Integrated Inspection Report 05000458/2023001
ML23116A235
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/01/2023
From: Jeffrey Josey
NRC/RGN-IV/DORS/PBC
To: Franssen R
Entergy Operations
References
IR 2023001
Download: ML23116A235 (1)


See also: IR 05000458/2023001

Text

May 01, 2023

Robert Franssen, Acting Site Vice President

Entergy Operations, Inc.

5485 U.S. Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION - INTEGRATED INSPECTION

REPORT 05000458/2023001

Dear Robert Franssen:

On March 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at River Bend Station. On April 4, 2023, the NRC inspectors discussed the results of this

inspection with you and other members of your staff. The results of this inspection are

documented in the enclosed report.

Three findings of very low safety significance (Green) are documented in this report. All of these

findings involved violations of NRC requirements, one of which was determined to be Severity

Level IV. Two Severity Level IV violations without an associated finding are documented in this

report. We are treating these violations as non-cited violations consistent with section 2.3.2 of

the Enforcement Policy.

Two licensee-identified violations which were determined to be of very low safety significance

are documented in this report. We are treating these violations as non-cited violations consistent

with section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this

inspection report, you should provide a response within 30 days of the date of this inspection

report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional

Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector

at River Bend Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the

NRC Resident Inspector at River Bend Station.

R. Franssen 2

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Signed by Josey, Jeffrey

on 05/01/23

Jeffrey E. Josey, Chief

Projects Branch C

Division of Operating Reactor Safety

Docket No. 05000458

License No. NPF-47

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

ML23116A235

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JMR Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:DORS/C ASRI:DORS/C RI:DORS/C SPE:DORS/C BC:DORS/C

NAME RKumana AChilds CWynar JRollins JJosey

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

DATE 04/26/23 04/28/23 05/01/23 04/27/23 05/01/23

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number: 05000458

License Number: NPF-47

Report Number: 05000458/2023001

Enterprise Identifier: I-2023-001-0010

Licensee: Entergy Operations, Inc.

Facility: River Bend Station

Location: St. Francisville, Louisiana

Inspection Dates: January 1, 2023, to March 31, 2023

Inspectors: D. Childs, Acting Senior Resident Inspector

J. Drake, Senior Reactor Inspector

R. Easter, Project Engineer

R. Kumana, Senior Resident Inspector

W. Schaup, Senior Project Engineer

C. Wynar, Resident Inspector

Approved By: Jeffrey E. Josey, Chief

Projects Branch C

Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at River Bend Station, in accordance with

the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for

overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information. Two licensee

-identified non-cited violations are documented in report section 71153.

List of Findings and Violations

Failure to Ensure Adequate Design of the Diesel Generator Starting System

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green None 71111.04

Systems NCV 05000458/2023001-01

Open/Closed

The inspectors identified a Green finding and associated non-cited violation of Title 10 of the

Code of Federal Regulations Part 50, appendix B, criterion III, Design Control, with two

examples, when the licensee failed to ensure that the design basis was correctly translated

into specifications, drawings, procedures, and instructions. Specifically, the licensee failed to

ensure that the minimum required pressure in both the standby and the high pressure core

spray diesel generator starting air receivers, all safety-related components to which appendix

B applies, were suitably designed to meet the required number and timing of consecutive

starts as described in the updated safety analysis report under the most adverse design

conditions.

Failure to Maintain Accurate Information in the Updated Safety Analysis Report

Cornerstone Severity Cross-Cutting Report

Aspect Section

Not Applicable Severity Level IV Not Applicable 71111.04

NCV 05000458/2023001-02

Open/Closed

The inspectors identified a Severity Level IV non-cited violation of Title 10 of the Code of

Federal Regulations 50.71(e) when the licensee failed to update the updated safety analysis

report to assure that the information included in the report contains the latest information

developed. Specifically, the licensee failed to ensure that the design capacity of the high

pressure core spray diesel generator air start system was updated to reflect a change to the

diesel engine start time requirement.

Failure to Mitigate Risk During Containment Unit Cooler Maintenance

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green [H.8] - 71111.13

Systems NCV 05000458/2023001-03 Procedure

Open/Closed Adherence

The inspectors identified a Green finding and associated non-cited violation of Title 10 of the

Code of Federal Regulations 50.65(a)(4) for failing to manage an increase in risk from

maintenance activities. Specifically, on December 14, 2022, the licensee failed to manage the

increase in risk from planned maintenance on the division 2 containment unit cooler.

2

Failure to Maintain Environmental Qualification of Standby Liquid Control Tank Level

Instrument

Cornerstone Significance/Severity Cross-Cutting Report

Aspect Section

Mitigating Green None 71111.15

Systems Severity Level IV

NCV 05000458/2023001-04

Open/Closed

The inspectors identified a Green finding and associated non-cited violation of Title 10 of the

Code of Federal Regulations 50.49(b)(3) with a traditional enforcement aspect for a violation

of Title 10 of the Code of Federal Regulations 50.59 when the licensee failed to maintain

environmental qualification of a level instrument. Specifically, starting in 2010, the licensee

failed to maintain the environmental qualification requirements for the standby liquid control

tank level instrument, a class 1E instrument required to be qualified by regulatory guide 1.97,

after incorrectly removing it from their environmental qualification program without prior NRC

approval. The inspectors additionally identified a traditional enforcement aspect to this finding

as a Severity Level IV non-cited violation of Title 10 of the Code of Federal Regulations

50.59(c)(2)(ii), Changes, Tests and Experiments, when the licensee failed to obtain a license

amendment prior to implementing a proposed change which resulted in more than a minimal

increase in the likelihood of occurrence of a malfunction of a structure, system, or component.

Failure to Obtain a License Amendment Prior to Implementing a Proposed Change

Cornerstone Severity Cross-Cutting Report

Aspect Section

Not Applicable Severity Level IV Not Applicable 71111.18

NCV 05000458/2023001-05

Open/Closed

The inspectors identified a Severity Level IV non-cited violation of Title 10 of the Code of

Federal Regulations 50.59(c)(2)(viii), Changes, Tests and Experiments, when the licensee

did not obtain a license amendment prior to implementing a proposed change which resulted

in a departure from a method of evaluation described in the updated safety analysis report

used in establishing the design basis. Specifically, the licensee changed the method for

establishing the design basis of the standby diesel generator air start system capacity from

eight starts of which five are 10-second starts to five starts with no specified time. This method

departed from the approved method described in the standard review plan and was

implemented without agency approval.

Additional Tracking Items

Type Issue Number Title Report Section Status

licensee 05000458/2022-002-00 Condition Prohibited by 71153 Closed

event Technical Specifications due

reports to Reactor Scram and

(LER) Turbine Trip Level 8 Trip

Setpoint Deviation

3

PLANT STATUS

River Bend Station began the inspection period at approximately 79 percent of rated thermal

power due to a coastdown to a scheduled refueling outage. Power continued to drift down for

the first half of the quarter. On February 11, 2023, where at approximately 71 percent of rated

thermal power, the licensee shut the plant down for the scheduled refueling outage. The mode

switch was taken to shut down at 0200 on February 11, 2023, and the unit remained shut down

for the remainder of the quarter.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

appendix D, Plant Status, observed risk significant activities, and completed on-site portions of

IPs. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission rules

and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to

the onset of seasonal cold temperatures on March 1, 2023, for the following systems:

service water system

standby service water system

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) diesel generator starting system on February 9, 2023

(2) reactor plant component cooling water on March 13, 2023

(3) standby service water system on March 13, 2023

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the

alternate decay heat removal system on March 13, 2023.

4

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1) residual heat removal pump B room, fire area AB-3, on February 3, 2023

(2) division 2 emergency diesel generator, fire area DG-4/Z-1, on February 3, 2023

(3) hydraulic control unit area east, fire area RC-3/Z-3, on March 28, 2023

(4) hydraulic control unit area west, fire area RC-4/Z-3, on March 28, 2023

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the on-site fire brigade training and performance during an

unannounced fire drill on February 1, 2023.

71111.08G - Inservice Inspection Activities (BWR)

BWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding

Activities (IP Section 03.01) (1 Sample)

(1) The inspectors verified that the reactor coolant system boundary, reactor vessel

internals, risk significant piping system boundaries, and containment boundary are

appropriately monitored for degradation and that repairs and replacements were

appropriately fabricated, examined, and accepted by reviewing the following activities

from February 27, 2023, to March 9, 2023:

03.01.a - Nondestructive Examination and Welding Activities.

radiographic examination, reactor coolant system, E51-MOVFO63, XI-FW02,

pipe to valve

radiographic examination, reactor coolant system, E51-MOVFO63, XI-FW03,

valve to pipe

ultrasonic examination, reactor coolant system, E51-MOVFO63, XI-FW03,

valve to pipe

ultrasonic examination, high pressure core spray, CSH-041-CD-A, pipe to

valve

ultrasonic thickness examination, reactor water cleanup, 3-inch diameter

45-degree elbow - This component had a relevant indication that was

evaluated as satisfactory for one cycle.

ultrasonic thickness examination, reactor water cleanup, 4-inch diameter

90-degree elbow

magnetic particle examination, residual heat removal, RHS-014-CD-A, pipe to

trunnion

visual test-1, jet pump 05-06 riser brace, RB-2b

visual test-1, steam dryer supports, SDSB 33, SDSB 90, SDSB 213, SDSB

270, SDSB 326

visual test-1, residual heat removal, RHS-045-CD-B, welded attachment

5

visual test-3, residual heat removal, RHS-PSA-2067-A2, pipe support-anchor

weld package for E51-MOVFO63, XI-FW02 and XI-FW003

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the control

room during shutdown on February 10, 2023.

(2) The inspectors observed and evaluated licensed operator performance in the control

room during cooldown on February 11, 2023.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1) emergent work controls for temporary repair of offsite power line on February 3, 2023

(2) elevated risk during work on containment unit cooler HVR-UC1B on March 13, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1) operability of transmitter E31-PDTN084B on January 17, 2023 (CR-RBS-2023-00097)

(2) operability of dryer support bracket on March 13, 2023 (CR-RBS-2023-01469)

(3) operability of standby liquid control tank level on March 21, 2023 (CR-RBS-2022-

06167)

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Engineering Change (EC) 93806, revise diesel air starting requirements, on February

24, 2023

6

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1) (Partial)

The inspectors evaluated refueling outage RF-22 activities from February 11, 2023, to

March 31, 2023. The inspectors completed inspection procedure 71111.20,

sections 3.01.a and 3.01.b.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system

operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (1 Sample)

(1) work order 589995, replacement of E31-N623B temperature switch, on February 24,

2023

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) STP-207-4241, revision 15, RCIC Equipment Room Ambient Temperature High

Channel Calibration and LSFT, on February 3, 2023

(2) STP-309-0602, revision 54, DIV II ECCS TEST, on March 13, 2023

(3) STP-256-6305, revision 14, Div I SSW Quarterly Valve Operability Test, on

March 13, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) STP-256-6610, revision 303, Div II 2 Year Position Indication Verification Test, on

March 7, 2023

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (1 Sample)

(1) January 1, 2022, through December 31, 2022

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

(1) January 1, 2022, through December 31, 2022

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) January 1, 2022, through December 31, 2022

7

71152A - Annual Follow-up Problem Identification and Resolution

Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)

The inspectors reviewed the licensee's implementation of its corrective action program

related to the following issue:

(1) load shed circuit information in the updated safety analysis report on February 6,

2023 (CR-RBS-2021-07166)

71153 - Follow Up of Events and Notices of Enforcement Discretion

Event Report (IP Section 03.02) (1 Sample)

The inspectors evaluated the following LERs:

LER 05000458/2022-002-00, Condition Prohibited by Technical Specifications due to

Reactor Scram and Turbine Trip Level 8 Trip Setpoint Deviation (ADAMS Accession

No. ML22160A397)

The inspection conclusions associated with this LER are documented in this report under

inspection results section 71153. This LER is closed.

INSPECTION RESULTS

Failure to Ensure Adequate Design of the Diesel Generator Starting System

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green None 71111.04

Systems NCV 05000458/2023001-01

Open/Closed

The inspectors identified a Green finding and associated non-cited violation of Title 10 of the

Code of Federal Regulations Part 50, appendix B, criterion III, Design Control, with two

examples, when the licensee failed to ensure that the design basis was correctly translated

into specifications, drawings, procedures, and instructions. Specifically, the licensee failed to

ensure that the minimum required pressure in both the standby and the high pressure core

spray diesel generator starting air receivers, all safety-related components to which

appendix B applies, were suitably designed to meet the required number and timing of

consecutive starts as described in the updated safety analysis report under the most adverse

design conditions.

Description: While performing an inspection on the alignment and configuration of diesel

generator starting air systems, the inspectors attempted to verify that the starting air receivers

had sufficient air pressure to meet the design requirements as specified in the licensing

basis. The inspectors determined that the standby diesel generators, consisting of the

division 1 and division 2 diesel generators, has four air receivers grouped into two banks, with

a minimum air pressure of 160 psig. The high pressure core spray (HPCS) diesel generator

has two air receivers grouped into two banks, with a minimum air pressure of 200 psig. Each

bank was part of a redundant diesel generator starting system train such that each of the

three diesel generators could start with either of the two starting system trains. The inspectors

requested the design basis for the minimum required pressure.

8

The licensees updated safety analysis report (USAR), section 9.5.6.1, Design Bases,

specified the following design requirements for the standby and HPCS diesel generator

starting systems:

Each redundant DGSS train is capable of providing the standby diesel

generator with eight starts (five of them are 10 sec starts) from two air

receivers without recharging the associated air receivers.

The HPCS diesel generator air start subsystem has sufficient capacity to

accelerate the diesel generator from standby conditions to operating

speed within 10 seconds five times without recharging. Either the forward

or rear air start subsystem has the capacity to satisfy these multiple start

requirements when initially charged to 200 psig.

The inspectors determined that the licensee had not used any calculational methods to

demonstrate that the receiver air pressures met the design basis requirements. Instead, the

licensee relied on preoperational testing to demonstrate the adequacy of the receivers. The

inspectors reviewed the preoperational testing data for the standby and HPCS diesel

generators.

Example 1: Standby Diesel Generators

The inspectors found that the preoperational test data for the standby diesel generators did

not demonstrate the ability to perform eight starts, five of them 10-second starts, from each

air bank if the air receivers were at the minimum air pressure of 160 psig. The inspectors

determined that the preoperational testing consisted of eight starts, none of which were

timed, from a pressure of approximately 250 psig. The inspectors noted that the licensee

recorded that the fourth start was from a pressure of 160 psig for division 1 and from a

pressure of 165 psig for division 2. The inspectors identified multiple issues with using that

data. First, the fourth start on division 2 was from a pressure above 160 psig. Next, the

inspectors noted that the licensee only recorded pressure on one of two receivers of only one

of two banks. The inspectors concluded that the licensee had not demonstrated that the other

receiver was not at a higher pressure which could invalidate the test data. Additionally, the

licensee had not demonstrated the second starting system train on either division could also

perform the required starts. Furthermore, the inspectors noted that the test data used the

pressure as read on the mechanical gauges. The licensees surveillance procedure to verify

the pressure was maintained above technical specification limits also used the pressure as

read on the gauges. The inspectors reviewed the specifications for the gauges and

determined that the instruments had a calibration tolerance of plus or minus 4 psig. The

inspectors concluded that if both receivers in a bank read 160 psig, the actual pressure could

be as low as 156 psig.

The inspectors also reviewed additional test data that the licensee considered relevant. The

inspectors determined that in 1992 the licensee had performed additional starts from

approximately 160 psig that were timed. The inspectors noted that in these tests, the licensee

performed a single timed start from one of the two air banks with the pressures on all

receivers recorded. The inspectors determined that the licensee started the division 1 diesel

in 8.49 seconds from a starting pressure of 165 psig in receiver 1A and 160 psig in

receiver 1C. The licensee did not account for instrument tolerance which meant the 1C

receiver could have had an actual pressure as high as 169 psig if the instrument was

9

calibrated. The inspectors also determined that the licensee started the division 2 diesel in

9.75 seconds from a starting pressure of 161 psig in receiver 1B and 160 psig in

receiver 1D. The inspectors noted that the 1B receiver could have been as high as 165 psig if

the instrument was calibrated.

Overall, the inspectors concluded that the licensee failed to demonstrate the ability to perform

eight starts, including five 10-second starts, from the lowest pressure that could exist under

design conditions, specifically a pressure of 156 psig in both receivers of either air bank. The

inspectors determined that the licensee failed to: (a) ensure the test data accounted for the

lowest possible air pressure, (b) ensure that both air banks were verified to meet design

requirements, (c) account for instrument error or calibration tolerances, and (d) ensure the

required starts could be performed within the design start times.

The inspectors noted that, after the inspectors raised the above concerns, the licensee made

a change to their licensing basis. The licensee removed the requirement to perform eight

starts and removed the requirement for the five starts to be 10-second starts. The inspectors

documented a separate violation of Title 10 of the Code of Federal Regulations

(10 CFR) 50.59 for this change.

Example 2: HPCS Diesel Generator

The inspectors found that the preoperational test data for the HPCS diesel generators did not

demonstrate the ability to perform five 13-second starts from each air receiver if the air

receivers were at the minimum air pressure of 200 psig. The inspectors noted that the

licensee had submitted license amendment 63 in 1991, which was subsequently approved, to

increase the required start time for the HPCS diesel generator from 10 seconds to

13 seconds. Section 9.5.6 of the USAR still states a design requirement for five 10-second

starts, but the inspectors reviewed the test data in consideration of the 13 second

requirement. The inspectors documented a separate violation of 10 CFR 50.71.e for the

failure to update the USAR.

The inspectors determined that the preoperational testing consisted of five timed starts from a

pressure of approximately 200 psig on receiver 1B and from approximately 225 psig on

receiver 1A. The inspectors identified multiple issues with using that data. First, the first start

on receiver 1A was from a pressure above 200 psig. Next, the inspectors noted that the test

data used the pressure as read on the mechanical gauges. The licensees surveillance

procedure to verify the pressure was maintained above technical specification limits also

used the pressure as read on the gauges. The inspectors reviewed the specifications for the

gauges and determined that the instruments had a calibration tolerance of plus or minus

6 psig. The inspectors concluded that if each receiver read 200 psig, the actual pressure

could be as low as 194 psig.

Overall, the inspectors concluded that the licensee failed to demonstrate the ability to perform

five 13-second starts, from the lowest pressure that could exist under design conditions,

specifically a pressure of 194 psig in either air bank. The inspectors determined that the

licensee failed to: (a) ensure the test data accounted for the lowest possible air pressure in

either air receiver, and (b) account for instrument error or calibration tolerances.

Corrective Action(s): The licensee entered this issue into their corrective action program.

Corrective Action Reference(s): CR-RBS-2022-02739 and CR-RBS-2023-03301

10

Performance Assessment:

Performance Deficiency: The inspectors determined that the failure to ensure the design

basis was correctly translated into specifications, drawings, procedures, and instructions was

a performance deficiency. Specifically, the licensee failed to ensure the design basis for the

standby and HPCS diesel generator starting system air receivers was correctly translated into

appropriate calculations or test procedures.

Screening: The inspectors determined the performance deficiency was more than minor

because it was associated with the Design Control attribute of the Mitigating Systems

cornerstone and adversely affected the cornerstone objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent undesirable

consequences. Specifically, the performance deficiency resulted in the standby and HPCS

diesel generator starting systems failing to meet design requirements for multiple starts.

Significance: The inspectors assessed the significance of the finding using IMC 0609,

appendix A, The Significance Determination Process (SDP) for Findings At-Power. Using

exhibit 2, Mitigating System Screening Questions, the inspectors determined that the finding

is a deficiency affecting the design or qualification of a mitigating structure, system, or

component (SSC), but the SSC maintained its operability and probabilistic risk assessment

functionality and was of very low safety significance (Green).

Cross-Cutting Aspect: No cross-cutting aspect was assigned to this finding because the

inspectors determined the finding did not reflect present licensee performance.

Enforcement:

Violation: Title 10 CFR Part 50, appendix B, criterion III, Design Control, requires in part,

that for those SSCs to which this appendix applies, measures shall be established to ensure

that the design basis is correctly translated into specifications, drawings, procedures, and

instructions.

Contrary to the above, from initial construction until March 2023, for quality -related

components associated with the standby and HPCS diesel generator starting systems to

which 10 CFR Part 50, appendix B applies, the licensee failed to ensure that the design basis

was correctly translated into specifications, drawings, procedures, and instructions.

Specifically, the licensee failed to ensure that the design basis for the standby and HPCS

diesel generator air receivers was demonstrated, through appropriate testing or calculational

methods, to ensure the ability to perform five 10-second starts from either subsystem from

the lowest possible air pressure under the most adverse design conditions.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

section 2.3.2 of the Enforcement Policy.

Failure to Maintain Accurate Information in the Updated Safety Analysis Report

Cornerstone Severity Cross-Cutting Report

Aspect Section

Not Severity Level IV Not 71111.04

Applicable NCV 05000458/2023001-02 Applicable

Open/Closed

The inspectors identified a Severity Level IV non-cited violation of Title 10 of the Code of

11

Federal Regulations 50.71(e) when the licensee failed to update the updated safety analysis

report to assure that the information included in the report contains the latest information

developed. Specifically, the licensee failed to ensure that the design capacity of the HPCS

diesel generator air start system was updated to reflect a change to the diesel engine start

time requirement.

Description: During a review of the diesel generator air start system, the inspectors identified

that the design capacity of the starting air banks for the HPCS diesel generator was

described in the USAR as capable of starting the HPCS diesel generator five times, each

within 10 seconds.

Specifically, section 9.5.6 of the USAR states:

The HPCS diesel generator air start subsystem has sufficient capacity to

accelerate the diesel generator from standby conditions to operating

speed within 10 seconds five times without recharging. Either the forward

or rear air start subsystem has the capacity to satisfy these multiple start

requirements when initially charged to 200 psig.

The inspectors reviewed the preoperational testing for the HPCS diesel generator and

determined that the testing did not demonstrate five starts from the minimum pressure were

within 10 seconds. Instead, the testing demonstrated that following the first start from the

minimum allowed pressure, multiple subsequent starts exceeded 10 seconds. The inspectors

asked the licensee how they were meeting the design requirement in the USAR.

In 1991, the licensee submitted a license amendment request that extended the allowed start

time for the HPCS diesel generator from 10 seconds to 13 seconds. The amendment was

approved by the NRC; however, the licensee failed to update the design capacity of the air

start system as described in the USAR.

The inspectors determined that the description in the USAR was not accurate because the

actual capacity, as amended, was not described in the USAR.

Corrective Action(s): The licensee entered this issue into their corrective action program.

Corrective Action Reference(s): CR-RBS-2023-00875

Performance Assessment: The inspectors determined this violation was associated with a

minor performance deficiency.

Enforcement: The Reactor Oversight Process SDP does not specifically consider the

regulatory process impact in its assessment of licensee performance. Therefore, it is

necessary to address this violation which impedes the NRCs ability to regulate using

traditional enforcement to adequately deter noncompliance.

Severity: Because this performance deficiency had the potential to impact the NRCs ability to

perform its regulatory function, it is necessary to address this violation using traditional

enforcement to adequately deter noncompliance. Using the NRC Enforcement Policy, dated

January 13, 2023, the violation was determined to be Severity Level IV in accordance with

section 6.1.d.3 because the lack of up-to-date information in the USAR had not resulted in

any unacceptable changes to the facility or procedures that resulted in a low -to -moderate or

greater safety significance.

Violation: Title 10 CFR 50.71(e), requires in part, that licensees shall update periodically, as

12

provided in paragraphs (e)(3) and (4) of 10 CFR 50.71, the USAR, originally submitted as

part of the application for the license, to assure that the information included in the report

contains the latest information developed.

Contrary to the above, from January 1992 through March 2023, the licensee failed to update

the USAR to assure that the information included in the report contains the latest information

developed. Specifically, USAR, section 9.5, did not contain accurate information about the

HPCS diesel generator starting system.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

section 2.3.2 of the Enforcement Policy.

Failure to Mitigate Risk During Containment Unit Cooler Maintenance

Cornerstone Significance Cross-Cutting Report

Aspect Section

Mitigating Green [H.8] - 71111.13

Systems NCV 05000458/2023001-03 Procedure

Open/Closed Adherence

The inspectors identified a Green finding and associated non-cited violation of Title 10 of the

Code of Federal Regulations 50.65(a)(4) for failing to manage an increase in risk from

maintenance activities. Specifically, on December 14, 2022, the licensee failed to manage the

increase in risk from planned maintenance on the division 2 containment unit cooler.

Description: The inspectors identified one example of maintenance activities that were

assessed as placing the plant in an elevated risk category but were not appropriately

managed in accordance with industry guidance and approved licensee procedures.

On December 14, 2022, the licensee was performing Procedure STP-410-6304, revision 004,

Division II Chilled Water System Quarterly Valve Operability Test. This makes containment

unit cooler 1B unavailable and places the plant in a yellow risk condition.

During a control room tour, the inspectors noticed that containment unit cooler 1A was not

protected. The inspectors reviewed Procedure EN-OP-119, revision 16, Protected

Equipment Postings, and noted that section 5.2.4 states, When the loss of the redundant

component or system would result in a TS action statement that requires an immediate plant

shutdown (24 hrs or less) and not performing a surveillance that meets the requirements of

step 5.2.9 then protect the component or system.

The inspectors determined that the licensee met the conditions in this section of

procedure EN-OP-119 that would require them to protect the division 1 containment unit

cooler 1A, since loss of the unit cooler 1A would result in a shutdown action statement of

20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />. The licensee failed to take the prescribed risk mitigating actions (RMAs) until

questioned by the inspectors.

Corrective Action(s): The licensee entered this issue into their corrective action program.

Corrective Action Reference(s): CR-RBS-2023-03302.

Performance Assessment:

Performance Deficiency: Title 10 CFR 50.65(a)(4) requires the licensee to assess and

manage the increase in risk that may result from maintenance activities before performing

13

them. The inspectors determined that during the maintenance on containment unit cooler 1B

system, the licensee failed to assess and manage the increase in risk for maintenance

activities by taking required RMAs and was therefore a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor

because it was associated with the Equipment Performance attribute of the Mitigating

Systems cornerstone and adversely affected the cornerstone objective to ensure the

availability, reliability, and capability of systems that respond to initiating events to prevent

undesirable consequences. Specifically, the failure to protect the redundant train of

containment unit cooler adversely affected the Mitigating Systems cornerstone because it

increased the likelihood that other Mitigating Systems could be affected.

Significance: The inspectors assessed the significance of the finding using IMC 0609,

appendix K, Maintenance Risk Assessment and Risk Management SDP. The inspectors

requested that the licensee perform a risk assessment of the specific configurations of both

conditions. In their assessments, the licensee estimated the risk deficits and incremental core

damage probabilities for each condition were less than 1.0E-6. A regional senior reactor

analyst independently reviewed the licensees assessments and confirmed the licensees risk

estimates. The inspectors applied this information to the flowcharts in appendix K to

determine this finding had very low safety significance (Green).

Cross-Cutting Aspect: H.8 - Procedure Adherence: Individuals follow processes, procedures,

and work instructions. Specifically, the licensee failed to follow their risk management

procedure and perform required RMAs.

Enforcement:

Violation: Title 10 CFR 50.65(a)(4) requires the licensee to assess and manage the increase

in risk that may result from maintenance activities.

Contrary to the above, on December 14, 2022, the licensee failed to assess and manage the

increase in risk before performing maintenance activities. Specifically, the licensee failed to

implement appropriate RMAs to manage the increase in risk that resulted from maintenance

on the containment unit cooler 1B system.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

section 2.3.2 of the Enforcement Policy.

Failure to Maintain Environmental Qualification of Standby Liquid Control Tank Level

Instrument

Cornerstone Significance/Severity Cross-Cutting Report

Aspect Section

Mitigating Green None 71111.15

Systems Severity Level IV

NCV 05000458/2023001-04

Open/Closed

The inspectors identified a Green finding and associated Severity Level IV non-cited violation

of Title 10 of the Code of Federal Regulations 50.49(b)(3) with a traditional enforcement

aspect for a violation of Title 10 of the Code of Federal Regulations 50.59 when the licensee

failed to maintain environmental qualification of a level instrument. Specifically, starting in

2010, the licensee failed to maintain the environmental qualification requirements for the

14

standby liquid control tank level instrument, a class 1E instrument required to be qualified by

regulatory guide 1.97, after incorrectly removing it from their environmental qualification

program without prior NRC approval. The inspectors additionally identified a traditional

enforcement aspect to this finding as a Severity Level IV non-cited violation of Title 10 of the

Code of Federal Regulations 50.59(c)(2)(ii), Changes, Tests and Experiments, when the

licensee failed to obtain a license amendment prior to implementing a proposed change

which resulted in more than a minimal increase in the likelihood of occurrence of a

malfunction of a structure, system, or component.

Description: On October 25, 2022, while reviewing condition reports (CRs), the inspectors

noted that CR-RBS-2022-06167 documented spurious standby liquid control (SLC) tank level

hi/low alarms on panel P601-19A-H06 in the control room. The SLC system is manually

initiated from the main control room, as directed by the emergency operating procedures, if

the operator believes the reactor cannot be shut down or kept shut down with the control

rods. This system injects borated water into the core to compensate for positive reactivity

effects that could occur during operation. The solution is stored in the SLC tank common to

both trains of SLC. The tank maintains the solution at specific temperature ranges and

chemistry technicians ensure the concentration of the sodium pentaborate solution is within

specification and normally contains around 4,000 gallons. While reviewing this CR for

operability, the inspectors discovered that the tank level instrument, C41-LTN001, was listed

in the USAR in table 7.5-2, number 34 as a category 2 variable type D instrument in

accordance with regulatory guide 1.97, which provides guidance on instrumentation for

post-accident monitoring. Regulatory guide 1.97, regulatory position C.1, specifies that

category 2 equipment should be qualified in accordance with regulatory guide 1.89,

Qualification for Class 1E Equipment for Nuclear Power Plants.

The inspectors found that the site did not have C41-LTN001 listed in its environmental

qualification (EQ) equipment lists. Further review showed that in 2010, under EC-22498, the

licensee incorrectly removed LTN001 from the EQ master list and stopped maintaining its

environmental qualification. The licensee believed that because the instrument did not

provide a safety function that it did not need to be environmentally qualified. However,

correspondence between the licensee and the NRC in 1985 regarding the station's safety

evaluation report states that the instrument would meet the requirements of regulatory guide

1.97. This requirement is still reflected in the licensees USAR, but the licensee did not

maintain that qualification. The failure to ensure the instrument is environmentally qualified is

a violation of 10 CFR 50.49(b)(3).

The inspectors discovered that EC-22498 did not contain a process applicability

determination (PAD) screening contrary to licensee procedure EN-DC-210, revision 1,

section 5.2.11, which states that any EQ downgrade requires a PAD. This PAD process

drives the licensee to do a 50.59 screening. Removing an instrument from the EQ program

results in a more than minimal increase in the likelihood of occurrence of a malfunction of an

SSC important to safety previously evaluated in the USAR and therefore requires prior NRC

approval.

Corrective Action(s): The licensee entered this issue into their corrective action program.

Corrective Action Reference(s): CR-RBS-2022-07295

15

Performance Assessment:

Performance Deficiency: The inspectors determined that the failure of the licensee to ensure

the components in the plant listed in their USAR as EQ are maintained as EQ is a

performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor

because it was associated with the Configuration Control attribute of the Mitigating Systems

cornerstone and adversely affected the cornerstone objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent undesirable

consequences. Specifically, the failure to maintain the SLC tank level instrument in the EQ

program degraded the Configuration Control attribute of the Mitigating Systems cornerstone.

Significance: The inspectors assessed the significance of the finding using IMC 0609,

appendix A, The SDP for Findings At-Power. Using Exhibit 2 - Mitigating Systems

Screening Questions, the inspectors determined this finding to be of very low safety

significance (Green) because it was a deficiency affecting the design or qualification of

equipment, but the equipment maintained its probability risk assessment functionality.

Cross-Cutting Aspect: No cross-cutting aspect was assigned to this finding because the

inspectors determined the finding did not reflect present licensee performance.

Enforcement: The Reactor Oversight Process SDP does not specifically consider the

regulatory process impact in its assessment of licensee performance. Therefore, it is

necessary to address this violation which impedes the NRCs ability to regulate using

traditional enforcement to adequately deter noncompliance.

Severity: The inspectors assessed the severity level using the NRC Enforcement Policy,

dated January 13, 2023, section 6.1.d.2 and determined that the violation was Severity

Level IV because it was a violation of 10 CFR 50.59 that resulted in conditions evaluated as

having very low safety significance (Green) by the SDP.

Violation: Title 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to

Safety for Nuclear Power Plants, requires in part, that a licensee establish a program for the

EQ of electric equipment important to safety. Title 10 CFR 50.49(b)(3) states that certain

post-accident monitoring equipment is required to be covered under this program.

Specifically, the applicable note four on this part states that specific guidance concerning the

types of variables to be monitored is provided in revision 2 of regulatory guide 1.97.

Revision 2 of regulatory guide 1.97 states that the SLC tank level instrument is category 2

variable D equipment, which is consistent with how the component is described in the

licensee USAR. Title 10 CFR 50.59(c)(2)(ii), states in part, that a licensee shall obtain a

license amendment pursuant to 10 CFR 50.90 prior to implementing a proposed change that

would result in a more than minimal increase in the likelihood of occurrence of a malfunction

of an SSC important to safety previously evaluated in the USAR.

Contrary to the above, since May of 2010, the licensee failed to maintain the EQ

requirements on 10 CFR 50.49 for C41-LTN001, SLC tank level instrument, when they used

EC-22498 to remove the level instrument from the EQ program without a license amendment,

thus resulting in a more than minimal increase in the likelihood of occurrence of a malfunction

of an SSC important to safety.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

16

section 2.3.2 of the Enforcement Policy.

Failure to Obtain a License Amendment Prior to Implementing a Proposed Change

Cornerstone Severity Cross-Cutting Report

Aspect Section

Not Severity Level IV Not 71111.18

Applicable NCV 05000458/2023001-05 Applicable

Open/Closed

The inspectors identified a Severity Level IV non-cited violation of Title 10 of the Code of

Federal Regulations 50.59(c)(2)(viii), Changes, Tests and Experiments, when the licensee

did not obtain a license amendment prior to implementing a proposed change which resulted

in a departure from a method of evaluation described in the USAR used in establishing the

design basis. Specifically, the licensee changed the method for establishing the design basis

of the standby diesel generator air start system capacity from eight starts of which five are 10-

second starts to five starts with no specified time. This method departed from the approved

method described in the standard review plan and was implemented without agency

approval.

Description: The inspectors performed a walkdown and review of the standby diesel

generator air start system. As part of the review, the inspectors reviewed the design basis for

the diesel air start receiver setpoints. The inspectors found that the design basis for the

standby diesel generator air receivers was based on performing eight consecutive starts, five

of which are 10-second starts, without recharging the receivers. The inspectors then

requested the documentation showing that the design basis was met.

The licensee used preoperational testing in lieu of a calculation to show the receivers had

adequate capacity at the minimum allowable pressure of 160 psig. The inspectors found that

the test data did not show the capability to perform eight starts, of which five were 10-second

starts, because the licensee failed to measure the time of the starts. The licensee stated their

belief that the 10-second start requirement was not accurate and that they were not required

to be capable of performing five 10-second starts. The inspectors disagreed but continued to

inspect the design basis of the standby diesel generator air receivers by conferring with

personnel in the Office of Nuclear Reactor Regulation.

While the inspectors were researching the licensing basis for the River Bend diesel

generators, the licensee issued EC-93806 to modify USAR section 9.5.6.1.5 to replace the

original design basis of the diesel generator air start system with a revised design basis.

The original design basis stated:

Each redundant DGSS train is capable of providing the standby diesel

generator with eight starts (five of them are 10 sec starts) from two air

receivers without recharging the associated air receivers.

The revised design basis stated:

Each redundant DGSS train is capable of providing the standby diesel

generator with five consecutive starts from two air receivers without

recharging the associated air receivers.

The standard review plan in NUREG-0800, SRP 9.5.6, revision 2, section II.4.g, states:

17

As a minimum, the air starting system should be capable of cranking a

cold diesel engine five times without recharging the receiver(s). The air

starting system capacity should be determined as follows: (1) each

cranking cycle duration should be approximately 3 seconds; (2) consist of

two to three engine revolutions; or (3) air start requirements per engine

start provided by the engine manufacturer; whichever air start

requirement is larger.

In the licensees evaluation of the EC, the licensee stated that they closely matched

criteria (1) or (2) but did not address whether they met criterion (3). The inspectors

determined that criterion (3), which was determined based on the design specification of the

diesel, was 10 seconds. Because the licensee had specified that value in the USAR, the

inspectors determined that was the method used to establish the design basis.

Because the removal of the requirement to perform five 10-second starts departed from the

method of evaluation described in the USAR, the inspectors determined that this change

required agency approval to implement it. The licensee issued this EC on September 22,

2022, without obtaining agency approval.

Corrective Action(s): The licensee entered this issue into their correction action program.

Corrective Action Reference(s): CR-RBS-2023-03307

Performance Assessment: The inspectors determined this violation was associated with a

minor performance deficiency. The licensee did not obtain a license amendment prior to

implementing a change to the facility in accordance with 10 CFR 50.59(c)(2)(viii) for a change

that resulted in a departure from a method described in the USAR to establish the design

basis but had not made an actual change to the system.

Enforcement: The ROPs SDP does not specifically consider the regulatory process impact in

its assessment of licensee performance. Therefore, it is necessary to address this violation

which impedes the NRCs ability to regulate using traditional enforcement to adequately deter

noncompliance.

Severity: Using the NRC Enforcement Policy, dated January 13, 2023, the violation was

determined to be a Severity Level IV violation in accordance with section 6.1.d.2 because the

change would not result in conditions that would be greater than very low safety significance

by the SDP.

Violation: Title 10 CFR 50.59(c)(2)(viii), Changes, Tests, and Experiments, states in part,

that a licensee shall obtain a license amendment prior to implementing a proposed change

that would result in a departure from a method described in the USAR to establish the design

basis.

Contrary to the above, on September 22, 2022, the licensee implemented a change,

EC-93806, that changed the method of establishing the design basis of the diesel generator

air start system but did not obtain a license amendment prior to implementing the change.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with

section 2.3.2 of the Enforcement Policy.

18

Licensee-Identified Non-Cited Violation 71111.05

This violation of very low safety significance was identified by the licensee, has been entered

into the licensee corrective action program, and is being treated as a non-cited violation,

consistent with section 2.3.2 of the Enforcement Policy.

Violation: The River Bend Station, Unit 1, Renewed Facility Operating License,

section 2.C(10), requires that the licensee implement and maintain in effect all provisions of

the approved fire protection program. The approved fire protection plan requires that hourly

administrative fire watches be conducted when fire doors are opened.

Contrary to the above, between February 11, 2023, and February 13, 2023, required hourly

fire watches were not conducted for door SH113-01.

Significance/Severity: Green. The inspectors assessed the significance of the finding using

IMC 0609, appendix F, Fire Protection and Post - Fire Safe Shutdown SDP. The inspectors

determined the finding was associated with fire confinement and was assigned a high

degradation rating. Using attachment 04, Initial Characterization of Findings, the inspectors

determined the finding was associated with the Mitigating Systems cornerstone. The

inspectors used step 1.4.4 to determine that the finding screened to Green.

The inspectors determined the performance deficiency was more than minor because it was

associated with the Protection Against External Factors attribute of the Mitigating Systems

cornerstone and adversely affected the cornerstone objective to ensure the availability,

reliability, and capability of systems that respond to initiating events to prevent undesirable

consequences. Specifically, the finding represented a loss of compensatory measures

needed for open fire barriers.

Corrective Action Reference(s): CR-RBS-2023-01049

Licensee-Identified Non-Cited Violation 71153

This violation of very low safety significance was identified by the licensee, has been entered

into the licensee corrective action program, and is being treated as a non-cited violation,

consistent with section 2.3.2 of the Enforcement Policy.

Violation: Title 10 CFR Part 50, appendix B, criterion III, Design Control, requires in part,

that measures include provisions to assure that the design basis is correctly translated into

specifications, drawings, procedures, and instructions.

Technical specification limiting condition for operation (LCO) 3.2.2 requires all minimum

critical power ratios (MCPRs) shall be greater than or equal to the MCPR operating limits

specified in the core operating limits report when thermal power is greater than or equal to

23.8 percent of rated thermal power. LCO 3.2.2, condition A, states that if any MCPR is not

within limits, restore the MCPRs to within limits in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. LCO 3.2.2, condition B, states that

if the required action and associated completion time of condition A is not met, reduce

thermal power to below 23.8 percent of rated thermal power in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Contrary to the above, prior to July 2021, for the quality-related components associated with

the reactor protection system, to which 10 CFR Part 50, appendix B applies, the licensee

failed to assure that the design basis for the reactor protection system was correctly

translated into specifications, drawings, procedures, and instructions. Specifically, the design

basis of the high reactor water level scram function required the high reactor water level

reactor scram to occur prior to or simultaneously with the high reactor water level turbine trip,

and the licensee failed to ensure the trip setpoints were set at appropriate values to meet that

requirement. The licensee identified this issue during a review of fleet CRs and implemented

19

interim compensatory measures to maintain MCPRs within allowable limits in accordance

with technical specification 3.2.2. The licensee subsequently determined that on multiple

occasions between July 15, 2018, and July 15, 2021, they failed to meet the MCPR operating

limits specified in the core operating limits report as required by technical specification 3.2.2.

Additionally, because the licensee was not aware of the failure to meet MCPR operating limits

during the units operation cycles, the required actions of LCO 3.2.2 conditions A and B were

not met.

Significance/Severity: Green. The inspectors assessed the significance of the finding using

appendix A, The SDP for Findings At-Power. Using exhibit 2, Mitigating Systems Screening

Questions, the finding was screened as very low safety significance (Green) because the

finding affected a single reactor protection system trip signal to initiate a reactor scram but did

not affect the function of other redundant trips or diverse methods of reactor shutdown.

Corrective Action Reference(s): CR-RBS-2021-04827 and CR-RBS-2022-02220

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 15, 2023, the inspectors presented the inservice inspection results to

Robert Franssen, Acting Site Vice President, and other members of the licensee staff.

On April 4, 2023, the inspectors presented the integrated inspection results to

Robert Franssen, Acting Site Vice President, and other members of the licensee staff.

20

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Procedures AOP-0029 Severe Weather Operation 47

71111.04 Corrective Action CR-RBS- 1995-00335, 1995-00339, 2022-02739

Documents

71111.04 Miscellaneous 1-PT-309-1 Standby Diesel Generator 1EGS-EG1A 09/18/1984

71111.04 Miscellaneous 1-PT-309-2 Standby Diesel Generator 1EGS-EG1B 12/04/1984

71111.04 Miscellaneous 1-PT-309-3 Diesel Generator 1EGS-EG1C 02/17/1985

71111.04 Miscellaneous 1.ILCSH.001 High Pressure Core Spray 4

71111.04 Miscellaneous 1.ILEGA.001 Generator Emergency Air Compressor Diesel Starting Air 2

71111.04 Miscellaneous ER-98-0519-ERT- Division I Diesel Generator Low Starting Air Pressure Lockout 2

01 Control Logic Modification

71111.04 Miscellaneous ER-98-0519-ERT- Division II Diesel Generator Low Starting Air Pressure Lockout 1

02 Control Logic Modification

71111.04 Procedures SOP-0016 Reactor Plant Component Cooling Water System 056

71111.04 Procedures SOP-0031 Residual Heat Removal (SYS #204) 344

71111.04 Procedures SOP-0042 Standby Service Water System 52

71111.04 Procedures SOP-0140 Suppression Pool Cleanup and Alternate Decay Heat 041

Removal (SYS #656)

71111.04 Work Orders WO 152401, 152402

71111.05 Fire Plans RB-114-004 HCU Area East RC-3/Z-3 3

71111.05 Fire Plans RB-114-005 HCU Area West RC-4/Z-3 2

71111.08G Calculations 10630932 Code Case N-513-4 Evaluation of Thinned RHR Drain Line 0

71111.08G Calculations G13.18.10.2*143 Determination of Acceptable Minimum Wall Thickness of 1

Piping Components Affected by Erosion/Corrosion

71111.08G Corrective Action CR-RBS- 2021-00056, 2021-00099, 2021-00128, 2021-00670, 2021-

Documents 00684, 2021-01056, 2021-01143, 2021-01480, 2021-01546,

2021-01593, 2021-01620, 2021-01801, 2021-01957, 2021-

02263, 2021-02264, 2021-02265, 2021-02266, 2021-02267,

2021-02287, 2021-03389, 2021-03596, 2021-03841, 2021-

03867, 2021-04316, 2021-04784, 2021-04910, 2021-05670,

2021-4585, 2021-05830, 2021-06380, 2021-6001, 2021-

06720, 2021-06812, 2021-06813, 2021-06815, 2021-07210,

2021-07266, 2016-06437, 2022-00378, 2022-00914,

21

Inspection Type Designation Description or Title Revision or

Procedure Date

2022-01005, 2022-01985, 2020-05390, 2020-05304, 2015-

00861, 2015-05418, 2015-04966, 2015-05485, 2022-02021,

2022-02421, 2022-02905, 2020-2680, 2021-2688, 2022-

03162, 2022-04220, 2022-05328, 2022-06180, 2023-01361,

2023-01376, 2023-01469 2023-1698, 2023-1718

71111.08G Corrective Action CR-RBS 2023-01975, 2023-01976, 2023-01979, 2023-2066, 2023-

Documents 2075, 2023-2083, 2023-2610

Resulting from

Inspection

71111.08G Drawings LRA-PID-26-03A Reactor Water Cleanup and Filter 38

71111.08G Engineering EC-56366 Design Of Weld Overlay for RWCU (Reactor Water Clean Up) 1

Changes Per CR-RBS-2015-2131 & 2199 R

71111.08G Engineering EC-89386 SWC Cooling Tower Basin Alternate Make-Up Water Using 1

Changes FPW System

71111.08G Engineering EC-25533 Replacement of Carbon Steel with Chrome Moly Alloy 0

Changes

71111.08G Engineering EC-32627 LDT-WCS Line Designation Table 0

Changes

71111.08G Engineering EC-565260 Replace E51-MOVF063 1/18/2023

Changes

71111.08G Miscellaneous LO-RLO-2019- River Bend Station Self-Assessment Report Inservice 10/26/2020

00075 Inspection (ISI) and Containment Inservice Inspection (CISI)

71111.08G Procedures CEP-COS-0100 Control And Use of Iddeal Concepts Software Entergy Nuclear 3

Engineering Programs

71111.08G Procedures CEP-COS-0110 Control and Use of the Iddeal Software Suite Version 8 311

Schedule Works and Version 9

71111.08G Procedures CEP-NDE-0255 Radiographic Examination ASME, ANSI, AWS, API, AWWA 10

Welds and Components

71111.08G Procedures CEP-NDE-0255 Radiographic Examination ASME, ANSI, AWS, API, AWWA 10

Welds and Components

71111.08G Procedures CEP-NDE-0400 Ultrasonic Examination 9

71111.08G Procedures CEP-NDE-0404 Manual Ultrasonic Examination of Ferritic Piping Welds 9

_ASME XI

71111.08G Procedures CEP-NDE-0407 Straight Beam Ultrasonic Examinations of Bolts and Studs 6

22

Inspection Type Designation Description or Title Revision or

Procedure Date

_ASME Section XI

71111.08G Procedures CEP-NDE-0423 Manual Ultrasonic Examination of Austenitic Piping Welds 9

ASME XI

71111.08G Procedures CEP-NDE-0428 Manual Ultrasonic Through Wall Sizing in Piping Welds 5

ASME XI

71111.08G Procedures CEP-NDE-0429 Ultrasonic Examination- ASME Section XI Appendix III 3

71111.08G Procedures CEP-NDE-0641 Liquid Penetrant Examination _PT_ For ASME Section XI 9

71111.08G Procedures CEP-NDE-0731 Section XI Magnetic Particle Examination _MT 6

71111.08G Procedures CEP-NDE-0901 VT-1 Examination 6

71111.08G Procedures CEP-NDE-0903 VT-3 Examination 8

71111.08G Procedures EN-DC-315 Flow Accelerated Corrosion Program 19

71111.08G Procedures EN-LI-102 Corrective Action Program 48

71111.08G Procedures EN-WM-110 Surveillance Program 2

71111.08G Procedures SEP-ISI-RBS-001 Program Section for ASME Section XI, Division 1 Riverbend 8

Station Inservice Inspection Program

71111.08G Procedures STP-000-6617 Check Valves Tested Per ASME XI Inservice Testing by 9

Disassembly

71111.08G Procedures WPS_CS_1_1_A Welding Procedure Specification 0

71111.08G Procedures WPS_CS_1_1_B Welding Procedure Specification 0

71111.08G Self-Assessments LO-RLO-2019- Inservice Inspection (ISI) and Containment Inservice 10/26/2020

00075 Inspection (CISI)

71111.08G Work Orders WO 52901381, 52900587, 52958382, 00137708, 00529256,

0559861

71111.13 Procedures EN-OP-119 Protected Equipment Postings 016

71111.13 Procedures SOP-0140 Suppression Pool Cleanup and Alternate Decay Heat 041

Removal (SYS #656)

71111.15 Procedures EN-OP-104 Operability Determination Process 018

71111.15 Work Orders WO 00506547

71111.18 Engineering EC-93806 Revise SDC-309 and UFSAR Section 9.5.6.1.5 Air Start 0

Changes Requirements, CR-RBS-2022-02739

71111.18 Miscellaneous SDC-309 Reactor Protection System Design Criteria - Standby Diesel 4

Generator Div I & II, 309

71111.24 Procedures EN-OP-115-09 Maintaining the Station Narrative Log 004

23

Inspection Type Designation Description or Title Revision or

Procedure Date

71153 Corrective Action CR-GGN- 2000-01810

Documents

71153 Corrective Action CR-RBS- 2021-04827, 2022-02220

Documents