ML20328A120

From kanterella
Jump to navigation Jump to search
Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000458/2021001) and Request for Information
ML20328A120
Person / Time
Site: River Bend 
Issue date: 11/23/2020
From: Vincent Gaddy
Region 4 Engineering Branch 1
To: Vercelli S
Entergy Operations
References
IR 2021001
Download: ML20328A120 (5)


See also: IR 05000458/2021001

Text

November 23, 2020

Mr. Steven Vercelli, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 U.S. Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,

TESTS, AND EXPERIMENTS INSPECTION (INSPECTION

REPORT 05000458/2021001) AND REQUEST FOR INFORMATION

Dear Mr. Vercelli:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your River Bend Station from March 1 - 5, 2021. The inspection will consist of

three reactor inspectors from the NRCs Region IV office for one week. The inspection will be

conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes,

Tests, and Experiments.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by February 15, 2021. Upon

review of these documents, the inspectors will select additional documentation for review upon

arrival. It is important that all of these documents are up-to-date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Bridget Johns of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Dustin Reinert, by telephone at 817-200-1534 or by e-mail at

Dustin.Reinert@nrc.gov.

S. Vercelli

2

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office

of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Vincent Gaddy, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 05000458

License No. NPF-47

Enclosure:

Request for Information

Evaluations of Changes, Tests, and

Experiments Inspection

cc w/ encl: Distribution via LISTSERV

Vincent G.

Gaddy

Digitally signed by Vincent

G. Gaddy

Date: 2020.11.23 10:46:43

-06'00'

ML20328A120

SUNSI Review

Initials: DRR

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI:EB1

BC:EB1

NAME

DReinert via Email

VGaddy VG

DATE

11/20/2020

11/23/2020

Enclosure

Request for Information

Evaluations of Changes, Tests, and Experiments Inspection

River Bend Station

Inspection Report: 05000458/2021001

Inspection Dates:

March 1 - 5, 2021

Inspection Procedure:

IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector:

Dustin Reinert, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by February 15, 2021, to the attention of Dustin Reinert. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

10 CFR 50.59 inspection that did not result in an evaluation.

3. Copies of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and

experiments performed since the last triennial 10 CFR 50.59 inspection that did not

result in an application for a license amendment.

4. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection.

5. A list with descriptions of all compensatory actions for degraded or nonconforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

6. A list with titles and descriptions of all normal, abnormal, and emergency operating

procedure changes implemented since the last triennial 10 CFR 50.59 inspection.

7. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial 10 CFR 50.59 inspection.

8. A list of personnel qualified to prepare, review, and approve 10 CFR 50.59 screenings

and/or evaluations, including qualification dates.

9. Current revisions of the technical specifications and bases and the Updated Final Safety

Analysis Report.

2

10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59

programs.

11. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

12. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Dustin Reinert

Reactor Inspector

817-200-1534

Dustin.Reinert@nrc.gov

Wes Cullum

Reactor Inspector

817-200-1563

Wes.Cullum@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Dustin Reinert

1600 East Lamar Blvd.

Arlington, TX 76011-4125