August 15, 2023
SUBJECT:
RIVER BEND STATION - FINAL SIGNIFICANCE DETERMINATION OF A WHITE FINDING, NOTICE OF VIOLATION, AND FOLLOW-UP ASSESSMENT LETTER; NRC INSPECTION REPORT 05000458/2023092
Dear Phil Hansett:
This letter provides you the final significance determination of the preliminary White finding discussed with you and members of your staff during the telephonic exit briefing on July 18, 2023. The finding involved errors associated with calibration of radiation monitoring systems which introduced the potential to not classify radiological emergencies up to a General Emergency as well as inaccurate dose assessments.
Following the exit briefing, you informed Geoffrey Miller, Director (Acting), Division of Radiological Safety & Security, and members of the U.S. Nuclear Regulatory Commission (NRC) staff that you accept the violation, as described in the exit briefing, and the characterization of the finding as White, a finding of low to moderate safety significance. In addition, you declined the opportunity to discuss this issue in a regulatory conference or to provide a written response, and understood that NRC Inspection Manual Chapter 0609, Attachment 2 appeal rights only apply to those licensees that have either attended a regulatory conference or submitted a written response to a preliminary determination letter.
After considering the information developed during the inspection, the NRC has concluded that the finding is appropriately characterized as White. The NRC has also determined that the failure to maintain the effectiveness of an emergency plan that met the requirements in Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix E, and the planning standards of 10 CFR 50.47(b), is a violation of 10 CFR 50.54(q)(2) as cited in Enclosure 1, Notice of Violation (Notice). The circumstances surrounding the violation are described in the inspection report, Enclosure 2. In accordance with the NRC Enforcement Policy, the Notice is considered an escalated enforcement action because it is associated with a White finding.
You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. If you have additional information that you believe the NRC should consider, you may provide it in your response to the Notice. The NRC review of your response to the Notice will also determine whether further enforcement action is necessary to ensure compliance with regulatory requirements. The NRC evaluated the finding in accordance with Inspection Manual Chapter 0305, Operating Reactor Assessment Program, to determine if the finding meets the criteria for an old design issue. The NRC determined that the finding did not meet the criteria for an old design issue because this finding involves calibration of radiation monitoring systems and the associated impacts on emergency action level classification and dose assessment that were introduced during system updates in the 2008 time period. The performance deficiency, which was the proximate cause of the degraded condition, involved a widely known issue that was shared through industry operating experience where your staff had opportunities between 2008 and 2023 to identify and correct. Therefore, this finding will be treated similar to any other inspection finding, and additional NRC actions will be taken in accordance with the Action Matrix.
As a result of our review of the River Bend Stations performance, including this White finding, we have assessed that the performance of River Bend Station continues to be in the Regulatory Response column of the NRCs Action Matrix, effective the second quarter of 2023. We had previously assessed the performance of the River Bend Station to be in the Regulatory Response column based on a White finding documented in our letter dated July 20, 2023, Agencywide Documents Access and Management System (ADAMS) Accession No. ML23187A639. Therefore, we plan to conduct a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, when your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root cause and contributing causes of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room and from the NRCs ADAMS, accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy or proprietary information so that it can be made available to the public without redaction.
If you have any questions concerning this matter, please contact Geoffrey Miller of my staff at 817-200-1180.
Sincerely, John D. Monninger Regional Administrator Docket No. 05000458 License No. NPF-47
Enclosures:
1.
Notice of Violation 2.
Inspection Report 05000458/2023092 Signed by Monninger, John on 08/15/23
ML23201A132 SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: JGK Yes No Publicly Available Sensitive OFFICE SES:ACES TL:ACES EPI:RCB C:RCB RC C:PBC NAME JKramer JGroom HStrittmatter BAlferink DCylkowski DProulx SIGNATURE
/RA/ E
/RA/ E
/RA/ E
/RA/ E
/RA/ E
/RA/ E DATE 07/20/23 07/21/23 07/20/23 07/25/23 07/25/23 07/25/23 OFFICE NSIR OE NRR D:DORS DD:DRSS RA NAME MWaters JPeralta RFelts MHay ARiveraVarona JMonninger SIGNATURE
/RA/ E
/RA/ E
/RA/ E
/RA/ E
/RA/ E
/RA/ E DATE 08/03/23 08/04/23 08/02/23 08/07/23 08/07/23 08/15/23
Enclosure 1 NOTICE OF VIOLATION Entergy Operations, Inc.
Docket No. 05000458 River Bend Station License No. NPF-47 EA-23-071 During an NRC inspection conducted from April 12 to July 18, 2023, a violation of NRC requirements was identified. In a
Inspection Report
Docket Number:
05000458
License Number:
Report Number:
Enterprise Identifier:
I-2023-092-0002
Licensee:
Entergy Operations, Inc.
Facility:
River Bend Station
Location:
St. Francisville, LA
Inspection Dates:
April 12 to July 18, 2023
Inspectors:
H. Strittmatter, Emergency Preparedness Inspector
Approved By:
Beth S. Alferink, Chief (Acting)
Response Coordination Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Maintain Accurate EAL Thresholds and Dose Assessment Methods Cornerstone Significance Cross-Cutting Aspect Report Section Emergency Preparedness White NOV 05000458/2023092-01 Open EA-23-071 None (NPP)71114.05 The inspectors identified a finding of low to moderate safety significance (White) and associated violation of 10 CFR 50.54(q)(2). Specifically, the licensee failed to maintain the reliable and accurate indications on four Wide Range Gas Monitors (WRGMs) and one liquid effluent monitor: RMS-RE125 (Main Plant Exhaust Primary), RMS-RE126 (Main Plant Exhaust Secondary), RMS-RE5A (Fuel Building Ventilation Primary), RMS-RE6A (Radwaste Building Vent Primary), RMS-RE107 (Liquid Radwaste Effluent). This resulted in the potential to not classify a potential emergency condition up to a General Emergency, as well as to produce inaccurate dose assessments from December 4, 2008, to May 22, 2023.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Partial)
(1)
(Partial)
The inspectors reviewed information related to calibration issues with Radiation Monitoring System (RMS) used for emergency response. Specifically, on March 18, 2023, condition report CR-RBS-2023-02765 documented potential issues associated with the calibration of 11 RMS and application of engineering conversion factors. The issues were further evaluated in condition report CR-RBS-2023-04450, created on May 18, 2023, and five RMS, categorized as Equipment Important to Emergency Response (EITER), were discovered to have the wrong engineering conversion factors post detector replacement. Since these instruments have been used as part of the licensees emergency action level (EAL) scheme, as well as for dose projection process, the NRC inspector evaluated the issues for emergency preparedness program impacts and non-compliances with NRC regulation.
INSPECTION RESULTS
Failure to Maintain Accurate EAL Thresholds and Dose Assessment Methods Cornerstone Significance Cross-Cutting Aspect Report Section Emergency Preparedness White NOV 05000458/2023092-01 Open EA-23-071 None (NPP)71114.05 The inspectors identified a finding of low to moderate safety significance (White) and associated violation of 10 CFR 50.54(q)(2). Specifically, the licensee failed to maintain the reliable and accurate indications on four Wide Range Gas Monitors (WRGMs) and one liquid effluent monitor: RMS-RE125 (Main Plant Exhaust Primary), RMS-RE126 (Main Plant Exhaust Secondary), RMS-RE5A (Fuel Building Ventilation Primary), RMS-RE6A (Radwaste Building Vent Primary), RMS-RE107 (Liquid Radwaste Effluent). This resulted in the potential to not classify a potential emergency condition up to a General Emergency, as well as to produce inaccurate dose assessments from December 4, 2008, to May 22, 2023.
Description:
On March 18, 2023, River Bend Station (RBS) staff conducted an extent of condition following the Waterford Steam Electric Station Unit 3 radiation monitor system White finding and subsequent 95001 inspection. During this extent of condition, RBS staff identified that calibration and engineering conversion factors for four of the wide range gas monitors (WRGMs) and one of the Liquid Effluent Monitors, had been in error for various lengths of time (condition report CR-RBS-2023-02765). The errors were introduced when new detectors were installed. In industry forums in 2009, end users were informed that radiation detectors being replaced needed to adjust engineering conversion factors for the new device specific to the new radiation detector. The station had an opportunity to correct the issues with the 2008 installation and prevent all those since 2009 based on the information made available in the 2009 industry forums. The RMSs are used during implementation of EALs and the four WRGMs are also inputs to the radiological dose assessment modeling software used in emergency response.
- RMS-RE125, Main Plant Exhaust Primary, Mid-Range and High-Range Detectors - errors introduced in 2018 and 2020, used in EALs AU1.1, AA1.1, AS1.1, and AG1.1
- RMS-RE126, Main Plant Exhaust Secondary, Low-Range Detector - errors introduced in 2009, used in EALs AU1.1, and AA1.1
- RMS-RE5A, Fuel Building Ventilation Primary, Low/Mid/High-Range Detectors - errors introduced in 2009, 2011, and 2012 - used in EALs AU1.1, AA1.1, AS1.1, and AG1.1
- RMS-RE6A, Radwaste Building Vent Primary, Low-Range and Mid-Range Detectors - errors introduced in 2008 and 2019, used in EALs AU1.1, AA1.1, and AS1.1
- RMS-RE107, Liquid Radwaste Effluent, Low-Range Detector, error introduced in 2021, used in EAL AU1.1 The licensee evaluated the potential effects on EAL classification. Since all the errors would have caused the instruments to indicate lower than actual, this precludes an over classification and resultant unnecessary protective action recommendations to the offsite response organizations. However, there would have been significant delays in providing protective action recommendations to offsite response organizations. The licensee determined that a classification of the appropriate level (i.e., Unusual Event, Alert, Site Area Emergency, General Emergency) would have been made in a timely and accurate manner using other EAL thresholds. The inspectors reviewed the licensees evaluation and determined that the licensee could have reasonably classified emergencies at the appropriate level in a timely and accurate manner using other EAL thresholds and plant indications.
Additionally, the four WRGMs provide inputs to the licensees dose assessment model. The licensee concluded that they would indicate lower than actual by the below percentages.
- RMS-RE125: 60 to 66 percent lower than expected.
- RMS-RE126: 29 percent lower than expected.
- RMS-RE5A: 25 to 35 percent lower than expected.
- RMS-RE6A: 78 to 96 percent lower than expected.
Based on these errors, the inspectors concluded that during events involving the above RMSs that the licensees dose projection process would have been incapable of providing technically adequate estimates of radioactive material releases to the environment or projected offsite doses in some cases.
Corrective Actions: The licensee corrected the engineering conversion and calibration factors for the RMSs on May 22, 2023. The licensee is conducting a root cause evaluation. The licensee is documenting the issues in the corrective action program.
Corrective Action References: Condition Report CR-RBS-2023-04450
Performance Assessment:
Performance Deficiency: The licensee failed to maintain correct function of the RMS equipment, which resulted in: a) not establishing and maintaining adequate emergency action levels (EALs), and b) the licensee was incapable of providing a technically adequate estimate of offsite doses using their dose assessment process. The effects adversely impacted the ability to classify a potential emergency condition associated with effluent releases accurately and in a timely manner, as well as the capability to accurately estimate offsite releases.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Facilities and Equipment attribute of the Emergency Preparedness cornerstone and adversely affected the cornerstone objective to ensure that the licensee is capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. The cornerstone objective was adversely affected because the licensee may not implement adequate measures to protect the health and safety of the public if they fail to implement classifications or protective actions that are appropriate based on the given radiological conditions.
Significance: The inspectors assessed the significance of the finding using Inspection Manual Chapter (IMC) 0609 Appendix B, Emergency Preparedness Significance Determination Process. Using IMC Chapter 0609, Attachment 4, Tables 1, 2, and 3 worksheets (effective date December 20, 2019); and the corresponding Appendix B, 2 (issue date September 22, 2015); the finding is a failure to comply with risk significant planning standards (RSPSs).
This finding is associated with risk significant planning standards 10 CFR 50.47(b)(4) and 10 CFR 50.47(b)(9), in addition to Appendix E to 10 CFR 50, IV.B, Assessment Actions.
- For the 10 CFR 50.47(b)(4) issue, since the General Emergency would not be declared for a particular off-normal event, but because of other EALs, an appropriate declaration could be made in an accurate and timely manner, the finding is not a Loss of RSPS function nor a Degraded RSPS function (Green).
- For the 10 CFR 50.47(b)(9) issue, since there were some (but not all) cases in which the dose assessment process would be incapable of providing technically adequate estimates of real or projected radioactive material releases to the environment in some cases, the finding is not a Loss of RSPS function but rather a Degraded RSPS function (White).
Cross-Cutting Aspect: Not Present Performance. No cross-cutting aspect was assigned to this finding because the inspectors determined the finding did not reflect present licensee performance. The cause of this issue occurred in 2008 and is not indicative of present performance.
Enforcement:
Violation: 10 CFR 50.54(q)(2) requires, in part, that a holder of a license under 10 CFR Part 50 shall follow and maintain the effectiveness of an emergency plan that meets the requirements in 10 CFR Part 50, Appendix E, and the planning standards of 10 CFR 50.47(b).
10 CFR 50.47(b)(4) requires, in part, that a standard emergency classification and action level scheme is in use by the nuclear facility licensee, and State and local response plans call for reliance on information provided by facility licensees for determinations of minimum initial offsite response measures.
10 CFR 50.47(b)(9) requires, in part, that adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use.
Contrary to the above, from December 4, 2008, to May 22, 2023, the licensee failed to follow and maintain the effectiveness of an emergency plan which met the requirements in 10 CFR Part 50 Appendix E and the planning standards of 10 CFR 50.47(b). Specifically, the licensee failed to maintain a standard emergency classification scheme as required by 10 CFR 50.47(b)(4) because RMS-RE125, RMS-RE126, RMS-RE5A, RMS-RE6A, and RMS-RE107 had errors causing them to read lower values than they should causing EALs up to the General Emergency level to be ineffective. In addition, the licensee failed to use adequate methods, systems, and equipment for assessing and monitoring actual and potential offsite consequences of a radiological emergency as required by 10 CFR 50.47(b)(9), because those same errors, excluding RMS-RE107 since it is not used for dose assessment, would result in inaccurate dose assessments for a radiological release through the main plant exhaust, fuel building, and radwaste building paths.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On July 18, 2023, the inspector presented the RMS issue inspection results to Phil Hansett, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective
Action
Documents
CR-RBS-2023-
04689. 02765, 02766, 02767,
2768, 04450
White Paper on EAL and
Dose Assessment Evaluation
05/31/2023
White Paper on Detector
Replacement and Calibration
05/31/2023
White Paper on EAL
Evaluation
06/15/2023
of License
Amendment Request to
Revise EAL Scheme to NEI 99-01 Revision 6
04/30/2018
1-4 of License
Amendment Request to
Revise EAL Scheme to NEI 99-01 Revision 6
04/30/2018
Response to Request for
Additional Information for
License Amendment Request,
Adoption of Emergency Action
Level Scheme Pursuant to
NEI 99-01 Revision 6
10/18/2018
Miscellaneous
Issuance of License
Amendment to Revise
Emergency Action Levels to a
Scheme Based on NEI 99-01,
Revision 6
05/14/2019
EIP-2-001
Classification Of Emergencies
EIP-2-024
Offsite Dose Calculations
Equipment Important to
Emergency Response
(EITER)
EN-EP-202-03
Procedures
EPP-2-503
River Bend Station Equipment
Important to Emergency
Response (EITER)
7