Category:Inspection Plan
MONTHYEARIR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter IR 05000458/20220062023-03-0101 March 2023 Annual Assessment Letter for River Bend Station Report 05000458/2022006 ML23059A2332023-03-0101 March 2023 Cyber Security Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22186A0762022-07-0505 July 2022 Information Request, Security IR 2022402 ML22175A0652022-06-30030 June 2022 Notification of Inspection (NRC Inspection Report 05000458/2022004) and Request for Information ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information IR 05000458/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000458/2021006) ML21253A2442021-09-13013 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (5000458/2021004) and Request for Information ML21232A2272021-09-0101 September 2021 RBS Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21063A2372021-03-0303 March 2021 RBS 2020 Annual Assessment Letter ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20328A1202020-11-23023 November 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000458/2021001) and Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection IR 05000458/20200052020-09-0101 September 2020 Updated Inspection Plan for River Bend Station (Report 05000458/2020005) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20105A3712020-04-14014 April 2020 Notification of NRC Design Bases - Assurance Inspection (Teams) (05000458/2020011) and Initial Request for Information ML20055E1572020-03-0303 March 2020 RBS2019006 Annual Assessment Letter IR 05000458/20190052019-08-30030 August 2019 Updated Inspection Plan for River Bend Station, Report 05000458/2019005 ML19128A1012019-05-0808 May 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000458/2019012) and Initial Request for Information IR 05000458/20180062019-03-0404 March 2019 Annual Assessment Letter for River Bend Station (Report 05000458/2018006) IR 05000458/20180052018-08-31031 August 2018 Updated Inspection Plan for River Bend Station (Report 05000458/2018005) ML18166A2362018-06-15015 June 2018 Notification Inspection Report 05000458/2018003, and Request for Information IR 05000458/20170062018-03-0101 March 2018 Annual Assessment Letter for River Bend Station (Report 05000458/2017006) IR 05000458/20170052017-08-28028 August 2017 Updated Inspection Plan for River Bend Station(Report 05000458/2017005) IR 05000458/20160062017-03-0101 March 2017 Annual Assessment Letter for River Bend Station (Report (05000458/2016006) ML17053C0312017-02-22022 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans(05000458/2017008) and RFI IR 05000458/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2016401) ML16242A3262016-08-31031 August 2016 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20150062016-03-0202 March 2016 Annual Assessment Letter for River Bend Station (Report 05000458/2015006) IR 05000458/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2015401) IR 05000458/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for River Bend Station (05000458/2015005) ML15170A2332015-06-19019 June 2015 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000458/2015007) and Request for Information IR 05000458/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2014006) IR 05000458/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2014402) IR 05000416/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) IR 05000458/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2013006) IR 05000458/20128012013-03-0404 March 2013 Annual Assessment Letter for River Bend Station (Report 05000458-12-801) IR 05000458/20120062012-09-0404 September 2012 IR 05000458-12-006, on 08/15/2012, Mid-Cycle Assessment Letter for River Bend Station, Inspection Plan ML12229A5112012-08-16016 August 2012 IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter ML12180A5012012-06-28028 June 2012 IR 05000458-12-004, on 08/06/2012 - 08/10/2012, River Bend Station - Notification of Inspection (NRC Inspection and Request for Information) IR 05000458/20120012012-03-0505 March 2012 Annual Assessment Letter for River Bend Station (Report 05000458/2012001) ML11250A0632011-09-0707 September 2011 IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information ML1124305932011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - River Bend Station IR 05000458/20110012011-03-0404 March 2011 IR 05000458-11-001, 03/01/2011 - 06/30/2012, Annual Assessment Letter for River Bend Station ML1024305742010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - River Bend Station IR 05000458/20100012010-03-0303 March 2010 Annual Assessment Letter - River Bend Station (Report 05000458-10-001) 2023-08-21
[Table view] Category:Letter
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23195A0222023-07-11011 July 2023 4-2022-012 Letter - OI Closure to Licensee IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report 2024-01-18
[Table view] Category:Inspection Report
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 IR 05000458/20230112023-04-12012 April 2023 NRC License Renewal Phase 1 Inspection Report 05000458/2023011 IR 05000458/20220062023-03-0101 March 2023 Annual Assessment Letter for River Bend Station Report 05000458/2022006 IR 05000458/20220042023-02-0101 February 2023 Integrated Inspection Report 05000458/2022004 IR 05000458/20223012023-01-0303 January 2023 NRC Examination Report 05000458/2022301 IR 05000458/20220102022-12-12012 December 2022 Triennial Fire Protection Inspection Report 05000458/2022010 IR 05000458/20220032022-11-0303 November 2022 and Independent Spent Fuel Storage Installation Integrated Inspection Report 05000458/2022003 and 07200049/2022001 IR 05000458/20224022022-09-12012 September 2022 NRC Security Inspection Report 05000458/2022402 (Full Report) IR 05000458/20220022022-08-0909 August 2022 Integrated Inspection Report 05000458/2022002 IR 05000458/20220112022-06-0202 June 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2022011 IR 05000458/20220012022-04-27027 April 2022 Integrated Inspection Report 05000458/2022001 IR 05000458/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000458/2021006) IR 05000458/20210042022-01-25025 January 2022 Integrated Inspection Report 05000458/2021004 ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 IR 05000458/20214022021-12-15015 December 2021 Security Baseline Inspection Report 05000458/2021402 IR 05000458/20214042021-12-0707 December 2021 Material Control and Accounting Program Inspection Report 05000458/2021404, Publicly Available IR 05000458/20214012021-12-0303 December 2021 Security Baseline Inspection Report 05000458/2021401 IR 05000458/20210032021-11-0404 November 2021 Integrated Inspection Report 05000458/2021003 IR 05000458/20210912021-09-30030 September 2021 Notice of Violation and Proposed Imposition of $150,000 Civil Penalty, NRC Inspection Report 05000458/2021091 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019 IR 05000458/20210022021-08-11011 August 2021 Integrated Inspection Report 05000458/2021002 IR 05000458/20210902021-07-0101 July 2021 NRC Inspection Report 05000458/2021090 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019 IR 05000458/20210132021-05-25025 May 2021 Rriver Bend Station - NRC Baseline Inspection Report 05000458/2021013 IR 05000458/20214032021-05-24024 May 2021 Security Baseline Inspection Report 05000458/2021403 IR 05000458/20210012021-05-0505 May 2021 RBS2021001-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2021001 IR 05000458/20210102021-03-18018 March 2021 2021 River Bend Station - Biennial Problem Identification and Resolution Inspection Report 05000458/2021010 and Notice of Violation IR 05000458/20200042021-02-11011 February 2021 RBS2020004-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2020004 IR 05000458/20200032020-11-16016 November 2020 Revised Integrated Inspection Report 05000458/2020003 ML20303A1402020-10-30030 October 2020 Integrated Inspection Report 05000458/2020003 IR 05000458/20200112020-10-0606 October 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000458/2020011 IR 05000458/20200122020-09-29029 September 2020 NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of Violation ML20273A2352020-09-29029 September 2020 NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of Violation IR 05000458/20204122020-09-28028 September 2020 Security Baseline Inspection Report 05000458/2020412 IR 05000458/20200502020-09-0303 September 2020 Special Inspection Report 05000458/2020050 IR 05000458/20204102020-09-0303 September 2020 Security Baseline Inspection Report 05000458/2020410 IR 05000458/20204112020-09-0303 September 2020 NRC Security Inspection Report 05000458/2020411 IR 05000458/20200052020-09-0101 September 2020 Updated Inspection Plan for River Bend Station (Report 05000458/2020005) IR 05000458/20200022020-07-30030 July 2020 Integrated Inspection Report 05000458/2020002 2024-01-18
[Table view] |
See also: IR 05000458/2012010
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
August 16, 2012
Mr. Eric W. Olson
Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61
St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM
FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT
05000458/2012010
Dear Mr. Olson:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
staff will conduct an augmented inspection team follow-up inspection at your River Bend
Station. The inspection will be comprised of resident inspectors and a regional reactor inspector
from the NRC Region IV office. The inspection will be conducted in accordance with Inspection
Procedure 93800 and multiple reactor oversight process baseline inspection procedures.
The schedule for the inspection is as follows:
In-office preparation: September 10 - 14, 2012
Onsite inspection: September 17 - 21, 2012
This inspection is resource intensive both for the NRC inspectors and your staff. In order to
minimize the impact to your onsite resources and to ensure a productive inspection, we have
enclosed a request for documents needed for this inspection. Please note that the documents
are requested to be provided by September 4, 2012. In addition, we request that appropriate
personnel knowledgeable of each of the unresolved items documented in NRC Inspection
Report 0500458/2012009 be available to support the inspectors during the onsite inspection
week.
We have discussed this inspection activity with your staff. If there are any questions about this
inspection or the material requested, please contact the team lead, Brian Tindell, at
254-897-1500 or by email at brian.tindell@nrc.gov.
E. Olson -2-
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget Control No.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Project Branch C
Division of Reactor Projects
Docket: 05000458
License: NPF-47
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request
cc w/ encl: Electronic Distribution
E. Olson -3-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\_REACTORS\_RB\2012\RBS2012010 Inspection Planning Ltr.doc ML 12229A511
SUNSI Rev Yes No ADAMS Yes No Reviewer Initials VGG
Compl.
Publicly Avail Yes No Sensitive Yes No Sens. Type Initials VGG
RI:DRP/A BC:DRP/C
BTindell VGGaddy
/RA via Email /RA/
08/16/2012 08/16/2012
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Augmented Inspection Team Follow-up Inspection Document Request
Inspection Dates: In-office preparation: September 10 - 14, 2012
Onsite: September 17 - 21, 2012
Inspection Procedures: IP 93800, Augmented Inspection Team
Various Reactor Oversight Process Baseline Inspection
Procedures
Team Lead: Brian Tindell, Resident Inspector, Comanche Peak NPP
The following information should be sent to the Region IV office in hard copy or electronic
format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation
electronically if possible. Also, we request that you categorize the documents with the
numbered list below. If you are unable to send the requested information, please inform the
inspectors and provide the documentation during the first day of the onsite inspection. The
inspectors will request additional documents during the preparation and onsite inspection
weeks. If you have any questions regarding this information request, please contact the team
lead.
For the following items from Augmented Inspection Team Inspection Report
05000458/2012009, please provide current copies, as applicable, of related condition reports,
work orders, root cause analysis and/or apparent cause evaluations, system design criteria,
vendor manuals, UFSAR descriptions, technical specification requirements, technical
requirements manual requirements, fire protection report descriptions, procedures, drawings,
plant safety index records, fire incident reports, scram reports, industry operating experience
screenings, and post-event risk analysis:
1. Main Control Room Annunciator Control and Conduct of Operations
2. Past Operability of the Reactor Core Isolation Cooling System
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in
February 2011
5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance
6. Implementation of the Station Cable Reliability Program
7. Onsite Safety Review Committee Implementation
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation
-1- Enclosure
Inspector Contact Information:
Brian Tindell
Resident Inspector
254-897-1500
brian.tindell@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Brian Tindell
1600 East Lamar Blvd.
Arlington, TX 76011-4511
-2- Enclosure