IR 05000458/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000458/2021401
ML21336A488
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/03/2021
From: Ray Kellar
Plant Support Branch-1
To: Vercelli S
Entergy Operations
C. Jewett
References
IR 2021401
Download: ML21336A488 (6)


Text

December 3, 2021

SUBJECT:

RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2021401

Dear Mr. Vercelli:

On October 28, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station and discussed the results of this inspection with Mr. Bruce Chenard, Director, Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000458 License No. NPF-47 Enclosure:

Inspection Report 05000458/2021401 Signed by Kellar, Ray on 12/06/21

ML21336A488 X SUNSI Review By: CAJ ADAMS:

X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE PSB1:PSI PSB1:C DRP-D:C PSB1:C NAME CAJewett RLKellar JMKozal RLKellar SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE 12/2/2021 12/2/2021 12/3/2021 12/3/2021

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000458

License Number:

NPF-47

Report Number:

05000458/2021401

Enterprise Identifier:

I-2021-401-0012

Licensee:

Entergy Operations, Inc.

Facility:

River Bend Station

Location:

St. Francisville, LA

Inspection Dates:

October 25, 2021 to October 28, 2021

Inspectors:

C. Jewett, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 28, 2021, the inspectors presented the security baseline inspection results to Mr. Bruce Chenard, Director, Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-RBS-2020-

00178, CR-RBS-

20-03035, CR-

RBS-2021-00770,

CR-RBS-2021-

248, CR-RBS-

21-01581, CR-

RBS-2021-03446

Corrective Action

Documents

Resulting from

Inspection

CR-RBS-2021-

06615, CR-RBS-

21-06616, CR-

RBS-2021-06620,

CR-RBS-2021-

07143

EN-NS-101-01

AA/FFD Facility Controls

013

EN-NS-101-04

Processing Potentially Disqualifying Information (PDI)

005

EN-NS-102

Fitness For Duty Program

26

EN-NS-102-01

Fitness for Duty Random and Follow-Up Testing Selection and

Notification

001

EN-NS-102-01

Fitness for Duty Random and Follow-Up Testing Selection and

Notification

2

EN-NS-102-02

Fitness for Duty Specimen Collection and Shipment

004

EN-NS-102-03

Processing of Fitness for Duty Test Results

003

EN-OM-123

Fatigue Management Program

018

71130.08

Procedures

FF-000

Entergys Nuclear Fitness for Duty Program Statement of

Policy

2