2 Post Maintenance Test Procedures B-88 Salem ATWS Item 3.2.3 Changes to T.S. for Post Maintenance Test Procedure B-92 Salem ATWS Item 4.5.1, Testing of Pilot Valves and Backup Scram Valves B-93 Salem ATWS Item 4.5.2, 4.5.3 On-line Testing; Justification for not performing /
Testing Intervals F-05 Update Emergency Operating Procedures F-08 TMI I.D.1.1, Control Rm Design Rev.
Prog. Plan F-09 TMI I.D 2, SPDS Review F-12 TMI II.B.3.2, Post Accident Sampling Procedure F-67 Emergency Planning F-71 TMI I.D.I.2 Control Rm Design Rev.
Summary Report}}

Latest revision as of 02:00, 31 December 2020

Forwards Lists of Generic multi-plant Actions for Input on Status by 860531.In Future,Nrr Will Need Estimated Dates Prior to Issuance of Safety Evaluation to Aid in long-term Program
ML20204A373
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/02/1986
From: Lo R
Office of Nuclear Reactor Regulation
To: Leonard J
LONG ISLAND LIGHTING CO.
References
NUDOCS 8605120136
Download: ML20204A373 (5)


Text

-

MAY 2 1986 Docket No. 50-322 DISTRIBUTION Docket File- M0'Brien NRC'PDR ACRS (10)

LPDR HSmith Mr. John D. Leonard, Jr. PD#4 Reading SScott Vice President - Nuclear Operations RBernero Long Island Lighting Company JPartlow Shoreham Nuclear Power Station BGrimes P.O. Box 618, North Country Road Edordan Wading River, New York 11792 RLo

Dear Mr. Leonard:

The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation of the status of power reactor licensees' implementation of approved regulatory improvements.

Enclosed please find a list of generic multi-plant actions (MPA) pertaining to Shoreham. To assist me in developing this information for Shoreham, your input on their status is requested. Those generic issues that have already been adequately addressed and resolved in the OL process (i.e., issues addressed in the FSAR, in the licensing SERs or incorporated into the licensing conditions) are not included in the list. Please review the enclosed list, add omitted significant actions to the list, and provide the date when all aspects of each identified requirement were completed / implemented or are expected to be completed.

For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column. For actions that have been completely implemented, readily known or best estimated dates (month and year) will suffice. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked-up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of a safety evaluation so that the estimated schedule may be included in the evaluation.

This request is covered by OMB Clearance Number 3150-0011, v.cich expires September 30, 1986.

Sincerely, 8605120136 860502 '/

DR ADOCK 0500 2 p Ronnie Lo, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc: See next page PD#4/PM/ PD#4/D)

RLo:lb WButler' 05/ 2 /86 05/f/86N

y ff #c o

g g

UNITED STATES NUCLEAR REGULATORY COMMISSION

,, ; E W ASHING TON. D. C. 20555 o #

  • MAY 2W Docket No. 50-322 Mr. John D. Leonard, Jr.

Vice President - Nuclear Operations Long Island Lighting Company Shoreham Nuclear Power Station P.O. Box 618, North Country Road Wading River, New York 11792

Dear Mr. Leonard:

The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is werking on a long-term program which will improve its documentation of the status of power reactor licensees

  • implementation of approved regulatory improvements.

Enclosed please find a list of generic multi-plant actions (MPA) pertaining to Shoreham. To assist me in developing this information for Shoreham, your input on their status is requested. Those generic issues that have already been adequately addressed and resolved in the OL process (i.e., issues addressed in the FSAR, in the licensing SERs or incorporated into the licensing conditions) are not included in the list. Please review the enclosed list, add omitted significant actions to the list, and provide the date when all aspects of each identified requirement were completed / implemented or are expected to be completed.

For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For reouirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status column. For actions that have been completely implemented, readily known or best estimated dates (month and year) will suffice. For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked-up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of a safety evaluation so that the estimated schedule may be included in the evaluation.

This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

Sincerely, Ronnie Lo, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated cc: See next page

i Mr. John D. Leonard, Jr. Shoreham Nuclear Power Station Long Island Lighting Company (list 1) cc:

Stephen B. Latham, Esq. Gerald C. Crotty, Esq.

John F. Shea, III, Esq. Ben Wiles, Esq.

Twomey, Latham & Shea Counsel to the Governor Attorneys at Law Executive Chamber Post Office Box 398 State Capitol 33 West Second Street Albany, New York 12224 Riverhead, New York 11901 Herbert H. Brown, Esq.

Alan S. Rosenthal, Esq., Chairman Lawrence Coe Lanpher, Esq.

Atomic Safety & Licensing Appeal Board Karla J. Letsche, Esq.

U.S. Nuclear Regulatory Commission Kirkpatrick & Lockhart Washington, D.C. 20555 1000 M Street, NW - Sth Floor Wasn Nston, D.C. 20036 W. Taylor Reveley, III, Esq.

Hunton & Williams Dr. Mor. roe Schneider 707 East Main Street North Shore Committee Post Office Box 1535 Post Office Box 231 Richmond, Virginia 23212 Wad; ins River, New York 11792 Howard A. Wilber Fabian G. Palomino, Esq.

Atomic Safety & Licensing Appeal Board Special Counsel to the Governor U.S. Nuclear Regulatory Comission Executive Chamber - State Capitol Washington, D.C. 20555 Albany, New York 12224 Atomic Safety & Licensing Board Panel Anthony F. Earley, Jr., Esq.

U.S. Nuclear Regulatory Comission General Counsel Washington, D.C. 20555 Long Island Lighting Company 175 East Old County Road Atomic Safety & Licensing Appeal Board Hicksville, New York 11801 Panel U.S. Nuclear Regulatory Commission Mr. Lawrence Britt Washingtor., D.C. 20555 Shoreham Nuclear Power Station Post Office Box 618 Gary J. Edles, Esq. Wading River, New York 11792 Atomic Safety & Licensing Appeal Board U.S. Nuclear Regulatory Commission Martin Bradley Ashare, Esq.

Washington, D.C. 20555 Suffolk County Attorney H. Lee Dennison Building Richard M. Kessel Veteran's Memorial Highway Chairman & Executive Director Hauppauge, New York 11788 New York State Consumer Protection Board ,

Room 1725 Resident Inspector 250 Broadway Shoreham NPS New York, New York 10007 U.S. Nuclear Regulatory Commission Post Office Box B Jonathan D. Feinberg, Esq. Rocky Point, New York 11778 New York State Department of Public Service Regional Administrator, Region I Three Empire State Plaza U.S. Nuclear Regulatory Comission Albany, New York 12223 631 Park Avenue King of Prussia, Pennsylvania 19406

i Shoreham (1) cc:

Robert Abrams, Esq. Mr. Francis J. Gluchowski Attorney General of the State Assistant Town Attorney of New York Town of Brookhaven ATTN: Peter Bienstock, Esq. Department of Law Department of Law 475 East Main Street State of New York Patchogue, New York 11772 Two World Trade Center Room 46-14 New York, New York 10047 Mr. William Steiger Plant Manager Shoreham Nuclear Power Station Post Office Box 628 Wading River, New York 11792 MHB Technical Associates 1723 Hamilton Aenue - Suite K San Jose, California 95125 Honorable Peter Cohalan Suffolk County Executive County Executive / Legislative Building Veteran's Memorial Highway Hauppauge, New York 11788 Mr. Jay Dunkleberger New York State Energy Office Agency Building 2

. Empire State Plaza Albany, New York 12223 Ms. Nora Bredes Shoreham Opponents Coalition 195 East Main Street Smithtown, New York 11787 Chris Nolin New York State Assembly Energy Committee 626 Legislative Office Building Albany, New York 12248 Peter S. Everett, Esq.

Hunton & Williams 2000 Pennsylvania Avenue, NW Washington, D.C. 20036

+ .

q.

g MPA# Title Status A-01 Inservice Inspection A-14 Inservice Testing A-17 Implementation of R.G. 1.97 A-20 10 CFR 50.62 Implementation of Salem ATWS Rules B-41 Fire Protection, Appendix R B-76 Salem ATWS Item 1.1, Post Trip Review B-77 Salem ATWS Item 2.1.1, 2.1.2 Equip. Class / Vendor Interface; Reactor Trip System B-78 Salem ATWS Item 3.1.1, 3.1.2 Post Maintenance Testing Vendor & Engineer Test Guidance, Procedure and T.S. Review B-79 Salem ATWS Item 3.1.3, T.S. Changes B-86 Salem ATWS Item 2.2.1, 2.2.2 Equip. Class / Vendor Interface; Safety Related Components B-87 Salem ATWS Item 3.2.1, 3.2.2 Post Maintenance Test Procedures B-88 Salem ATWS Item 3.2.3 Changes to T.S. for Post Maintenance Test Procedure B-92 Salem ATWS Item 4.5.1, Testing of Pilot Valves and Backup Scram Valves B-93 Salem ATWS Item 4.5.2, 4.5.3 On-line Testing; Justification for not performing /

Testing Intervals F-05 Update Emergency Operating Procedures F-08 TMI I.D.1.1, Control Rm Design Rev.

Prog. Plan F-09 TMI I.D 2, SPDS Review F-12 TMI II.B.3.2, Post Accident Sampling Procedure F-67 Emergency Planning F-71 TMI I.D.I.2 Control Rm Design Rev.

Summary Report