May 24, 2021

SUBJECT:

RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2021403

Dear Mr. Vercelli:

On May 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station and discussed the results of this inspection with Mr. K. Scott, General Plant Manager, Plant Operations and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 05000458 License No. NPF-47

Enclosure:

As stated

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2021403

Enterprise Identifier: I-2021-403-0015

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station

Location:

St. Francisville, LA

Inspection Dates:

May 11, 2021 to May 13, 2021

Inspectors:

D. Hostetter, Physical Security Inspector

C. Jewett, Sr. Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy and performance evaluation program. The inspectors observed two licensee annual force on force exercises. The initial sample for this inspection procedure was completed during the September 2020 inspection.

Due to the Public Health Emergency, the final sample was delayed until the licensee could safely perform their protective strategy exercise. The final sample was accomplished in May 2021 when the licensee performed their protective strategy exercises. The following elements were evaluated:

Protective Strategy Evaluation (1 Sample)

(1)

  • Tier I: Initial sample can be found in inspection report 2020412
  • Tier II: 02.07 a,d, initial sample can be found in inspection report 2020412
  • Tier III: Initial sample can be found in inspection report

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 13, 2021, the inspectors presented the security baseline inspection results to Mr. K. Scott, General Plant Manager, Plant Operations and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.05

Corrective Action

Documents

River Bend

Corrective Action

Program

CR-RBS-2021-00930, CR-RBS-2021-01235, CR-RBS-2021-

2104, CR-RBS-2021-02880, CR-RBS-2021-02964, CR-

RBS-2020-03878, CR-RBS-2020-03879, CR-RBS-2020-

04465, CR-RBS-2020-04823

Multiple

Corrective Action

Documents

Resulting from

Inspection

River Bend

Corrective Action

Program

CR-RBS-2021-00796, CR-RBS-2021-03624, CR-RBS-2021-

03625, CR-RBS-2021-03626, CR-RBS-2021-03627, CR-

RBS-2021-03628, CR-RBS-2021-03629, CR-RBS-2021-

03630, CR-RBS-2021-03632, CR-RBS-2021-03633, CR-

RBS-2021-03634, CR-RBS-2021-03635, CR-RBS-2021-

03636, CR-RBS-2021-03637

Multiple

Miscellaneous

21 Annual FOF

Exercise

Player Matrix

05/12/2021

21 Annual FOF

Exercise

Adversary Weight Chart

05/12/2021

21 Annual FOF

Exercise

Adversary Brief Worksheet

05/12/2021

Protective

Strategy

River Bend Protective Strategy Overview

2019

River Bend SEL

Security Event Logs

2/31/2020-

05/04/2021

Procedures

NSF-215-03

Controller Critique

Revision 4

NSF-215-08

Controller Information Booklet

Revision 6

NSF-215-11

Scenario Matrix Template, RBS-SEC-Drill-15

Revision 4

NSF-215-11

Scenario Matrix Template, RBS-SEC-Drill-12

Revision 4

NSF-234-02

JCAF Team Evaluation

Revision 1

River Bend

Physical Security

Plan

Physical Security, Safeguards Contingency & Training &

Qualification

Revision 13

SDI-10

Security Systems Compensation

Revision 14

SPI-36

SOCA Monitoring Center

Revision 1

STI-17-7-11

SOCA Early Warning System Operational Testing

Revision 10