Summer Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:40:11 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1
2515/169 IP Mitigating Systems Performance Index Verification 2
RP-95001
- FOLLOWUP FOR WHITE TRANSPORTATION VIO Baseline Inspections 09/11/2006 09/14/2006 1
7112202 IP Radioactive Material Processing and Transportation 2
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 10/16/2006 10/20/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/16/2006 10/20/2006 1
7112102 IP ALARA Planning and Controls 1
EB3-ISI
- INSERVICE INSPECTION Baseline Inspections 10/23/2006 10/27/2006 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3TI150
- 2515/150 RPV & VHP NOZZLE Safety Issues 10/30/2006 11/02/2006 1
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI Safety Issues 11/05/2006 11/10/2006 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
4 TFP
- TFP INFO TRIP Baseline Inspections 02/20/2007 02/22/2007 1
7111105T IP Fire Protection [Triennial]
4 TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 03/19/2007 03/23/2007 1
7111105T IP Fire Protection [Triennial]
Baseline Inspections 04/02/2007 04/06/2007 1
7111105T IP Fire Protection [Triennial]
1 PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 05/14/2007 05/16/2007 1
7112101 IP Access Control to Radiologically Significant Areas 5
OL PREP
- INITIAL EXAM PREP Not Applicable 05/14/2007 05/18/2007 1
V23265 SUMMER/JUNE 2007 EXAM AT POWER FACILITIES 5
OL EXAM
- INITIAL EXAM Not Applicable 06/04/2007 06/08/2007 1
V23265 SUMMER/JUNE 2007 EXAM AT POWER FACILITIES 3
PSB1-RP
- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 06/04/2007 06/08/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/04/2007 06/08/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 06/04/2007 06/08/2007 1
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 06/04/2007 06/08/2007 1
71151 IP Performance Indicator Verification 1
EB3-HS
- HEAT SINK Baseline Inspections 09/10/2007 09/14/2007 1
7111107B IP Heat Sink Performance 2
PS2-EP
- EP EXERCISE Baseline Inspections 10/01/2007 10/05/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 10/01/2007 10/05/2007 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/01/2007 10/05/2007 1
71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Summer Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:40:11 Report 22 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 12/10/2007 12/14/2007 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/10/2007 12/14/2007 1
7111117B IP Permanent Plant Modifications 4
- PROBLEM IDENTIFICATION & RESOLUTION - BI Baseline Inspections 03/10/2008 03/14/2008 1
71152B IP Identification and Resolution of Problems Baseline Inspections 03/24/2008 03/28/2008 1
71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.