{{#Wiki_filter:==SUBJECT:== | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
==REGION IV== | |||
611 RYAN PLAZA DRIVE, SUITE 400 | |||
==SUBJECT:== | |||
ANNUAL ASSESSMENT LETTER - WATERFORD STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000382/2007001) | ANNUAL ASSESSMENT LETTER - WATERFORD STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000382/2007001) | ||
==Dear Mr. Walsh:== | ==Dear Mr. Walsh:== | ||
On February 7, 2007, the NRC staff completed its performance review of your Waterford Steam Electric Station, Unit 3. | On February 7, 2007, the NRC staff completed its performance review of your Waterford Steam Electric Station, Unit 3. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | ||
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan. | |||
Overall, Waterford Steam Electric Station, Unit 3, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the | Overall, Waterford Steam Electric Station, Unit 3, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. | ||
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review | The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at ( | Entergy Operations, Inc. -2-document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). | ||
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | Sincerely, | ||
/i; | /i; Y J e f f Clark, Chief Project Branch E Division of Reactor Projects Docket: 50-382 License: NPF-38 Enclosure: | ||
Waterford 3 Inspection/Activity Plan cc w/enclosure: | |||
Executive Vice President and Chairman Chief Operating Officer Louisiana Public Service Commission Entergy Operations, Inc. P.O. Box 91 154 P.O. Box 31995 Baton Rouge, LA 70825-1697 Jackson, MS 39286-1995 Director, Nuclear Safety Assurance Vice President, Operations Support Entergy Operations, Inc. | |||
Entergy Operations, Inc. 17265 River Road P.O. Box 31995 Killona, LA 70057-3093 Jackson, MS 39286-1995 Richard Penrod, Senior Environmental General Manager, Plant Operations Scientist, State Liaison Officer Waterford 3 SES Office of Environmental Services Entergy Operations, lnc. Northwestern State University 17265 River Road Russsell Hall, Room 201 Killona, LA 70057-3093 Natchitoches, LA 71497 Manager, Licensing Entergy Operations, Inc. | |||
17265 River Road Killona, LA 70057-3093 | |||
Entergy Operations, Inc. -3-Chairperson Rep. Gary L. Smith, Jr. | |||
Denton Field Office State of Louisiana, District 56 Chemical and Nuclear Preparedness P.O. Box 189 and Protection Division Norco, LA 70079 Office of Infrastructure Protection Preparedness Directorate Rep. Ernest D. Wooten Dept. of Homeland Security State of Louisiana, District 105 800 North Loop 288 8018 Highway 23, Suite 214 Federal Regional Center Belle Chasse, LA 70037 Denton, TX 76201-3698 Senator Joel T. Chaisson, I I Parish President State of Louisiana, District 19 Council P.O. Box 1255 St. Charles Parish Destrehan, LA 70047 P.O. Box 302 Hahnville, LA 70057 Tab Troxler, Director St. Charles Parish Department Federal Emergency Management Agency of Emergency Preparedness ATTN: William E. Peterson, Regional P.O. Box 302 Director Hahnville, LA 70057 Region VI, Federal Center 800 North Loop 288 Lance Marino, Councilman-at-Large Denton, TX 76201-3698 St. Charles Parish Division A 660 Pine Street Col. Jeff Smith, Deputy Director Norco, LA 70079 Louisiana Office of Homeland Security and Emergency Preparedness Clayton Snookie Faucheux 7667 Independence Blvd. Councilman-at-Large Baton Rouge, LA 70806 St. Charles Parish Division B 140 North Oak Court Jeffrey P. Meyers, Division Administrator P.O. Box 1342 Emergency and Radiological Services Luling, LA 70070 Division Louisiana Department of Environmental Desmond J. Hilaire, Councilman Quality St. Charles Parish District 1 P.O. Box 4312 P.O. Box 111 Baton Rouge, LA 70821-4312 Hahnville, LA 70057 Albert D. Laque, Parish President Brian A. Fabre, Councilman St. Charles Parish St. Charles Parish District 2 P.O. Box 302 322 Beaupre Drive Hahnville, LA 70057 Luling, LA 70070 Sheriff Greg Champagne G. Ram Ramchandran, Councilman St. Charles Parish Sheriffs Office St. Charles Parish District 3 P.O. Box7 13 Hermitage Court Hahnville, LA 70057 Destrehan, LA 70047 | |||
Entergy Operations, Inc. -4-Derryl Walls, Councilman St. Charles Parish District 4 P.O. Box 721 Des Allemands, LA 70030 April Black, Councilwoman St. Charles Parish District 5 162 Oak Manor Lane St. Rose, LA 70087 Richard Dickie Duhe, Councilman St. Charles Parish District 6 401 Oak Street Norco, LA 70079 Barry Minnich, Councilman St. Charles Parish District 7 337 Wanda Street Luling, LA 70070 Nickie Monica, Parish President St. John the Baptist Parish 1801 West Airline Highway Laplace, LA 70068 Paul Oncale, Public Safety Director St. John the Baptist Parish 1801 W. Airline Highway Laplace, LA 70068 Sheriff Wayne Jones St. John the Baptist Parish 1801 W. Airline Highway Laplace, LA 70068 Institute of Nuclear Power Operations (INPO) | |||
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 | |||
m C m m m m m m m m m m m 0) m m C C C c C K C C C C C C c c | |||
.-c 0 .P e | |||
.P c | |||
.o c | |||
._ | |||
c 0 .- | |||
c 0 .P c | |||
.P e | |||
._ | |||
c 0 .P .P .o e + + - | |||
._ | |||
c 0 .P c | |||
.e c | |||
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a, mas, a, a, a l a , a, C u a l a , a, m a , | |||
m 0. Q Q Q Q m Q Q Q Q Q a a m m m m Q m u ) m Q 0. | |||
- C a, | |||
- - - | |||
C C m a a , | |||
C -c a, | |||
-a, c -C -K m a , | |||
-C m m-C -K -C m-C m m-C -C a, a, m a , | |||
- | |||
._C | |||
- | |||
.E .r | |||
- .r- -c | |||
.- -c | |||
._ .- | |||
- C .- | |||
-K -C | |||
._ -c | |||
._ - | |||
.& -.E a, a o a , (11 m | |||
a, m o a m, a, m a , | |||
m m m m m a, | |||
m 3 m m m m m m m | |||
m m m m (0 m m m | |||
a m | |||
m m m m m m m m I- b I - I - I- I- I-I- b I - I - I- I-I-I- I-I-I- m m m 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 | |||
. | |||
p! | |||
ul T-cu | |||
9 " | |||
ulaa 0 0 0 c! | |||
0) | |||
m | |||
. | |||
p! | |||
m | |||
m 3s | |||
ec! | |||
ol- | |||
-I - E E p0! 0 | |||
$ $ $ | |||
N N 0 0 e | |||
d c! | |||
W p!" | |||
$ 2 2 p!cucu a a a | |||
. | |||
p! | |||
m N | |||
m | |||
$ $ | |||
- | |||
7 | |||
2 0 0 0 0 0 0 0 0 0 Y Y - 7 - 0 0 0 I- I- I- I-I- I-I-I- I- m m m | |||
. . . | |||
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cu e $ $ eep! cu cu | |||
8 l- | |||
p! | |||
m Q | |||
m | |||
. | |||
m | |||
m | |||
Y 30 0 s | |||
Z Z Z | |||
$a$ | |||
0 0 0 | |||
p! | |||
m | |||
. | |||
m | |||
m | |||
$ 2 r l - | |||
0 0 | |||
m cE k | |||
0) | |||
m | |||
.-C g .E | |||
.a Io E | |||
s-2 W m a, c | |||
._ C c | |||
E? 3 | |||
: | |||
0 c a, | |||
e m a | |||
: E d c 4 .-dC m U | |||
C m | |||
c C | |||
a, S | |||
D sf : | |||
x Y-C 3 C 2 C 0 E | |||
.- .-c 0 a .-m c W c | |||
m | |||
0 a, | |||
C | |||
._ | |||
0 lii (I) | |||
-x | |||
- | |||
v I | |||
C a, | |||
3 | |||
._ | |||
5- | |||
-I - | |||
Q m | |||
C c | |||
c m | |||
._ 2 rn ._ d - | |||
m e ul e 2 c | |||
L UC m | |||
a, t z z -00 c W E - | |||
m c m m a | |||
> 0 0 ._ 8 -1 | |||
4I- m m | |||
.-c 0 3 m c | |||
c I | |||
m 2 I- | |||
U K | |||
m 73 C t z | |||
6 ._m 0 | |||
._ 0 n - 0 m | |||
+ ._ | |||
c C | |||
$ | |||
a, fJl n | |||
m a, | |||
U-c k -I d-I c | |||
m | |||
._ | |||
C c? | |||
n t3 8 a, c a, | |||
S c C C K sh 0 C m | |||
rn .- | |||
K | |||
c | |||
> | |||
.- | |||
C a, | |||
C C | |||
m s a z | |||
B K | |||
c m m .-0 | |||
Q E fJl fJl 6 n: W z ._ $ a 0 a, I- | |||
U U d d k a, A I-2 5 | |||
is I-a 0 a 4 z 3 2 a B z 2 I sI I | |||
0 | |||
I I m E - a z2 7 | |||
7-cu - | |||
.-- | |||
7 | |||
N z2 cu m - a 2 - 0 0 E | |||
- | |||
cu - 2 3 m 7 T-m -I | |||
N m 4I- | |||
a ? cu a | |||
a 7 7 T-l-- | |||
I- 3 | |||
i; I- I-T- | |||
I- I-Y n a a a | |||
- a Ea 9 n n a ad.!&& | |||
a a a m m m m m m m m m m m m m m m m m m m m m m m | |||
m m m m m m m m m C C C C C C C C C | |||
.P | |||
- e | |||
.P .o .P .E .P c c - c | |||
.o c | |||
.e e | |||
._ | |||
c | |||
0 0 0 0 0 0 0 0 0 m a , a , a , a , a , a,a, a, a n a a a n a n a m m m m m m m m | |||
- - | |||
C C m a , | |||
- - - - | |||
C C a m m a , | |||
C C - - | |||
C ala, C -mC a, | |||
.E .E -c u - | |||
.E .E - .E -.E - .E | |||
.E - ._ | |||
- C ziii m m a , aa, a, m m o m m m a m m 3 3 3 3 m m m m m | |||
m m a | |||
m m | |||
m m m m m m m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 | |||
$2 0 0 0 | |||
. | |||
F N N N 2 2 c! | |||
T - T - | |||
m | |||
u N | |||
h l222 N | |||
h N | |||
2 T - T - | |||
T - T - | |||
s i= | |||
c m | |||
0 0 0 0 0 0 0 0 0 m m m m m m m m m ss . | |||
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 | |||
T - T - | |||
0 0 | |||
N N 3 3 3 3 N N T - T - T - T - | |||
2 2 2 2 0 0 0 0 | |||
s 0 0 | |||
s . | |||
N In T-m | |||
v) | |||
v) | |||
W m 0) | |||
(0 0 aC, a, C | |||
0 a>, | |||
>. | |||
e .- | |||
. I | |||
- | |||
.- | |||
c | |||
lii z- a, z-a, 3z 8 c P | |||
C c | |||
P C | |||
8a, 0 L a, L I- L3 3 m m da d 0 a | |||
d | |||
K - m | |||
- | |||
-I C 2 a ._ e 0 .- | |||
z m a | |||
c m | |||
a 0 3 | |||
L3 | |||
I-33 8 8 | |||
0 0 T- T-I E E 9 9 Gai T-In T-T- | |||
T- | |||
? | |||
7- | |||
n & | |||
I- | |||
&cia&a I-a K m m m m m c r , m m m | |||
gov SUNS1 Review Completed: -JAG- ADAMS: OYes 0 No Initials: -JAC- 0 Publicly Available El Non-Publicly Available Sensitive Non-Sensitive R:\ REACTORS\EOC and Midcvcle\EOC Assessment Letters\2006 - dated 3-2-07\WAT.w~d | Entergy Operations, Inc. -5-Electronic distribution by RIV: | ||
Regional Administrator (BSMI) | |||
DRP Director (ATH) | |||
DRS Director (DDC) | |||
DRS Deputy Director (RJCI) | |||
Senior Resident Inspector (GFLI) | |||
Branch Chief, DRPIE (JAC) | |||
Project Engineer, DRPlE (JCK3) | |||
Team Leader, DRPITSS (RLNI) | |||
RlTS Coordinator (MSH3) | |||
V. Dricks, P A 0 (VLD) | |||
W. Maier, RSLO (WAM) | |||
L. Owen, RA Secretary (LAO) | |||
DRS Branch Chiefs (WBJ, ATG, LJS, MPSI) | |||
C. Miller, Chief, TRPS, OED0 (CGM) | |||
S. Richards, Deputy Director, DIRS, NRR (SAR) | |||
J. Lubinski, Deputy Director, DORL, NRR (JWL) | |||
C. Haney, Director, DORL, NRR (CXH) | |||
D. Terao, Chief, PLB IV, DORL, NRR (DXT) | |||
M. Fields, NRR Project Manager for Waterford (MBFI) | |||
RidsNrrDirslPab@,nrc.gov ROPreportsCQnrc.gov SUNS1 Review Completed: -JAG- ADAMS: OYes 0 No Initials: -JAC-0 Publicly Available El Non-Publicly Available Sensitive Non-Sensitive R:\ REACTORS\EOC and Midcvcle\EOC Assessment Letters\2006 - dated 3-2-07\WAT.w~d I | |||
I1 JAClark;df | |||
/RA/ | |||
2114/07 DDChamberlain | |||
/RA/ | |||
I 2114/07 ATHowell I l l AVegel for 12/25/07 JAClark | |||
/RA/ | |||
13/2/07 OFFICIAL RECORD COPY T=Telepho ne E=E-mail F=Fax | |||
}} | }} |
Latest revision as of 08:56, 23 November 2019
ML070610613 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 03/02/2007 |
From: | Clark J NRC/RGN-IV/DRP/RPB-E |
To: | Walsh K Entergy Operations |
References | |
IR-07-001 | |
Download: ML070610613 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
SUBJECT:
ANNUAL ASSESSMENT LETTER - WATERFORD STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000382/2007001)
Dear Mr. Walsh:
On February 7, 2007, the NRC staff completed its performance review of your Waterford Steam Electric Station, Unit 3. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.
Overall, Waterford Steam Electric Station, Unit 3, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs
Entergy Operations, Inc. -2-document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/i; Y J e f f Clark, Chief Project Branch E Division of Reactor Projects Docket: 50-382 License: NPF-38 Enclosure:
Waterford 3 Inspection/Activity Plan cc w/enclosure:
Executive Vice President and Chairman Chief Operating Officer Louisiana Public Service Commission Entergy Operations, Inc. P.O. Box 91 154 P.O. Box 31995 Baton Rouge, LA 70825-1697 Jackson, MS 39286-1995 Director, Nuclear Safety Assurance Vice President, Operations Support Entergy Operations, Inc.
Entergy Operations, Inc. 17265 River Road P.O. Box 31995 Killona, LA 70057-3093 Jackson, MS 39286-1995 Richard Penrod, Senior Environmental General Manager, Plant Operations Scientist, State Liaison Officer Waterford 3 SES Office of Environmental Services Entergy Operations, lnc. Northwestern State University 17265 River Road Russsell Hall, Room 201 Killona, LA 70057-3093 Natchitoches, LA 71497 Manager, Licensing Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093
Entergy Operations, Inc. -3-Chairperson Rep. Gary L. Smith, Jr.
Denton Field Office State of Louisiana, District 56 Chemical and Nuclear Preparedness P.O. Box 189 and Protection Division Norco, LA 70079 Office of Infrastructure Protection Preparedness Directorate Rep. Ernest D. Wooten Dept. of Homeland Security State of Louisiana, District 105 800 North Loop 288 8018 Highway 23, Suite 214 Federal Regional Center Belle Chasse, LA 70037 Denton, TX 76201-3698 Senator Joel T. Chaisson, I I Parish President State of Louisiana, District 19 Council P.O. Box 1255 St. Charles Parish Destrehan, LA 70047 P.O. Box 302 Hahnville, LA 70057 Tab Troxler, Director St. Charles Parish Department Federal Emergency Management Agency of Emergency Preparedness ATTN: William E. Peterson, Regional P.O. Box 302 Director Hahnville, LA 70057 Region VI, Federal Center 800 North Loop 288 Lance Marino, Councilman-at-Large Denton, TX 76201-3698 St. Charles Parish Division A 660 Pine Street Col. Jeff Smith, Deputy Director Norco, LA 70079 Louisiana Office of Homeland Security and Emergency Preparedness Clayton Snookie Faucheux 7667 Independence Blvd. Councilman-at-Large Baton Rouge, LA 70806 St. Charles Parish Division B 140 North Oak Court Jeffrey P. Meyers, Division Administrator P.O. Box 1342 Emergency and Radiological Services Luling, LA 70070 Division Louisiana Department of Environmental Desmond J. Hilaire, Councilman Quality St. Charles Parish District 1 P.O. Box 4312 P.O. Box 111 Baton Rouge, LA 70821-4312 Hahnville, LA 70057 Albert D. Laque, Parish President Brian A. Fabre, Councilman St. Charles Parish St. Charles Parish District 2 P.O. Box 302 322 Beaupre Drive Hahnville, LA 70057 Luling, LA 70070 Sheriff Greg Champagne G. Ram Ramchandran, Councilman St. Charles Parish Sheriffs Office St. Charles Parish District 3 P.O. Box7 13 Hermitage Court Hahnville, LA 70057 Destrehan, LA 70047
Entergy Operations, Inc. -4-Derryl Walls, Councilman St. Charles Parish District 4 P.O. Box 721 Des Allemands, LA 70030 April Black, Councilwoman St. Charles Parish District 5 162 Oak Manor Lane St. Rose, LA 70087 Richard Dickie Duhe, Councilman St. Charles Parish District 6 401 Oak Street Norco, LA 70079 Barry Minnich, Councilman St. Charles Parish District 7 337 Wanda Street Luling, LA 70070 Nickie Monica, Parish President St. John the Baptist Parish 1801 West Airline Highway Laplace, LA 70068 Paul Oncale, Public Safety Director St. John the Baptist Parish 1801 W. Airline Highway Laplace, LA 70068 Sheriff Wayne Jones St. John the Baptist Parish 1801 W. Airline Highway Laplace, LA 70068 Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
m C m m m m m m m m m m m 0) m m C C C c C K C C C C C C c c
.-c 0 .P e
.P c
.o c
._
c 0 .-
c 0 .P c
.P e
._
c 0 .P .P .o e + + -
._
c 0 .P c
.e c
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a, mas, a, a, a l a , a, C u a l a , a, m a ,
m 0. Q Q Q Q m Q Q Q Q Q a a m m m m Q m u ) m Q 0.
- C a,
- - -
C C m a a ,
C -c a,
-a, c -C -K m a ,
-C m m-C -K -C m-C m m-C -C a, a, m a ,
-
._C
-
.E .r
- .r- -c
.- -c
._ .-
- C .-
-K -C
._ -c
._ -
.& -.E a, a o a , (11 m
a, m o a m, a, m a ,
m m m m m a,
m 3 m m m m m m m
m m m m (0 m m m
a m
m m m m m m m m I- b I - I - I- I- I-I- b I - I - I- I-I-I- I-I-I- m m m 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0
.
p!
ul T-cu
9 "
ulaa 0 0 0 c!
0)
m
.
p!
m
m 3s
ec!
ol-
-I - E E p0! 0
$ $ $
N N 0 0 e
d c!
W p!"
$ 2 2 p!cucu a a a
.
p!
m N
m
$ $
-
7
2 0 0 0 0 0 0 0 0 0 Y Y - 7 - 0 0 0 I- I- I- I-I- I-I-I- I- m m m
. . .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cu e $ $ eep! cu cu
8 l-
p!
m Q
m
.
m
m
Y 30 0 s
Z Z Z
$a$
0 0 0
p!
m
.
m
m
$ 2 r l -
0 0
m cE k
0)
m
.-C g .E
.a Io E
s-2 W m a, c
._ C c
E? 3
0 c a,
e m a
- E d c 4 .-dC m U
C m
c C
a, S
D sf :
x Y-C 3 C 2 C 0 E
.- .-c 0 a .-m c W c
m
0 a,
C
._
0 lii (I)
-x
-
v I
C a,
3
._
5-
-I -
Q m
C c
c m
._ 2 rn ._ d -
m e ul e 2 c
L UC m
a, t z z -00 c W E -
m c m m a
> 0 0 ._ 8 -1
4I- m m
.-c 0 3 m c
c I
m 2 I-
U K
m 73 C t z
6 ._m 0
._ 0 n - 0 m
+ ._
c C
$
a, fJl n
m a,
U-c k -I d-I c
m
._
C c?
n t3 8 a, c a,
S c C C K sh 0 C m
rn .-
K
c
>
.-
C a,
C C
m s a z
B K
c m m .-0
Q E fJl fJl 6 n: W z ._ $ a 0 a, I-
U U d d k a, A I-2 5
is I-a 0 a 4 z 3 2 a B z 2 I sI I
0
I I m E - a z2 7
7-cu -
.--
7
N z2 cu m - a 2 - 0 0 E
-
cu - 2 3 m 7 T-m -I
N m 4I-
a ? cu a
a 7 7 T-l--
I- 3
i; I- I-T-
I- I-Y n a a a
- a Ea 9 n n a ad.!&&
a a a m m m m m m m m m m m m m m m m m m m m m m m
m m m m m m m m m C C C C C C C C C
.P
- e
.P .o .P .E .P c c - c
.o c
.e e
._
c
0 0 0 0 0 0 0 0 0 m a , a , a , a , a , a,a, a, a n a a a n a n a m m m m m m m m
- -
C C m a ,
- - - -
C C a m m a ,
C C - -
C ala, C -mC a,
.E .E -c u -
.E .E - .E -.E - .E
.E - ._
- C ziii m m a , aa, a, m m o m m m a m m 3 3 3 3 m m m m m
m m a
m m
m m m m m m m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
$2 0 0 0
.
F N N N 2 2 c!
T - T -
m
u N
h l222 N
h N
2 T - T -
T - T -
s i=
c m
0 0 0 0 0 0 0 0 0 m m m m m m m m m ss .
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
T - T -
0 0
N N 3 3 3 3 N N T - T - T - T -
2 2 2 2 0 0 0 0
s 0 0
s .
N In T-m
v)
v)
W m 0)
(0 0 aC, a, C
0 a>,
>.
e .-
. I
-
.-
c
lii z- a, z-a, 3z 8 c P
C c
P C
8a, 0 L a, L I- L3 3 m m da d 0 a
d
K - m
-
-I C 2 a ._ e 0 .-
z m a
c m
a 0 3
L3
I-33 8 8
0 0 T- T-I E E 9 9 Gai T-In T-T-
T-
?
7-
n &
I-
&cia&a I-a K m m m m m c r , m m m
Entergy Operations, Inc. -5-Electronic distribution by RIV:
Regional Administrator (BSMI)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJCI)
Senior Resident Inspector (GFLI)
Branch Chief, DRPIE (JAC)
Project Engineer, DRPlE (JCK3)
Team Leader, DRPITSS (RLNI)
RlTS Coordinator (MSH3)
V. Dricks, P A 0 (VLD)
W. Maier, RSLO (WAM)
L. Owen, RA Secretary (LAO)
DRS Branch Chiefs (WBJ, ATG, LJS, MPSI)
C. Miller, Chief, TRPS, OED0 (CGM)
S. Richards, Deputy Director, DIRS, NRR (SAR)
J. Lubinski, Deputy Director, DORL, NRR (JWL)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, PLB IV, DORL, NRR (DXT)
M. Fields, NRR Project Manager for Waterford (MBFI)
RidsNrrDirslPab@,nrc.gov ROPreportsCQnrc.gov SUNS1 Review Completed: -JAG- ADAMS: OYes 0 No Initials: -JAC-0 Publicly Available El Non-Publicly Available Sensitive Non-Sensitive R:\ REACTORS\EOC and Midcvcle\EOC Assessment Letters\2006 - dated 3-2-07\WAT.w~d I
I1 JAClark;df
/RA/
2114/07 DDChamberlain
/RA/
I 2114/07 ATHowell I l l AVegel for 12/25/07 JAClark
/RA/
13/2/07 OFFICIAL RECORD COPY T=Telepho ne E=E-mail F=Fax