March 2, 2022

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR RIVER BEND STATION (REPORT 05000458/2021006)

Dear Mr. Scott:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of River Bend Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2021 through December 31, 2021. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program

- Operations Phase.

The NRC determined the performance at River Bend Station during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2023.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302),

it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission. For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No.

ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet. On January 14, 2022, the NRC issued Inspection Report 05000416/2021010, which documented the completion of a follow-up inspection of Entergys implementation of actions required by the Confirmatory Order (ML22011A099). The inspection documented in that report represents the final completion of the NRCs planned follow-up inspection activities for the Confirmatory Order, and no additional inspections are included in the enclosed inspection plan.

Between October 1, 2020, and September 30, 2021, the NRC issued three Severity Level III traditional enforcement violations associated with willfulness. The Regional Administrator has previously authorized follow-up inspection to be performed using Inspection Procedure 92722, Follow Up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled when you notify the NRC of your readiness.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely, Jeffrey E. Josey, Chief Project Branch C Division of Operating Reactor Safety Docket No. 05000458 License No. NPF-47 Enclosure:

Inspection Plan

/RA/

ML22053A348 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: PJV Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/C C:DORS/C NAME PVossmar JJosey SIGNATURE

/RA/

/RA/

DATE 2/23/22 02/23/2022

07200049 - River Bend (ISFSI)

01/01/2022 - 12/31/2023 Unit Start End Activity CAC Title Staff Count River Bend ISFSI Triennial Loading Inspection (1 week in July)(Part 72)

1 7/1/2022 7/29/2022 IP 60855 001001 Operation Of An ISFSI Prepared on 2/22/2022 1:44:08 PM 1 of 3 Site Inspection Activity Plan

River Bend 01/01/2022 - 12/31/2023 Unit Start End Activity CAC Title Staff Count FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - RB

1 2/28/2022 3/4/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

3/21/2022 3/25/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Power-Operated Valves Inspection - 21N - River Bend Station

1 4/4/2022 4/22/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements River Bend Target Set Review

1 4/18/2022 4/29/2022 IP 71130.14 000743 Review of Power Reactor Target Sets Security Access Control.02

1 5/9/2022 5/13/2022 IP 71130.02 000734 Access Control

5/9/2022 5/13/2022 IP 71130.09 001656 Security Plan Changes

5/9/2022 5/13/2022 IP 71151 001338 Performance Indicator Verification River Bend ISFSI Triennial Loading Inspection (Part 50) Feeder for Residents

1 7/1/2022 7/2/2022 IP 60855 001001 Operation Of An ISFSI RBS 2022 BRQ

1 8/28/2022 9/3/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Training/Equip Maint.07 and.04

1 8/29/2022 9/2/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

8/29/2022 9/2/2022 IP 71130.07 000739 Security Training Fire Protection Inspection - RBS

1 10/17/2022 10/21/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

10/31/2022 11/4/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

EP 2022 Biennial Exercise & PI Inspection - RBS

1 10/17/2022 10/21/2022 IP 71114.01 000716 Exercise Evaluation

10/17/2022 10/21/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

10/17/2022 10/21/2022 IP 71151 001397 Performance Indicator Verification RP 1,4,PI - RBS

1 11/14/2022 11/18/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

11/14/2022 11/18/2022 IP 71124.04 000728 Occupational Dose Assessment RBS 2022 INITIAL EXAM

1 10/30/2022 11/5/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

12/4/2022 12/10/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Design Bases Assurance Inspection (Team) - 21M - River Bend Station

Prepared on 2/22/2022 1:44:08 PM 2 of 3 Site Inspection Activity Plan

1/1/2023 6/30/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Inservice Inspection RFO 22 - RBS

1 2/20/2023 3/3/2023 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI -

1 2/27/2023 3/3/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2/27/2023 3/3/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Protective Strategy.05 (Place Holder)

1 5/8/2023 5/12/2023 IP 71130.05 000737 Protective Strategy Evaluation Security Access Authorization.01 and Access Control.02 + PIV + Plan Change.09

1 6/19/2023 6/23/2023 IP 71130.01 000733 Access Authorization

6/19/2023 6/23/2023 IP 71130.02 000734 Access Control

6/19/2023 6/23/2023 IP 71130.09 001656 Security Plan Changes

6/19/2023 6/23/2023 IP 71151 001338 Performance Indicator Verification RP 5,8 -

1 7/24/2023 7/28/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

7/24/2023 7/28/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security FFD.08

1 8/7/2023 8/11/2023 IP 71130.08 000740 Fitness For Duty Program EP 2023 Program & PI Inspection - RBS

1 8/14/2023 8/18/2023 IP 71114.02 000717 Alert and Notification System Testing

8/14/2023 8/18/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

8/14/2023 8/18/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

8/14/2023 8/18/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness

8/14/2023 8/18/2023 IP 71151 001397 Performance Indicator Verification River Bend Station Biennial PI&R

1 10/16/2023 10/20/2023 IP 71152B 000747 Problem Identification and Resolution

10/30/2023 11/3/2023 IP 71152B 000747 Problem Identification and Resolution Prepared on 2/22/2022 1:44:08 PM 3 of 3 Site Inspection Activity Plan