December 3, 2021

SUBJECT:

RIVER BEND STATION - SECURITY BASELINE INSPECTION REPORT 05000458/2021401

Dear Mr. Vercelli:

On October 28, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at River Bend Station and discussed the results of this inspection with Mr. Bruce Chenard, Director, Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Kellar, Ray on 12/06/21 Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000458 License No. NPF-47 Enclosure:

Inspection Report 05000458/2021401

ML21336A488 X SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: CAJ X Yes No X Non-Sensitive X Publicly Available NRC-002 OFFICE PSB1:PSI PSB1:C DRP-D:C PSB1:C NAME CAJewett RLKellar JMKozal RLKellar SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 12/2/2021 12/2/2021 12/3/2021 12/3/2021

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2021401 Enterprise Identifier: I-2021-401-0012 Licensee: Entergy Operations, Inc.

Facility: River Bend Station Location: St. Francisville, LA Inspection Dates: October 25, 2021 to October 28, 2021 Inspectors: C. Jewett, Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements Tier II: All Requirements Tier III: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 28, 2021, the inspectors presented the security baseline inspection results to Mr. Bruce Chenard, Director, Engineering, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.08 Corrective Action CR-RBS-2020-

Documents 00178, CR-RBS-

20-03035, CR-

RBS-2021-00770,

CR-RBS-2021-

248, CR-RBS-

21-01581, CR-

RBS-2021-03446

Corrective Action CR-RBS-2021-

Documents 06615, CR-RBS-

Resulting from 2021-06616, CR-

Inspection RBS-2021-06620,

CR-RBS-2021-

07143

Procedures EN-NS-101-01 AA/FFD Facility Controls 013

EN-NS-101-04 Processing Potentially Disqualifying Information (PDI) 005

EN-NS-102 Fitness For Duty Program 026

EN-NS-102-01 Fitness for Duty Random and Follow-Up Testing Selection and 001

Notification

EN-NS-102-01 Fitness for Duty Random and Follow-Up Testing Selection and 002

Notification

EN-NS-102-02 Fitness for Duty Specimen Collection and Shipment 004

EN-NS-102-03 Processing of Fitness for Duty Test Results 003

EN-OM-123 Fatigue Management Program 018

FF-000 Entergys Nuclear Fitness for Duty Program Statement of 002

Policy

4