{{#Wiki_filter:ACCELERATED DiOIRIBUTION
{{#Wiki_filter:ACCELERATED           DiOIRIBUTION ..DEMONSIOATION                 SYSTEM Lp   q
..DEMONSIOATION SYSTEM Lp q.I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8712290385 DOC.DATE: 87/12/22 NOTARIZED:
  . I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET P$FACIL:50-220 Nine Mile Point Nuclear Station, Unit.1, Niagara Powe 05000220 AUTH.NAME AUTHOR AFFILIATION MAZZAFERRO,P.A.
ACCESSION NBR:8712290385         DOC.DATE: 87/12/22   NOTARIZED: NO             DOCKET P$
Niagara Mohawk Power Corp.LEMPGES,T.E.
FACIL:50-220 Nine Mile Point Nuclear Station, Unit. 1, Niagara Powe           05000220 AUTH. NAME         AUTHOR AFFILIATION MAZZAFERRO,P.A. Niagara Mohawk Power Corp.
Niagara, Mohawk Power Corp.RECIP.NAME RECIPIENT AFFILIATION W/8 DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR
LEMPGES,T.E.       Niagara, Mohawk Power Corp.
)ENCL II SIZE: TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.NOTES
RECIP.NAME         RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
LER 87-023-00:on 870422,reactor bldg emergency ventilation initiation because of fuse failure.ltr.RECIPIENT ID CODE/NAME PD1-1 LA BENEDICT,R INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS NRR/DEST/ELB NRR/DEST/MEB NRR/DEST/PSB NRR/DEST/SGB NRR/DLPQ/QAB NRR/DREP/RAB-DR-I SIB RGF 02 S ELFORD, J RGN1 FILE 01 EXTERNAL: EG&G GROH,M H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1-~1 1 1 1 1 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD HAUGHEY,M ACRS MOELLER AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB NRR/DEST/ICSB NRR/DEST/MTB NRR/DEST/RSB NRR/DLPQ/HFB NRR/DOEA/EAB NRR/DREP/RPB NRR/PMAS/ILRB RES DEPY GI RES/DE/EIB FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1.1 1 1 1 1 1 1 1 1 j A D TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 46  
LER   87-023-00:on 870422,reactor bldg emergency       ventilation initiation   because of fuse failure.
W/8        ltr.
DISTRIBUTION CODE: IE22D      COPIES RECEIVED:LTR  )  ENCL II  SIZE:
TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.
NOTES ID RECIPIENT CODE/NAME PD1-1 LA COPIES LTTR ENCL 1-  ~
1 ID RECIPIENT CODE/NAME PD1-1 PD COPIES LTTR ENCL 1    1 j
BENEDICT,R             1    1    HAUGHEY,M              1    1                A INTERNAL: ACRS MICHELSON           1    1    ACRS MOELLER            2    2 AEOD/DOA               1    1    AEOD/DSP/NAS            1    1 AEOD/DSP/ROAB           2    2    AEOD/DSP/TPAB          1    1 ARM/DCTS/DAB           1    1    DEDRO                  1    1 NRR/DEST/ADS           1    0    NRR/DEST/CEB            1    1 NRR/DEST/ELB            1    1    NRR/DEST/ICSB          1    1 NRR/DEST/MEB            1    1    NRR/DEST/MTB            1     1 NRR/DEST/PSB            1    1    NRR/DEST/RSB            1    1 NRR/DEST/SGB            1    1    NRR/DLPQ/HFB            1    1 NRR/DLPQ/QAB            1    1    NRR/DOEA/EAB           1    1 NRR/DREP/RAB            1    1    NRR/DREP/RPB           2    2
                      -DR-I  SIB          1    1    NRR/PMAS/ILRB           1    1 RGF            02      1    1    RES DEPY   GI           1 . 1 S  ELFORD, J        1    1    RES/DE/EIB             1    1 RGN1    FILE  01      1    1 EXTERNAL: EG&G GROH,M              5    5    FORD BLDG HOY,A         1     1 H ST LOBBY WARD        1     1   LPDR                    1     1 NRC PDR                1     1   NSIC HARRIS,J          1     1 NSIC MAYS,G            1     1 D
TOTAL NUMBER OF COPIES REQUIRED: LTTR       47   ENCL   46


Ix NRC Form 366 (5 63)LICENSEE EVENT REPORT (LER)U.S.NUCLEAR REOULATORY COMMISSION APPROVED OMB NO.3)504104 EXPIRES: 5/31/SS FACILITY NAME (I)DOCKET NUMBER 11)o 5 n o o PAOE ISI 1 OF""'"'eactor Building Emergency Ventilation Initiation Because Of Fuse Failure And Failure T T nt'With R t F EVENT DATE (SI MONTH OAY YEAR YEAR LER NUMBER (6)SEOUENTtAL NrsMSEA NUMBER REVtSt0N MONTH OAY YEAR REPORT DATE(7)FACILI'TY NAMES DOCKET NUMBER(SI 0 5 0 0 0 OTHER FACILITIES INVOLVED 0))0 5 0 0 0 OPERATING MODE (5)POWER LEVEL (10)t.""@V".(~TI::.
Ix NRC Form 366                                                                                                                                                   U.S. NUCLEAR REOULATORY COMMISSION (5 63)                                                                                                                                                                  APPROVED OMB NO. 3)504104 EXPIRES: 5/31/SS LICENSEE EVENT REPORT (LER)
j$%j(jan%,", NAME 20.402(S)20.405(~)ill(i)20.405(el(i)(ill 20.405(~l(1)(iiil 20.405(el(i)(iv) 20.405(~l(1)(s)20.405(cl 50.36(cl(11 50.36(c)(2)60.73(~l(2)(il 60.73(~l(1 l(ill 50.73(e l(2)(i(i l LICENSEE CON1'ACT FOR THIS LER (12)60.73(~I(2)liv)60.73(~l(2)(v)50,73(~l(2)(vBI 50.73(~l(2((villi~(A)Ei0.73(el(21(villi(B) 60.73(~l(2)(xl AREA CODE THIS REPORT IS SUBMITTED PUASUANT 7 0 THE REQUIREMENTS OF 10 CFR ('): (Chests one or more Ot rhe fotiovtinti (11 73.71(tr)73.71(cl DTHER fspscIty in Aosfrecr perovr end In text, IVRC Form JSSAI TELEPHONE NUMBER Peter A.Hazzaferro, Assistant Su ervisor Technical Su ort 3 1 5 3 4 9-2 COMPLETE ONE LINE FOR EACh COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)CAUSE SYSTEM COMPONENT MANUFAC.TURER TO NPADS P~P+~~g~@P.~P, CAUSE SYSTEM COMPONENT r!y4kayn.:.
DOCKET NUMBER 11)                              PAOE ISI FACILITY NAME (I) o 5   n   o     o                   1   OF
x.N, MANUFAC.TVAER EPOSITABLE TO NPRDS yyytr~lgu gyes k%%+m~40'~B H F U H 175 N jg~)g~P'I(III'cj)k+t'@Rjk~~jb l&y~(i@414.
  ""'"'eactor                       Building Emergency Ventilation Initiation Because Of                                                                   Fuse       Failure         And       Failure T                   T                 nt'With R                     t   REPORT DATE(7)
" SUPPLEMENTAL REPORT EXPECTED llll YES III yes, compieN EXPECTED SUBMISSION OA TEI NO ABSTRACT I(.imit to f400 sprees.I e., epproximereiy tifteen sinore specs typevvrsrren Ii nmi (15)EXPECTED SUBMISSION DATE (151 MONTH DAY YEAR ABSTRACT This Licensee Event Report reports two related events.The.first event involved an Engineered Safety Feature actuation.
F OTHER FACILITIES INVOLVED0))
On April 22, 1987, Nine Mile Point Unit 1 (NMPl)was operating at full power.At 1434 hours, the unit experienced a trip of the normal reactor building ventilation and an initiation of Reactor Building Emergency Ventilation (RBEV).The cause of this event w'as personnel error involving inadvertant shorting of a fuse to ground in the initiation circuit of the RBEV.Immediate corrective action involved replacing the fuse under a station work request.The RBEV was secured at 1645 hours on April 22 and the normal reactor building ventilation was returned to service.On November 23, 1987, the NMP1 Technical Support Department became aware that the 10 CFR 50.73 report had not yet been submitted for the April 22 event.The cause of this event is personnel error.Immediate corrective action involved a discussion with the personnel involved as to how and why this event occurred.Subsequent corrective action will involve preparing a Lessons Learned Transmittal to inform the personnel of the affected departments of the need for attention to detail during work activities.
EVENT DATE (SI                           LER NUMBER (6)
8712290385 871222 PDR ADOCK 05000220 S DCn NAC Form 365 io oil  
SEOUENTtAL           REVtSt0N                   OAY     YEAR                   FACILI'TY NAMES                     DOCKET NUMBER(SI MONTH          OAY      YEAR    YEAR              NrsMSEA          NUMBER MONTH 0   5   0     0     0 0   5    0     0     0 THIS REPORT IS SUBMITTED PUASUANT 7 0 THE REQUIREMENTS OF 10 CFR                      ('): (Chests one or more Ot rhe fotiovtinti (11 OPERATING MODE (5)                       20.402(S)                                     20.405(cl                                  60.73( ~ I(2)liv)                            73.71(tr) 20.405( ~ )ill(i)                             50.36(cl(11                                          l(2)(v) 60.73( ~ l(2((villi                          73.71(cl POWER LEVEL                                                                                                                                                                    DTHER fspscIty in Aosfrecr (10)                               20.405(el(i)(ill                            50.36(c) (2)                               50,73( ~ l(2) (vBI perovr end In  text, IVRC Form 20.405( ~ l(1)(iiil                          60.73( ~ l(2)(il                            50.73( ~          (A)
Ei0.73(el(21(villi(B)                        JSSAI t.""@V".(~TI::.
j$      %j(jan%,",
20.405(el(i)(iv) 20.405( ~ l(1 )(s) 60.73( ~ l(1 l(ill 50.73(e l(2)(i(il                          60.73( ~ l(2)(xl LICENSEE CON1'ACT FOR THIS LER (12)
NAME                                                                                                                                                                    TELEPHONE NUMBER AREA CODE Peter A. Hazzaferro, Assistant                                         Su     ervisor Technical                     Su       ort             3     1   5 3       4 9       -     2 COMPLETE ONE LINE FOR EACh COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)
MANUFAC.                                                                                                MANUFAC.          EPOSITABLE yyytr~lgu gyes CAUSE     SYSTEM         COMPONENT                                             P~P+~~g~@P.~P,             CAUSE SYSTEM         COMPONENT             TVAER            TO NPRDS TURER            TO NPADS r!y4kayn.:.     x. N,                                                                               k%%+m ~40'~
B H F         U               H       175               N jg~)g~P'I(III'cj)k+t'@Rjk~~jb"                                                                          l &y~(i@414.
SUPPLEMENTAL REPORT EXPECTED               llll                                                     EXPECTED MONTH        DAY    YEAR SUBMISSION DATE (151 YES     IIIyes, compieN EXPECTED SUBMISSION OA TEI                                           NO ABSTRACT I(.imit to f400 sprees. I e., epproximereiy tifteen sinore specs typevvrsrren Ii nmi   (15)
ABSTRACT This Licensee Event Report reports two related events.                                                                             The. first event involved an Engineered Safety Feature actuation. On April 22, 1987, Nine Mile Point Unit 1 (NMPl) was operating at full power. At 1434 hours, the unit experienced a trip of the normal reactor building ventilation and an initiation of Reactor Building Emergency Ventilation (RBEV). The cause of this event w'as personnel error involving inadvertant shorting of a fuse to ground in the initiation circuit of the RBEV. Immediate corrective action involved replacing the fuse under a station work request.                                                                                         The RBEV was secured at 1645 hours on April 22 and the normal reactor building ventilation was returned to service.
On   November 23, 1987, the NMP1 Technical Support Department became aware that the           10 CFR 50.73 report had not yet been submitted for the April 22 event.           The cause of this event is personnel error.                                                                   Immediate corrective action       involved a discussion with the personnel involved as to how and why this event occurred.                             Subsequent corrective action will involve preparing a Lessons             Learned Transmittal to inform the personnel                                                                       of the affected departments of the need for attention to detail during work activities.
8712290385                   871222 PDR             ADOCK       05000220 S                                         DCn NAC Form 365 io oil


O'RC Form 3BEA (94)3)LICENSEE NT REPORT (LERI TEXT CONTINUA N U.S.NUCLEAR REOULATORY COMMISSION APPROVEO OMB NO.3150M)04 EXPIRES: 8/31/88 FACILITY NAME 111 OOCKET NUMBER 12)LER NUMBER (EI SEQUENTIAL
O'RC     Form 3BEA                                                                                                           U.S. NUCLEAR REOULATORY COMMISSION (94)3)
'Fr REVISION NUMBER r, r/NUMBER PACE 13)Nine Nile Point Unit 1 Tl)IT///rrroro 4/rBCO/4)o)/rlorS rrFF//BOor4////IC
LICENSEE                       NT REPORT (LERI TEXT CONTINUA         N                 APPROVEO OMB NO. 3150M)04 EXPIRES: 8/31/88 FACILITY NAME 111                                                                   OOCKET NUMBER 12)             LER NUMBER (EI                       PACE 13)
%%dnrr 3/ES4'4/11 7)22 08 7 023 0 0 0 2"0 4 DESCRIPTION OF EVENT This Licensee Event Report (LER)reports two related events.The first event is an Engineered Safety Feature (ESF)initiation which occurred on April 22, 1987.The second event is the failure to report the first event in accordance with 10 CFR 50.73.Because of the period'f time involved between the event date and the discovery date of the second event, it has been difficult to reconstruct the specifics of these events with respect to the exact causes.However, according to the persons involved and all available documentation, the following narrative is an accurate account of the events.EVENT NUMBER ONE On April 22, 1987, NMPl was operating at full power with the mode switch in the NRUN" position.At 1434 hours, the unit experienced a trip of the normal reactor building ventilation system and the subsequent Reactor Building Emergency Ventilation System (RBEV)initiation.
SEQUENTIAL   'Fr REVISION NUMBER   r, r/ NUMBER Nine Nile Point Unit                           1                                           22 08  7      023                0 0 0        2    "0          4 Tl)IT///rrroro 4/rBCO/4)o)/rlorS rrFF //BOor4////IC %%dnrr 3/ES4'4/ 11 7)
The cause of the initiation was deenergization of the Channel ll Reactor Protection System (RPS)Reactor Building Ventilation System logic.The reason for the trip was not immediately obvious, since the channel 11 and channel 12 reactor building ventilation radiatio'n.monitors (Equipment Piece Numbers[EPNs]202-11 and 202-12 respectively) indicated no high radiation condition present.in the reactor building ventilation.
DESCRIPTION OF EVENT This Licensee Event Report (LER) reports two related events.                                             The first event is an Engineered Safety Feature (ESF) initiation which occurred on April 22, 1987. The second event is the failure to report the first event in accordance with 10 CFR 50.73. Because of the period'f time involved between the event date and the discovery date of the second event, difficult to reconstruct the specifics of these events with respect to the it    has been exact causes.                       However, according to the persons involved and all available documentation, the following narrative is an accurate account of the events.
A Station Work Request (WR), number 106300, was'nitiated to investigate the cause of the initiation.
EVENT NUMBER ONE On     April       22, 1987, NMPl was operating at full power with the mode switch in the           NRUN"         position. At 1434 hours, the unit experienced a trip of the normal reactor building ventilation system and the subsequent Reactor Building Emergency Ventilation System (RBEV) initiation. The cause of the initiation was deenergization of the Channel Building Ventilation System logic.
The RBEV, however, remained in service until the cause of the trip could be identified.
ll   Reactor Protection System (RPS) Reactor The reason   for the trip was not immediately obvious, since the channel 11 and channel 12 reactor building ventilation radiatio'n .monitors (Equipment Piece Numbers [EPNs] 202-11 and 202-12 respectively) indicated no high radiation condition present. in the reactor building ventilation. A Station Work Request (WR), number 106300, was to investigate the cause of the initiation. The RBEV, however,                                                 'nitiated remained in service until the cause of the trip could be identified.
At the time of the RBEV initiation, an Instrument and Control Department (I&C)technician was performing an unrelated surveillance test within an area of the control panel which is common to the control circuits of several different process monitoring systems.During the performance of the test, the technician inadvertantly shorted to ground a 6 amp fuse in one of the 24 volt control circuits.During the investigation of this event,.it was found that this fuse was associated with auxiliary relay 18K1.Relay 18Kl is one of two relays that, when deenergized, trip the normal reactor building ventilation and initiate RBEV.The logic for this operation is noncoincident, The affected fuse and the portion of the circuit that operates relay 18K1 are not an integral part of the indication/trip unit of radiation monitor EPN 202-11 or an associated auxiliary trip unit.Therefore, the only indication that operations personnel received as a result of the fuse failure was an annunciator actuation reflecting the trip of the normal reactor building ventilation.
At the time of the RBEV initiation, an Instrument and Control Department (I&C) technician was performing an unrelated surveillance test within an area of the control panel which is common to the control circuits of several different process monitoring systems. During the performance of the test, the technician inadvertantly shorted to ground a 6 amp fuse in one of the 24 volt control circuits. During the investigation of this event,.
The fuse was replaced, the RBEV was secured, and the normal reactor building ventilation was restored at 1645 hours on April 22, 1987.EVENT NUMBER TWO Under WR 106300, 1&C personnel investigated the cause of the first event.The Occurrence Report (OR)initiated to track the event was inadvertantly attached to WR 106300.When the WR was closed out, it was not noticed by any of the reviewers that the OR was still attached.The WR was then filed.As a NRC FOAM 3444 I94)31 o U.S.GPO:1988 0.824'538r488 0
this fuse was associated with auxiliary relay 18K1. Relay 18Kl is one of two it    was found that relays that, when deenergized, trip the normal reactor building ventilation and initiate RBEV.                                 The logic for this operation is noncoincident,                             The affected fuse and the portion of the circuit that operates relay 18K1 are not an integral part of the indication/trip unit of radiation monitor EPN 202-11 or an associated auxiliary trip unit. Therefore, the only indication that operations personnel received as a result of the fuse failure was an annunciator actuation reflecting the trip of the normal reactor building ventilation. The fuse was replaced, the RBEV was secured, and the normal reactor building ventilation was restored at 1645 hours on April 22, 1987.
NRC Fotm 3SBA IQ43 I LICENSEE NT REPORT ILER)TEXT CONTINUA N U.S.NUCLEAR REOUI.ATORY COMMISSION APPROVED OMB NO 3ISO&10E EXPIRES: 8/31/88 FACILITY NAME III OOCKET NUMBER ISI YEAR LER NUMBER I6I SEOVENTIAL NVMSER No REVISION NVM PACE ISI Nine Mile Point Unit 1 TEXT/4'/IKoe EPoop/E/oqvted, vM//I/oOo~/YRC Form 38SA'u/IITI EVENT NUMBER TWO (Cont'd)0 5 0 0 0 P P 0 8 7 0 2 3 p p p 3 QF result, the OR was not logged and did not receive the required second level review in a timely manner.Therefore, the Technical Support Department, responsible for second level review and LER preparation, was not aware that there had been a reportable event.On November 20, 1987, the NMPl Technical Support Department was contacted by telephone by a Nuclear Regulatory Commission consultant.
EVENT NUMBER TWO Under       WR 106300,                   1&C personnel investigated the cause of the first event.
The subject of the call was the 10 CFR 50.72 notification made by the NMP1 Operations Department on April 22.The Technical Support Department had at that time no record of the occurrence.
The         Occurrence Report (OR) initiated to track the event was inadvertantly attached to WR 106300. When the WR was closed out,                                     it was not noticed by any of the reviewers that the OR was                                 still   attached. The WR was then filed. As a NRC FOAM 3444                                                                                                                           o U.S.GPO:1988 0.824'538r488 I94)31
A'n investigation was then initiated.
At approximately 1100 hours on November 23, 1987, after the investigation had located the misplaced OR, Technical Support Department personnel became aware that although the initial telephone notifications regarding the event were made in a timely manner, the written (LER)report was not submitted within the required thirty day period.During the interval since the 10 CFR 50.72 notification, NMP1 had operated at up to full power.The second event was the failure to submit the 10 CFR 50.73 report within thirty days.This was a violation of, Nine Mile Point Unit, 1 Technical Specifications section 6.6.1a., which requires conformance to 10 CFR 50.73 reporting requirements.
CAUSE OF THE EVENT EVENT NUMBER ONE The root cause of the first event was equipment failure due to personnel error.The 6 amp fuse in the control circuit failed because it was inadvertantly shorted to ground by an 1&C technician.
EVENT NUMBER TWO The root cause of the second event was personnel error.The OR was inadvertently attached to the WR.During closeout of the paperwork no one noticed that the original OR was attached.ANALYSIS OF THE EVENT There were no adverse safety consequences as a result of the first event.The RBEV operated as.designed and in the conservative direction.
This analysis would be valid under any normal operating configuration or power level.The second event involved subsequent reporting requirements only.Since plant operations and public safety were not affected, there were no adverse safety consequences
'as a result of the second event.NRC FORM SEEA I94ISI~U.S,OPO:I988 0.83E SBBMSS


')IRC Poem 388A)94)3)LICENSEE EV T REPORT ILER)TEXT CONTINUAT U.S.NUCLEAR REGUI.ATORY COMMISSION APPROVED OM8 NO.3)SONICS EXPIRES: 8/31/88 FACILITY NAME 0)DOCKET NUMBER (2)YEAR LER NUMEER IEI SEOVSNTIAL NVM8ER r.'rM REVISION NVM884 PAGE (3)Nine l1ile Point Unit 1 TACT///IIMMo R>>oo/8/R)vfot/oso aRS5ono/HRC
0 NRC Fotm 3SBA                                                                                                              U.S. NUCLEAR REOUI.ATORY COMMISSION IQ43 I LICENSEE                  NT REPORT ILER) TEXT CONTINUA                N                APPROVED OMB NO 3ISO&10E EXPIRES: 8/31/88 FACILITY NAME III                                                              OOCKET NUMBER ISI                  LER NUMBER I6I                      PACE ISI YEAR     SEOVENTIAL NVMSER No  REVISION NVM QF Nine Mile Point Unit                       1                       0  5  0  0  0  P P 0    8 7      0    2 3          p p      p 3 TEXT /4'/IKoe EPoop /E /oqvted, vM //I/oOo ~ /YRC Form 38SA'u/ IITI EVENT NUMBER TWO                  (Cont'd) result, the OR was not logged and did not receive the required second level review in a timely manner.                              Therefore, the Technical Support Department, responsible for second level review and LER preparation, was not aware that there had been                a  reportable event.
%%d 3/ELd'8/)17)CORRECTIVE ACTIONS 05000/2087 0 2 3 0 0 OF Initial corrective action, with respect to the first event,'nvolved initiating a WR to investigate the cause of the event.Subsequent corrective action consisted of replacing the blown fuse, securing the RBEV, and returning the normal Reactor Building Ventilation System to service.Initial corrective action,'with respect to the second event, involved locating WR 106300 and verifying the failure to report the event in accordance with 10 CFR 50.73.Subsequent corrective action on the second event included initiating an OR and performing an investigation into the event.In addition, a Lessons Learned Transmittal is being prepared in order to call attention to the need for attention to detail during work activities.
On    November 20, 1987, the NMPl Technical Support Department was contacted by telephone by a Nuclear Regulatory Commission consultant.                                            The subject of the call was the 10 CFR 50. 72 notification                                      made  by    the   NMP1      Operations Department on April 22. The Technical Support                                  Department      had  at    that      time no record of the occurrence.                        A'n investigation      was  then  initiated.
The transmittal will be reviewed by the departments involved.ADDITIONAL INFOIQIATION Similar events were discussed in NMPl LERs 86-10 (Actuation of Reactor Building Emergency Ventilation Resulting From Blown Fuse)and 85-07 (Initiation Of Reactor Building Emergency Ventilation Due To Power Supply Short).The fuse which was shorted is believed to have been a BUSS type, class H, NON, 6 amp fuse rated at 250 volts or less.It was manufactured by McGraw Edison Company of St.Louis, Missouri.The following table lists the identifier codes of the involved equipment according to IEEE 805-1983, IEEE 803A-1983, and Table 9 of the NPRDS Reporting Procedures Manual.EPN~tom onent Model Number IEEE 805 IEEE 803 NPRDS Table 9~decem~Satan Manufacturer Fuse NON, 6 AMP, BUSS Type BH FU M175 Geiger-Mueller Tube 18550 BH DET A370 RN04B-5 Detector Sensor and Converter 194X927G2 BH DET G080 RN07B-5 Radiation Monitor 129B2802 BH MON G080 RN25'rip Auxiliaries Unit 194X940G7 BH MON G080 NRC FORM Sdda)943)o U.S.GPO;1985 0 828 538M55
At approximately 1100 hours on November 23, 1987, after the investigation had located the misplaced OR, Technical Support Department personnel became aware that although the initial telephone notifications regarding the event were made in a timely manner, the written (LER) report was not submitted within the required thirty day period. During the interval since the 10 CFR 50.72 notification, NMP1 had operated at up to full power. The second event was the failure to submit the 10 CFR 50.73 report within thirty days.                                                        This was a violation of, Nine Mile Point                                Unit,  1  Technical    Specifications              section 6.6.1a., which requires conformance to 10 CFR 50.73 reporting requirements.
CAUSE OF THE EVENT EVENT NUMBER ONE The root cause of the first event was equipment failure                                    due to personnel error. The 6 amp fuse in the control circuit failed                                                  because          it    was inadvertantly shorted to ground by an 1&C technician.
EVENT NUMBER TWO The root cause of the second event was personnel error.                                               The     OR    was inadvertently attached to the WR. During closeout of the paperwork                                                      no one noticed that the original OR was attached.
ANALYSIS OF THE EVENT There were no adverse                    safety consequences        as a  result of the first event.
The      RBEV        operated            as .designed      and    in the conservative direction. This analysis            would be            valid under      any normal        operating    configuration or                power level.
The second              event involved subsequent                reporting requirements            only. Since plant operations                  and      public safety were not affected,               there were no adverse safety consequences                      'as a result of the second event.
NRC FORM SEEA                                                                                                                          ~ U.S,OPO:I988 0.83E SBBMSS I94ISI


NIAGARA MOHAWK POWER CORPORATION pe~NIAGARA~j MOHAWK THOMAS E.LEMPGES VCf PACSOtw1~VCLCAAOCI4AATON 301 PLAINFIELD ROAD SYAACUSE,NY 13212 NIIP30256 December 22, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RE: Docket No.50-220 LER 87-23 Gentlemen:
')IRC Poem 388A                                                                                                      U.S. NUCLEAR REGUI.ATORY COMMISSION
In=accordance with 10 CFR 50.73, we hereby submit the following Licensee Event Report: LER 87-23 Which is being submitted in accordance with 10 CFR 50.73 (a)(2)(iv),"Any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature (ESF), including the Reactor Protection System (RPS).However, actuation of an ESF, including the RPS, that resulted from and was part of the preplanned sequence during testing or reactor operation need not be reported" and 10 CFR 50.73 (a)(2)(i)(B),"Any operation or condition prohibited by the plant's Technical Specifications." The 10 CFR 50.72 report was made at 1700 hours on April 22, 1987.This report was completed in the format designated in NUREG-1022, Supplement 2, dated September 1985.Very truly yours, Vice President Nuclear Generation TEL/meh Attachment cc: William T.Russell Regional Administrator i/I}}
  )94)3)
LICENSEE EV              T REPORT ILER) TEXT CONTINUAT                            APPROVED OM8 NO. 3)SONICS EXPIRES: 8/31/88 FACILITYNAME 0)                                                          DOCKET NUMBER (2)                LER NUMEER IEI                      PAGE (3)
YEAR    SEOVSNTIAL        REVISION NVM8ER    r.'rM NVM884 Nine l1ile Point Unit                    1 TACT ///IIMMoR>>oo /8 /R)vfot/ oso aRS5ono/HRC %%d 3/ELd'8/ )17) 05000/2087                        0    2 3          0 0 OF CORRECTIVE ACTIONS Initial        corrective action, with respect to the first event,'nvolved initiating          a  WR to investigate            the cause of the event. Subsequent corrective action consisted of replacing the blown fuse, securing the RBEV, and returning the normal Reactor Building Ventilation System to service.
Initial corrective action, 'with respect to the second event, involved locating WR 106300 and verifying the failure to report the event in accordance with 10 CFR 50.73. Subsequent corrective action on the second event included initiating an OR and performing an investigation into the event.
In addition,            a Lessons      Learned Transmittal is being prepared                    in order to call attention to                    the need for attention to detail during work                        activities.
The transmittal will be reviewed by the departments involved.
ADDITIONAL INFOIQIATION Similar events were discussed in NMPl LERs 86-10 (Actuation of Reactor Building Emergency Ventilation Resulting From Blown Fuse) and 85-07 (Initiation Of Reactor Building Emergency Ventilation Due To Power Supply Short).
The    fuse which was shorted is believed to have been a BUSS type, class H, NON,      6 amp      fuse rated at 250 volts or less.                    It  was manufactured by McGraw Edison Company of St. Louis, Missouri.                                The following table lists the identifier codes of the involved equipment according to IEEE 805-1983, IEEE 803A-1983, and Table 9 of the NPRDS Reporting Procedures Manual.
IEEE 805      IEEE 803            NPRDS      Table      9 EPN              ~tom  onent              Model Number      ~decem        ~Satan              Manufacturer Fuse                      NON, 6 AMP,            BH          FU                        M175 BUSS Type Geiger-                  18550                  BH          DET                      A370 Mueller      Tube RN04B-5            Detector                  194X927G2              BH          DET                      G080 Sensor and Converter RN07B-5          Radiation                  129B2802                BH          MON                      G080 Monitor RN25          'rip Auxiliaries 194X940G7              BH          MON                      G080 Unit NRC FORM Sdda                                                                                                                    o U.S.GPO;1985 0 828 538M55
  )943)
 
NIAGARA MOHAWK POWER CORPORATION pe~
NIAGARA     ~j     MOHAWK 301 PLAINFIELDROAD SYAACUSE,NY 13212 THOMAS E. LEMPGES VCf PACSOtw1~VCLCAAOCI4AATON                                                                             NIIP30256 December 22, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RE:       Docket No. 50-220 LER 87-23 Gentlemen:
In =accordance   with 10 CFR   50.73,     we   hereby submit the following Licensee Event Report:
LER 87-23     Which   is being submitted in accordance with 10 CFR 50.73 (a)(2)(iv),   "Any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature (ESF),
including the Reactor Protection System (RPS). However, actuation of an ESF, including the RPS, that resulted from and was part of the preplanned sequence during testing or reactor operation need not be reported" and 10 CFR 50.73   (a)(2)(i)(B),         "Any operation or condition prohibited   by the     plant's Technical Specifications."
The 10 CFR 50.72     report   was made       at 1700 hours on   April 22, 1987.
This report was completed in the format designated                 in NUREG-1022, Supplement 2, dated September 1985.
Very   truly yours, Vice President Nuclear Generation TEL/meh Attachment cc:       William T. Russell Regional Administrator i/I}}

Latest revision as of 23:34, 21 October 2019

LER 87-023-00:on 870422,trip of Normal Reactor Bldg Ventilation & Initiation of Emergency Ventilation Occurred. Caused by Personnel Error.Fuse Replaced.On 871123,util Discovered LER Not Submitted for event.W/871222 Ltr
ML18038A759
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/22/1987
From: Lempges T, Mazzaferro P
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
LER-87-023-01, NMP30256, NUDOCS 8712290385
Download: ML18038A759 (12)


Text

ACCELERATED DiOIRIBUTION ..DEMONSIOATION SYSTEM Lp q

. I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8712290385 DOC.DATE: 87/12/22 NOTARIZED: NO DOCKET P$

FACIL:50-220 Nine Mile Point Nuclear Station, Unit. 1, Niagara Powe 05000220 AUTH. NAME AUTHOR AFFILIATION MAZZAFERRO,P.A. Niagara Mohawk Power Corp.

LEMPGES,T.E. Niagara, Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 87-023-00:on 870422,reactor bldg emergency ventilation initiation because of fuse failure.

W/8 ltr.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ) ENCL II SIZE:

TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.

NOTES ID RECIPIENT CODE/NAME PD1-1 LA COPIES LTTR ENCL 1- ~

1 ID RECIPIENT CODE/NAME PD1-1 PD COPIES LTTR ENCL 1 1 j

BENEDICT,R 1 1 HAUGHEY,M 1 1 A INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 1 DEDRO 1 1 NRR/DEST/ADS 1 0 NRR/DEST/CEB 1 1 NRR/DEST/ELB 1 1 NRR/DEST/ICSB 1 1 NRR/DEST/MEB 1 1 NRR/DEST/MTB 1 1 NRR/DEST/PSB 1 1 NRR/DEST/RSB 1 1 NRR/DEST/SGB 1 1 NRR/DLPQ/HFB 1 1 NRR/DLPQ/QAB 1 1 NRR/DOEA/EAB 1 1 NRR/DREP/RAB 1 1 NRR/DREP/RPB 2 2

-DR-I SIB 1 1 NRR/PMAS/ILRB 1 1 RGF 02 1 1 RES DEPY GI 1 . 1 S ELFORD, J 1 1 RES/DE/EIB 1 1 RGN1 FILE 01 1 1 EXTERNAL: EG&G GROH,M 5 5 FORD BLDG HOY,A 1 1 H ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC HARRIS,J 1 1 NSIC MAYS,G 1 1 D

TOTAL NUMBER OF COPIES REQUIRED: LTTR 47 ENCL 46

Ix NRC Form 366 U.S. NUCLEAR REOULATORY COMMISSION (5 63) APPROVED OMB NO. 3)504104 EXPIRES: 5/31/SS LICENSEE EVENT REPORT (LER)

DOCKET NUMBER 11) PAOE ISI FACILITY NAME (I) o 5 n o o 1 OF

""'"'eactor Building Emergency Ventilation Initiation Because Of Fuse Failure And Failure T T nt'With R t REPORT DATE(7)

F OTHER FACILITIES INVOLVED0))

EVENT DATE (SI LER NUMBER (6)

SEOUENTtAL REVtSt0N OAY YEAR FACILI'TY NAMES DOCKET NUMBER(SI MONTH OAY YEAR YEAR NrsMSEA NUMBER MONTH 0 5 0 0 0 0 5 0 0 0 THIS REPORT IS SUBMITTED PUASUANT 7 0 THE REQUIREMENTS OF 10 CFR ('): (Chests one or more Ot rhe fotiovtinti (11 OPERATING MODE (5) 20.402(S) 20.405(cl 60.73( ~ I(2)liv) 73.71(tr) 20.405( ~ )ill(i) 50.36(cl(11 l(2)(v) 60.73( ~ l(2((villi 73.71(cl POWER LEVEL DTHER fspscIty in Aosfrecr (10) 20.405(el(i)(ill 50.36(c) (2) 50,73( ~ l(2) (vBI perovr end In text, IVRC Form 20.405( ~ l(1)(iiil 60.73( ~ l(2)(il 50.73( ~ (A)

Ei0.73(el(21(villi(B) JSSAI t.""@V".(~TI::.

j$ %j(jan%,",

20.405(el(i)(iv) 20.405( ~ l(1 )(s) 60.73( ~ l(1 l(ill 50.73(e l(2)(i(il 60.73( ~ l(2)(xl LICENSEE CON1'ACT FOR THIS LER (12)

NAME TELEPHONE NUMBER AREA CODE Peter A. Hazzaferro, Assistant Su ervisor Technical Su ort 3 1 5 3 4 9 - 2 COMPLETE ONE LINE FOR EACh COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

MANUFAC. MANUFAC. EPOSITABLE yyytr~lgu gyes CAUSE SYSTEM COMPONENT P~P+~~g~@P.~P, CAUSE SYSTEM COMPONENT TVAER TO NPRDS TURER TO NPADS r!y4kayn.:. x. N, k%%+m ~40'~

B H F U H 175 N jg~)g~P'I(III'cj)k+t'@Rjk~~jb" l &y~(i@414.

SUPPLEMENTAL REPORT EXPECTED llll EXPECTED MONTH DAY YEAR SUBMISSION DATE (151 YES IIIyes, compieN EXPECTED SUBMISSION OA TEI NO ABSTRACT I(.imit to f400 sprees. I e., epproximereiy tifteen sinore specs typevvrsrren Ii nmi (15)

ABSTRACT This Licensee Event Report reports two related events. The. first event involved an Engineered Safety Feature actuation. On April 22, 1987, Nine Mile Point Unit 1 (NMPl) was operating at full power. At 1434 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.45637e-4 months <br />, the unit experienced a trip of the normal reactor building ventilation and an initiation of Reactor Building Emergency Ventilation (RBEV). The cause of this event w'as personnel error involving inadvertant shorting of a fuse to ground in the initiation circuit of the RBEV. Immediate corrective action involved replacing the fuse under a station work request. The RBEV was secured at 1645 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.259225e-4 months <br /> on April 22 and the normal reactor building ventilation was returned to service.

On November 23, 1987, the NMP1 Technical Support Department became aware that the 10 CFR 50.73 report had not yet been submitted for the April 22 event. The cause of this event is personnel error. Immediate corrective action involved a discussion with the personnel involved as to how and why this event occurred. Subsequent corrective action will involve preparing a Lessons Learned Transmittal to inform the personnel of the affected departments of the need for attention to detail during work activities.

8712290385 871222 PDR ADOCK 05000220 S DCn NAC Form 365 io oil

O'RC Form 3BEA U.S. NUCLEAR REOULATORY COMMISSION (94)3)

LICENSEE NT REPORT (LERI TEXT CONTINUA N APPROVEO OMB NO. 3150M)04 EXPIRES: 8/31/88 FACILITY NAME 111 OOCKET NUMBER 12) LER NUMBER (EI PACE 13)

SEQUENTIAL 'Fr REVISION NUMBER r, r/ NUMBER Nine Nile Point Unit 1 22 08 7 023 0 0 0 2 "0 4 Tl)IT///rrroro 4/rBCO/4)o)/rlorS rrFF //BOor4////IC %%dnrr 3/ES4'4/ 11 7)

DESCRIPTION OF EVENT This Licensee Event Report (LER) reports two related events. The first event is an Engineered Safety Feature (ESF) initiation which occurred on April 22, 1987. The second event is the failure to report the first event in accordance with 10 CFR 50.73. Because of the period'f time involved between the event date and the discovery date of the second event, difficult to reconstruct the specifics of these events with respect to the it has been exact causes. However, according to the persons involved and all available documentation, the following narrative is an accurate account of the events.

EVENT NUMBER ONE On April 22, 1987, NMPl was operating at full power with the mode switch in the NRUN" position. At 1434 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.45637e-4 months <br />, the unit experienced a trip of the normal reactor building ventilation system and the subsequent Reactor Building Emergency Ventilation System (RBEV) initiation. The cause of the initiation was deenergization of the Channel Building Ventilation System logic.

ll Reactor Protection System (RPS) Reactor The reason for the trip was not immediately obvious, since the channel 11 and channel 12 reactor building ventilation radiatio'n .monitors (Equipment Piece Numbers [EPNs] 202-11 and 202-12 respectively) indicated no high radiation condition present. in the reactor building ventilation. A Station Work Request (WR), number 106300, was to investigate the cause of the initiation. The RBEV, however, 'nitiated remained in service until the cause of the trip could be identified.

At the time of the RBEV initiation, an Instrument and Control Department (I&C) technician was performing an unrelated surveillance test within an area of the control panel which is common to the control circuits of several different process monitoring systems. During the performance of the test, the technician inadvertantly shorted to ground a 6 amp fuse in one of the 24 volt control circuits. During the investigation of this event,.

this fuse was associated with auxiliary relay 18K1. Relay 18Kl is one of two it was found that relays that, when deenergized, trip the normal reactor building ventilation and initiate RBEV. The logic for this operation is noncoincident, The affected fuse and the portion of the circuit that operates relay 18K1 are not an integral part of the indication/trip unit of radiation monitor EPN 202-11 or an associated auxiliary trip unit. Therefore, the only indication that operations personnel received as a result of the fuse failure was an annunciator actuation reflecting the trip of the normal reactor building ventilation. The fuse was replaced, the RBEV was secured, and the normal reactor building ventilation was restored at 1645 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.259225e-4 months <br /> on April 22, 1987.

EVENT NUMBER TWO Under WR 106300, 1&C personnel investigated the cause of the first event.

The Occurrence Report (OR) initiated to track the event was inadvertantly attached to WR 106300. When the WR was closed out, it was not noticed by any of the reviewers that the OR was still attached. The WR was then filed. As a NRC FOAM 3444 o U.S.GPO:1988 0.824'538r488 I94)31

0 NRC Fotm 3SBA U.S. NUCLEAR REOUI.ATORY COMMISSION IQ43 I LICENSEE NT REPORT ILER) TEXT CONTINUA N APPROVED OMB NO 3ISO&10E EXPIRES: 8/31/88 FACILITY NAME III OOCKET NUMBER ISI LER NUMBER I6I PACE ISI YEAR SEOVENTIAL NVMSER No REVISION NVM QF Nine Mile Point Unit 1 0 5 0 0 0 P P 0 8 7 0 2 3 p p p 3 TEXT /4'/IKoe EPoop /E /oqvted, vM //I/oOo ~ /YRC Form 38SA'u/ IITI EVENT NUMBER TWO (Cont'd) result, the OR was not logged and did not receive the required second level review in a timely manner. Therefore, the Technical Support Department, responsible for second level review and LER preparation, was not aware that there had been a reportable event.

On November 20, 1987, the NMPl Technical Support Department was contacted by telephone by a Nuclear Regulatory Commission consultant. The subject of the call was the 10 CFR 50. 72 notification made by the NMP1 Operations Department on April 22. The Technical Support Department had at that time no record of the occurrence. A'n investigation was then initiated.

At approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on November 23, 1987, after the investigation had located the misplaced OR, Technical Support Department personnel became aware that although the initial telephone notifications regarding the event were made in a timely manner, the written (LER) report was not submitted within the required thirty day period. During the interval since the 10 CFR 50.72 notification, NMP1 had operated at up to full power. The second event was the failure to submit the 10 CFR 50.73 report within thirty days. This was a violation of, Nine Mile Point Unit, 1 Technical Specifications section 6.6.1a., which requires conformance to 10 CFR 50.73 reporting requirements.

CAUSE OF THE EVENT EVENT NUMBER ONE The root cause of the first event was equipment failure due to personnel error. The 6 amp fuse in the control circuit failed because it was inadvertantly shorted to ground by an 1&C technician.

EVENT NUMBER TWO The root cause of the second event was personnel error. The OR was inadvertently attached to the WR. During closeout of the paperwork no one noticed that the original OR was attached.

ANALYSIS OF THE EVENT There were no adverse safety consequences as a result of the first event.

The RBEV operated as .designed and in the conservative direction. This analysis would be valid under any normal operating configuration or power level.

The second event involved subsequent reporting requirements only. Since plant operations and public safety were not affected, there were no adverse safety consequences 'as a result of the second event.

NRC FORM SEEA ~ U.S,OPO:I988 0.83E SBBMSS I94ISI

')IRC Poem 388A U.S. NUCLEAR REGUI.ATORY COMMISSION

)94)3)

LICENSEE EV T REPORT ILER) TEXT CONTINUAT APPROVED OM8 NO. 3)SONICS EXPIRES: 8/31/88 FACILITYNAME 0) DOCKET NUMBER (2) LER NUMEER IEI PAGE (3)

YEAR SEOVSNTIAL REVISION NVM8ER r.'rM NVM884 Nine l1ile Point Unit 1 TACT ///IIMMoR>>oo /8 /R)vfot/ oso aRS5ono/HRC %%d 3/ELd'8/ )17) 05000/2087 0 2 3 0 0 OF CORRECTIVE ACTIONS Initial corrective action, with respect to the first event,'nvolved initiating a WR to investigate the cause of the event. Subsequent corrective action consisted of replacing the blown fuse, securing the RBEV, and returning the normal Reactor Building Ventilation System to service.

Initial corrective action, 'with respect to the second event, involved locating WR 106300 and verifying the failure to report the event in accordance with 10 CFR 50.73. Subsequent corrective action on the second event included initiating an OR and performing an investigation into the event.

In addition, a Lessons Learned Transmittal is being prepared in order to call attention to the need for attention to detail during work activities.

The transmittal will be reviewed by the departments involved.

ADDITIONAL INFOIQIATION Similar events were discussed in NMPl LERs 86-10 (Actuation of Reactor Building Emergency Ventilation Resulting From Blown Fuse) and 85-07 (Initiation Of Reactor Building Emergency Ventilation Due To Power Supply Short).

The fuse which was shorted is believed to have been a BUSS type, class H, NON, 6 amp fuse rated at 250 volts or less. It was manufactured by McGraw Edison Company of St. Louis, Missouri. The following table lists the identifier codes of the involved equipment according to IEEE 805-1983, IEEE 803A-1983, and Table 9 of the NPRDS Reporting Procedures Manual.

IEEE 805 IEEE 803 NPRDS Table 9 EPN ~tom onent Model Number ~decem ~Satan Manufacturer Fuse NON, 6 AMP, BH FU M175 BUSS Type Geiger- 18550 BH DET A370 Mueller Tube RN04B-5 Detector 194X927G2 BH DET G080 Sensor and Converter RN07B-5 Radiation 129B2802 BH MON G080 Monitor RN25 'rip Auxiliaries 194X940G7 BH MON G080 Unit NRC FORM Sdda o U.S.GPO;1985 0 828 538M55

)943)

NIAGARA MOHAWK POWER CORPORATION pe~

NIAGARA ~j MOHAWK 301 PLAINFIELDROAD SYAACUSE,NY 13212 THOMAS E. LEMPGES VCf PACSOtw1~VCLCAAOCI4AATON NIIP30256 December 22, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RE: Docket No. 50-220 LER 87-23 Gentlemen:

In =accordance with 10 CFR 50.73, we hereby submit the following Licensee Event Report:

LER 87-23 Which is being submitted in accordance with 10 CFR 50.73 (a)(2)(iv), "Any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature (ESF),

including the Reactor Protection System (RPS). However, actuation of an ESF, including the RPS, that resulted from and was part of the preplanned sequence during testing or reactor operation need not be reported" and 10 CFR 50.73 (a)(2)(i)(B), "Any operation or condition prohibited by the plant's Technical Specifications."

The 10 CFR 50.72 report was made at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> on April 22, 1987.

This report was completed in the format designated in NUREG-1022, Supplement 2, dated September 1985.

Very truly yours, Vice President Nuclear Generation TEL/meh Attachment cc: William T. Russell Regional Administrator i/I