{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E LAMAR BLVD
                                                REGION IV
ARLINGTON, TX 76011
                                            1600 E LAMAR BLVD
-4511 August 31, 2016
                                        ARLINGTON, TX 76011-4511
Mr. William F. Maguire
                                            August 31, 2016
Site Vice President
Mr. William F. Maguire
Entergy Operations, Inc.
Site Vice President
River Bend Station
Entergy Operations, Inc.
5485 U.S. Highway 61N
River Bend Station
St. Francisville, LA 70775
5485 U.S. Highway 61N
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION
St. Francisville, LA 70775
(REPORT 05000458/2016005)
SUBJECT:         MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT
Dear Mr. Maguire: O n August 10, 2016 , the U.S. Nuclear Regulatory Commission (NRC)
                05000458/2016005)
completed its mid-cycle performance review of River Bend Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June
Dear Mr. Maguire:
30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
  The NRC determined the performance at River Bend Station during the most recent quarter was within the Regulatory Response
performance review of River Bend Station. The NRC reviewed the most recent quarterly
Column of the NRC
performance indicators (PIs) in addition to inspection results and enforcement actions from
's Reactor Oversight Process (ROP) Action Matrix because
July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your
the Unplanned Scrams with Complications PI
facility during this period and its plans for future inspections at your facility.
was a White input
The NRC determined the performance at River Bend Station during the most recent quarter was
in the Initiating Events Cornerstone
within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action
from the fourth quarter of 2014 through the third quarter of
Matrix because the Unplanned Scrams with Complications PI was a White input in the Initiating
2015, and a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," has not been completed.   O n August 12, 2016, your staff notified the NRC of your readiness for a supplemental inspection to review the actions taken to address the performance issues
Events Cornerstone from the fourth quarter of 2014 through the third quarter of 2015, and a
associated with this PI. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental  
supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental
inspection in accordance with IP
Inspection for One or Two White Inputs in a Strategic Performance Area, has not been
95001 in September 2016. The supplemental inspection will provide assurance that the root causes and contributing causes of risk
completed.
-significant performance issues are understood, that the extent of condition and extent of cause of risk
On August 12, 2016, your staff notified the NRC of your readiness for a supplemental inspection
significant performance issues are identified, and that the corrective actions for risk
to review the actions taken to address the performance issues associated with this PI.
-significant performance issues are sufficient to address the root and contributing causes and prevent  
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental
inspection in accordance with IP 95001 in September 2016. The supplemental inspection will
provide assurance that the root causes and contributing causes of risk-significant performance
issues are understood, that the extent of condition and extent of cause of risk significant
performance issues are identified, and that the corrective actions for risk-significant
performance issues are sufficient to address the root and contributing causes and prevent
recurrence.
recurrence.
  Additionally, one finding in the Mitigating Systems Cornerstone, as described in our letter (ML15253A352) dated September 10, 2015, was a White input beginning in the second quarter of 2015. On April 13, 2016, the NRC issued supplemental inspection
Additionally, one finding in the Mitigating Systems Cornerstone, as described in our letter
report 05000458/2016010 (ML16146A792), which stated that the performance issue
(ML15253A352) dated September 10, 2015, was a White input beginning in the second quarter
will remain open beyond the normal four quarters and will not be removed from consideration in the NRC's assessment program until the identified weaknesses involving the extent of condition evaluation
of 2015. On April 13, 2016, the NRC issued supplemental inspection report 05000458/2016010
are addressed and corrected. On May 25, 2016, your staff notified the NRC of your readiness to resume the  
(ML16146A792), which stated that the performance issue will remain open beyond the normal
W. Maguire
four quarters and will not be removed from consideration in the NRCs assessment program
- 2 -   supplemental inspection to review the actions taken to address the
until the identified weaknesses involving the extent of condition evaluation are addressed and
inadequate extent of condition evaluation
corrected. On May 25, 2016, your staff notified the NRC of your readiness to resume the
. On June 29, 2016, the NRC completed the
 
supplemental inspection
W. Maguire                                         -2-
in accordance with IP 95001. Based on the results of this inspection, as documented in supplemental inspection report 05000458/2016011 (ML16223A956) dated August 10, 2016, the  
supplemental inspection to review the actions taken to address the inadequate extent of
White finding is no
condition evaluation. On June 29, 2016, the NRC completed the supplemental inspection in
longer considered as an Action
accordance with IP 95001. Based on the results of this inspection, as documented in
Matrix input as of the end of the second quarter of 2016.
supplemental inspection report 05000458/2016011 (ML16223A956) dated August 10, 2016, the
  The NRC identified the first occurrence of a cross-cutting theme in the Human Performance area. Specifically, there were twenty findings issued during the assessment period which had a cross-cutting aspect in Human Performance
White finding is no longer considered as an Action Matrix input as of the end of the second
. The NRC will continue to monitor your staff's effort and progress in addressing human performance
quarter of 2016.
until the theme criterion is no longer met.
The NRC identified the first occurrence of a cross-cutting theme in the Human Performance
 
area. Specifically, there were twenty findings issued during the assessment period which had a
The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
cross-cutting aspect in Human Performance. The NRC will continue to monitor your staffs
  The inspections listed during the second half
effort and progress in addressing human performance until the theme criterion is no longer met.
of the inspection plan are tentative and may be revised at the end
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact  
inspections performed by resident inspectors are not included in the inspection plan. The
you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
inspections listed during the second half of the inspection plan are tentative and may be revised
-publicly available correspondence.
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
  The NRC staff received
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
the River Bend Station Final Compliance letter for
you as soon as possible to discuss changes to the inspection plan should circumstances
Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
warrant any changes. This inspection plan does not include security related inspections, which
-Design-Basis External Events," and Order EA
will be sent via separate, non-publicly available correspondence.
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool
The NRC staff received the River Bend Station Final Compliance letter for Order EA-12-049,
Instrumentation."  T
Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-
he NRC staff issued the River Bend Station Safety Evaluation on August, 11, 2016, and will confirm full implementation of the orders  
Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard
mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency  
to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the River Bend Station
Preparedness Communication/Staffing/Multi
Safety Evaluation on August, 11, 2016, and will confirm full implementation of the orders
-Unit Dose Assessment Plans."
mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of
  In Staff Requirements Memorandum  
Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency
- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
-cycle assessment process beginning in calendar year 2017. This will be the final mid
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
-cycle assessment letter. The staff will contin
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
ue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
  In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the  
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC Public Document Room or from the Publicly Available Records (PARS) component of
 
W. Maguire
- 3 -  NRC's Agencywide Documents Access and Management System
(ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).  Please contact Greg Warnick
at 817-200-1144 with any questions you have regarding this letter.
  Sincerely,  /RA/ 
Troy Pruett, Director
Division of Reactor Projects
  Docket No.
50-458 License No.
NPF-47  Enclosure:
River Bend Station Inspection
/    Activity Plan 
Page 1 of 2
08/30/2016
09:36:05 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteRiver BendInspection / Activity Plan
07/01/2016
-06/30/2018EXAM-INITIAL EXAM
4 1 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
X02575 08/15/2016
08/19/2016
1 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
X02575 09/12/2016
09/16/2016
EP-2-EP PERFORMANCE INDICATORS
2 1 IP Drill/Exercise Performance71151-EP01
06/27/2016
07/01/2016
1 IP ERO Readiness71151-EP02
06/27/2016
07/01/2016
1 IP A lert & Notification System Reliability71151-EP03
06/27/2016
07/01/2016
EP-3-BIENNIAL EXERCISE INSPECTION
4 1 IP Exercise Evaluation7111401 06/27/2016
07/01/2016
1 IP Emergency Action Level and Emergency Plan Changes7111404 06/27/2016
07/01/2016
INSP-BIENNIAL REQUAL INSPECTION
2 1 IP Licensed Operator Requalification Program7111111B 08/29/2016
09/02/2016
RS 12 PI-RADIATION SAFETY
2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/06/2017
02/10/2017
1 IP Occupational ALARA Planning and Controls71124.02 02/06/2017
02/10/2017
1 IP Occupational Exposure Control Effectiveness71151-OR01
02/06/2017
02/10/2017
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
02/06/2017
02/10/201771111.08-INSERVICE INSPECTION
1 1 IP Inservice Inspection Activities - BWR7111108G 02/13/2017
02/17/2017TSB 52B-BIENNIAL PI&R
5 1 IP Problem Identification and Resolution71152B 04/10/2017
04/14/2017
1 IP Problem Identification and Resolution71152B 04/24/2017
04/28/2017
EP-1-BIENNIAL EP PROGRAM INSPECTION
1 1 IP A lert and Notification System Testing7111402 05/22/2017
05/26/2017
1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/22/2017
05/26/2017
1 IP Emergency Action Level and Emergency Plan Changes7111404 05/22/2017
05/26/2017
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/22/2017
05/26/2017
EP-2-EP PERFORMANCE INDICATOR VERIFICATION
1 1 IP Drill/Exercise Performance71151-EP01
05/22/2017
05/26/2017
1 IP ERO Readiness71151-EP02
05/22/2017
05/26/2017
1 IP A lert & Notification System Reliability71151-EP03
05/22/2017
05/26/2017
EB1-21M-RBS COMPONENT DESIGN BASIS INSPECTION
6 1 IP Component Design Bases Inspection (Teams)7111121M 06/12/2017
07/14/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
08/30/2016
09:36:05 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteRiver BendInspection / Activity Plan
07/01/2016
-06/30/2018
RS 5678-RS TEAM 5 1 IP Radiation Monitoring Instrumentation71124.05 08/21/2017
08/25/2017
1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/21/2017
08/25/2017
1 IP Radiological Environmental Monitoring Program71124.07 08/21/2017
08/25/2017
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/21/2017
08/25/2017
EB1-07T-RBS HEAT SINK PERFORMANCE
1 1 IP Heat Sink Performance7111107T 09/18/2017
09/22/2017EXAM-INITIAL EXAM
5 1 INITIAL EXAM RB(6/18)
X02622 05/21/2018
05/25/2018
1 INITIAL EXAM RB(6/18)
X02622 06/25/2018
07/03/2018
EB2-02-LICENSE RENEWAL INSPECTION
4 1 IP License Renewal Inspection
71002 03/05/2018
03/09/2018
1 IP License Renewal Inspection
71002 03/19/2018
03/23/2018
EP-1-EP EXERCISE INSPECTION
4 1 IP Exercise Evaluation7111401 06/25/2018
06/29/2018
1 IP Emergency Action Level and Emergency Plan Changes7111404 06/25/2018
06/29/2018
1 IP Drill/Exercise Performance71151-EP01
06/25/2018
06/29/2018
1 IP ERO Readiness71151-EP02
06/25/2018
06/29/2018
1 IP A lert & Notification System Reliability71151-EP03
06/25/2018
06/29/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.


   ML16242A32
W. Maguire                                  -3-
6  SUNSI Review
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
  By: CHY ADAMS Yes    No Publicly Available
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
  Non-Publicly Available
Electronic Reading Room).
  Non-Sensitive Sensitive Keyword: NRC-002 OFFICE DRP:C/SPE DRS: D DRP:PBC DRP: D   NAME CYoung AVegel GWarnick TPruett   SIGNATURE /RA/ /RA/JClark,for
Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.
/RA/ /RA/   DATE 8/16/16 8/17/16 8/29/16 8/22/16    
                                              Sincerely,
Letter to Mr. William F. Maguire
                                              /RA/
from Troy W. Pruett dated August 31, 2016
                                              Troy Pruett, Director
  DISTRIBUTION
                                              Division of Reactor Projects
: Regional Administrator (Kriss.Kennedy@nrc.gov)
Docket No.      50-458
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
License No.    NPF-47
DRP Deputy Director (Ryan.Lantz@nrc.gov)
Enclosure:
DRS Director (Anton.Vegel@nrc.gov)
River Bend Station Inspection/
DRS Deputy Director (Jeff.Clark@nrc.gov)  
   Activity Plan
Senior Resident Inspector (Jeffrey.Sowa@nrc.gov) Acting Resident Inspector (Jim.Melfi@nrc.gov)
 
Administrative Assistant (Lisa.Day@nrc.gov)
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information      RB
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)  
Page 1 of 2                                                                                    River Bend
Senior Project Engineer (Cale.Young@nrc.gov)
08/30/2016    09:36:05                                                                Inspection / Activity Plan
Project Engineer (Michael.Stafford@nrc.gov)
Report 22
Project Engineer (Lindsay.Brandt@nrc.gov)
                                                                                        07/01/2016 - 06/30/2018
Public Affairs Officer (Victor.Dricks@nrc.gov
  Unit          Planned Dates                                                                                                                  No. of Staff
) Project Manager (Stephen.Koenick@nrc.gov)
Number          Start        End        Inspection Activity                                                                Title                on Site
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
                                        EXAM          - INITIAL EXAM                                                                                  4
RITS Coordinator (Marisa.Herrera@nrc.gov
1          08/15/2016      08/19/2016        X02575                INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
) ACES (R4Enforcement.Resource@nrc.gov)
1          09/12/2016      09/16/2016        X02575                INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)
Regional Counsel (Karla.Fuller@nrc.gov
                                        EP-2          - EP PERFORMANCE INDICATORS                                                                      2
) Technical Support Assistant (Loretta.Williams@nrc.gov)
1          06/27/2016      07/01/2016    IP 71151-EP01            Drill/Exercise Performance
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
1          06/27/2016      07/01/2016    IP 71151-EP02            ERO Readiness
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
1          06/27/2016      07/01/2016    IP 71151-EP03            Alert & Notification System Reliability
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov
                                        EP-3          - BIENNIAL EXERCISE INSPECTION                                                                  4
) RIV RSLO (Bill.Maier@nrc.gov)
1          06/27/2016      07/01/2016    IP 7111401              Exercise Evaluation
Director, DIRS, NRR (Chris.Miller@nrc.gov)
1          06/27/2016      07/01/2016    IP 7111404              Emergency Action Level and Emergency Plan Changes
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
                                        INSP          - BIENNIAL REQUAL INSPECTION                                                                    2
Director, DORL, NRR (Anne.Boland@nrc.gov)
1          08/29/2016      09/02/2016    IP 7111111B              Licensed Operator Requalification Program
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
                                        RS 12 PI      - RADIATION SAFETY                                                                              2
Director, NSIR (Brian.Holian@nrc.gov)
1          02/06/2017      02/10/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
1          02/06/2017      02/10/2017    IP 71124.02              Occupational ALARA Planning and Controls
DRP Branch Chiefs (R4DRPBC@nrc.gov)
1          02/06/2017      02/10/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
DRS Branch Chiefs (R4DRSBC@nrc.gov)
1          02/06/2017      02/10/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
ROPreports.Resource@nrc.gov
                                        71111.08      - INSERVICE INSPECTION                                                                          1
ROPassessment.Resource@nrc.gov
1          02/13/2017      02/17/2017    IP 7111108G              Inservice Inspection Activities - BWR
                                        TSB 52B        - BIENNIAL PI&R                                                                                  5
1          04/10/2017      04/14/2017    IP 71152B                Problem Identification and Resolution
1          04/24/2017      04/28/2017    IP 71152B                Problem Identification and Resolution
                                        EP-1          - BIENNIAL EP PROGRAM INSPECTION                                                                1
1          05/22/2017      05/26/2017    IP 7111402              Alert and Notification System Testing
1          05/22/2017      05/26/2017    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          05/22/2017      05/26/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          05/22/2017      05/26/2017    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                        EP-2          - EP PERFORMANCE INDICATOR VERIFICATION                                                          1
1          05/22/2017      05/26/2017    IP 71151-EP01            Drill/Exercise Performance
1          05/22/2017      05/26/2017    IP 71151-EP02            ERO Readiness
1          05/22/2017      05/26/2017    IP 71151-EP03            Alert & Notification System Reliability
                                        EB1-21M        - RBS COMPONENT DESIGN BASIS INSPECTION                                                          6
1          06/12/2017      07/14/2017    IP 7111121M              Component Design Bases Inspection (Teams)
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                          RB
Page 2 of 2                                                                                    River Bend
08/30/2016    09:36:05                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                        No. of Staff
Number          Start        End        Inspection Activity                                                                Title                                    on Site
                                        RS 5678        - RS TEAM                                                                                                            5
1          08/21/2017      08/25/2017    IP 71124.05              Radiation Monitoring Instrumentation
1          08/21/2017      08/25/2017    IP 71124.06              Radioactive Gaseous and Liquid Effluent Treatment
1          08/21/2017      08/25/2017    IP 71124.07              Radiological Environmental Monitoring Program
1          08/21/2017      08/25/2017    IP 71124.08              Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                        EB1-07T        - RBS HEAT SINK PERFORMANCE                                                                                          1
1          09/18/2017      09/22/2017    IP 7111107T              Heat Sink Performance
                                        EXAM          - INITIAL EXAM                                                                                                        5
1          05/21/2018      05/25/2018        X02622                INITIAL EXAM RB(6/18)
1          06/25/2018      07/03/2018        X02622                INITIAL EXAM RB(6/18)
                                        EB2-02        - LICENSE RENEWAL INSPECTION                                                                                          4
1          03/05/2018      03/09/2018    IP 71002                License Renewal Inspection
1          03/19/2018      03/23/2018    IP 71002                License Renewal Inspection
                                        EP-1          - EP EXERCISE INSPECTION                                                                                              4
1          06/25/2018      06/29/2018    IP 7111401              Exercise Evaluation
1          06/25/2018      06/29/2018    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          06/25/2018      06/29/2018    IP 71151-EP01            Drill/Exercise Performance
1          06/25/2018      06/29/2018    IP 71151-EP02            ERO Readiness
1          06/25/2018      06/29/2018    IP 71151-EP03            Alert & Notification System Reliability
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.
                                                                                                                                                                      Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
 
  ML16242A326
  SUNSI Review           ADAMS              Publicly Available      Non-Sensitive Keyword:
  By: CHY                   Yes No         Non-Publicly Available  Sensitive     NRC-002
OFFICE         DRP:C/SPE DRS: D         DRP:PBC       DRP: D
NAME           CYoung   AVegel         GWarnick     TPruett
SIGNATURE /RA/           /RA/JClark,for /RA/           /RA/
DATE           8/16/16   8/17/16         8/29/16       8/22/16
                                     
Letter to Mr. William F. Maguire from Troy W. Pruett dated August 31, 2016
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)
Acting Resident Inspector (Jim.Melfi@nrc.gov)
Administrative Assistant (Lisa.Day@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Stephen.Koenick@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 15:42, 30 October 2019

Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005)
ML16242A326
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/31/2016
From: Troy Pruett
NRC/RGN-IV/DRP
To: Maguire W
Entergy Operations
Warnick G
References
ML15253A352, ML16146A792, ML16223A956 IR 2016005
Download: ML16242A326 (7)


See also: IR 05000458/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. William F. Maguire

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61N

St. Francisville, LA 70775

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT

05000458/2016005)

Dear Mr. Maguire:

On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of River Bend Station. The NRC reviewed the most recent quarterly

performance indicators (PIs) in addition to inspection results and enforcement actions from

July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your

facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at River Bend Station during the most recent quarter was

within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action

Matrix because the Unplanned Scrams with Complications PI was a White input in the Initiating

Events Cornerstone from the fourth quarter of 2014 through the third quarter of 2015, and a

supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental

Inspection for One or Two White Inputs in a Strategic Performance Area, has not been

completed.

On August 12, 2016, your staff notified the NRC of your readiness for a supplemental inspection

to review the actions taken to address the performance issues associated with this PI.

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental

inspection in accordance with IP 95001 in September 2016. The supplemental inspection will

provide assurance that the root causes and contributing causes of risk-significant performance

issues are understood, that the extent of condition and extent of cause of risk significant

performance issues are identified, and that the corrective actions for risk-significant

performance issues are sufficient to address the root and contributing causes and prevent

recurrence.

Additionally, one finding in the Mitigating Systems Cornerstone, as described in our letter

(ML15253A352) dated September 10, 2015, was a White input beginning in the second quarter

of 2015. On April 13, 2016, the NRC issued supplemental inspection report 05000458/2016010

(ML16146A792), which stated that the performance issue will remain open beyond the normal

four quarters and will not be removed from consideration in the NRCs assessment program

until the identified weaknesses involving the extent of condition evaluation are addressed and

corrected. On May 25, 2016, your staff notified the NRC of your readiness to resume the

W. Maguire -2-

supplemental inspection to review the actions taken to address the inadequate extent of

condition evaluation. On June 29, 2016, the NRC completed the supplemental inspection in

accordance with IP 95001. Based on the results of this inspection, as documented in

supplemental inspection report 05000458/2016011 (ML16223A956) dated August 10, 2016, the

White finding is no longer considered as an Action Matrix input as of the end of the second

quarter of 2016.

The NRC identified the first occurrence of a cross-cutting theme in the Human Performance

area. Specifically, there were twenty findings issued during the assessment period which had a

cross-cutting aspect in Human Performance. The NRC will continue to monitor your staffs

effort and progress in addressing human performance until the theme criterion is no longer met.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

The NRC staff received the River Bend Station Final Compliance letter for Order EA-12-049,

Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-

Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard

to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the River Bend Station

Safety Evaluation on August, 11, 2016, and will confirm full implementation of the orders

mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of

Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency

Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

W. Maguire -3-

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy Pruett, Director

Division of Reactor Projects

Docket No. 50-458

License No. NPF-47

Enclosure:

River Bend Station Inspection/

Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB

Page 1 of 2 River Bend

08/30/2016 09:36:05 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

EXAM - INITIAL EXAM 4

1 08/15/2016 08/19/2016 X02575 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)

1 09/12/2016 09/16/2016 X02575 INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)

EP-2 - EP PERFORMANCE INDICATORS 2

1 06/27/2016 07/01/2016 IP 71151-EP01 Drill/Exercise Performance

1 06/27/2016 07/01/2016 IP 71151-EP02 ERO Readiness

1 06/27/2016 07/01/2016 IP 71151-EP03 Alert & Notification System Reliability

EP-3 - BIENNIAL EXERCISE INSPECTION 4

1 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation

1 06/27/2016 07/01/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes

INSP - BIENNIAL REQUAL INSPECTION 2

1 08/29/2016 09/02/2016 IP 7111111B Licensed Operator Requalification Program

RS 12 PI - RADIATION SAFETY 2

1 02/06/2017 02/10/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 02/06/2017 02/10/2017 IP 71124.02 Occupational ALARA Planning and Controls

1 02/06/2017 02/10/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 02/06/2017 02/10/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

71111.08 - INSERVICE INSPECTION 1

1 02/13/2017 02/17/2017 IP 7111108G Inservice Inspection Activities - BWR

TSB 52B - BIENNIAL PI&R 5

1 04/10/2017 04/14/2017 IP 71152B Problem Identification and Resolution

1 04/24/2017 04/28/2017 IP 71152B Problem Identification and Resolution

EP-1 - BIENNIAL EP PROGRAM INSPECTION 1

1 05/22/2017 05/26/2017 IP 7111402 Alert and Notification System Testing

1 05/22/2017 05/26/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 05/22/2017 05/26/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 05/22/2017 05/26/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

EP-2 - EP PERFORMANCE INDICATOR VERIFICATION 1

1 05/22/2017 05/26/2017 IP 71151-EP01 Drill/Exercise Performance

1 05/22/2017 05/26/2017 IP 71151-EP02 ERO Readiness

1 05/22/2017 05/26/2017 IP 71151-EP03 Alert & Notification System Reliability

EB1-21M - RBS COMPONENT DESIGN BASIS INSPECTION 6

1 06/12/2017 07/14/2017 IP 7111121M Component Design Bases Inspection (Teams)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information RB

Page 2 of 2 River Bend

08/30/2016 09:36:05 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

RS 5678 - RS TEAM 5

1 08/21/2017 08/25/2017 IP 71124.05 Radiation Monitoring Instrumentation

1 08/21/2017 08/25/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

1 08/21/2017 08/25/2017 IP 71124.07 Radiological Environmental Monitoring Program

1 08/21/2017 08/25/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

EB1-07T - RBS HEAT SINK PERFORMANCE 1

1 09/18/2017 09/22/2017 IP 7111107T Heat Sink Performance

EXAM - INITIAL EXAM 5

1 05/21/2018 05/25/2018 X02622 INITIAL EXAM RB(6/18)

1 06/25/2018 07/03/2018 X02622 INITIAL EXAM RB(6/18)

EB2-02 - LICENSE RENEWAL INSPECTION 4

1 03/05/2018 03/09/2018 IP 71002 License Renewal Inspection

1 03/19/2018 03/23/2018 IP 71002 License Renewal Inspection

EP-1 - EP EXERCISE INSPECTION 4

1 06/25/2018 06/29/2018 IP 7111401 Exercise Evaluation

1 06/25/2018 06/29/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 06/25/2018 06/29/2018 IP 71151-EP01 Drill/Exercise Performance

1 06/25/2018 06/29/2018 IP 71151-EP02 ERO Readiness

1 06/25/2018 06/29/2018 IP 71151-EP03 Alert & Notification System Reliability

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16242A326

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: CHY Yes No Non-Publicly Available Sensitive NRC-002

OFFICE DRP:C/SPE DRS: D DRP:PBC DRP: D

NAME CYoung AVegel GWarnick TPruett

SIGNATURE /RA/ /RA/JClark,for /RA/ /RA/

DATE 8/16/16 8/17/16 8/29/16 8/22/16

Letter to Mr. William F. Maguire from Troy W. Pruett dated August 31, 2016

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Acting Resident Inspector (Jim.Melfi@nrc.gov)

Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Stephen.Koenick@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov