|
---|
Category:Inspection Plan
MONTHYEARIR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter IR 05000458/20220062023-03-0101 March 2023 Annual Assessment Letter for River Bend Station Report 05000458/2022006 ML23059A2332023-03-0101 March 2023 Cyber Security Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22186A0762022-07-0505 July 2022 Information Request, Security IR 2022402 ML22175A0652022-06-30030 June 2022 Notification of Inspection (NRC Inspection Report 05000458/2022004) and Request for Information ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information IR 05000458/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000458/2021006) ML21253A2442021-09-13013 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (5000458/2021004) and Request for Information ML21232A2272021-09-0101 September 2021 RBS Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21063A2372021-03-0303 March 2021 RBS 2020 Annual Assessment Letter ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20328A1202020-11-23023 November 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000458/2021001) and Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection IR 05000458/20200052020-09-0101 September 2020 Updated Inspection Plan for River Bend Station (Report 05000458/2020005) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20105A3712020-04-14014 April 2020 Notification of NRC Design Bases - Assurance Inspection (Teams) (05000458/2020011) and Initial Request for Information ML20055E1572020-03-0303 March 2020 RBS2019006 Annual Assessment Letter IR 05000458/20190052019-08-30030 August 2019 Updated Inspection Plan for River Bend Station, Report 05000458/2019005 ML19128A1012019-05-0808 May 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000458/2019012) and Initial Request for Information IR 05000458/20180062019-03-0404 March 2019 Annual Assessment Letter for River Bend Station (Report 05000458/2018006) IR 05000458/20180052018-08-31031 August 2018 Updated Inspection Plan for River Bend Station (Report 05000458/2018005) ML18166A2362018-06-15015 June 2018 Notification Inspection Report 05000458/2018003, and Request for Information IR 05000458/20170062018-03-0101 March 2018 Annual Assessment Letter for River Bend Station (Report 05000458/2017006) IR 05000458/20170052017-08-28028 August 2017 Updated Inspection Plan for River Bend Station(Report 05000458/2017005) IR 05000458/20160062017-03-0101 March 2017 Annual Assessment Letter for River Bend Station (Report (05000458/2016006) ML17053C0312017-02-22022 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans(05000458/2017008) and RFI IR 05000458/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2016401) ML16242A3262016-08-31031 August 2016 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20150062016-03-0202 March 2016 Annual Assessment Letter for River Bend Station (Report 05000458/2015006) IR 05000458/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2015401) IR 05000458/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for River Bend Station (05000458/2015005) ML15170A2332015-06-19019 June 2015 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000458/2015007) and Request for Information IR 05000458/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2014402) IR 05000458/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2014006) IR 05000416/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) IR 05000458/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2013006) IR 05000458/20128012013-03-0404 March 2013 Annual Assessment Letter for River Bend Station (Report 05000458-12-801) IR 05000458/20120062012-09-0404 September 2012 IR 05000458-12-006, on 08/15/2012, Mid-Cycle Assessment Letter for River Bend Station, Inspection Plan ML12229A5112012-08-16016 August 2012 IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter ML12180A5012012-06-28028 June 2012 IR 05000458-12-004, on 08/06/2012 - 08/10/2012, River Bend Station - Notification of Inspection (NRC Inspection and Request for Information) IR 05000458/20120012012-03-0505 March 2012 Annual Assessment Letter for River Bend Station (Report 05000458/2012001) ML11250A0632011-09-0707 September 2011 IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information ML1124305932011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - River Bend Station IR 05000458/20110012011-03-0404 March 2011 IR 05000458-11-001, 03/01/2011 - 06/30/2012, Annual Assessment Letter for River Bend Station 2024-08-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23081A4602023-03-22022 March 2023 RFI River Bend CETI 2023012 Drr ML23004A0422023-01-0404 January 2023 License Renewal Phase 1 Request for Information ML22354A0812022-12-20020 December 2022 Inservice Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20126G3922020-05-0101 May 2020 Request for Information, May 01, 2020, River Bend Station Special Inspection, NRC Inspection Report 2020050 ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML18250A3112018-09-0404 September 2018 NRR E-mail Capture - Final RAI - RBS EAL Scheme Change LAR (L-2018-LLA-0130) ML18229A0082018-08-16016 August 2018 NRR E-mail Capture - Final Request for Additional Information for P-T Curves - NON-PROPRIETARY Version ML18250A3102018-08-0101 August 2018 NRR E-mail Capture - Draft RAI - RBS EP EAL Scheme Change LAR (L-2018-LLA-0130) ML18151A0822018-05-30030 May 2018 Summary of a Telephone Conference Call Held on May 21, 2018, Between NRC and Entergy Regarding the Need for Additional Information to Support the River Bend Station License Renewal Application RBG-47861, Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification2018-05-29029 May 2018 Response to License Renewal Application NRC Request for Additional Information Sets 14,15 and Operating Experience Review Clarification ML18149A2882018-05-24024 May 2018 NRR E-mail Capture - River Bend Station Request for Additional Information - Reactor Core Isolation Cooling Piping Modification (L-2018-LLA-0029) ML18141A4882018-05-21021 May 2018 Draft Response (RAI 3.6.2.2.2.2-1a) from LRA Review Revised After the May 17, 2018 Call ML18141A3172018-05-21021 May 2018 OE Draft RAI 3-0-5 Rogers ML18131A2412018-05-11011 May 2018 RBS 012 Item 158a Response (RAI 3.2.2.3.2-1a) Revised - Received on 05/10/2018 ML18124A0092018-05-0303 May 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staff'S Review on the River Bend License Renewal Application ML18121A0292018-04-30030 April 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion ML18113A3322018-04-23023 April 2018 035 RB Buried Pipe 3rd Round RAI - Allik Holston ML18103A0152018-04-12012 April 2018 NRR E-mail Capture - Summary of Public Telephone Conference Call Held on March 27, 2018, Between the U.S. Nuclear Regulatory Commission and Entergy and Final Requests for Additional Information for the Safety Review of the River Bend Statio ML18073A0912018-03-14014 March 2018 NRC and Energy Public Meeting on Fatigue Analysis Related to River Bend License Renewal ML18068A1872018-03-0909 March 2018 Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 ML18065A2132018-03-0606 March 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 ML18060A1532018-03-0101 March 2018 NRR E-mail Capture - River Bend Station: Request for Additional Information Concerning New Technical Specification for Control Building Air Conditioning (L-2017-LLA-0291) ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18043A3512018-02-12012 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 ML18043A0082018-02-0808 February 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 ML18038B4702018-02-0707 February 2018 NRR E-mail Capture - Fyi_River Bend Station RAIs Set 9 ML18022A9412018-01-22022 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 ML18011A0462018-01-10010 January 2018 Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information IR 05000458/20184062018-01-10010 January 2018 River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information ML18009A9092018-01-0909 January 2018 Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 2024-09-16
[Table view] |
Text
Information Request Biennial Problem Identification and Resolution Inspection River Bend Station December 11, 2020 Inspection Report: 50-458/2021010 Inspection Dates: January 25-29 & February 8-12, 2021 Due to the COVID-19 pandemic conditions within the state of Louisiana, this inspection may be conducted remotely.
This inspection will cover the period from March 1, 2019, through February 12, 2021. All requested information is limited to this period or to the date of this request unless otherwise specified. To the extent possible, the requested information should be provided electronically in word-searchable Adobe PDF (preferred) or Microsoft Office format. If any information requested is determined to be sensitive, the specific handling of this information should be discussed in advance between the NRC inspectors and the River Bend Station representatives assigned to the Problem Identification and Resolution Inspection to ensure appropriate handling.
Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable format. Please be prepared to provide any significant updates to this information during the teams first week of inspection and then as new information becomes available. As used in this request, corrective action documents refers to condition reports, notifications, action requests, cause evaluations, and/or other similar documents, as applicable to River Bend Station.
Please provide the following information no later than January 7, 2021:
- i. Document Lists Note: For these summary lists, please include the document/reference number, the document title, initiation date, current status, and long-text description of the issue.
- a. Summary list of all corrective action documents related to significant conditions adverse to quality that were opened, closed, or evaluated during the period
- b. Summary list of all corrective action documents related to conditions adverse to quality that were opened or closed during the period
- c. Summary list of all condition reports related to non-conditions adverse to quality that were opened or closed during the period
- d. Summary list of all apparent cause evaluations (or equivalent) performed during the period; if fewer than approximately 40, provide full documents and attachments
- e. Summary list of all currently open corrective action documents associated with conditions first identified prior to the beginning of the inspection period
- f. Summary list of all corrective action documents that were upgraded or downgraded in priority/significance during the period (these may be limited to those downgraded from, or upgraded to, apparent-cause level or higher)
- g. Summary list of all corrective action documents initiated during the period that identify an adverse or potentially adverse trend in safety-related or risk-significant equipment performance or in any aspect of the stations safety culture.
- h. Summary lists of operator workarounds, operator burdens, temporary modifications, and control room deficiencies (1) currently open and (2) that were evaluated and/or closed during the period; this should include the date that each item was opened and/or closed.
- i. Summary list of all prompt operability determinations or other engineering evaluations to provide reasonable assurance of operability; if fewer than approximately 20, provide full documents and attachments
- j. Summary list of plant safety issues raised or addressed by the Employee Concerns Program (or equivalent) (sensitive information should be made available by appropriate means after discussion with the team lead)
- 2. Full Documents with Attachments
- a. All root cause evaluations completed during the period; include a list of any planned or in progress
- b. Quality Assurance audits performed during the period
- c. Audits/surveillances performed during the period on the Corrective Action Program, of individual corrective actions, or of cause evaluations
- d. Functional area self-assessments and non-NRC third-party assessments (e.g.,
peer assessments performed as part of routine or focused station self- and independent assessment activities; do not include INPO assessments) that were performed or completed during the period; include a list of those that are currently in progress
- e. Any assessments of the safety-conscious work environment at River Bend Station including any safety culture survey results; if none performed during the inspection period, provide the most recent
- f. Corrective action documents generated during the period associated with the following:
- i. NRC findings and/or violations issued to River Bend Station ii. Licensee Event Reports issued by River Bend Station
- g. Corrective action documents generated for the following, if they were determined to be applicable to River Bend Station (for those that were evaluated but determined not to be applicable, provide a summary list):
- i. NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during the period ii. Part 21 reports issued or evaluated during the period iii. Vendor safety information letters (or equivalent) issued or evaluated during the period iv. Other external events and/or operating experience evaluated for applicability during the period
- h. Corrective action documents generated for the following:
- i. Maintenance preventable functional failures that occurred or were evaluated during the period ii. Adverse trends in equipment, processes, procedures, or programs that were evaluated during the period iii. Action items generated or addressed by offsite review committees during the period
- 3. Logs and Reports
- a. Corrective action performance trending/tracking information generated during the period and broken down by functional organization (if this information is fully included in item 3.b, it need not be provided separately)
- b. Current system health reports, Management Review Meeting package, or similar information; provide past reports as necessary to include greater-than-or-equal to 12 months of metric/trending data
- c. Radiation protection event logs during the period
- d. Security event logs and security incidents during the period (sensitive information should be made available during the teams first weekdo not provide electronically) - Handling of this item will need additional discussion
- e. Employee Concerns Program (or equivalent) logs (sensitive information should be made available during the teams first week of inspectiondo not provide electronically)
- f. List of training deficiencies, requests for training improvements, and simulator deficiencies for the period Note: For item 3.c-3.d, if there is no log or report maintained separate from the corrective action program, please provide a summary list of corrective action program items for the category described.
- 4. Procedures Note: For these procedures, please include all revisions that were in effect at any time during the period.
- a. Corrective action program procedures, to include initiation and evaluation procedures, operability determination procedures, cause evaluation procedures, and any other procedures that implement the corrective action program at River Bend Station, including applicable corporate procedures
- b. Quality Assurance program procedures (specific audit procedures are not necessary)
- c. Employee Concerns Program (or equivalent) procedures
- d. Procedures that implement/maintain a Safety Conscious Work Environment
- e. Conduct of Operations procedure (or equivalent) and any other procedures or policies governing control room conduct, operator burdens and workarounds, etc.
- f. Maintenance rule procedures and any procedures implementing any portion of the maintenance rule at River Bend Station
- g. Operating experience program procedures and any other procedures or guidance documents that describe the sites use of operating experience information
- 5. Other
- a. List of risk-significant components and systems, ranked by risk worth; if the list uses system designators, provide a list of the associated equipment/system names
- b. List of structures, systems and components and/or functions that were in maintenance rule (a)(1) status or evaluated for (a)(1) status at any time during the inspection period; include dates and results of expert panel reviews and dates of status changes
- c. Organization charts for plant staff and long-term/permanent contractors
- d. Electronic copies of the Updated Final Safety Analysis Report (or equivalent),
technical specifications, and technical specification bases, if available
- e. Table showing the number of corrective action documents (or equivalent) initiated during each month of the inspection period, by screened significance
- f. For each day the team is inspecting,
- i. Planned work/maintenance schedule for the station ii. Schedule of management or corrective action review meetings (e.g.
operations focus meetings, condition report screening meetings,
Corrective Action Review Boards, Management Review Meetings, challenge meetings for cause evaluations, etc.)
iii. Agendas and materials for these meetings Note: Please provide the items listed in 5.f on a daily basis All requested documents should be provided electronically (e.g., Certrecs IMS) where possible.
Doug Dodson U.S. NRC Senior Reactor Inspector Inspection Program and Assessment Team Division of Reactor Safety, Region IV 1600 E. Lamar Blvd, Arlington, TX 76011 Douglas.Dodson@nrc.gov