Inspection/Activity Plan, 09/01/2009 - 12/31/2010
ML092440368
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
South Carolina Electric & Gas Co
References
Download: ML092440368 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 07:51:41 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer PSB1-RP

- RADIATION PROTECTION PUBLIC INSPECTION 2

1 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 09/14/2009 09/18/2009 1

IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 09/14/2009 09/18/2009 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1 IP Exercise Evaluation 7111401 10/05/2009 10/09/2009 1

IP Emergency Action Level and Emergency Plan Changes 7111404 10/05/2009 10/09/2009 1

IP Performance Indicator Verification 71151 10/05/2009 10/09/2009 EB3ISI

- INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/26/2009 10/30/2009 EB3TI172

- TI-172 RCS DM BUTT WELDS 1

1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/26/2009 10/30/2009 PSB1-RP

- RP ACCESS CONTROLS INSPECTION ( OUTAGE) 1 1

IP Access Control to Radiologically Significant Areas 7112101 10/26/2009 10/30/2009 EB3SGISI

- STEAM GENERATOR ISI 1

1 IP Inservice Inspection Activities - PWR 7111108P 11/02/2009 11/06/2009 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1 IP Identification and Resolution of Problems 71152B 05/03/2010 05/07/2010 1

IP Identification and Resolution of Problems 71152B 05/17/2010 05/21/2010 TFPI 805

- TRIENNIAL FIRE PROTECTION 6

1 IP Fire Protection [Triennial]

7111105T 06/14/2010 06/18/2010 1

IP Fire Protection [Triennial]

7111105T 06/28/2010 07/02/2010 EB3 HS

- HEAT SINK INSPECTION 1

1 IP Heat Sink Performance 7111107T 07/26/2010 07/30/2010 EB1

- MODIFICATIONS - 10CFR50.59 3

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/23/2010 08/27/2010 OL RQ

- REQUAL INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 08/16/2010 08/20/2010 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Alert and Notification System Testing 7111402 10/04/2010 10/08/2010 1

IP Emergency Response Organization Augmentation Testing 7111403 10/04/2010 10/08/2010 1

IP Emergency Action Level and Emergency Plan Changes 7111404 10/04/2010 10/08/2010 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 10/04/2010 10/08/2010 1

IP Performance Indicator Verification 71151 10/04/2010 10/08/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2009 07:51:41 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 1 2

1 IP Access Control to Radiologically Significant Areas 7112101 10/18/2010 10/22/2010 1

IP ALARA - Required 7112102-7112102R 10/18/2010 10/22/2010 1

IP Radioactive Material Processing and Transportation 7112202 10/18/2010 10/22/2010 1

IP Performance Indicator Verification 71151 10/18/2010 10/22/2010 OL EXAM

- INITIAL EXAM - PREP 2

1 SUMMER/NOVEMBER 2010 EXAM AT POWER FACILITIES V23340 11/01/2010 11/05/2010 PSB1-RP

- RP OCCUPATIONAL BASELINE WEEK 2 2

1 IP Access Control to Radiologically Significant Areas 7112101 11/01/2010 11/05/2010 1

IP ALARA - Required 7112102-7112102R 11/01/2010 11/05/2010 1

IP Radioactive Material Processing and Transportation 7112202 11/01/2010 11/05/2010 1

IP Performance Indicator Verification 71151 11/01/2010 11/05/2010 OL EXAM

- INITIL EXAM WEEK 2

1 SUMMER/NOVEMBER 2010 EXAM AT POWER FACILITIES V23340 11/15/2010 11/19/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure