ML19327A814: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 33: Line 33:
k
k
                       'WGH,III/NJS/gm                                                                                ;
                       'WGH,III/NJS/gm                                                                                ;
                                                                                                                      ;
xc:    Georaia Power ComDanY Mr. C. K. McCoy                                                                        '
xc:    Georaia Power ComDanY Mr. C. K. McCoy                                                                        '
Mr. G. Bockhold, Jr.
Mr. G. Bockhold, Jr.
Line 39: Line 38:
L.'                            U. S. Nuclear Reaulatory Commission l                              Mr. S. D. Ebneter, Regional Administrator Mr. J. B. Hopkins,_ Licensing Project Manager, NRR L
L.'                            U. S. Nuclear Reaulatory Commission l                              Mr. S. D. Ebneter, Regional Administrator Mr. J. B. Hopkins,_ Licensing Project Manager, NRR L
Mr. J. F. Rogge, Senior Resident Inspector, Vogtle                                    ,
Mr. J. F. Rogge, Senior Resident Inspector, Vogtle                                    ,
                                                                                                                      ;
k!k              '
k!k              '
gen $M8${g4                                                            'S              :
gen $M8${g4                                                            'S              :
R
R


i
i i            .
            *                                                                                      ;
i            .
n                                                                                                  ;
n                                                                                                  ;
:                                                ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1                      l MONTHLY OPERATING REPORT FOR SEPTEMBER, 1989                      ,
:                                                ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1                      l MONTHLY OPERATING REPORT FOR SEPTEMBER, 1989                      ,
TABLE OF CONTENTS.
TABLE OF CONTENTS.
                                                                                                  ;
NARRATIVE REPORT                                              Page Vl-1 OPERATING DATA REPORT                                          Page VI-2          !
NARRATIVE REPORT                                              Page Vl-1 OPERATING DATA REPORT                                          Page VI-2          !
AVERAGE DAILY POWER LEVEL                                      Pege VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS                            Page VI-4
AVERAGE DAILY POWER LEVEL                                      Pege VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS                            Page VI-4
Line 63: Line 58:
Vl-1
Vl-1


                                                                                                                    ;
                       .                                                                                                l L                                                                                                                      :
                       .                                                                                                l L                                                                                                                      :
OPERATING DATA REPORT            DOCKET NO. 50-424                            l DATE:                    1989                i OCTOBER COMPLETED  BY J. 5,C. WILLIAMS              '
OPERATING DATA REPORT            DOCKET NO. 50-424                            l DATE:                    1989                i OCTOBER COMPLETED  BY J. 5,C. WILLIAMS              '
Line 226: Line 220:


t.
t.
  ''        ;.
1 UNIT SHUTDOWNS AND POWER REDUCTIONS                      DOCKET NO. 50-425 '
1 UNIT SHUTDOWNS AND POWER REDUCTIONS                      DOCKET NO. 50-425 '
DATE:        OCTOBER 5 1989 UNIT NAME:      VEGP UNIT 2                      COMPLETED BY: J.C.WILEIAMS 4
DATE:        OCTOBER 5 1989 UNIT NAME:      VEGP UNIT 2                      COMPLETED BY: J.C.WILEIAMS 4

Latest revision as of 16:14, 18 February 2020

Monthly Operating Repts for Sept 1989 for Vogtle Electric Generating Plant,Units 1 & 2.W/891011 Ltr
ML19327A814
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/30/1989
From: Hairston W, Williams J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ELV-00957, ELV-957, NUDOCS 8910180177
Download: ML19327A814 (12)


Text

~ :l t8

.'[ Georgia Powt4r Compary/

333 Pedmont Acue Atf anta. Ocotg;a 30309 .

Tc;cphone A04 526 3195

~

McAng A&1ress-40 Inverness Center ratkway Post Offce Box 1295 Birmingham Alabama 35201 Telephone POS B08 5581 1*w uu"vm twt t niem W. G. Hairston, til Senior vce President October 11, 1989 Nac! car Operat.ons ELV-00957 0049 Docket Nos. 50-424 -

50-425 -

I U. S. Nuclear Regulatory Commission i l- ATTN: Document Control Desk '

Washington, D. C. 20555 r

Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT .

MONTHLY OPERATING REPORTS Enclosed are the September,1989 monthly operating re) orts for Vogtle Units 1 and 2. These reports are submitted in accordance witi Technical Specification , 6.8.1.5.  !

Sincerely, Y- [

W. G. Hairston, III .

k

'WGH,III/NJS/gm  ;

xc: Georaia Power ComDanY Mr. C. K. McCoy '

Mr. G. Bockhold, Jr.

Mr. P. D. Rushton i NORMS -

L.' U. S. Nuclear Reaulatory Commission l Mr. S. D. Ebneter, Regional Administrator Mr. J. B. Hopkins,_ Licensing Project Manager, NRR L

Mr. J. F. Rogge, Senior Resident Inspector, Vogtle ,

k!k '

gen $M8${g4 'S  :

R

i i .

n  ;

ENCLOSURE 1 V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 l MONTHLY OPERATING REPORT FOR SEPTEMBER, 1989 ,

TABLE OF CONTENTS.

NARRATIVE REPORT Page Vl-1 OPERATING DATA REPORT Page VI-2  !

AVERAGE DAILY POWER LEVEL Pege VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4

?

e t

9

NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: OCTOBER 5 1989 COMPLETED BY: J.C.Will.IAMS TELEPHONE: (404) 826-4279

, SEPTEMBER 1 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

l SEPTEMBER 30 18:15 COMMENCE POWER REDUCTION TO 75% FOR "A" MFPT OUTAGE.

l SEPTEMBER 30 23:59 UNIT 1 AT 75% POWER FOR "A" MFPT OUTAGE.

Vl-1

. l L  :

OPERATING DATA REPORT DOCKET NO. 50-424 l DATE: 1989 i OCTOBER COMPLETED BY J. 5,C. WILLIAMS '

TELEPHONE: (404) 826-4279 .

OPERATING STATUS i 1

1. UNIT NAME: VEGP UNIT 1  !
2. REPORT PERIOD: SEPTEMBER 89 )
3. LICENSED THERMAL POWER (MWt : 3411  !
4. NAMEPLATE RATING 1148 l
5. DESIGN ELECTRICAL RATING JN (GROSS T MWe): MWe : 1101
6. MAXIMUM DEPENDABLE CAPACI1Y (GROSS MWe): 1137
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1083
8. IF CHANGES OCCUR IN CAPACITY RATING 3 l (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: l I
9. POWER LEVEL TO WHICH RESTRICTED NO RESTRICTIONS
10. REASONS FOR RESTRICTION,: IF ANY, IF ANY (NETN/A MWe): l THIS MONTH YR. TO DATE CUMULATIVE II. HOURS IN REPORTING PERIOD: 720 6551 20472  !
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 6291.0 17166.1 r
13. REACTOR RESERVE SHUTDOWN HOURS:

~

0.0 0 0  :

14. HOURS GENERATOR ON-LINE: 720.0 6172.9 16665.6 ,
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0 0  :
16. GROSS THERMAL ENERGY GENERATED MWH): 2450229 20487477 54918633
17. GROSS ELEC. ENERGY GENERATED (M H 811970 6780360 18170430 l
18. NET ELEC. ENERGY GENERATED (MWH :): 774750 100.0%

6441390 96.0%

17153520 83.9%

19 REACTOR SERVICE FACTOR

20. REACTOR AVAILABILITY FACTOR 100.0% 96.0% 83.9%-

210 UNIT SERVICE FACTOR: 100.0% 94.2% 81.4%

22. UNIT AVAILABILITY FACTOR: 100.0% 94.2% 81.4%  !
23. UNIT CAPACITY FACTOR USING MDC NFT): 99.4% 90.8% 77.4%
24. UNIT CAPACITY FACTOR USING DER NET): 97.7% 89.3% 76.1%

5.8% 11.8% i 250 UNIT FORCED OUTAGE RA E: 0.0%

26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING -- FEB 23 -- 45 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i t

l V1-2

c .

l:

UNIT I AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: OCTOBER 5 1989  :

, COMPLETED BY: J. C. WILLIAMS  !

TELEPHONE: (404) 826-4279 ,

DAY Net MW 1 ......... 1065 2 ......... 1050  ;

3 ......... 1065 i 4 ......... 1076 5 ......... 1076 6 ......... 1074 7 ......... 1077 r

8 ......... 1076 s 9 ......... 1078 l 10 ......... 1072  !

11 ......... 1073 L 12 ......... 1073 ,

13 ......... 1072 14 ......... 1077 15 ......... 1072 16 ......... 1074 17 ......... 1083

  • 18 ......... 1081 19 ......... 1085
  • 20 ......... 1083 * '

21 ......... 1074 t 22 ......... 1075 23 ......... 1081  ;

24 ......... 1093

  • 25 ......... 1086
  • 26 ......... 1062 27 ......... 1085
  • 28 ~ ....... 1090
  • 29 ......... 1081 30 ......... 1054
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS VI-3

l UNIT SHUTDOWNS AND POWER RE0VCTIONS DOCKET NO. 50-424 DATE: 1989 UNIT NAME: VEGP UNIT 1 COMPLETED BY: V.TOBER5[IAMS J. C. WIL TELEPHONE: (404) 826-4279 REPORT MONTH SEPTEMBER 89 R M 5 E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO HE NO. DATE E (HOURS) N D NUMBER (SUBC0DE) PREVENT RECURRENCE 89-10 09\30 S 5.75 A 5 N\A JK SIC SEE BELOW F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED 1 - MANUAL A GREATER THAN 20%

A-EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM B-MAINTENANCE OR TEST REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINVATIONS THE PRECEEDING 24 HOURS.

E-0PERATOR TRAINING fi LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 89-10 CAUSE: INTERMITTENT SIGNAL SPIKES ON MAIN FEEDWATER PUMP TURBINE SPEED PICKVP (SSPV-1)~.

CORRECTIVE ACTION: POWER REDUCTION IN ORDER TO RE:40VE MAIN FEEDWATER PUMP "A" FROM SERVICE TO REPLACE FEEDWATER PUMP TURBINE SPEED PICKUP (SSPU-1).

VI-4

(- .-

O i

I i

ENCLOSURE 2 V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR SEPTEMBER, 1989 TABLE OF CONTENTS f.

NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 [

i AVERAGE DAILY POWER LEVEL Page V2-3 i UNIT SHUTOOWNS AND POWER REDUCTIONS Page V2-4 p

r s

9 y.

(

0 . ,

NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE: OCTOBER 5 1989 COMPLETED BY: J.C.WIL(IAMS TELEPHONE: (404) 826-4279 ,

t SEPTEMBER 1 00:00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS. '

SEPTEMBER 4 04:30 IS0 PHASE BUS DUCT COOLING ALARM. POWER REDUCED TO 80%.

i SEPTEMBER 4 06:18 COMMENCE RAMP TO FULL POWER.

SEPTEMBER 4 14:03 REACTOR AT FULL POWER WITH NO OPERATIONAL PROBLEMS.

SEPTEMBER 11 18:00 COMMENCE LOAD REDUCTION TO 90% 10 REPAIR MFPT "A" MALFUNCTIONING POWER SUPPLY #1.

SEPTEMBER 12 05:07 COMMENCE RAMP TO FULL POWER.

SEPTEMBER 12 10:06 REACTOR AT FULL POWER WITH NO OPERATIONAL PROBLEMS.

COMMENCE LOAD REDUCTION TO 90% TO REPLACE MFPT "A" FAILED SEPTEMBER 12 20:26 POWER SUPPLY #1.

' SEPTEMBER 13 01:30 COMMENCE LOAD RErr. TION 10 60% TO REPLACE MFPT "A" FAILED POWER SUPPLY #2.

SEPTEMBER 13 02:30 COMMENCE RAMP TO FULL POWER.

SEPTEMBER 13 09:55 REACTOR AT FULL POWER WITH NO OPERATIONAL PROBLEMS.

SEPTEMBER 30 23:59 UNIT 2 AT 100% POWER WITH N0 OPERATIONAL PROBLEMS, 1

1 i

V2-1

  • s c .

3 OPERATING DATA REPORT DOCKET NO. 50-425  !

DATE: 1989 .

COMPLETEDOCTOBER BY: J. 5,C. WILLIAMS ,

TELEPHONE: (404) 826-4279 l OPERATING STATUS  :

1. UNIT NAME: VEGP UNIT 2 r
2. REPORT PERIOD: SEPTEMBER 1989
3. LICENSED THERMAL POWER (MWt : 3411  ;
4. NAMEPLATE RATING (GROSS MWe : 1148 ,
5. DESIGN ELECTRICAL RATING FN T MWe): 1101 1137  ;
6. MAXIMUM DEPENDABLE CAPACIfY (GROSS MWe):
7. MAXIMUM DEPENDABLE CAPACITY 1083
8. IF CHANGES OCCUR INRATINGS. CAPACITY (NET MWe): t 1: (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: l
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWe): No restrictions 10.- REASONS FOR RESTRICTION, IF ANY,: N/A ,

THIS MONTH YR. TO DATE CUMULATIVE  !

11. HOURS IN REPORTING PERIOD: 720 3216 3216 i

-12. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.0 3152.3 3152.3

13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 720.0 3106.0 3106.0
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 .
16. GROSS THERMAL ENERGY GENERATED MWH 2439109 10486689 10486689.0
17. GROSS ELEC. ENERGY GENERATED (M H):): 825104 3524985 3524985 3368085 i
18. NET ELEC. ENERGY GENERATED (MWH : 789574 3368085
19. REACTOR SERVICE FACTOR 100.0% 98.0% 98.0%

r 20. REACTOR AVAILABILITY FACTOR 100.0% 98.0% 98.0%

1

21. UNIT SERVICE FACTOR: 100.0% 96.6% 96.6% f l 22. UNIT AVAILABILITY FACTOR: 100.0% 96.6% 96.6%

23.UNITCAPACITYFACTORquSINGMDCNET): 101.3% 96.7% 96.7%  !

24. UNIT CAPACITY FACTOR I USING DER NET): 99.6% 95.1% 95.1%  :

l 25 UNIT FORCED OUTAGE RAiE: 0.0% 2.2% 2.2%

i- 26. SHU1 DOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): l

27. IF SHUT 00WNMAINTENANCE AT END OF (SNUBBER REPORT INSPECTIONS -- OCT 6 -- 5 DAYS PERIOD, ESTIMATED)DATE OF STARTUP:

N/A I

1 V2-2 i

~,. .. a.

' O UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE: 1989 COMPLETED BY: OCTOBER J. C. WIL 5[IAMS TELEPHONE: (404) 826-4279 DAY Net MW l ......... 1098

  • 2 ......... 1094
  • 3 ......... 1101
  • 4 ......... 1070 5 ......... 1104
  • 6 ......... 1102
  • 7 ......... 1097
  • 8 ......... 1098
  • 9 ......... 1097
  • 10 ......... 1098
  • 11 ......... 1070 12 ......... 1050 13 ......... 993 14 ......... 1095
  • 15 ......... 1096
  • 16 ......... 1102
  • 17 ......... 1108
  • 18 ......... 1111
  • 19 ......... 1113
  • 20 ......... 1111
  • 21 ......... 1099
  • 22 ......... 1098
  • 23 ......... 1105
  • 24 ......... 1119
  • 25 ......... 1119
  • 26 ......... 1114
  • L 27 ......... 1113
  • h 28 ......... 1115
  • 29 ......... 1107
  • 30 ......... 1103 *
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS 1

l l'

I 1

L V2-3 l

l I

i l

l-l

t.

1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 '

DATE: OCTOBER 5 1989 UNIT NAME: VEGP UNIT 2 COMPLETED BY: J.C.WILEIAMS 4

! TELEPHONE: (404) 826-4279 REPORT MONTH SEPTEMBER 89 R R 5 E E Y T A T LICENSEE SC Y S H EVENT T0 COMPONENT CAUSE & CORRECTIVE P DURATION 0 0 REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER HE (SUBCODE) PREVENT RECURRENCE NONE

!. F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED I - MANUAL A GREATER THAN 20%

A-EQUIPMENTFAILURE(EXPLAIN)2-MANUALSCRAM B-MAINTENANCE OR TES' REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.

, NI RAT 95 R A) l

' G-0PERATIONAL ERROR (EXPLAIN)

H-0THER (EXPLAIN) 1 V2-4

.'"'~

l (ATTACHMENT 1) )

VEGP UNITS 1 & 2 DATE: OCTOBER S 1989 j COMPLETED BY: J. C. WILLIAMS TELEPiiONE: (404) 826-4279 CHALLENGES TO PORV OR SAFETY VALVES i l

l L VT 1 EY NP DATE TAG NUMBER TE DESCRIPTION THERE WERE NO CHALLENGES TO PORV OR SAFETY VALVES.

i EVENT TYPE :

A-AUTOMATIC 1 M-MANUAL