May 8, 2019
Mr. Steven Vercelli
Site Vice President
Entergy Operations, Inc.
5485 U.S. Highway 61N
St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - NOTIFICATION OF NRC DESIGN BASES
ASSURANCE INSPECTION (PROGRAMS) (05000458/2019012) AND INITIAL
REQUEST FOR INFORMATION
Dear Mr. Vercelli:
On July 15, 2019, the Nuclear Regulatory Commission (NRC) will begin an inspection at the
River Bend Station, Unit 1. A three-person team will perform this inspection using NRC
Inspection Procedure 71111.21N, Design Bases Inspection (Programs), Attachment 1,
Environmental Qualification under 10 CFR 50.49 Programs, Processes, and Procedures.
This inspection will evaluate the implementation of the environmental qualification of electrical
equipment program, as required by the River Bend Station, Unit 1 Operating License.
Additionally, the team will perform an inspection of the equipment qualification documentation
files to verify that electrical equipment important to safety meets the requirements of
10 CFR 50.49. The team will select components that will be subjected to harsh environments
and required to mitigate the consequences of a design basis accident.
The inspection will include an information gathering site visit by the team leader and 2 weeks of
onsite inspection by the team. The inspection will consist of three NRC inspectors. The current
inspection schedule is as follows:
Onsite Information Gathering Visit: June 24 - 28, 2019
Preparation Weeks: July 8 - 12, 2019, and July 22 - 26, 2019
Onsite Weeks: July 15 - 19, 2019, and July 29 - August 2, 2019
The purpose of the information gathering visit is to meet with members of your staff to become
familiar with the River Bend Station, Unit 1 environmental qualification program. The lead
inspector will request a meeting with your personnel to discuss the site environmental
qualification program and procedures. Additionally, the lead inspector will request a discussion
with your staff to become familiar with the equipment qualification regulations and standards to
which the site is committed. Additional information and documentation needed to support the
inspection will be identified during the inspection, including interviews with engineering
managers and engineers.
Our experience with these inspections has shown that they are resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection, we have enclosed a request for information needed for
S. Vercelli
2
the inspection. This information should be made available to the lead inspector during the
June 24 - 28, 2019, visit. Since the inspection will be concentrated on the environmental
qualification of the equipment, the equipment qualification master list (EQML) should be
available to review during the information gathering visit to assist in our selection of
components.
It is requested that this information be provided to the lead inspector as the information is
generated during the inspection. Additional requests by inspectors will be made during the
onsite week for specific documents needed to complete the review of that component/selection.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. In order to facilitate the inspection, we request that a contact individual be
assigned to each inspector to ensure information requests, questions, and concerns are
addressed in a timely manner.
The lead inspector for this inspection is Ronald A. Kopriva. We understand that our licensing
engineer contact for this inspection is Ms. Bridget Johns. If there are any questions about
the inspection or the requested materials, please contact the lead inspector by telephone
at 817-200-1104 or by e-mail at Ron.Kopriva@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA Wayne Sifre Acting for/
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-458
License No. NPF-47
Enclosure: Design Bases Inspection (Programs)
Environmental Qualification Request for Information
Electronic Distribution for the River Bend Station, Unit 1
Enclosure
Initial Request for Information
Design Bases Inspection (Programs), Environmental Qualification
RIVER BEND STATION, UNIT 1
Inspection Report: 05000458/2019012
Information Gathering Dates:
June 24 - 28, 2019
Inspection Dates:
July 15 - 19, 2019, and July 29 - August 2, 2019
Inspection Procedure:
IP 71111, Attachment 21N, Design Bases Inspection
(Programs)
Lead Inspector:
Ronald A. Kopriva, Senior Reactor Inspector
I.
Information Requested for Information Gathering Visit (June 24, 2019)
The following information should be provided to the lead inspector in hard copy or
electronic format, to the attention of Ronald Kopriva by June 17, 2019, to facilitate the
reduction in the items to be selected for a final list of components. The inspection team
will finalize the selected list during the prep week using the documents requested in this
enclosure. The specific items selected from the lists shall be available and ready for
review on the day indicated in this request. *Please provide requested documentation
electronically in pdf files, Excel, or other searchable formats, if possible. The
information should contain descriptive names and be indexed and hyperlinked to
facilitate ease of use. Information in "lists" should contain enough information to be
easily understood by someone who has knowledge of boiling water reactor technology.
If requested documents are large and only hard copy formats are available, please
inform the inspectors, and provide subject documentation during the first day of the
onsite inspection.
1. List of components that are in equipment qualification master list (EQML). If plant is
approved to categorize structures, systems, and component in accordance with
10 CFR 50.69, please provide the Risk Informed Safety Category of the component.
2. Listing of the EQML components sorted by Birnbaum risk importance.
3. List of all post-accident monitoring instrumentation components and locations.
4. Documents which show the environmental service conditions expected for areas in
which the equipment qualification components are located.
5. River Bend Station, Unit 1 word-searchable Updated Final Safety Analysis Report
(UFSAR), License Conditions, and Technical Specifications. Specifically identify
which UFSAR sections address environmental (including seismic) qualification,
seismic.
6. NRC Safety Evaluation Report(s) associated with River Bend Station, Unit 1
environmental qualification program.
2
7. Identify the various environmental qualification standards (including year, edition, or
revision) that River Bend Station, Unit 1 is committed.
8. Identify whether River Bend Station, Unit 1 has entered its period of extended
operation (i.e., operation past the original 40-year license period).
9. Site (and corporate if applicable) procedures associated with the 10 CFR 50.49
environmental qualification program for electrical components. Additionally, please
provide similar procedures used to verify mechanical components meet their
10 CFR 50, Appendix A, Criterion 4, Environmental and Dynamic Effects Design
Bases. Include procedures for procurement of qualified equipment, maintenance of
qualified equipment, and modification to qualified equipment (including equivalency
or commercial grade dedication programs).
10. Site high energy line break analyses, including associated plant area drawings.
11. Procedures for material storage and shelf life controls.
12. List of commercial grade dedication evaluations performed, for which the dedicated
parts have been issued for installation on equipment qualification applications in the
plant, for the previous 5 years. Include a description of the component the
replacement part was issued to repair, work order, and date issued or installed.
13. List of condition reports related to the equipment qualification program or
environmental qualification of components (both electrical and mechanical) for the
previous 5 years.
14. Lists of modifications, repairs, or replacement of EQML components completed for
the previous 5 years.
15. List of modifications, repairs, or replacements of containment penetrations for the
previous 5 years.
16. List of components removed from the environmental qualification program since
beginning of operation.
17. Any self-assessments and quality assurance assessments of the environmental
qualification program performed in the previous 5 years.
18. List of systems, system numbers/designators and corresponding names.
19. List of site contacts that will be associated with the inspection.
II.
Discussions Requested
1. Interview with representative to discuss site environmental qualification service
condition analyses for plant areas, including plant drawings and assumptions. This
includes analysis for areas that are subject to high energy line breaks (HELB).
3
2. Interview with representative to discuss environmental qualification mandated
maintenance elements are integrated into plant programs and procedures.
3. Interview with representative to discuss maintaining qualification for plant/equipment
that has entered its period of extended operation, if applicable.
III.
Information Requested for Inspection Preparation (July 15, 2019)
1. Equipment qualification documentation files, including test reports, for the electrical
components selected by the lead inspector listed on the EQML.
2. References associated with the electrical components equipment qualification
document files.
3. Vendor manuals and technical sheets associated with the selected electrical
components.
4. Tours of the rooms in which the selected electrical components are installed.
5. Tour of stored selected electrical components in the warehouse.
Inspector Contact Information:
Ronald A. Kopriva
Senior Reactor Inspector
817-200-1104
Ron.Kopriva@nrc.gov
Reactor Inspector
817-200-1563
Wes.Cullum@nrc.gov
Reactor Inspector
817-200-1507
Shiattin.Makor@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Ronald Kopriva
1600 East Lamar Blvd.
Arlington, TX 76011-4511
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: RAK Yes No
Publicly Available Sensitive
OFFICE
SRI:EB1
C:EB1
C:PBC
C:EB1
NAME
RKopriva
VGaddy
JKozal
VGaddy
SIGNATURE
/RA/
/RA/
/RA/
/RA WCS for/
DATE
05/06/2019
05/07/2019
05/06/2019
05/08/2019