| | number = ML20205Q808 | | | number = ML20205Q808 |
| | issue date = 03/31/1999 | | | issue date = 03/31/1999 |
| | title = Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with 990413 Ltr | | | title = Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with |
| | author name = Beasley J, Sheibani M | | | author name = Beasley J, Sheibani M |
| | author affiliation = SOUTHERN NUCLEAR OPERATING CO. | | | author affiliation = SOUTHERN NUCLEAR OPERATING CO. |
Line 11: |
Line 11: |
| | contact person = | | | contact person = |
| | document report number = LCV-1306-C, NUDOCS 9904220074 | | | document report number = LCV-1306-C, NUDOCS 9904220074 |
| | | title reference date = 04-13-1999 |
| | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT |
| | page count = 6 | | | page count = 6 |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 ML20199B6301997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H5991997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216H6071997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Vogtle Electric Generating Plant ML20210K5081997-07-31031 July 1997 Monthly Operating Repts for July 1997 for VEGP ML20140D7301997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Vogtle Electric Generating Plant ML20141D8531997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20137T6191997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Vogtle Electric Generating Plant ML20136G3471997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20134H3481997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20133F6551996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2 ML20132B9671996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20134K7361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20128N1541996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20117N1731996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20116J3461996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20115E9821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Vogtle Electric Generating Plant ML20112H6411996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20111B2461996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20101R0251996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Vogtle Electric Generating Plant ML20100R2701996-02-29029 February 1996 Monthly Operating Repts for Feb 1995 for Vogtle Electric Generating Plant ML20100F2071996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20096C3051995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Vogtle Electric Generating Plant,Units 1 & 2 ML20095E0201995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant ML20094J0741995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2 ML20093F5031995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Vogtle Electric Generating Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
.
J.B;rnie Beasley,Jr P.E.
Souther 2 N: clear Vice President Operating Company,Inc.
Vogtle Project 40 invemess Center Parkway PO Box 1295 l Birmmgham, Alabama 35201 l
Tel 205 992.7110 fax 205 992 0403 SOUTHERN COMPANY Energy to Serve Your World" 999 LCV-1306-C Docket Nos. 50-424 50-425 P
l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 l
Gentlemen:
i VOGTLE ELECTRIC GENERATING PLANT l MONTIILY OPERATING REPORT - MARCH 1999 Enclosed are the March 1999, monthly operating reports for Vogtle Electric i
Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with the Technical Specification 5.6.4.
i S'n rely,
'l $ b
. B. 3ea ey,t .
l JBB/JLL Enclosures El- VEGP Unit 1 Monthly Operating Report - March 1999 E2- VEGP Unit 2 Monthly Operating Report - March 1999 cc: Southern Nuclear Operating Company l Mr. J. T. Gasser l Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. R. Assa, Project Manager, NRR gJN Mr. J. Zeiler, Senior Resident Inspector, Vogtle
, . o (30 9904220074 990331 PDet ADOCK 05000424 R PDR _
I.,.
l I l ENCLOSUREl 1
i VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR MARCH 1999 TABLE OF CONTENTS i l
OPERATING DATA REPORT and CIIALLENGES to PORV and SAFETY VALVES Page El-1 l UNIT SIlUTDOWNS and NARRATIVE REPORT Page El-2
.. i OPERATIN9 DATA REPORT Docket No.: 50-424 Unit Name: VEGP UNIT 1 Date: Aprd 1,1999 j Completed By: M. Sheibani !
Telephone: (706) 826-3205 i
Duratianaishet j l
- 1. Reporting Period: March .1999 l
- 2. Design Electrical Rating (Net MWe): 1169
- 3. Maximum Dependable Capacity (Net MWe): 1151 This Month year To D_ ate Cymyla1Lvg j l
- 4. Number Of Hours Reactor Was Critical: 140.0 1531.6 91.263 6 I
- 5. Hours Generator On Line: 117.9 1509.3 89.922.6
- 6. Unit Reserve Shutdown Hours: 00 0.0 00
- 7. Net Electrical Energy Generated (MWHe): 82,603 1,698.369 99.377.628 l
l 1
CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date Tag No. Event Desenption N/A N/A N/A I
)
l l
E11
b UNIT SHUTDOWNS Docket No.: 50-424 Unit Name: VEGP UNIT 1 Date: Apnl 1.1999 Completed By: M. Sheibani Telephone: (706)826-3209 Reporting Period: March 1999 Type Method of F: Forced Duration Shutting Cause/ Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments 99-1 2/27/99 S 622.2 C 4 See Below 99-2 3/27/99 S 2.8 8 2 See Below i 99-3 3/28/99 S 1.1 B 2 See Below (1) REASON: (2) METHOD: I A Equipment Failure (Explain) E - Operator Training /Licenso Examination 1. Manual 4. Continuation B Maintenance or Test F- Administrative 2. Manual Trip / Scram 5. Other C - Refueling G - Operational Error (Explain) 3. AutomaticTrip/ Scram D - Regulatory Restriction H Other(Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS:
EVENT 99-1 CAUSE, Scheduled Refueling Outage (continued from Feb.)
CORRECTIVE ACTION: Routine Outage Maintenance CRITICAL PATH WAS: Cooldown to 110 Deg. F, Vessel Disassembly, Fuel off load, Mid-loop Maintenance, Re-load fuel in core, Reassemble vnsel, Fill and vent reactor vessel and, complete prerequisites for mode changes.
EVENT 912 A
Q_A_MSE; Turbine Cverspeed Test CORRECTIVE ACTION: Routine Turbine overspeed trip test.
CRITICAL PATH WAS: Complete overspeed trip test and re-tie generator to grid.
I EVENT 913 CAUSE. Reperformance of Turbine Overspeed Test CORRECTIVE ACTION; Reperformance of Turbine Overspeed Test to venfy Generator Output Breaker trip delay. j CRITICAL PATH WA_S; Complete overspeed trip test and re-tie generator to grid.
i NARRATIVE REPORT Ma'ch 01,1999 00:00 Unit 1 in mode 4 for scheduled refueling outage.
March 01,1999 00.27 Unit i entered mode 5. 4 March 03,199916:36 Unit i enteret toue 6. '
March 05,199911:13 Unit 1 commenced fuel off-load.
March h7,199916:25 Unit 1 core off-load complete; entered defueled window.
March 11,199915:58 Unit 1 entered mode 6.
March 17,1999 23:22 Unit i entered mode 5.
March 23,1999 01:14 Unit i entered mode 4.
March 24,1999 03.33 Unit 1 entered mode 3. l March 26,1999 01:25 Unit i entered mode 2.
March 26,1999 04:02 Unit i reactor critical.
March 26,199917:00 * 't i entered mode 1.
March 26,1999 22:14 w..t 1 generator tied to gnd.
March 27,199910:20 Unit 1 turbine tripped for overspeed test.
March 27,199913 08 Unit i generator ted to grid.
March 28,1999 02:31 Unit i turbine tripped for overspeed test.
March 28,1999 03.37 Unit 1 generator tied to grid.
March 30,1999 22.00 Unit i retumed to 100% power.
March 31.1999 23 59 Unit 1 at 100% power with no operating problems.
E1-2
ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 !
MONTIiLY OPERATING REPORT FOR MARCH 1999 TABLE OF CONTENTS ,
OPERATING DATA REPORT and CHALLENGES to PORV and SAFETY VALVES Page E2-1 UNIT SHUTDOWNS and NARRATIVE REPORT Page E2-2 i
i
OPERATIN3 DATA REPORT Docket No.: 50-425 Unit Name: VEGP UNIT 2 Date: Apnl 1,1999 a
Completed By- M. Shelbant Telephone: (706)826-3209 l l
Operatinaltaly,
- 1. Reporting Period' March - 1999
- 2. Design Electncal Rating (Net MWe): 1169
- 3. Maximum Dependable Capacity (Net MWe): 1154 lhjtMontt) Year To Date Qur.aylgyf
- 4. Number Of Hours Reactor Was Critical: 719.2 2135.2 78,373.9 5 Hours Generator On Line: 711.9 2115.3 77.624 5
- 6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated (MWHe): 828.526 2.483.304 86.458.642 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES :
1 l
Date Tag No. Event Desenption i
N/A N/A N/A l l
E2-1