IR 05000395/2013001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/04/2014 | | issue date = 03/04/2014 | ||
| title = Annual Assessment Letter for Virgil C. Summer Nuclear Station, Unit 1 - Report 05000395/2013001 | | title = Annual Assessment Letter for Virgil C. Summer Nuclear Station, Unit 1 - Report 05000395/2013001 | ||
| author name = King M | | author name = King M | ||
| author affiliation = NRC/RGN-II/DRP/RPB5 | | author affiliation = NRC/RGN-II/DRP/RPB5 | ||
| addressee name = Gatlin T | | addressee name = Gatlin T | ||
| addressee affiliation = South Carolina Electric & Gas Co | | addressee affiliation = South Carolina Electric & Gas Co | ||
| docket = 05000395 | | docket = 05000395 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES rch 4, 2014 | ||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/ | ==SUBJECT:== | ||
ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2013001 | |||
==Dear Mr. Gatlin:== | ==Dear Mr. Gatlin:== | ||
On February | On February 19, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Virgil C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
completed its end | |||
-of-cycle performance review of Virgil C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, | |||
The NRC determined that overall, Virgil C. Summer Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1 during the most recent quarter was within the Licensee Response Column of the | The NRC determined that overall, Virgil C. Summer Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through June 30, | The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | ||
-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | |||
Additionally, the NRC plans on conducting three non-ROP baseline inspections which include Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, TI-189, Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a, and Independent Spent Fuel Storage Installation (ISFSI) Pad Construction. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) | |||
- | 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
- | |||
Please contact me at 404-997-4511 with any questions you may have regarding this letter. | |||
Please contact me at 404-997- | |||
Sincerely, | Sincerely, | ||
/RA/ Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50 | /RA/ | ||
-395 License No.: NPF | Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Enclosure: Virgil C. Summer Inspection/Activity Plan (03/01/2014 - 06/30/2015) | ||
-12 Enclosure: Virgil C. Summer Inspection/Activity Plan (03/01/ | |||
_________________________ | _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON /RA/ Via email MFK /RA/ | ||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON /RA/ Via email MFK /RA/ NAME SNinh JReece MKing DATE 02/27/2014 03/03/2014 03/04/2014 E-MAIL COPY? | NAME SNinh JReece MKing DATE 02/27/2014 03/03/2014 03/04/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Thomas from Michael F. King dated March 4, 2014 SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2013001 Distribution w/encl: | ||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Thomas from Michael F. King dated March 4, 2014 | C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource Institute of Nuclear Power Operations (INPO) | ||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/ | |||
ROP Assessment | ROP Assessment | ||
Page 1 of 2 03/04/2014 08:50:29 | Page 1 of 2 Summer 03/04/2014 08:50:29 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 1 03/03/2014 03/05/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping RP - RP OCCUPATIONAL BASELINE WEEK 1 3 1 04/07/2014 04/11/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/07/2014 04/11/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/07/2014 04/11/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/07/2014 04/11/2014 IP 71124.04 Occupational Dose Assessment 1 04/07/2014 04/11/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 04/07/2014 04/11/2014 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment 1 04/21/2014 04/25/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 04/21/2014 04/25/2014 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 2 1 04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR TI-189 - TI-189 DYNAMIC RESTRAINT PROGRAM 1 1 04/21/2014 04/25/2014 IP 2515/189 Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a ISFSI - ISFSI PAD CONSTRUCTION 1 1 07/28/2014 08/01/2014 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 08/04/2014 08/08/2014 IP 71152B Problem Identification and Resolution 1 08/18/2014 08/22/2014 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 3 1 09/08/2014 09/12/2014 IP 7111402 Alert and Notification System Testing 1 09/08/2014 09/12/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/08/2014 09/12/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/08/2014 09/12/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/08/2014 09/12/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures. | ||
-06/30/ | |||
Page 2 of 2 03/04/2014 08:50:29 | Page 2 of 2 Summer 03/04/2014 08:50:29 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 6 1 09/15/2014 09/19/2014 IP 7111121 Component Design Bases Inspection 1 10/06/2014 10/10/2014 IP 7111121 Component Design Bases Inspection 1 10/20/2014 10/24/2014 IP 7111121 Component Design Bases Inspection 1 11/03/2014 11/07/2014 IP 7111121 Component Design Bases Inspection TFPI - TRIENNIAL FIRE PROTECTION INSP 4 1 04/20/2015 04/24/2015 IP 7111105T Fire Protection [Triennial] | ||
-06/30/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 6 1 | 1 05/04/2015 05/08/2015 IP 7111105T Fire Protection [Triennial] | ||
This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Latest revision as of 08:22, 4 November 2019
ML14063A380 | |
Person / Time | |
---|---|
Site: | Summer ![]() |
Issue date: | 03/04/2014 |
From: | Mark King NRC/RGN-II/DRP/RPB5 |
To: | Gatlin T South Carolina Electric & Gas Co |
References | |
IR-13-001 | |
Download: ML14063A380 (6) | |
Text
UNITED STATES rch 4, 2014
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2013001
Dear Mr. Gatlin:
On February 19, 2014, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Virgil C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Virgil C. Summer Nuclear Station, Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Virgil C. Summer Nuclear Station, Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, the NRC plans on conducting three non-ROP baseline inspections which include Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2, TI-189, Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a, and Independent Spent Fuel Storage Installation (ISFSI) Pad Construction. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4511 with any questions you may have regarding this letter.
Sincerely,
/RA/
Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Enclosure: Virgil C. Summer Inspection/Activity Plan (03/01/2014 - 06/30/2015)
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE SON /RA/ Via email MFK /RA/
NAME SNinh JReece MKing DATE 02/27/2014 03/03/2014 03/04/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Thomas from Michael F. King dated March 4, 2014 SUBJECT: ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2013001 Distribution w/encl:
C. Evans, RII L. Douglas, RII R. Hannah, RII J. Ledford, RII J. Pelchat, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource Institute of Nuclear Power Operations (INPO)
ROP Assessment
Page 1 of 2 Summer 03/04/2014 08:50:29 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 1 03/03/2014 03/05/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping RP - RP OCCUPATIONAL BASELINE WEEK 1 3 1 04/07/2014 04/11/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/07/2014 04/11/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/07/2014 04/11/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/07/2014 04/11/2014 IP 71124.04 Occupational Dose Assessment 1 04/07/2014 04/11/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 04/07/2014 04/11/2014 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment 1 04/21/2014 04/25/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 04/21/2014 04/25/2014 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 2 1 04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR TI-189 - TI-189 DYNAMIC RESTRAINT PROGRAM 1 1 04/21/2014 04/25/2014 IP 2515/189 Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a ISFSI - ISFSI PAD CONSTRUCTION 1 1 07/28/2014 08/01/2014 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 08/04/2014 08/08/2014 IP 71152B Problem Identification and Resolution 1 08/18/2014 08/22/2014 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 3 1 09/08/2014 09/12/2014 IP 7111402 Alert and Notification System Testing 1 09/08/2014 09/12/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/08/2014 09/12/2014 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 09/08/2014 09/12/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 09/08/2014 09/12/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.
Page 2 of 2 Summer 03/04/2014 08:50:29 Inspection / Activity Plan Report 22 03/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASES INSPECTION 6 1 09/15/2014 09/19/2014 IP 7111121 Component Design Bases Inspection 1 10/06/2014 10/10/2014 IP 7111121 Component Design Bases Inspection 1 10/20/2014 10/24/2014 IP 7111121 Component Design Bases Inspection 1 11/03/2014 11/07/2014 IP 7111121 Component Design Bases Inspection TFPI - TRIENNIAL FIRE PROTECTION INSP 4 1 04/20/2015 04/24/2015 IP 7111105T Fire Protection [Triennial]
1 05/04/2015 05/08/2015 IP 7111105T Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.