IR 05000458/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for River Bend Station(Report 05000458/2017005)
ML17242A230
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/28/2017
From: Jason Kozal
NRC/RGN-IV/DRP
To: Maguire W
Entergy Operations
JASON KOZAL
References
IR 2017005
Download: ML17242A230 (5)


Text

ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR RIVER BEND STATION (REPORT 05000458/2017005)

Dear Mr. Maguire:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for River Bend Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Jason W. Kozal, Chief Division of Reactor Projects Docket No. 50-458 License No. NPF-47 Enclosure:

Inspection Plan for River Bend Station

ML17242A230 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: CHY/dll Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE /RA/

DATE 8/28/17

Page 1 of 2 River Bend 08/25/2017 08:23:40 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 8 - RAD SAFETY 08 1 1 07/24/2017 07/28/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RS 5678 - RS TEAM 3 1 08/21/2017 08/25/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 08/21/2017 08/25/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/21/2017 08/25/2017 IP 71124.07 Radiological Environmental Monitoring Program EB1-07T - RBS HEAT SINK PERFORMANCE 2 1 09/18/2017 09/22/2017 IP 7111107T Heat Sink Performance EXAM - INITIAL EXAM 5 1 06/25/2018 06/29/2018 X02622 INITIAL EXAM RB(6/18)

1 07/23/2018 07/27/2018 X02622 INITIAL EXAM RB(6/18)

RS 24 - RAD SAFETY 2 1 01/22/2018 01/26/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 01/22/2018 01/26/2018 IP 71124.04 Occupational Dose Assessment EB2-02 - LICENSE RENEWAL INSPECTION 4 1 03/05/2018 03/09/2018 IP 71002 License Renewal Inspection 1 03/19/2018 03/23/2018 IP 71002 License Renewal Inspection EP-1 - EP EXERCISE INSPECTION 4 1 06/25/2018 06/29/2018 IP 7111401 Exercise Evaluation 1 06/25/2018 06/29/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 06/25/2018 06/29/2018 IP 71151-EP01 Drill/Exercise Performance 1 06/25/2018 06/29/2018 IP 71151-EP02 ERO Readiness 1 06/25/2018 06/29/2018 IP 71151-EP03 Alert & Notification System Reliability BRQ - BRQ 2 1 08/27/2018 08/31/2018 IP 7111111B Licensed Operator Requalification Program EB1-17T - RBS 50.59 CHANGES, TESTS, EXPERIMENTS 3 1 09/10/2018 09/14/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments RS 13PI - RAD SAFETY 2 1 11/05/2018 11/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/05/2018 11/09/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/05/2018 11/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/05/2018 11/09/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 River Bend 08/25/2017 08:23:40 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - BIENNIAL PI&R INSPECTION 4 1 02/11/2019 02/15/2019 IP 71152B Problem Identification and Resolution 1 02/25/2019 03/01/2019 IP 71152B Problem Identification and Resolution 7111108 - INSERVICE INSPECTION RF20 1 1 02/14/2019 04/25/2019 IP 7111108G Inservice Inspection Activities - BWR 7111108 - INSERVICE INSPECTION RF20 1 1 02/18/2019 02/22/2019 IP 7111108G Inservice Inspection Activities - BWR RS 12 PI - RP INSPECTION 3 1 02/25/2019 03/01/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/25/2019 03/01/2019 IP 71124.02 Occupational ALARA Planning and Controls 1 02/25/2019 03/01/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/25/2019 03/01/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.