ML20079E528: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 2
| page count = 2
| project = TAC:51908
| stage = Meeting
}}
}}


Line 30: Line 32:
Office of Inspection and Enforcement                                                                                                    RII: JPO Region II - Suite 2900                                                                                                                    /50-366 101 Marietta Street, NW                                                                                                                  Pipe Whip Restraints s
Office of Inspection and Enforcement                                                                                                    RII: JPO Region II - Suite 2900                                                                                                                    /50-366 101 Marietta Street, NW                                                                                                                  Pipe Whip Restraints s
Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly GENTLINEN:
Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly GENTLINEN:
On June 23, 1983, we reported that certain pipe whip restraints had not been installed at Plant Hatch-Unit 2 (See I.ER 50-366/283-46). By letters dated June 28,'1983 and July 6, 1983, we orovided information regarding circumstances of the finding, corrective setions, and justification for continued operation. Discussions were held among Georgia Power Company representatives, NRC Region II staff, and NRC NRR staff, including a meeting at Region II headquarters on June 30, 1983 to discuss this matter in detail. In those discussions and, as stated in our July 6,1983 letter, we concluded that operation of Plant Hatch - Unit 2 (with missing pipe whip
On June 23, 1983, we reported that certain pipe whip restraints had not been installed at Plant Hatch-Unit 2 (See I.ER 50-366/283-46). By letters dated June 28,'1983 and July 6, 1983, we orovided information regarding circumstances of the finding, corrective setions, and justification for continued operation. Discussions were held among Georgia Power Company representatives, NRC Region II staff, and NRC NRR staff, including a meeting at Region II headquarters on June 30, 1983 to discuss this matter in detail. In those discussions and, as stated in our {{letter dated|date=July 6, 1983|text=July 6,1983 letter}}, we concluded that operation of Plant Hatch - Unit 2 (with missing pipe whip
                       ' restraints) to the end of 1983 would not constitute a significant reduction
                       ' restraints) to the end of 1983 would not constitute a significant reduction
                     - in margins of safety.
                     - in margins of safety.
On September 28, 1983, we met with NRC Region II and NRR management at Georgia Power Company headquarters to present revised, future outage plans for Plant Hatch. It was stated in that meeting and documented in our October 5,1983 letter to NRR that extensions in time would be needed for completion of certain work, including installation and/or re-analysis of pipe whip restraints, since it 'is our intention to operate PlantLater,                                                                                                          Hatchon-Unit 2 into January 1984 before undertaking a major outage.
On September 28, 1983, we met with NRC Region II and NRR management at Georgia Power Company headquarters to present revised, future outage plans for Plant Hatch. It was stated in that meeting and documented in our {{letter dated|date=October 5, 1983|text=October 5,1983 letter}} to NRR that extensions in time would be needed for completion of certain work, including installation and/or re-analysis of pipe whip restraints, since it 'is our intention to operate PlantLater,                                                                                                          Hatchon-Unit 2 into January 1984 before undertaking a major outage.
October 11, 1983, representatives of Georgia Power Company met with NRR (including Mr. Harold Denton) to explain our overall plans and need for NRC accommodations.                                            In both the September 28, 1983 and the October 11, 1983 meetings,                                NRC              management                                                agreed with our plans, subject to further discussions.
October 11, 1983, representatives of Georgia Power Company met with NRR (including Mr. Harold Denton) to explain our overall plans and need for NRC accommodations.                                            In both the September 28, 1983 and the October 11, 1983 meetings,                                NRC              management                                                agreed with our plans, subject to further discussions.
i DFSIGNAT      ORIGINAL 840127 03I222 PDR AD
i DFSIGNAT      ORIGINAL 840127 03I222 PDR AD

Latest revision as of 00:26, 27 September 2022

RO 50-366/83-46:on 830623,certain Pipe Whip Restraints Reported Not Installed.Commitment Made at 830928 Meeting Not to Operate Beyond End of CY83 W/O Completion of Corrective Action Extended Into Jan 1984
ML20079E528
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/22/1983
From: Gucwa L
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NED-83-642, RO-50-366-83-46, TAC-51908, NUDOCS 8401170345
Download: ML20079E528 (2)


Text

_

Ceoro's 90++a C = c:n

. * , 333 Pedmont Avan:e

  • A"aal3. G3.or a 30T8

' Telermone 404 E66K6

~

Maang Acres:-

  • Post 0:1ce Em JE45 t

A: tar'ta Gec:p a 203C2 h Georgia Power L. T. Gucws the soufPn eacfoe 5 vs?m Manter N.cmar Ea; meg and Ch et Nucer Engner hE-83-64 2 December 22, 1983 U. S. Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement RII: JPO Region II - Suite 2900 /50-366 101 Marietta Street, NW Pipe Whip Restraints s

Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly GENTLINEN:

On June 23, 1983, we reported that certain pipe whip restraints had not been installed at Plant Hatch-Unit 2 (See I.ER 50-366/283-46). By letters dated June 28,'1983 and July 6, 1983, we orovided information regarding circumstances of the finding, corrective setions, and justification for continued operation. Discussions were held among Georgia Power Company representatives, NRC Region II staff, and NRC NRR staff, including a meeting at Region II headquarters on June 30, 1983 to discuss this matter in detail. In those discussions and, as stated in our July 6,1983 letter, we concluded that operation of Plant Hatch - Unit 2 (with missing pipe whip

' restraints) to the end of 1983 would not constitute a significant reduction

- in margins of safety.

On September 28, 1983, we met with NRC Region II and NRR management at Georgia Power Company headquarters to present revised, future outage plans for Plant Hatch. It was stated in that meeting and documented in our October 5,1983 letter to NRR that extensions in time would be needed for completion of certain work, including installation and/or re-analysis of pipe whip restraints, since it 'is our intention to operate PlantLater, Hatchon-Unit 2 into January 1984 before undertaking a major outage.

October 11, 1983, representatives of Georgia Power Company met with NRR (including Mr. Harold Denton) to explain our overall plans and need for NRC accommodations. In both the September 28, 1983 and the October 11, 1983 meetings, NRC management agreed with our plans, subject to further discussions.

i DFSIGNAT ORIGINAL 840127 03I222 PDR AD

-S M 05000366 PDR Certifica By h  ;

OFFICIAL COPY q S3& l }

o

GeorgiaPower d U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 2900 December 22, 1983 Page Two Consequently, regarding the aforementioned issue on pipe whip, we have modified our previous commitment not to operate Plant Hatch - Unit 2 beyond the end of calendar year 1983 without completing corrective actions. We now We plan to continue to operate Plant Hatch - Unit 2 into January 1984.

understand that this schedule is acceptable to you.

Sincerely yours, ff~ Q: m L. T. Gucwa