Category:Letter
MONTHYEARML25062A3012025-03-0303 March 2025 Spent Fuel Storage Radioactive Effluent Release Report for 2024 IR 05000382/20254012025-02-26026 February 2025 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000382/2025401 ML25056A2692025-02-26026 February 2025 Regulatory Audit Plan in Support of LAR to Use Online Monitoring Methodology IR 05000382/20254032025-02-19019 February 2025 Security Baseline Inspection Report 05000382/2025403 ML25027A4212025-01-27027 January 2025 Entergy Operations, Inc. - Application to Revise Technical Specifications to Adopt TSTF-591, Revised Risk Informed Completion Time (RICT) Program IR 05000382/20240402025-01-23023 January 2025 Supplemental Inspection Report 05000382/2024040 and Follow Up Assessment Letter IR 05000382/20244202025-01-13013 January 2025 Security Baseline Inspection Report 05000382/2024420 IR 05000382/20240102024-12-0606 December 2024 – Biennial Problem Identification and Resolution Inspection Report 05000382/2024010 ML24339B3042024-12-0404 December 2024 Application to Revise Technical Specifications to Use Online Monitoring Methodology ML24338A0522024-12-0303 December 2024 Entergy - 2024 Certification of Foreign Ownership and Control or Influence (FOCI) IR 05000382/20240122024-11-21021 November 2024 License Renewal Phase 2 Inspection Report 05000382/2024012 IR 05000382/20240032024-11-0808 November 2024 Integrated Inspection Report 05000382/2024003 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) 05000382/LER-2024-001-01, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-11-0707 November 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure IR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-27027 September 2024 Amended Integrated Inspection Report 05000382/2023004 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 2025-03-03
[Table view] Category:License-Operator
MONTHYEARML25059A0532025-03-0303 March 2025 Licensed Operator Positive Fitness-for-Duty Test IR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18333A3432018-11-14014 November 2018 4 W3-2018-11 Draft Written Exam Comments ML18333A3442018-11-14014 November 2018 5_W3-2018-11 Draft Operating Test ML18333A3452018-11-14014 November 2018 6_W3-2018-11 Draft Operating Test Comments ML18333A3412018-11-14014 November 2018 2 W3-2018-11 Draft Outline Comments ML18333A3472018-11-14014 November 2018 8_W3-2018-11 Final Written Exam ML18333A3482018-11-14014 November 2018 9_W3-2018-11 Final Operating Test W3F1-2018-0071, 10 W3-2018-11 Post-Exam Analysis2018-11-14014 November 2018 10 W3-2018-11 Post-Exam Analysis ML18333A3402018-11-14014 November 2018 1 W3-2018-11 Draft Outlines ML18333A3422018-11-14014 November 2018 3 W3-2018-11 Draft Written Exam ML18333A3462018-11-14014 November 2018 7_W3-2018-11 Final Outlines ML18349A0052018-11-14014 November 2018 11 W3-2018-11 Public Forms ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines 2025-03-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18333A3432018-11-14014 November 2018 4 W3-2018-11 Draft Written Exam Comments ML18333A3482018-11-14014 November 2018 9_W3-2018-11 Final Operating Test ML18333A3442018-11-14014 November 2018 5_W3-2018-11 Draft Operating Test ML18333A3402018-11-14014 November 2018 1 W3-2018-11 Draft Outlines W3F1-2018-0071, 10 W3-2018-11 Post-Exam Analysis2018-11-14014 November 2018 10 W3-2018-11 Post-Exam Analysis ML18333A3412018-11-14014 November 2018 2 W3-2018-11 Draft Outline Comments ML18333A3452018-11-14014 November 2018 6_W3-2018-11 Draft Operating Test Comments ML18333A3422018-11-14014 November 2018 3 W3-2018-11 Draft Written Exam ML18349A0052018-11-14014 November 2018 11 W3-2018-11 Public Forms ML18333A3462018-11-14014 November 2018 7_W3-2018-11 Final Outlines ML18333A3472018-11-14014 November 2018 8_W3-2018-11 Final Written Exam ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 2024-09-03
[Table view] |
Text
March 14, 2008
SUBJECT:
WATERFORD 3 - NRC EXAMINATION REPORT 05000382/2007301
Dear Mr. Walsh:
NRC Inspection Report 05000382/2007301 has been canceled; therefore, no inspection report will be issued
Sincerely,
/RA/
Ryan E. Lantz, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-382 License: NPF-38
cc:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
UNITED STATES NUCLEAR REGULATORY COMMISSION RE GI O N IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005
Entergy Operations, Inc.
- 2 -
Vice President, Operations Support Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
Director Nuclear Safety Assurance Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
Manager, Licensing Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093
Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70825-1697
Richard Penrod, Senior Environmental Scientist, State Liaison Officer Office of Environmental Services Northwestern State University Russsell Hall, Room 201 Natchitoches, LA 71497
Entergy Operations, Inc.
- 3 -
Parish President Council St. Charles Parish P.O. Box 302 Hahnville, LA 70057
Director, Nuclear Safety & Licensing Entergy, Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312
Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312
Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209
Entergy Operations, Inc.
- 4 -
Electronic distribution by RIV:
Regional Administrator (EEC)
DRP Director (DDC)
DRS Director (RJC1)
DRS Deputy Director (ACC)
Senior Resident Inspector (RVA)
Branch Chief, DRP/E (JAC)
Senior Project Engineer, DRP/E (GDR)
Senior Project Engineer, DRP/E (GBM)
Team Leader, DRP/TSS (CJP)
RITS Coordinator (MSH3)
DRS STA (DAP)
D. Pelton, OEDO RIV Coordinator (DLP)
ROPreports WAT Site Secretary (AHY)
SUNSI Review Completed: _Y____ ADAMS: 7 Yes No Initials: __lmb____
7 Publicly Available Non-Publicly Available Sensitive 7 Non-Sensitive
DRS Sec C:OB
LMBerger RELantz
/RA/
/RA/
3/13/08 3/14/08
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax