05000220/LER-1983-006-03, /03L-0:on 830411,while Performing Design Review, Discovered That Poured Concrete North & West Walls of Control Room Would Not Meet Original Seismic Criteria. Mods Made to Improve Wall Structural Loading Capabilities

From kanterella
(Redirected from ML20023D255)
Jump to navigation Jump to search
/03L-0:on 830411,while Performing Design Review, Discovered That Poured Concrete North & West Walls of Control Room Would Not Meet Original Seismic Criteria. Mods Made to Improve Wall Structural Loading Capabilities
ML20023D255
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/11/1983
From: Randall R
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20023D248 List:
References
LER-83-006-03L, LER-83-6-3L, NUDOCS 8305200290
Download: ML20023D255 (1)


LER-1983-006, /03L-0:on 830411,while Performing Design Review, Discovered That Poured Concrete North & West Walls of Control Room Would Not Meet Original Seismic Criteria. Mods Made to Improve Wall Structural Loading Capabilities
Event date:
Report date:
2201983006R03 - NRC Website

text

--

F t

17 771 LICENSEE EVENT REPORT CONiHOL tiLOC A.

l l

l l

l (PLE ASE PRINT oR TYPE AL L REQUIRED INroRN1ATIoN) lo l i I LN IY IN IM IP ltJOLotol LcLoLoLol l oLaLJGL I I2I I

IGl IJG 4

a e uussu cUa ie 1

~ m w.m.,

ow.a n u -

con'T

'7,l" 1 L l@l 01 s i o l o l o l 2 l 21 o l@l 014111118131@l 01 s l i l 11 s i s l@

IOlil S

t 7

8 60 61 DOCK ET NUYBER 68 69 EVENT DATE 74 75 RE? ORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h O 2 l While performiTm a desien review. it was discovered that the poured concrete north 1

1013] I and west walls of the Control Room would not meet the original seismic criteria as l

1014 I l stated in the FSAR. Since the Reactor was defueled for a maior maintenance outane, 1 10 I s l I safety consequences were minimal.

I l

10161 l 10171 I I

l 10181 l 80 7

3 9 SYSTEM

CAUSE

CAUSE COMP.

VALv2 CODE CODE SUSCODE COMPONENT CODE SueCODE SUSCODE 1 xl x l@ LB_j@ [A_j h l Z l Z l Z l Z l Z l Z lh [Zj@ LZj @

10191 V

8 9

to 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER RO EVENT YEAR REPORT NO.

CODE TYPE N O.

@,aEgg 18 l 3 l

[-j l0l0l6l y

lo 131 LLJ L---J W

_ 21 22 23 24 26 27 28 29 30 31 32 KN ~ A ON ON PL NT E

HOURS 22 SB IT FOR 8.

SUPP 1 MAN FACTURER l F lgl34F lg l35Zl@ lZ[@

[0l0l0l l

lNlg g g l2l@

lZl9l9l9lg 33 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS liI0 l l Modifications have been made to improve the structural loading capabilities of the l

[ijil l walls so that the original seismic criteria is met.

I I

l li 121 l i

I l

l i l 31 I l

t ila i I 80 7

8 9 STA S

. POWER OTHER ST ATUS SCO RY DISCOVERY DESCRIPTION I

li J s l l Gl@ l 0 l 0 l 0 l@l NA l

lZlgl Engineering Design Review l

A TIVITY CO TENT l

RELEASED OF RELIASE AVOUNT OF ACTivlTY LOCATION OF RELE ASE NA l

l NA l

[2]@ [2jgl l

i s 7

8 9 10 44 45 80 PERSONNEL EXPOSURES l o l o l 0 lhl TYPE @l DESCRIPTION NUMBE R Zl NA l

i 7 PERSONNE L INJURt ES l

NUMBER

DESCRIPTION

NA l

li ia l l o l o l o l@l

^k'P[d '"" @

$$f$D0$ DOS 000bbo

$SS E

ESC PDR l

l i l 9 l Whl NA S

80 7

8 9 10 Pust iciTY NRC USE ONL Y

,J

(_Njh, DESCRIPTION ISSUED l

NA l

llllll1IIliIII 2 o c,

n NAYE OF PHEPAHEH PHONE: