Security Baseline Inspection Report 05000458/2021403
ML21144A233
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/24/2021
From: Ray Kellar
Plant Support Branch-1
To: Vercelli S
Entergy Operations
References
IR 2021403
Download: ML21144A233 (6)


Text

May 24, 2021

SUBJECT:

RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2021403

Dear Mr. Vercelli:

On May 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station and discussed the results of this inspection with Mr. K. Scott, General Plant Manager, Plant Operations and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Digitally signed by Ray L. Kellar Kellar Date: 2021.05.24 14:21:09 -05'00'

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000458 License No. NPF-47

Enclosure:

As stated

Inspection Report

Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2021403 Enterprise Identifier: I-2021-403-0015 Licensee: Entergy Operations, Inc.

Facility: River Bend Station Location: St. Francisville, LA Inspection Dates: May 11, 2021 to May 13, 2021 Inspectors: D. Hostetter, Physical Security Inspector C. Jewett, Sr. Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy and performance evaluation program. The inspectors observed two licensee annual force on force exercises. The initial sample for this inspection procedure was completed during the September 2020 inspection.

Due to the Public Health Emergency, the final sample was delayed until the licensee could safely perform their protective strategy exercise. The final sample was accomplished in May 2021 when the licensee performed their protective strategy exercises. The following elements were evaluated:

Protective Strategy Evaluation (1 Sample)

(1)

  • Tier I: Initial sample can be found in inspection report 2020412
  • Tier II: 02.07 a,d, initial sample can be found in inspection report 2020412
  • Tier III: Initial sample can be found in inspection report

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 13, 2021, the inspectors presented the security baseline inspection results to Mr. K. Scott, General Plant Manager, Plant Operations and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.05 Corrective Action River Bend CR-RBS-2021-00930, CR-RBS-2021-01235, CR-RBS-2021- Multiple

Documents Corrective Action 02104, CR-RBS-2021-02880, CR-RBS-2021-02964, CR-

Program RBS-2020-03878, CR-RBS-2020-03879, CR-RBS-2020-

04465, CR-RBS-2020-04823

Corrective Action River Bend CR-RBS-2021-00796, CR-RBS-2021-03624, CR-RBS-2021- Multiple

Documents Corrective Action 03625, CR-RBS-2021-03626, CR-RBS-2021-03627, CR-

Resulting from Program RBS-2021-03628, CR-RBS-2021-03629, CR-RBS-2021-

Inspection 03630, CR-RBS-2021-03632, CR-RBS-2021-03633, CR-

RBS-2021-03634, CR-RBS-2021-03635, CR-RBS-2021-

03636, CR-RBS-2021-03637

Miscellaneous 2021 Annual FOF Player Matrix 05/12/2021

Exercise

21 Annual FOF Adversary Weight Chart 05/12/2021

Exercise

21 Annual FOF Adversary Brief Worksheet 05/12/2021

Exercise

Protective River Bend Protective Strategy Overview 2019

Strategy

River Bend SEL Security Event Logs 12/31/2020-

05/04/2021

Procedures NSF-215-03 Controller Critique Revision 4

NSF-215-08 Controller Information Booklet Revision 6

NSF-215-11 Scenario Matrix Template, RBS-SEC-Drill-15 Revision 4

NSF-215-11 Scenario Matrix Template, RBS-SEC-Drill-12 Revision 4

NSF-234-02 JCAF Team Evaluation Revision 1

River Bend Physical Security, Safeguards Contingency & Training & Revision 13

Physical Security Qualification

Plan

SDI-10 Security Systems Compensation Revision 14

SPI-36 SOCA Monitoring Center Revision 1

STI-17-7-11 SOCA Early Warning System Operational Testing Revision 10

4