May 24, 2021
SUBJECT:
RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2021403
Dear Mr. Vercelli:
On May 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station and discussed the results of this inspection with Mr. K. Scott, General Plant Manager, Plant Operations and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 05000458 License No. NPF-47
Enclosure:
As stated
Inspection Report
Docket Number:
05000458
License Number:
Report Number:
Enterprise Identifier: I-2021-403-0015
Licensee:
Entergy Operations, Inc.
Facility:
River Bend Station
Location:
St. Francisville, LA
Inspection Dates:
May 11, 2021 to May 13, 2021
Inspectors:
D. Hostetter, Physical Security Inspector
C. Jewett, Sr. Physical Security Inspector
Approved By:
Ray L. Kellar, P.E., Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy and performance evaluation program. The inspectors observed two licensee annual force on force exercises. The initial sample for this inspection procedure was completed during the September 2020 inspection.
Due to the Public Health Emergency, the final sample was delayed until the licensee could safely perform their protective strategy exercise. The final sample was accomplished in May 2021 when the licensee performed their protective strategy exercises. The following elements were evaluated:
Protective Strategy Evaluation (1 Sample)
(1)
- Tier I: Initial sample can be found in inspection report 2020412
- Tier II: 02.07 a,d, initial sample can be found in inspection report 2020412
- Tier III: Initial sample can be found in inspection report
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 13, 2021, the inspectors presented the security baseline inspection results to Mr. K. Scott, General Plant Manager, Plant Operations and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
River Bend
Corrective Action
Program
CR-RBS-2021-00930, CR-RBS-2021-01235, CR-RBS-2021-
2104, CR-RBS-2021-02880, CR-RBS-2021-02964, CR-
RBS-2020-03878, CR-RBS-2020-03879, CR-RBS-2020-
04465, CR-RBS-2020-04823
Multiple
Corrective Action
Documents
Resulting from
Inspection
River Bend
Corrective Action
Program
CR-RBS-2021-00796, CR-RBS-2021-03624, CR-RBS-2021-
03625, CR-RBS-2021-03626, CR-RBS-2021-03627, CR-
RBS-2021-03628, CR-RBS-2021-03629, CR-RBS-2021-
03630, CR-RBS-2021-03632, CR-RBS-2021-03633, CR-
RBS-2021-03634, CR-RBS-2021-03635, CR-RBS-2021-
03636, CR-RBS-2021-03637
Multiple
Miscellaneous
21 Annual FOF
Exercise
Player Matrix
05/12/2021
21 Annual FOF
Exercise
Adversary Weight Chart
05/12/2021
21 Annual FOF
Exercise
Adversary Brief Worksheet
05/12/2021
Protective
Strategy
River Bend Protective Strategy Overview
2019
River Bend SEL
Security Event Logs
2/31/2020-
05/04/2021
Procedures
NSF-215-03
Controller Critique
Revision 4
NSF-215-08
Controller Information Booklet
Revision 6
NSF-215-11
Scenario Matrix Template, RBS-SEC-Drill-15
Revision 4
NSF-215-11
Scenario Matrix Template, RBS-SEC-Drill-12
Revision 4
NSF-234-02
JCAF Team Evaluation
Revision 1
River Bend
Physical Security
Plan
Physical Security, Safeguards Contingency & Training &
Qualification
Revision 13
SDI-10
Security Systems Compensation
Revision 14
SPI-36
SOCA Monitoring Center
Revision 1
STI-17-7-11
SOCA Early Warning System Operational Testing
Revision 10