ML18040A3492 July 1998LER 98-017-00:on 980602,control Room Ventilation Sys Was Declared Inoperable.Caused by Original Design Deficiency. Mod Designed,Tested & Implemented Prior to Startup from RF06 to Correct Design deficiency.W/980702 LtrTime of Discovery
ML17059C10124 June 1998LER 98-014-00:on 980525,noted Differences Between Actual Valve Weights & Weights Shown on Engineering Drawings.Caused by Vendor Failing to Provide Accurate Valve Weights.Revised Valve Drawings & Associated Calculation,Per 10CFR21Time of Discovery
ML18040A3454 June 1998LER 98-004-01:on 980302,TS Required LSFT of Level 8 Trip of Main Turbine Was Missed.Caused by Knowledge Deficiency of EHC Sys.Revised Applicable LSFT Procedures Prior to Refueling Outage 6.W/980604 Ltr
ML18040A2858 December 1993LER 93-010-00:on 931108,HPCS Was Inoperable Due to Equipment Deficiency,Inadequate Managerial Methods & Poor Work Practices.Replaced Deficient Contactors & Restored Tap Setting.Also Reportable Per Part 21.W/931208 LtrSafe Shutdown
Probabilistic Risk Assessment
Earthquake
Fuel cladding
ML18038A31910 August 1990LER 90-006-00:on 891027,discovered Unverified Assumption in App R Safe Shutdown Analysis.Caused by Fire Protection Program Failure to Provide Detailed Procedural Instructions for Operator Actions.New Procedures developed.W/900810 LtrSafe Shutdown
Fire Protection Program
ML18038A47015 May 1989LER 89-014-00:on 890413,unit Reactor Experienced Reactor Scram Which Was Result of Turbine Trip Due to Actuation of Generator Protection Circuitry.Turbine Trip Caused by Disconnected Wire.Wire relanded.W/890515 LtrSafe Shutdown
Unanalyzed Condition
Boric Acid
Reactor Vessel Water Level
Emergency Lighting
ML18038A41322 August 1988LER 88-051-01:on 870813,shutdown Cooling Sys Isolated & Tech Specs 3.4.9.2 Exceeded.Caused by Equipment Failure,Personnel Error & Procedural & Design Deficiencies.Shutdown Cooling Sys Manually restored.W/880822 LtrHalf scram
ML18038A4051 July 1988LER 88-024-00:on 880605,ESF Actuation Occurred Due to Resetting of Failed Radiation Monitor Microcomputer.Caused by Lack of Personnel Training.Defective Cards & Modules in RE14B Microcomputer & DRMS Panel replaced.W/880701 Ltr
ML18038A39012 April 1988LER 88-014-00:on 880313,reactor Scram & ESF Actuations Occurred.Caused by Equipment Failure Due to Design Deficiency.Transmitter Replaced W/Upgraded Model & Temporary Mod Performed to Bypass Logic for valves.W/880412 LtrTemporary Modification
Scram Discharge Volume
ML18038A38917 February 1988LER 88-001-00:on 880120,reactor Scram Occurred Due to Actual Low Water Level Condition.Caused by Design & Personnel Errors.Operator Disciplined & Mod Addressed Inadvertent Feedwater Control Valve lockup.W/880217 LtrSafe Shutdown
ML18038A75922 December 1987LER 87-023-00:on 870422,trip of Normal Reactor Bldg Ventilation & Initiation of Emergency Ventilation Occurred. Caused by Personnel Error.Fuse Replaced.On 871123,util Discovered LER Not Submitted for event.W/871222 Ltr
ML18038A25815 June 1987LER 87-025-00:on 870519,secondary Containment Isolation Signal Generated Due to Technician Relanding Lifted Lead Prematurely.Caused by Breakdown in Communications.Gaitronics Phone &/Or Headset Jack installed.W/870615 Ltr
ML18004C00613 April 1987LER 86-002-01:on 861104,procedure N2-OSP-RMC-W0002 Ran for Over 2 H Thereby Violating Tech Specs.Caused by Personnel Error & Procedure Deficiency.Temporary Change Notice Issued to procedure.W/870413 Ltr
ML20024E83316 August 1983LER 83-021/03L-0:on 830720,22,26 & 28,emergency Cooling Sys Loop 11 Taken Out of Svc for Periods Up to 5 H.Caused by Attempt to Reseat Isolation Valve 39-05.Valve Seat Lapped & Loop Returned to svc.W/830819 Ltr
ML20024E6342 August 1983LER 83-017/03L-0:on 830707,HPCI Feedwater Booster Pumps 11 & 13 Taken Out to Svc to Inspect Impellers Due to Similar Problem on nonsafety-related Pump.Parts of Strainer Found in Pumps But Pumps undamaged.W/830805 Ltr
ML20024E02522 July 1983LER 83-019/03L-0:on 830623,two Monthly Surveillance Tests on Inadequate Core cooling-accident Level Monitor Missed Following 811231 Installation.Surveillance Procedures Generated & Added to schedule.W/830725 Ltr
ML20024B77117 June 1983LER 83-010/03L-0:on 830524,core Topping Pump 121 Removed from Svc to Replace Packing.Caused by Air Leaking Due to Iltr Pressure Introduction in Pump.Packing Replaced & Pump Returned to Svc within 22 h.W/830621 Ltr
ML19277C58816 June 1983LER 83-013/03L-0:on 830610,during Routine Surveillance,Lock Found Missing from Outside Inlet Valve 40-12 for Core Spray Sys.Valve & Breaker in Open Position.Lock Missing for No More than 15 Days.Lock replaced.W/830708 Ltr
ML20024B71016 June 1983LER 83-011/03L-0:on 830604,electromatic Relief Valve 121 Failed to Open.Caused by Dirty Pilot Due to Oxide Buildup During Extended Outage.Pilot Cleaned & Retested & Normal Shutdown initiated.W/830628 Ltr
ML20023D95724 May 1983LER 83-009/03L-0:on 830426,control Room Ventilation Sys Removed from Svc for Mods to Control Room Wall,Per LER 83-06.Temporary Flexible Ducting in Place During Mods. Mods Completed.Ventilation Sys Returned to svc.W/830526 Ltr
ML20023D25511 May 1983LER 83-006/03L-0:on 830411,while Performing Design Review, Discovered That Poured Concrete North & West Walls of Control Room Would Not Meet Original Seismic Criteria. Mods Made to Improve Wall Structural Loading Capabilities
ML20023B83218 April 1983LER 81-053/03L-1:on 811120,discovered That Single Failure of Electrical Power Supply Could Either Isolate Both Condenser Sys or Cause Failure to Isolate.Logic for Initiation & Isolation of Condenser Sys Reviewed
ML20028C8395 January 1983LER 82-018/03L-0:on 821207,during Maint Outage,Leakage from Valves 68-05 & 68-08 Found Exceeding Tech Specs.Caused by Poor Seal Design.Mods Will Be Completed During Current Outage & Followed by Retest
ML20028C8365 January 1983LER 82-017/03L-0:on 821206,during Maint Outage,Leakage from Valves 68-06 & 68-09 Found Exceeding Tech Specs.Caused by Poor Seal Design.Mods Will Be Completed During Current Outage & Followed by Retest
ML20027C96819 October 1982LER 82-001 Has Been Canceled
ML17341B6655 August 1982LER 82-011/03L-0:on 820802,oil Leak on Fuel Oil Supply Manifold Discovered on Diesel Fire Pump.Caused by Defective Braze Joint.Leak Repaired by Manufacturer
ML20050N6695 April 1982LER 82-009/01T-0:on 820323,while Conducting Routine Reactor Vessel Hydrostatic Testing Prior to Startup,Water Observed Leaking from Insulation on Recirculation Piping.Cause Being InvestigatedHydrostatic
ML20050C38829 March 1982LER 82-008/01T-0:on 820317,review of Surveillance Test N1-ST-R7 Revealed Potential for Reactor Steam to Leak to Atmosphere from Emergency Condenser Vents.Caused by Potential Sys Leaks.Sys Modified Per NUREG-0737 Item II.B.1
ML20052F89924 March 1982LER 82-009:on 820323,during Routine Reactor Vessel Hydrostatic Testing Prior to Startup,Water Observed Leaking from Insulation on 11 Recirculation Piping Suction from Reactor Vessel.Cause Under InvestigationHydrostatic
ML20042C50423 March 1982LER 82-006/04L-0:on 820225,during Normal Operation,While Tempering Plant Inlet Canal,Plant Discharge Temp Exceeded 85 F.Caused by Increase in Lake Temp Due to Weather Conditions & Inability to Fully Lower Tempering Gate
ML20052F84618 March 1982LER 82-008:on 820317,discovered Potential Path for Reactor Steam from Emergency Condenser Steam Line Vents to Atmosphere If Emergency Condenser Tube Leaks Occur.Caused by Mods Made to Comply w/NUREG-0737,Item II.B.1
ML20042A68912 March 1982LER 82-007/04L-0:on 820222,while Reviewing Environ Radiation Fish Analysis Sample Data,Lower Limit of Detection Sensitivity Was Determined Not Met for Nov 1981.Cause Not Stated.Tech Spec Proposal Being Submitted to Update Stds
ML20049H61019 February 1982LER 82-005/03L-0:on 820208,115 Kv Line Taken Out of Svc for Maint,Placing Plant in Limited Condition of Operation.Maint on Line Required Due to Open Loop.Line Repaired & Returned to Svc
ML20041C16519 February 1982LER 82-004/01T-0:on 820207,during Routine 115-KV Breaker Exercising,Ground Directional Relay Caused Opening of Breaker Alternate 115-KV.Caused by Momentary Loss Offsite Power.Power Restored After Closing Oswego-NMP1 Breaker
ML20041C11717 February 1982LER 82-003/01T-0:on 820204,at 100% Power,Reactor Bldg Ventilation Sys Isolated & Emergency Ventilation Sys Initiated Due to Radioactive Release.Caused by Overflow of Reactor Water Cleanup Sys Filter Sludge Tank
ML20041A75110 February 1982LER 82-002/01T-0:on 820129,NRC Inspector Discovered That Primary Containment Following DBA LOCA May Not Be Vented Using Operating Procedure Due to Inaccessibility of Reactor Bldg.Combustible Gas Control Sys Will Be Installed
ML20052F8968 February 1982LER 82-004:on 820207,during Steady State Operation,Momentary Loss of 115 Kv Offsite Power Caused Emergency Diesel Generators to auto-start on Low Voltage to Power Boards 102 & 103
ML20052F8985 February 1982LER 82-003:on 820204,during Steady State Operation,Cleanup Sludge Tank Vent Overflowed Into Reactor Bldg Exhaust Ventilation Sys Causing Emergency Ventilation Sys to Initiate.Cause Not Stated.Decontamination in Progress
ML20052F8931 February 1982LER 82-002:on 820129,during Steady State Power,Upon Review by Resident Inspector,Discovered That Operating Procedure Describing Steps to Vent Primary Containment Following DBA LOCA Required Personnel to Enter Reactor Bldg
ML20040B86218 January 1982LER 81-054/03L-0:on 811221,insertion of Shallow Control Rods Resulted in Average Planar Linear Heat Generation Rate in Excess of Tech Spec Limits.Caused by Flux Coupling Between Control Rods.Extra Rods Inserted & Tech Specs Modified
ML20039E2952 January 1982LER 81-025,is Cancelled
ML20039C09514 December 1981LER 81-053/03L-0:on 811120,emergency Condensers 11 & 12 Were Isolated When Emergency Condenser Vent Radiation Monitor de-energized Due to Loss of Dc Motor Speed Control.Caused by Defective Silicon Controlled Rectifier.Rectifier Replaced
ML20038B49725 November 1981LER 81-008/01X-1:on 810316,ultrasonic Testing Revealed Indication on Southeast Reactor Feedwater Nozzle Inside Bore.Caused by Inadequate Investigation.Dye Penetrant & Surface Exam Revealed Indication Nonreportable
ML20038B45625 November 1981LER 81-050/03L-0:on 810715,reactor Bldg Ventilation Duct Radiation Monitor Showed Abnormal Spiking Which Initiated Emergency Ventilation Sys.Caused by Malfunctioning sensor-convertor Unit.Unit Replaced & Calibr
ML20038B88024 November 1981LER 81-052/03L-0:on 810812,failure of One Reactor Vessel Electromatic Relief Valve Thermocouple & Two Reactor Vessel Head Safety Valve Thermocouples Noted in Testing.Cause to Be Investigated Given Drywell Access in Next Cold Shutdown
ML20038B77024 November 1981LER 81-049/03L-0:on 811112,during Normal Operation,Feedwater Hydraulic Snubber 29-HS-6 Taken Out of Svc for Preventative Maint Because of Small Oil Leak.Cause Not Stated.Snubber Rebuilt & Returned to Svc
ML20038B45820 November 1981LER 81-051/04L-0:on 811109,while Reviewing Environ Radiation Fish Analysis Sample Data,Lower Limit of Detection Sensitivity (LLD) Not Met.Caused by Higher LLD Values When Test Data Converted from Wet to Dry Weight Units
ML20011A48530 September 1981LER 81-046/04T-0:on 810922,review of 810813 & 14 ETS Semiannual Samples of Cladophora Showed Co-60 & Nb-95 at Level of 10 Times Control Value.Probably Caused by Liquid Effluent Discharge & Oct 1980 Chinese Weapons Test
ML20010G69310 September 1981LER 81-042/04T-0:on 810831,during Weekly Environ Radiation Monitor Insp,Only Six Monitors Found Functioning Due to Defective Power Supply Units.Cause Unknown.Portable Monitor Installed
ML20010G4344 September 1981LER 81-040/03L-0:on 810818,chromated Water Found in Diesel Generator 102 Raw Water Due to Water Leaking Through Heat Exchangers.Cause Unknown.Raw Water Lines Drained & All Chromate Recovered