UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. William F. Maguire

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61N

St. Francisville, LA 70775

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT

05000458/2016005)

Dear Mr. Maguire:

On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of River Bend Station. The NRC reviewed the most recent quarterly

performance indicators (PIs) in addition to inspection results and enforcement actions from

July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your

facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at River Bend Station during the most recent quarter was

within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action

Matrix because the Unplanned Scrams with Complications PI was a White input in the Initiating

Events Cornerstone from the fourth quarter of 2014 through the third quarter of 2015, and a

supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental

Inspection for One or Two White Inputs in a Strategic Performance Area, has not been

completed.

On August 12, 2016, your staff notified the NRC of your readiness for a supplemental inspection

to review the actions taken to address the performance issues associated with this PI.

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental

inspection in accordance with IP 95001 in September 2016. The supplemental inspection will

provide assurance that the root causes and contributing causes of risk-significant performance

issues are understood, that the extent of condition and extent of cause of risk significant

performance issues are identified, and that the corrective actions for risk-significant

performance issues are sufficient to address the root and contributing causes and prevent

recurrence.

Additionally, one finding in the Mitigating Systems Cornerstone, as described in our letter

(ML15253A352) dated September 10, 2015, was a White input beginning in the second quarter

of 2015. On April 13, 2016, the NRC issued supplemental inspection report 05000458/2016010

(ML16146A792), which stated that the performance issue will remain open beyond the normal

four quarters and will not be removed from consideration in the NRCs assessment program

until the identified weaknesses involving the extent of condition evaluation are addressed and

corrected. On May 25, 2016, your staff notified the NRC of your readiness to resume the

W. Maguire

- 2 -

supplemental inspection to review the actions taken to address the inadequate extent of

condition evaluation. On June 29, 2016, the NRC completed the supplemental inspection in

accordance with IP 95001. Based on the results of this inspection, as documented in

supplemental inspection report 05000458/2016011 (ML16223A956) dated August 10, 2016, the

White finding is no longer considered as an Action Matrix input as of the end of the second

quarter of 2016.

The NRC identified the first occurrence of a cross-cutting theme in the Human Performance

area. Specifically, there were twenty findings issued during the assessment period which had a

cross-cutting aspect in Human Performance. The NRC will continue to monitor your staffs

effort and progress in addressing human performance until the theme criterion is no longer met.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

The NRC staff received the River Bend Station Final Compliance letter for Order EA-12-049,

Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-

Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard

to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the River Bend Station

Safety Evaluation on August, 11, 2016, and will confirm full implementation of the orders

mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of

Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency

Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

W. Maguire

- 3 -

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy Pruett, Director

Division of Reactor Projects

Docket No.

50-458

License No.

NPF-47

Enclosure:

River Bend Station Inspection/

Activity Plan

Page 1 of 2

08/30/2016

09:36:05

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

River Bend

Inspection / Activity Plan

07/01/2016 - 06/30/2018

EXAM

- INITIAL EXAM

4

1

INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)

X02575

08/15/2016

08/19/2016

1

INITIAL EXAM RIVER BEND STATION UNIT 1 (09/2016)

X02575

09/12/2016

09/16/2016

EP-2

- EP PERFORMANCE INDICATORS

2

1

IP

Drill/Exercise Performance

71151-EP01

06/27/2016

07/01/2016

1

IP

ERO Readiness

71151-EP02

06/27/2016

07/01/2016

1

IP

Alert & Notification System Reliability

71151-EP03

06/27/2016

07/01/2016

EP-3

- BIENNIAL EXERCISE INSPECTION

4

1

IP

Exercise Evaluation

7111401

06/27/2016

07/01/2016

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

06/27/2016

07/01/2016

INSP

- BIENNIAL REQUAL INSPECTION

2

1

IP

Licensed Operator Requalification Program

7111111B

08/29/2016

09/02/2016

RS 12 PI

- RADIATION SAFETY

2

1

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

02/06/2017

02/10/2017

1

IP

Occupational ALARA Planning and Controls

71124.02

02/06/2017

02/10/2017

1

IP

Occupational Exposure Control Effectiveness

71151-OR01

02/06/2017

02/10/2017

1

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

02/06/2017

02/10/2017

71111.08

- INSERVICE INSPECTION

1

1

IP

Inservice Inspection Activities - BWR

7111108G

02/13/2017

02/17/2017

TSB 52B

- BIENNIAL PI&R

5

1

IP

Problem Identification and Resolution

71152B

04/10/2017

04/14/2017

1

IP

Problem Identification and Resolution

71152B

04/24/2017

04/28/2017

EP-1

- BIENNIAL EP PROGRAM INSPECTION

1

1

IP

Alert and Notification System Testing

7111402

05/22/2017

05/26/2017

1

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

05/22/2017

05/26/2017

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

05/22/2017

05/26/2017

1

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

05/22/2017

05/26/2017

EP-2

- EP PERFORMANCE INDICATOR VERIFICATION

1

1

IP

Drill/Exercise Performance

71151-EP01

05/22/2017

05/26/2017

1

IP

ERO Readiness

71151-EP02

05/22/2017

05/26/2017

1

IP

Alert & Notification System Reliability

71151-EP03

05/22/2017

05/26/2017

EB1-21M

- RBS COMPONENT DESIGN BASIS INSPECTION

6

1

IP

Component Design Bases Inspection (Teams)

7111121M

06/12/2017

07/14/2017

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

RB

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

Page 2 of 2

08/30/2016

09:36:05

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

River Bend

Inspection / Activity Plan

07/01/2016 - 06/30/2018

RS 5678

- RS TEAM

5

1

IP

Radiation Monitoring Instrumentation

71124.05

08/21/2017

08/25/2017

1

IP

Radioactive Gaseous and Liquid Effluent Treatment

71124.06

08/21/2017

08/25/2017

1

IP

Radiological Environmental Monitoring Program

71124.07

08/21/2017

08/25/2017

1

IP

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124.08

08/21/2017

08/25/2017

EB1-07T

- RBS HEAT SINK PERFORMANCE

1

1

IP

Heat Sink Performance

7111107T

09/18/2017

09/22/2017

EXAM

- INITIAL EXAM

5

1

INITIAL EXAM RB(6/18)

X02622

05/21/2018

05/25/2018

1

INITIAL EXAM RB(6/18)

X02622

06/25/2018

07/03/2018

EB2-02

- LICENSE RENEWAL INSPECTION

4

1

IP

License Renewal Inspection

71002

03/05/2018

03/09/2018

1

IP

License Renewal Inspection

71002

03/19/2018

03/23/2018

EP-1

- EP EXERCISE INSPECTION

4

1

IP

Exercise Evaluation

7111401

06/25/2018

06/29/2018

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

06/25/2018

06/29/2018

1

IP

Drill/Exercise Performance

71151-EP01

06/25/2018

06/29/2018

1

IP

ERO Readiness

71151-EP02

06/25/2018

06/29/2018

1

IP

Alert & Notification System Reliability

71151-EP03

06/25/2018

06/29/2018

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

RB

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

ML16242A326

SUNSI Review

By: CHY

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

DRP:C/SPE

DRS: D

DRP:PBC

DRP: D

NAME

CYoung

AVegel

GWarnick

TPruett

SIGNATURE

/RA/

/RA/JClark,for

/RA/

/RA/

DATE

8/16/16

8/17/16

8/29/16

8/22/16

Letter to Mr. William F. Maguire from Troy W. Pruett dated August 31, 2016

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeffrey.Sowa@nrc.gov)

Acting Resident Inspector (Jim.Melfi@nrc.gov)

Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Michael.Stafford@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Stephen.Koenick@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov