UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 21, 2017 Mr. George A. Lippard III, Vice President Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065
SUBJECT:
UPDATED INSPECTION PLAN FOR VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - REPORT 05000395/2017005
Dear Mr. Lippard:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Virgil C. Summer Nuclear Station, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available, correspondence.
Additionally, the NRC plans on conducting two non-ROP baseline inspections which include an initial license examination and Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
G. Lippard 2
Please contact me at 404-997-4465 with any questions you may have regarding this letter.
Sincerely,
/RA/
Anthony D. Masters, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12
Enclosure:
Summer Inspection/ Activity Plan (09/01/2017 - 06/30/2019) cc Distribution via ListServ
ML OFFICE RII/DRP RII/DRP RII/DRP NAME BBishop SNinh AMasters DATE 8/15/2017 8/15/2017 8/21/2017 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 3 08/21/2017 10:05:14 OL EXAM
- INITIAL LICENSE EXAM PREP 3
1 SUMMER U1/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILLITIES V23499 08/28/2017 09/01/2017 DBAI
- DESIGN BASES ASSURANCE INSPECTION (TEAM) 7 1
IP Design Bases Assurance Inspection (Teams) 7111121M 08/28/2017 09/01/2017 1
IP Design Bases Assurance Inspection (Teams) 7111121M 09/25/2017 09/29/2017 1
IP Design Bases Assurance Inspection (Teams) 7111121M 10/16/2017 10/20/2017 OL EXAM
- INITIAL LICENSE EXAM 3
1 SUMMER U1/SEPTEMBER 2017 INITIAL EXAM AT POWER FACILLITIES V23499 09/18/2017 09/22/2017 DRP/RPB5
- 92723 2
1 IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 10/01/2017 12/31/2017 EP
- EP EXERCISE 3
1 IP Exercise Evaluation 7111401 10/30/2017 11/03/2017 1
IP Emergency Action Level and Emergency Plan Changes 7111404 10/30/2017 11/03/2017 1
IP Exercise Evaluation - Scenario Review 7111408 10/30/2017 11/03/2017 1
IP Performance Indicator Verification 71151 10/30/2017 11/03/2017 TI-191
- MITIGATING STRATEGIES 4
1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 12/11/2017 12/15/2017 EQI
- DESIGN BASES ASSURANCE INSPECTION (PROGR 3
1 IP Design Bases Assurance Inspection (Programs) 7111121N 01/08/2018 01/12/2018 1
IP Design Bases Assurance Inspection (Programs) 7111121N 01/29/2018 02/02/2018 1
IP Design Bases Assurance Inspection (Programs) 7111121N 02/12/2018 02/16/2018 OL EXAM
- INITIAL LICENSE EXAM PREP 3
1 SUMMER U1/JUNE 2018 INITIAL EXAM AT POWER FACILITIES V23513 05/07/2018 05/11/2018 OL EXAM
- INITIAL LICENSE EXAM 3
1 SUMMER U1/JUNE 2018 INITIAL EXAM AT POWER FACILITIES V23513 06/04/2018 06/08/2018 EP
- EP PROGRAM INSPECTION 4
1 IP Alert and Notification System Testing 7111402 08/27/2018 08/31/2018 1
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/27/2018 08/31/2018 1
IP Emergency Action Level and Emergency Plan Changes 7111404 08/27/2018 08/31/2018 1
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/27/2018 08/31/2018 1
IP Drill/Exercise Performance 71151-EP01 08/27/2018 08/31/2018 1
IP ERO Readiness 71151-EP02 08/27/2018 08/31/2018 1
IP Alert & Notification System Reliability 71151-EP03 08/27/2018 08/31/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 3 08/21/2017 10:05:14 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 4
1 IP Problem Identification and Resolution 71152B 09/10/2018 09/14/2018 1
IP Problem Identification and Resolution 71152B 09/24/2018 09/28/2018 ISI
- UNIT 1 IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/15/2018 10/19/2018 SGISI
- UNIT 1 SG IN-SERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 10/15/2018 10/19/2018 RP
- RP OCCUPATIONAL WEEK 1 3
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/22/2018 10/26/2018 1
IP Occupational ALARA Planning and Controls 71124.02 10/22/2018 10/26/2018 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/22/2018 10/26/2018 1
IP Occupational Dose Assessment 71124.04 10/22/2018 10/26/2018 1
IP Radiation Monitoring Instrumentation 71124.05 10/22/2018 10/26/2018 1
IP Occupational Exposure Control Effectiveness 71151-OR01 10/22/2018 10/26/2018 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/22/2018 10/26/2018 RP
- RP OCCUPATIONAL WEEK 2 2
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/05/2018 11/09/2018 1
IP Occupational ALARA Planning and Controls 71124.02 11/05/2018 11/09/2018 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/05/2018 11/09/2018 1
IP Occupational Dose Assessment 71124.04 11/05/2018 11/09/2018 1
IP Radiation Monitoring Instrumentation 71124.05 11/05/2018 11/09/2018 1
IP Occupational Exposure Control Effectiveness 71151-OR01 11/05/2018 11/09/2018 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 11/05/2018 11/09/2018 EP
- EP EXERCISE INSPECTION 1
1 IP Exercise Evaluation 7111401 03/25/2019 03/29/2019 1
IP Emergency Action Level and Emergency Plan Changes 7111404 03/25/2019 03/29/2019 1
IP Exercise Evaluation - Scenario Review 7111408 03/25/2019 03/29/2019 1
IP Performance Indicator Verification 71151 03/25/2019 03/29/2019 RP
- RP RADHAZARD & PUBLIC 4
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/17/2019 06/21/2019 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/17/2019 06/21/2019 1
IP Radiological Environmental Monitoring Program 71124.07 06/17/2019 06/21/2019 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/17/2019 06/21/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 3 of 3 08/21/2017 10:05:14 RP
- RP RADHAZARD & PUBLIC 4
1 IP Occupational Exposure Control Effectiveness 71151-OR01 06/17/2019 06/21/2019 1
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/17/2019 06/21/2019 HS
- TRIENNIAL HEAT SINK PERFORMANCE 1
1 IP Heat Sink Performance 7111107T 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.